CE 260 SURVEYING CHAPTER 5 THEODOLITES

Similar documents
Total Station & Distomat

Theodolite Instructions

ANOOP BANWALA LECT. IN CIVIL ENGINEERING GGSGP CHEEKA

DRONACHARYA GROUP OF INSTITUTIONS, GREATER NOIDA Department of CIVIL Engineering Semester: III Branch: CIVIL Session: Subject: Surveying Lab

Pack 11. Surveying processes. Equipment 11.1 Method 11.2 Using the recorded data to calculate the height of the building 11.3

MAHATMA GANDHI MISSION S JAWAHARLAL NEHRU ENGINEERING COLLEGE, AURANGABAD. (M.S.)

SREE VAHINI INSTITUTE OF SCIENCE AND TECHNOLOGY

TOPOGRAPHICAL AND SITE SURVEY (Standard Of Procedure)

Topic 5: THEODOLITE TABLE OF CONTENTS

SURVEYING-II(5 TH CIVIL) CHAPTER-1 Name of the Chapter - Leveling

APPENDIX D THEODOLITE OPERATIONS

Alignment with the Wild T1A theodolite

Angles and Directions

LAB MANUAL. Department of Civil Engineering CE6407 SURVEY PRACTICAL II CHENNAI INSTITUTE OF TECHNOLOGY CHENNAI Survey Practical - II

FACULTY OF CIVIL ENGINEERING & EARTH RESOURCES ENGINEERING SURVEY FIELDWORK. CURVE RANGING COMPUTATION & SETTING-OUT (Standard Of Procedure)

ADVANCED SURVEYING (S-II)

PHILADELPHIA UNIVERSITY Faculty of Engineering. Department of Civil Engineering. SURVEYING. Chapter 3. Leveling

GUDLAVALLERU ENGINEERING COLLEGE SESHADRI RAO KNOWLEDGE VILLAGE: GUDLAVALLERU DEPARTMENT OF CIVIL ENGINEERING

1. PRECAUTIONS. Thank you for choosing RUIDE theodolite Disteo 23. Please read this manual carefully before use.


Rugged and waterproof, plus high-power telescope with superior Nikon optics

Faculty:-Prof. Mrs. N. Soundarya Semester:-III Class: - C.E. Course Code:-CE -207-F


ENGI 3703 Surveying and Geomatics

KOMAR UNIVERISTY OF SCIENCE AND TECHNOLOGY

1. In chain surveying tie lines are primarily provided a) to check the accuracy of the survey b) to take offsets for detail survey c) to avoid long

E D I T I O N PRODUCT LIST SURVEY PRODUCTS LTD

AVT Model Tripod.

MAHARASHTRA STATE BOARD OF TECHNICAL EDUCATION (Autonomous) (ISO/IEC Certified)

Spotting Scope Instruction Manual

Spotting Scope Instruction Manual

Level 6 Graduate Diploma in Engineering Engineering surveying

QUAD 1000 OWNERS MANUAL OPERATION GUIDE

Electronic Measurement Device (EMD) Set-Up Protocol

Trigonometry for Surveyors p. 1 Trigonometry p. 1 Angles and Their Measurement p. 1 Expressing the Fractional Part of a Degree in Minutes and Seconds

User Manual. English Version 2.0. Leica NA2/NAK2

SUMMER EXAMINATION Subject code: Advanced Surveying

Technical English -I 5 th week SURVEYING AND MAPPING

Aluminum Rods NAR09E NAR14. Measurements in Eighths. Measurements in Tenths. Measurements in Metric

LEICA T1800 TC1800 TCA1800

Mk II 3DR MULTI-LINE LASER INSTRUCTION MANUAL

Aligning Parallelism of Rolls Has Never Been Faster. L-732 Precision Dual-Scan Roll Alignment System

ADVANCED SURVEYING LAB MANUAL

Index. Back bearing 138 Back sight 28 Back station 133 Balancing line 325 choice of 329 example of its use in costing earthmoving

Trimble. S6 Total Station. Demonstration Guide

R13 PART-A PART-B. 2. a) Explain method of intersection in Plane table surveying b) What is error of closure? How is it balanced graphically?

Setup Information Panosaurus May 3, 2011

CE 371 Surveying ANGLE MEASURING_3

CHAPTER 01 Basics of Surveying

Leica Builder... Built to Build

SURVEY PRACTICAL LABORATARY MANUAL SUB:CODE - 407

Operating Manual. AdirPro HV8RL Red Beam Horizontal/Vertical Laser level

ASC Initial Alignment Procedures

UNIVERSITI MALAYSIA SARAWAK FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT

Surveying I. Lecture 1.

Self-leveling Laser Marker (4V1HXL)

Vertical angle calibration of a theodolite

CONTENT FORWORDS... 1 PRECAUTIONS: APPEARANCE AND FUNCTIONS... 3

Measurement solutions. for construction and surveying.

