CV activities on LHC complex during the long shutdown

Similar documents
Efficiency of Data Center cooling

Energy Management of the Refrigeration Systems at Zurich Airport. Burkhard Bein. Schaffhausen,

T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management

Engineered Energy Solutions An Overview. Controls, Automation and Energy Conservation

IXcellerate Moscow One Datacentre - Phase 1 & 2 Overview

MSYS 4480 AC Systems Winter 2015

IBM Symposium Data Center Cooling. EC Systems for HVAC architecture and Direct air Cabinet Cooling

7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America

Data Center Infrastructure Management (DCIM) By Jesse Zhuo

Utility System Infrastructure

Fair City Plaza. Task: Diagnose problems, recommend improvements for small municipal district cooling system

Silicon Valley Power Data Center Program Rebate Application

International 6SigmaDC User Conference CFD Modeling for Lab Energy Savings DCSTG Lab Temperature Setpoint Increase

HIGH EFFICIENCY Central Chiller

Rack cooling solutions for high density racks management, from 10 to 75 kw

Measuring and Managing a Data Center Cooling Shutdown

Prediction of Chilled Water Plant Failures and System Optimization Using Multivariate Modeling Techniques

Computational Fluid Dynamics at CERN

CHILLED WATER. HIGH PRECISION AIR CONDITIONERS, FROM 7 TO 211 kw

IBM Site Enablement Services

where we are, where we could be, how we can get there. 12/14/2011

Switching Devices 7/1. 7/4 Product overview. 7/5 5TT5 remote control switches. 7/8 5TT3 0 switching relays. 7/9 5TT5 7 Insta contactors

District Cooling Marches on in Dubai The Emirates Towers Case Study

What s New for Data Centers in Title Jeff Stein, PE Taylor Engineering

PROCESS & DATA CENTER COOLING. How and Why To Prepare For What s To Come JOHN MORRIS REGIONAL DIRECTOR OF SALES

Dykin Engineering Part & Services Sdn. Bhd.

Data Center Optimized Controls

ANSI/BICSI Data Center Design and Implementation Best Practices

Drives and motors. A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC)

Hot vs Cold Energy Efficient Data Centers. - SVLG Data Center Center Efficiency Summit

Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling. Jeremiah Stikeleather Applications Engineer

Switch to Perfection

STATE DATA CENTER DRAFT PROPOSAL. STATE OF OREGON DATA CENTER 28 October 2016

Building Management Systems (BMS) Back to Basics. Presented By: Andrew Smith Leader Building Technologies A.G. Coombs Advisory

CSCS CERN videoconference CFD applications

Future of Cooling High Density Equipment. Steve Madara Vice President and General Manager Liebert Precision Cooling Business Emerson Network Power

CLICK TO EDIT MASTER TITLE STYLE. AdvanTEC Solutions CHILLER PLANT HEALTH MANAGER

System Overview. Liquid Cooling for Data Centers. Negative Pressure Cooling Without Risk of Leaks

Service, Maintenance, Support

DEDICATED HEAT RECOVERY UNIT (DHRC)

Driving Proactive Facility Operations with Automated HVAC Diagnostics

Chiller Plant Optimization: A Case Study

APC InRow Cooler Prototype Initial Report - Test Setup Verification. H. Coles, S. Greenberg Contributing: J. Bean (APC) November 18, 2011

DCIM Data Center Infrastructure Management

Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101. Nick Gangemi Regional Sales Manager Data Aire

Chilled Water Distribution Design Considerations in Super Tall Buildings. Dusan Mrdalj, Associate, ChapmanBDSP

The challenge is that BAS are often very complex with 1000s of data points to review. EMS Optimization Software

FACT SHEET: IBM NEW ZEALAND DATA CENTRE

Designing Ultra-Efficient Building Cooling Systems

1 HBC-NRE. How smart are buildings?

Supplement to PM WSC/WDC-1 MicroTech II for Centrifugal Compressor Water Chillers

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

Your Solution For Energy and Cost Savings. McQuay Packaged Chiller Plant

User Guide. FreeCool : Free Cooling unit V1.1 ENGY-SVU001A-GB

Performance Comparisons

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect

Data Centers. Powerful Solutions That Put You in Control. Energy Management Solutions. Where your energy dollars are used. 1

Water cooled chiller plant (all-variable)

Analyze and Implement: Modernizing an Airport Central Utility Plant

THE ADVANTAGE MISSION CRITICAL JOKAKE CONSTRUCTION. INSPIRE. BUILD. PARTNER. INSPIRE. BUILD. PARTNER.

