Unofficial English translation offered by EuropElectro, for reference only

Similar documents
Unofficial English translation offered by EuropElectro, for reference only

Unofficial English translation offered by EuropElectro, for reference only

Regulations for Compulsory Product Certification

Unofficial English translation offered by EuropElectro, for reference only

CNCA-C11-09:2014. Translated English of Chinese CCC Regulations: CNCA C11-09:2014. Translated by:

CNAS-RC01. Rules for Accreditation of Certification Bodies

CNCA / CCC Serial No.: CNCA-C11-04:2014

Regulatory Measures on Organic Product Certification Management

CNAS-RC02. Rules for Sanctions against the Accreditation of Certification Bodies

Rules for LNE Certification of Management Systems

Indonesia - SNI Certification Service Terms

TURKISH STANDARDS INSTITUTION

USDA ISO Guide 65 Program Accreditation for Certification Bodies

Implementation Rules for the Certification of Organic Products

DQS Inc. Management Systems Solutions Certification Requirements

CERTIFICATION RULES - PORTABLE FIRE EXTINGUISHERS

Timber Products Inspection, Inc.

VOLUNTARY CERTIFICATION SCHEME FOR MEDICINAL PLANT PRODUCE

Accreditation of Product Certification Scheme for Construction Materials By Ir C K Cheung Hong Kong Accreditation Service

VOLUNTARY CERTIFICATION SCHEME FOR MEDICINAL PLANT PRODUCE REQUIREMENTS FOR CERTIFICATION BODIES

Discontinuing the Metallic Handcuffs Compliance Testing Program and Request for

Certification. Causes of Reduction of Scope of Certification

IAF Mandatory Document for the Transfer of Accredited Certification of Management Systems

Areas of impact for client consideration taken from the Rules for achieving IATF recognition Third edition for ISO/TS

Description of the TÜV NORD CERT certification procedure GMP+ FC (Feed Certification scheme) of GMP+ International B.V. (NL)

Reliable Quality Assurance Pvt. Ltd.

Unofficial translation

LAW OF THE REPUBLIC OF KAZAKSTAN «ON CERTIFICATION»

Regulation for the accreditation of product Certification Bodies

Minimum Requirements For The Operation of Management System Certification Bodies

SGS INTRON CERTIFICATIE CERTIFICATION AND ATTESTATION REGULATIONS 2015 TABLE OF CONTENT

Certification Description of Malaysia Sustainable Palm Oil (MSPO) Standard

Certification program PCWU-3

CERTIFICATION CONDITIONS

IT Security Evaluation and Certification Scheme Document

Conformity Assessment Schemes and Interoperability Testing (1) Keith Mainwaring ITU Telecommunication Standardization Bureau (TSB) Consultant

RSPO Certification Step by step

IATF - International Automotive Task Force Rules for achieving and maintaining IATF Recognition IATF Rules 5 th Edition Sanctioned Interpretations

Ongoing conformance of the product with the standard is the responsibility of the certificate holder and the Australian manufacturer or importer.

ITU Asia-Pacific Centres of Excellence Training on Conformity and Interoperability. Session 2: Conformity Assessment Principles

Network Certification Body

CERTIFICATION CENTER UB-Gİ-BP-001 GC CERTIFICATION PROGRAMME 1. OBJECTIVE

S. Scholz / K. Meyer / J.E. Nielsen / Harald Drück/J.Fernández/E.Prado/L.Nelson Page 1 of 7

For the Certification of Operations Located in Canada to the Canadian Organic Regime (COR)

AsureQuality Limited. CodeMark Programme. Certificate Holder Responsibilities and Requirements

Inhalt. Description of Certification Procedure ISO 22000, HACCP and DIN 15593

Areas of impact for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949

IBD CERTIFICAÇÕES. Fair Trade Certification Step by step. Welcome to IBD!

Requirements for Certification Bodies operating Certification against the PEFC International Chain of Custody Standard

Audit and Certification Process of GUTcert for

An unofficial translation, in case of any discrepancies between the English version and the original Swedish version the latter will prevail.