NIKON SURVEY PRODUCT CATALOG

Series10 SET210 SET310S

Pack 12. Surveying processes. Equipment 12.1 Method 12.2 Checklist 12.3 Calculations 12.4

GSN SunShot Procedures Using Internet Solar Position Calculator

Further Information can be found at

(a) Barometric levelling (b) Trigonometric levelling (c) Spirit levelling [16]

HD NO HOLES MOUNT RAM SSV

V40 Videoboom MAIN OPERATING INSTRUCTIONS INDEX 5. SPECIFICATIONS V40 1. INTRODUCTION 2. LIST OF FUNCTIONS AND PARTS

Operation Manual. Autocollimator Test Wedge for quick testing of Electronic Autocollimators

Provided by Xpert Survey Equipment Click Topcon GPT-8003A for Product Info and Updated Pricing GPT-8000A/GTS-810A SERIES AUTO TRACKING TOTAL STATION

SPECIFICATION FOR BLACK BODY CALIBRATION SOURCE

Leica Builder... Built to Build

Version 4.0 English. Leica Builder User Manual

DX-M. Owner s Manual. Photo Tripod

Leica NA700 Series Jobsite Tough, Clearly Precise

CE 1204 SURVEYING-I. G.GNANA GEETHA Lecturer, Dept of Civil Engg.

TEL: / FAX:

PV Series. Owner s Manual. Photo Tripod

Measuring range X / Y mm 100 / / /170 Z travel mm 200 / 400** Max. table load kg 20

BPL SERIES INSTALLATION INSTRUCTIONS THIS SHEET CONTAINS IMPORTANT SAFETY INSTRUCTIONS. SAVE THESE INSTRUCTIONS.

II/IV B.Tech (Regular/Supply) Degree Examination (Nov-2017) I SEM SURVEYING - I (14CE303) (CIVIL ENGINEERING) Scheme of Evaluation


BE Series. Dual Action Ballhead. You re on steady ground

(40-455) Student Launcher

User Manual. Trinocular Stereo Microscope

862 PROLASER CROSS LINE LASER

SURVEYING INSTRUMENTS. Series20K. SET220K SET320K SET520K SET620K Electronic Total Station. Class 1 Laser Product OPERATOR'S MANUAL

SKYLINE TRIPOD KIT. Micro-Fluid Head. Adjustable Quick-Release Plate. Center Column Height Adjustment Knob. Leg Angle Release Tabs.

Polarization Microscope. Omano OM349P Series. User Guide

LESSON 6: DETERMINING DIRECTION

Aligning Continuous Casters and Steel Mill Rolls

The Ridgeview Tripod. Your Ridgeview TM tripod is a mid-size field-packing tripod with a ball head for fast operation. Quick-Release Plate

ENGI 3703 Surveying and Geomatics

Optical Lever for Setting Pitch of Optic

SIDDHARTH GROUP OF INSTITUTIONS :: PUTTUR Siddharth Nagar, Narayanavanam Road QUESTION BANK (DESCRIPTIVE)

TERRESTRIAL AND NUMERICAL PHOTOGRAMMETRY 1. MID -TERM EXAM Question 4

SURVEY PRODUCT CATALOG

3001 SYSTEM AIR 3005 SYSTEM AIR C/F Fluid Head + Tripod. Operators Manual

Series30R SET230R/R3 SET330R/R3 SET530R/R3 SET630R Reflectorless Total Station

Provided by Xpert Survey Equipment Click Topcon GPT-8205A for Product Info and Updated Pricing GPT-8200A/GTS-820A SERIES AUTO TRACKING TOTAL STATION

Tacheometric Surveying STUDY NOTES

Transcription:

CE 260 SURVEYING CHAPTER 5 THEODOLITES General Background: Theodolites or Transits are surveying instruments designed to precisely measure horizontal and vertical angles. 1

They are used to establish straight and curved lines. To establish or measure distance (Stadia) To establish Elevation when used as a level. (When we set the vertical angle to 90 ). THEODOLITES TRANSITS They have: 4 screw level base. Metallic vertical and horizontal circles read with Vernier scale. Plumb Bob Low precision Old instrument. Not in use now. 2

They have: 3 screw level base THEODOLITES Glass horizontal and vertical circles, read directly or through micrometer. Right angle prism (optical plummet) High precision Tripod Head Horizontal Tripod Height - middle to upper chest height Feet - Dug into ground (if possible) 3

Hold Theodolite by handle Attach to tripod head Do not let go of handle until theodolite is attached to tripod. Levelling Screw or Foot Screw 4

Plate Bubble For accurate levelling Pond Bubble For approximate levelling Internal Focus (For sighting object) Eyepiece Focus (For cross Collimation hairs) Axis Standing axis Slow motion (up / down) Slow motion (left / right) Trunnion axis Telescope clamp (up / down) Upper plate clamp (left / right) 5