Disaster recovery of the INFN Tier-1 data center: lesson learned. Luca dell Agnello INFN - CNAF CHEP 2018 conference Sofia, July

Minutes of the GERDA Infrastructure Meeting

CHORE-TRONICS 3 Whole House Controller

Detector Control LHC

PMx Sequential Samplers Giano & Gemini

ANSI/BICSI Data Center Design and Implementation Best Practices

Drives and motors. A guide to using variable speed drives and motors in data centres Meeting your Carbon Reduction Commitment (CRC)

How much power?! Data Centre Efficiency. How much Money?! Carbon Reduction Commitment (CRC)

The Basics of HVAC Operation and the Role of Automation. Mr. Jay Zaino GxP Automation, LLC

High Performance Computing (HPC) Data Center Proposal

HPC/Advanced Cooling Track. Rolf Brink/CEO/Asperitas

IDS 500 mobile Intelligent mobile chart recorder

Cyber-Physical Energy Systems

ES practical tools for energy and environmental monitoring and control

Case Study: Energy Systems Integration Facility (ESIF)

Existing Building Energy Saving

Energy Logic: Emerson Network Power. A Roadmap for Reducing Energy Consumption in the Data Center. Ross Hammond Managing Director

Is Data Center Free Cooling Feasible in the Middle East? By Noriel Ong, ASEAN Eng., PMP, ATD, PQP

LANL High Performance Computing Facilities Operations. Rick Rivera and Farhad Banisadr. Facility Data Center Management

a) Provision of a chilled water supply b) Provision of electric power supply and other fuels

Chart recorder. DS 500 mobile Intelligent mobile chart recorder

2016 COOLING THE EDGE SURVEY. Conducted by Vertiv Publication Date: August 30, 2016

18 th National Award for Excellence in Energy Management. July 27, 2017

SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station

Control systems for spallation target in China ADS systems

Ecolibrium. Cloud control. Keeping data centres cool. OCTOBER 2018 VOLUME 17.9 RRP $14.95 PRINT POST APPROVAL NUMBER PP352532/00001

Siemens tiastar TM Motor Control Center (MCC)

Safety during powering tests

JEFFERSON COLLEGE COURSE SYLLABUS HRA249 COMMERCIAL REFRIGERATION SYSTEMS. 5 Credit Hours. Prepared by William Kaune November 30, 2010

ΕΠΛ372 Παράλληλη Επεξεργάσια

Trane mytest Water-cooled Chiller Performance Validation What you spec is what you get *

Cisco Lab Setpoint Increase. Energy Efficient Data Center Demonstration Project

Building Re-Tuning (BRT) Lesson 4: SOI Air-Handling Unit Part II

Case study on Green Data Center. Reliance Jio Infocomm Limited

Trane Controls. Smart Solutions for Smart Buildings

Aquaflair. Uniflair TRAC, TRAF and TRAH. Air-cooled chillers, free-cooling chillers and heat pumps with scroll compressors.

BENEFITS OF ASETEK LIQUID COOLING FOR DATA CENTERS

Position Title: H V A C T E C H N I C I A N. G.E.D. or High School Diploma required, an Associate s Degree is preferred.