ETHIOPIAN NATIONAL ACCREDITATION OFFICE. Minimum Requirements For The Operation Of Product Certification Bodies

EXAM PREPARATION GUIDE

7 The Protection of Certification Marks under the Trademark Act (*)

EXAM PREPARATION GUIDE

CERTIFICATION THROUGH FIELD OFFICES (BRANCH AND REGIONAL OFFICES) -C.K. MAHESHWARI SCIENTIST G (Certification) 1 BUREAU OF INDIAN STANDARDS

PEFC Certification System Netherlands - Certification Procedures

EXAM PREPARATION GUIDE

SCHEME OF SUPERVISION AND CONTROL OF THE USE OF THE HONG KONG GREEN MARK GENERAL REQUIREMENTS AND OBLIGATIONS APPLICABLE TO ALL CERTIFIED COMPANIES

Certification Rights and Duties

Testing and Certification Regulations For an SA8000 Applicant Status Certification

The Role of the American National Standards Institute (ANSI) Irwin Silverstein, Ph.D. IPEA

Description of the TÜV NORD CERT Certification Procedure BRC Global Standards

SIRIM QAS International Sdn. Bhd.

Checklist According to ISO IEC 17065:2012 for bodies certifying products, process and services

Minimum Scheme Requirements to Certify Criminal Justice Restraints Described

Certification of Quality Management Systems with respect to Product Compliance

Plumbing Product Certification WaterMark Level 2

SIRIM QAS International Sdn. Bhd.

Information for your Certification

GLOBAL MANAGEMENT CERTIFICATION SERVICES PRIVATE LIMITED PROCEDURE

Orion Registrar, Inc. Certification Regulations Revision J Effective Date January 23, 2018

ISO/IEC 17065:2012 VERTICAL/FILE REVIEW ASSESSMENT

Chain of Custody Policy. July, 2015

C E R T I F I C A T I O N O F M A N A G E M E N T S Y S T E M S

EA-7/05 - EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits

Procedure for the Recognition of Foreign Testing Laboratories

Procedure for Issue and Withdrawal of Certificates

IEC Quality Assessment System for Electronic Components (IECQ System)

EXAM PREPARATION GUIDE

1. Purpose of Policy Alerts Scope of the Internet Domain in Handling Complaints Types of Complaints 4

Federal Communication Commission (FCC) Office of Engineering and Technology (OET) Program Accreditation Procedure

Certification Process Overview

EXAM PREPARATION GUIDE

Criteria for SQF Certification Bodies

SCI QUAL INTERNATIONAL PTY LTD ENQUIRY & APPLICATION/RENEWAL FORM FOR CERTIFICATION

PRODUCT CERTIFICATION AND CONFORMITY ASSESSMENT SCHEME GENERAL PRINCIPLES

Mutual Recognition Agreement/Arrangement: General Introduction, Framework and Benefits

Description of the certification procedure MS - ISO 9001, MS - ISO 14001, MS - ISO/TS and MS BS OHSAS 18001, MS - ISO 45001, MS - ISO 50001

SECTION IV VOLUNTARY CERTIFICATION SCHEME FOR AYUSH PRODUCTS Certification Process

R NOMINATED REPRESENTATIVE AND SIGNATORIES: RESPONSIBILITIES, QUALIFICATIONS AND APPROVAL

Examination Regulations for Employee Certification regarding Usability Engineering

CNAS-RC03. Rules for Certification Bodies to Report Information

IAF Guidance on the Application of ISO / IEC Guide 65:1996

NATRUE Requirements for Certification Bodies Version

Accreditation Body Evaluation Procedure for AASHTO R18 Accreditation

EXAM PREPARATION GUIDE

Rules for Operators. Version 6 / Version 6, 13 May 2011 Page 1/12

2.4 The inspection and certification orders are processed in the order in which the documents and/or information are received.