Standing Axis Collimation Axis Trunnion Axis All three axes should be mutually at right angles Plate Level Bubble Tube Required to move the bubble to the right Foot Screws Bubble follows direction of left thumb Both thumbs move in (or out) 6

Vertical Circle - (for vertical angles) Face Left F/L Face Right (F/R) 7

THEODOLITES SET-UP 1. Place the instrument over the point with the tripod plate as level as possible and with two tripod legs on the downhill side, if applicable. 2. Stand back a pace or two and see if the instrument appears to be over the station; if it does not, adjust the location and check again from a pace or two away. THEODOLITES SET-UP 3. Move to a position 90 opposed to the original inspection location and repeat step 2. 4. Check that the station point can now be seen through the optical plummet (or that the laser plummet spot is reasonably close to the setup mark). Then push the tripod legs firmly by pressing down on the tripod shoe spurs. 8

THEODOLITES SET-UP 5. While looking through the optical plumb (or at the laser spot), manipulate the leveling screws (one, two or all the three at a time) until the cross hair (bull s-eye) of the optical plummet or the laser spot is directly on the station mark. 6. Level the theodolite circular bubble by adjusting the tripod legs up or down. THEODOLITES SET-UP 7. Perform a check through the optical plummet or note the location of the laser spot to confirm that it is still quite being over the station mark. 8. Turn one (or more) leveling screws to be sure that the circular bubble is now exactly centered (if necessary). 9

THEODOLITES SET-UP 9. Loosen the tripod clamp bolt a bit and slide the instrument on the flat tripod top (if necessary) until the optical plummet or laser spot is exactly centered on the station mark. Retighten the tripod clamp bolt and reset the circular bubble, if necessary. THEODOLITES SET-UP 10. The instrument can now be precisely leveled by centering the tubular bubble. Set the tubular bubble so that it is aligned in the same direction as two of the foot screws. Turn these two screws (together or independently) until the bubble is centered. Then turn the instrument 90, at which point the tubular bubble will be aligned with the third leveling screw. 10

THEODOLITES SET-UP 10. Next, turn that third screw to center the bubble. The instrument now should be level, although it is always checked by turning the instrument through 180. ELECTRONIC THEODOLITE Electronic read out 1 eliminate mistakes in reading the angles. Precision varies from 0.5 20 Zero is set by a button. Repeated angle averaging. Replacing optical theodolites (It is less expensive to purchase and maintain). 11

THEODOLITES Top image shows the Electronic Theodolite. Bottom shows the Scale readings. THEODOLITES ELECTRONIC THEODOLITE DETAILS 12

THEODOLITES OPERATION KEYS AND DISPLAYS Field noted for repeated angles THEODOLITES 13

THEODOLITES Repeating optical theodolite: Has 3 leveling screws Optical plummet, light weight, glass circle, micrometer (to read the angles). Most theodolites are equipped with compensating device (automatic horizontal). 90 or 270 vertical angle of horizon. THEODOLITES Micrometer used to read vertical and horizontal angles. 2 independent motion (upper and lower). 14

THEODOLITES Angle Measurement with an Optical Theodolite 15

DIRECT OPTICAL THEODOLITE Has only one motion (upper). To find angle: Read the initial direction (L target) Read the final direction (R target) Determine the difference between the two. DIRECT OPTICAL THEODOLITE Direct optical theodolite generally is more precise. Some models can read directly 0.2 and estimate 0.1. Several sightings are required for precise work. Distribute initial reading around the circle to minimize the effect of circle graduation distribution, so initial reading read 0, 45,90,135, 16

DIRECT OPTICAL THEODOLITE Angles measured with a Direction Theodolite 17

LAYING OFF ANGLES The angle is to be laid out no more precisely than the least count of the transit or theodolite. LAYING OFF ANGLES Process: Lock angle, rotate theodolite, then open lock and measure again same angle. Should have double the first angle measurement. 18

PROLONGING A STRAIGHT LINE Start by taking distance at A. Then go to B, rotate 180, look back at A, plunge and make another line towards C. BUCKING IN (INTERLINGING) Read A, then plunge to B. If Distance between B and B is 1 M, then you have to move 0.5 M to find C. then do the sighting again. 19

INTERSECTION OF 2 STRAIGHT LINES Put 2 strings between points and then get the intersection. PROLONGING A MEASUREMENT LINE BY TRIANGULATION OVER AN OBSTACLE 20

PROLONGING A LINE PAST AN OBSTACLE There are 3 methods for it: 1. Right-angle offset method. 2. Random-line method. 3. Triangulation method. PROLONGING A LINE PAST AN OBSTACLE 21

THE END OF CHAPTER 5 THANK YOU! 22