Case Study Host Europe Group

DATACENTER BERLIN Definitely a Good Perspective

Transcription:

CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011

Contents Maintenance Upgrade projects UW pumping upgrade Back up for the primary cooling for cryo Back up for the primary cooling for Atlas CCC Other projects Consolidation 2012 2013 Conclusion 2

Maintenance status Equipment Cooling Ventilation underground units Ventilation on the surface, sump and compressed air Maintenance done Cleaning of the cooling towers Mecanical maintenance of the pumps Filters and belts replacement Complete maintenance Maintenance not done 1/1/2012: missing since Safety tests Instrumentation Electrical maintenance Test alarm transmission... Instrumentation Mecanical maintenance Electrical maintenance Test alarm transmission... 3 years 2 years - 1 year For the long shutdown: Need for real stop of the cooling 4 weeks/point Need longer acces for the ventilation in the underground: 2 weeks/point 3

Projects 2011-2017 Type of project Example Number Upgrade UW, CCR, Chilled water point 2 18 New installations Original CV consolidation plan Consolidation injectors 25 years Linac 4, critical power 513, CMS clean room, Isolde, bldg 107 21 PM32, PS and Booster ventilation 36 Cooling of the PS magnet and Central bldg Total 87 Foreseen projects 2011-2012: 37 12 One project might concern several plants (i.e. cooling tower back up) 4

UW upgrade : stand by pumps Aim of the project: Increase Sector the reliability, Present decrease the downtime in case of failure, overflow and integrate the new need. Sector 1-2 30 % Project consist of : Installing Sector 2-3 the redundant 18 % pump for each sector + TI2 Sector and TI8. 3-4 38 % Changing the pumps for two sectors. Sector 4-5 9 % Duration Sector of 5-6 the work: 18 % 8 Sector months6-7 0 % Stop Sector of the 7-8circuits 25 for % 6 weeks (sensible point in the alcoves) Sector 8-1 17 % Cost estimate : 850 kchf 5

Back up for the primary cooling for cryo Aim of the project: Ensure the cooling during the maintenance of the cooling tower for point 4, 6 and 8. Project consist of : Installing a back up cooling plant for 6MW, only for the cryo. Connect it to the existing distribution circuit. Duration of the work : 3 months/point Stop of the cryo circuit for 2 weeks. Cost estimate : 3.6 MCHF 6

Back up for the primary cooling for ATLAS Aim of the project: Ensure the cooling during the maintenance of the cooling tower for ATLAS (coordination with SPS schedule) Project consist of : Connecting the ATLAS primary circuit to the SPS ring. Pipework and civil engineering Duration of the work : 4 months Stop of the ATLAS circuit for 4 weeks Cost estimate : 500 kchf 7

CCC upgrade Aim of the project: Remove the dependency from the BA3 chilled water (Test AUG) Increase the cooling capacity Get a redundant system Resist to the power cut Project consist of : Adding two dedicated chillers for the CCR, Modifying the electrical supply with new UPS and diesel generator, Installing new air handling units, Installing a cooling system directly on the racks Duration of the work: 6 months. 1 month stop of cooling (incl. BA3). Cost estimate : 2 MCHF 8

Other projects Upgrade of the primary water in point 4 Add a stand by pump and reduce the risk of affecting LHC in case of failure. Reduce the energy consumption of the plant (EDF). Upgrade of the chilled water production of point 2 Install new chillers to get a redundant system. Overpressure in Point 8 tunnel vs LHCb cavern Install a ventilated sas in the RB84 and RB86 to achieve correct dynamic confinement between tunnel and cavern Monitoring of the air in the LHC tunnel Install new sensors for air speed, temperature, and delta P 9

Consolidation PM32 : Evacutation of the underground water Replace the electrical and control cubicles (no spare parts) New type of pump and civil engineering work to integrate the new acces constraint avoid the manual operation of sand removing. 3 months of work. Keeping the existing system running in degraded mode. SR building ventilation refurbishment Replace the electrical and control cubicles (no spare parts) Motors, ventilators, sensors and actuators change 1 year of work. Condition inside the building could be affected. 10

If the long shutdown : 2013 Maintenance and reliability: 4 years without any safety test and very light maintenance could lead to longer and frequent stops. Run for one more year with the actual weakness: UW sector, SR ventilation, no redundant chiller in point 2, no redundant primary pump in point 4,... Projects : Not affected Important project like Linac 4, 513, Hiradmat will be completed by 2013. 11

Conclusion Maintenance Will be a strategic activity to recover correct technical condition of the equipment for the successive run. A stop of the installations will be mandatory. Project Very important workload Impact on the availability of the plant coordination with other activities. - 2013? No major issue 12