Scheme Document SD 003

Transcription:

No.: CNCA C03 01:2014 Implementation Rules for Compulsory Certification of Low-voltage Electrical Apparatus Low-voltage Switchgear Assembly Announced on July.16.2014 Implemented on Sep.1.2014 Certification and Accreditation Administration of People s Republic of China 1

CONTENTS 0 FOREWORD... 3 1 SCOPE... 3 2 TERMS AND DEFINITION... 3 3 REFERENCE STANDARD FOR CERTIFICATION... 3 4 CERTIFICATION MODE... 4 5 PRINCIPLE FOR CLASSIFICATION OF CERTIFICATION UNITS... 4 6 CERTIFICATION APPLICATION... 4 6.1 Apply and Acceptance of Certification Application... 4 6.2 Application documents... 5 6.3 Implementation arrangement... 5 7 CERTIFICATION IMPLEMENTATTION... 5 7.2 Design verification... 6 7.3 Evaluation and determination of certification... 6 7.4 Time of Certification... 6 8 POST-CERTIFICATION SURVELLIANCE... 7 8.1 Follow-up inspection... 7 8.2 Frequency and time of follow-up surveillance... 7 8.3 Record of follow-up inspection... 7 8.4 Evaluation of results of post-certification surveillance... 7 9 CERTIFICATE... 7 9.1 The maintenance of the certificates... 7 9.2 Change of certified products... 7 9.3 Extension of certified products... 8 9.4 Cancellation, suspension and withdrawal of the certificates... 8 9.5 Use of certificates... 8 10 CERTIFICATION MARK... 8 10.1 Design of mark allowed to use... 8 10.2 Marking method... 9 11 CHARGE... 9 12 CERTIFICATION RESPONSIBILITY... 9 13 IMPLEMENTATION SPECIFICATION... 9 2

0 FOREWORD This Rules determines the basic principle and requirements for implementation of compulsory product certification on low-voltage switchgear assembly based on safety risk and certification risk in lowvoltage switchgear assembly. This Rules is supplementary to general implementation rules issued by Certification and Accreditation Administration of People s Republic of China( Hereafter CNCA ) such as Implementation Rules for Compulsory Products Certification Manufacturer Classification, Selection and Determination of Certification Mode, Implementation Rules for Compulsory Products Certification Utilization of Testing Resources of Manufacturer and Other Certification Results, Implementation Rules for Compulsory Products Certification General Rules for Factory Inspection. Accredited Certification body shall draft implementation specification in accordance with common implementation rules and this Rules and carry out certification activity on the basis of these two reference rules. Manufacturer shall ensure its certificated products to maintain an ongoing conformance to certification and applied standard's requirements. 1 SCOPE This Rules is applicable to low-voltage switchgear assembly including power switchgear assembly with rated AC voltage no more than 1000V and the frequency no more than 1000Hz, busbar trunking system(busway), distribution board, assemblies for construction sites, complete equipment for power distribution in public networks assemblies, reactive power compensator, etc. Any modification to scope due to changes of legislation regulation, product standard, technical and industry policy shall consider the announcement by CNCA as the final version. 2 TERMS AND DEFINITION Design Verification: In this Rules, design verification refers to a non-test verification used to prove that products meet the requirements of standards applied in certification through comparison and evaluation. 3 REFERENCE STANDARD FOR CERTIFICATION NO. Product Type Reference Standard for certification 1 low-voltage switchgear assembly GB 7251.12 2 busbar trunking system(busway) GB 7251.2 3 distribution board GB 7251.3 4 assemblies for construction sites GB 7251.4 5 complete equipment for power distribution in public networks GB 7251.5 assemblies 6 reactive power compensator GB/T 15576 For the intelligent equipment of product No.1-No.6, GB/T 7251.8: Low-voltage switchgear and control gear assemblies--general technology requirement for intelligent assemblies shall be adopted as reference standard for supplementary test. 3

In principle, the reference standards shall apply the latest edition issued by Standardization Administration of China (SAC).Otherwise, if necessary, apply other applicable editions as required in CNCA announcement of reference standard. 4 CERTIFICATION MODE The fundamental certification modes for compulsory products certification for low-voltage switchgear assembly are: Type Test + Follow-Up Inspection Or Design Verification+ Type Test (part items) + Follow-Up Inspection If an enterprise possesses relevant design capacity and benchmark data for design verification, certification body can replace design verification with type test for part items; Otherwise, type test shall applicable to all items to verify whether the product meet the reference standards. The certification body shall, according to the requirements of Implementation Rules for Compulsory Products Certification Manufacturer Classification, Selection and Determination of Certification Mode, implement classification management for manufacturers. Meanwhile, based on manufacturer classification, certification body shall add quality assurance ability of manufacturer and check of product consistency (initial factory inspection) and relevant elements to the fundamental certification mode for post-certification surveillance to ensure a mode which suits applicants best. 5 PRINCIPLE FOR CLASSIFICATION OF CERTIFICATION UNITS In principle, certification unit is divided according to type, model, size, working principle, safety structure of products. Products of the same structure, same base bus-bar rated short-time withstand current grade and corresponding inlet wire rated current range (see table below) belongs to a certification unit(reactive power compensator with different switched capacitor type of the main circuit control shall be divided into different certification units). Rated short-time withstand current ICW Rated current In (A) (ka) Icw>80 In 4000 50<Icw 80 1600 In 4000 30<Icw 50 1000 In 2500 Icw 30 In 1600 Products, of the same manufacturer, of the same model/type, but from different factories, or products of different manufacturer but of same model/type and same factory shall carry out type test on one application unit sample. For products of other manufacturers/factories, it is required to provide related documents for product consistency check. Certification bodies shall specify requirements for unit classification in implementation rules for certification in accordance with relevant documents issued by CNCA and by combing manufacturer classification. 6 CERTIFICATION APPLICATION 6.1 Apply and Acceptance of Certification Application Certification applicant should submit a certification application to a certification body in an appropriate way. Certification body shall response to the application with a feedback of acceptance or rejection within the time frame specified in implementation specification. If application request conflicts with requirement of national law and regulation or industrial policy, certification body shall not accept the request. 4

6.2 Application documents Certification body shall define application document list in implementation specification according to laws and regulations, standard and needs for certification implementation, which at least includes certification application form or contract, registration verification of applicant/manufacturer/factory. Where inspection on quality assurance ability of manufacturer and check of product consistency (initial factory inspection) is not involved in the certification implementation, Certification body shall have the right to oblige applicant to provide a self-evaluation report to demonstrate the quality assurance ability of relevant factory owned by manufacturer. Applicant shall prepare application documents as required in application document list in implementation specification. Certification body is responsible for verifying, managing, recording and keeping the confidentiality of relevant information and inform applicant with the result. 6.3 Implementation arrangement Certification body and applicant shall reach an agreement on the responsibility and arrangement for each other during each certification section. Certification body shall determine the specific implementation program and inform the applicant, based on the requirement of this Rules and implementation specification and putting actual situation of manufacturer and manufacturer classification in to consideration. 7 CERTIFICATION IMPLEMENTATTION 7.1 Type test 7.1.1 Type Test program After the application document being verified, certification body shall develop a type test program and inform the applicant. Type test program consists of all requirements and quantity of samples, test standards and laboratory information. 7.1.2 Requirements on type test samples Certification body shall clarify sample delivery/selection requirement of product to be certified in implementation specification. In general, representative samples is selected and delivered by applicant for type test in accordance with the requirement of certification body. If necessary, certification body could select/seal products onsite to obtain sample for type test. Applicant shall ensure sample provided is consistent with manufactured product. Certification body and/or laboratory shall verify the authenticity of sample. With any doubt to the authenticity, laboratory shall explain the situation and deal with it in an appropriate way. Certification body shall determine the requirement of critical unit components and material list of products in implementation specification based on relevant regulatory documents issued by CNCA. For the critical unit components and material purchased at home which falls within the product category of China Compulsory Certification (CCC), manufacture shall provide certificate of CCC. For those critical unit components and material which is not required for compulsory product certification, certification body shall clarify the condition and detailed requirements on the accepted or acknowledged certificate of voluntary certification and type test report. 7.1.3 Items for type test In principle, type test is applicable to all applicable items specified in product standards. If design verification is involved in certification implementation, the parts of inspection items for design verification shall be determined by certification body and notify applicants. 7.1.4 Implementation of type test In principle, type test is required to complete in laboratory designated by CNCA. Laboratory carries out type test on samples, records and files the entire process in order to ensure the traceability of testing process and result. 5

Without affecting the effectiveness of certification result, certification body could develop relevant management procedure based on Implementation Rules for Compulsory Products Certification Utilization of Testing Resources of Manufacturers and Other Certification Results. Designated laboratory shall assign inspectors to implement or witness type test in accordance with standard requirements and by utilizing testing resources of manufacturer and issue testing reports. It s the obligation of laboratory to ensure the authenticity, correctness and traceability of its result. Certification body shall determine specific requirement and procedures in implementation specification. 7.1.5 Type test report Certification body shall determine a standardized format of type test report. After type test, laboratory shall issue the type test report to certification body and applicant in a timely manner. Report shall include certification relevant information of all products within the range of application unit. After receiving certificate, applicant shall be able to provide complete and valid type test report to certification body and law enforcement organs for surveillance purpose. 7.2 Design verification 7.2.1 IMPLEMENATION PRINCIPLE OF DESIGN VERIFICATION The certification bodies shall, on premise of controlling risks and based on manufacturer classification, determine the scope and process for implementing design verification in implementation specification. 7.2.2 METHOD OF DESIGN VERIFICATION Design verification can be implemented in two methods: verification comparison and verification evaluation. Verification comparison is the comparison between suggested design structure and tested design structure of switchgear assembly or partial switchgear assembly. Verification evaluation is the design verification based strictly on designing criteria and calculated sample machines or components of switchgear assembly to prove that the design can meet requirements of relevant standards for switchgear assembly. 7.2.3 IMPLEMENTAION OF DESIGN VERIFICATION Certification applicant needs to provide design verification report completed by factory and related materials if design verification is covered in certification mode. Certification body shall select laboratory designated by CNCA to verify the design verification report and relevant materials and determine which parts of inspection item are need for type test. After the verification and inspection, laboratory shall submit the result to certification body. 7.3 Evaluation and determination of certification Certification body shall make the certification determination based on a comprehensive evaluation on type test conclusion and relevant information/documents. The certificate will be issued when the evaluation is qualified. The certification body will disapprove and terminate the application when the type test result is unqualified. 7.4 Time of Certification Certification body shall clarify the time frame of each certification section and ensure certification being completed before the deadline. Applicant shall cooperate with certification implementation actively. In general, certificate shall be issued to applicant within 90 days after the application being accepted. 6

8 POST-CERTIFICATION SURVELLIANCE Post-certification surveillance in this Rules refers to follow-up inspection by certification body as a mean of surveillance for certified products and its manufacturer. Certification body shall determine the specific requirement on the method of post-certification surveillance, based on the requirements of this Rules and implementation specification and putting actual situation of manufacturer and manufacturer classification into consideration. 8.1 Follow-up inspection 8.1.1 Principle of follow-up inspection Certification body shall implement effective follow-up inspection on certified products and its manufacturer based on manufacturer classification with the aim to verify the ongoing conformity of quality assurance ability of manufacturer with certification requirements, ensure the ongoing conformity of certified products with standard requirements and ongoing products consistency with type test sample. Follow-up inspection shall preferred to been implemented during the normal production of manufacturer without notice in advance. For products manufactured discontinuously, certification applicant shall provide production plan to certification body to facilitate the effective implementation of follow-up inspection. 8.1.2 Content of follow-up inspection The certification body shall determine the specific requirements on follow-up inspection, check for product consistency and inspection for quality control of manufacturer etc. in accordance with Implementation Rules for Compulsory Certification Requirement on Quality Assurance Ability of the Factory, and clarify them in implementation specification. 8.2 Frequency and time of follow-up surveillance Certification body shall implement post-certification surveillance at different frequency towards different types of manufacturers and determine surveillance time in a reasonable way based on the manufacturer classification. Specific principle shall be clarified in implementation specification. 8.3 Record of follow-up inspection The certification body record and file the entire post-certification surveillance process in order to ensure the traceability of certification process and result. 8.4 Evaluation of results of post-certification surveillance Certification body shall make a comprehensive evaluation on conclusion of follow-up inspection and relevant information/documents. The certificates can be retained and the certification marks can be continuously used upon favorable inspection results. If any inspection failed, certification body will suspend or withdraw the certificate according to relevant condition make a public announcement. 9 CERTIFICATE 9.1 The maintenance of the certificates The term of validity of the certificates for product certification prescribed in this rule is 5 years. Within the term of validity, certificates are maintained based on post-certification surveillance by certification bodies. Certificate holder shall submit application for certificate extension within 90 days before the expiration of certificate if he/she intends to extend the use of certificate after its expiration. If the last result of post-certification surveillance for the relevant certificate within its term of validity is qualified, the certification body shall renew the certificate after receiving the application. 9.2 Change of certified products After certificate issued, should any change occurs in critical unit components and material of certified products or the design, electric construction involved in safety or EMC of the appliances or other items specified in implementation specification of certification by certification body, an application for approving/recording the changes shall be made by applicant to the certification body. 7

9.2.1 Application for change and requirement Certification body should clarify specific requirements on change of certificate in implementation specification of certification including scope and procedure of application for change. For change of certificates for which products or contents are same, from same factory but several manufacturers, applicant need submit only one application and certification body should grant the validity of associated certificates. 9.2.2 Evaluation and approval of change The certification body shall evaluate the change according to the submitted information and confirm whether it can be approved. If sampling test and/or factory inspection is necessary, the change will be approved upon a qualified test result. In principle, sample of representative model which is used for full type tests initially is the base sample for evaluation of change. 9.2.3 Recording for change Change of critical components and materials could be, when sampling test is not required, determined and approved by certification technical responsible person from manufacturer accredited by certification body. Relevant documents shall be recorded for the check in post-certification surveillance and verification test is required when necessary. Certification body shall specify relevant requirement for the technical person in implementation rules of certification. 9.3 Extension of certified products For extension of the range of products covered by certified products, certificate holder should submit an extension application to certification body. Based on the technical information related to the extended products provided by the certification applicant, certification body shall check the consistency of the extended products against the certified products and confirm the applicability of the original certification results to the extended products and carry out the additional test or inspection for onsite products based on the differences. After approval, either a separate certificate can be issued or the original certificate can be updated at the request of the certificate holder In principle, sample of representative model which is used for full type tests initially is the base sample for evaluation of change. 9.4 Cancellation, suspension and withdrawal of the certificates Cancellation, suspension and withdrawal of the certificates shall be implemented in accordance with Regulations for Compulsory Product Certification, Implementation Rules for Cancellation, Suspension and Withdrawal of Compulsory Product Certification, and relevant provisions of certification body. The certification body shall determine categories and scope of nonconformance product, and make an announcement of certificates being cancelled, suspended or withdrawn in appropriate manner. 9.5 Use of certificates Use of certificates shall comply with Regulations for Compulsory Product Certification. 10 CERTIFICATION MARK The management and use of the certification mark shall follow Regulations for Compulsory Product Certification Mark. 10.1 Design of mark allowed to use The compulsory product certification of low-voltage switchgear assembly adopts the certification mark S. 8

10.2 Marking method Standard-size marks and irregular-size pressing/printing marks printed only by CNCA could be adopted. 11 CHARGE The certification shall be charged by certification body and laboratory according to national regulation on charge for compulsory products certification. 12 CERTIFICATION RESPONSIBILITY The certification body shall be responsible for its certification conclusions. The laboratory shall be responsible for its testing results and reports. The certification body and its factory inspector assigned shall be responsible for its factory inspection conclusion. The certification applicant shall be responsible for the authenticity and legitimacy of the documents and samples submitted for certification. 13 IMPLEMENTATION SPECIFICATION The certification body shall, according to the principles and requirements of this Rules, develop scientific, reasonable and operable implementation specifications for certification which shall be announced to public for implementation after being reported to CNCA for recording. Implementation specifications shall at least include the following aspects: (1) Certification procedure and time frame; (2) Selection on certification mode and relevant requirements; (3) Specification of division of certification units and relevant requirements; (4) Requirements on manufacturer classification; (5) Application materials for certification and relevant requirements; (6) Requirements on sample inspection (including type test, inspection utilizing manufacturer s own testing resources); (7) Implementation requirements on design verification (8) Requirements on initial factory inspection and post-certification surveillance (including coverage of factory inspection which includes the division of product categories, inspection for manufacturer quality assurance ability and product consistency check, inspection for quality control of manufacturer, key unit components and materials, factory inspection, surveillance frequency and sampling test or inspection of ODM/OEM mode etc.); (9) Requirements on change of certification (including update of standard version); (10) List of key unit components and materials; (11) Requirements on technical person of certification; (12) Reference and requirements on charge; (13) Procedure and time frame related to technical disputes and complaints. 9