Lake County Housing Authority North U.S. Highway 45 Grayslake, IL 60030

Similar documents
VERMILION COUNTY BOARD Vermilion County, Illinois

REQUEST FOR PROPOSAL (RFP)

Qs & As from CSD RFP pre-submission conference

FLORIDA DEPARTMENT OF TRANSPORTATION

2 Geek Tech Support Services 2GTSS Products

ADDENDUM #1. Date: 12/21/2018

SHIED IP Camera RSCM-13601B/W

RETAIL CAPTURE IT WITH CLARITY

Product and Company Overview 2015 Beyond High Definition

Mini Catalogue. March 2015

THE CORPORATION OF THE CITY OF STRATFORD

!!"#$%&%"'(%$ $ $ $ $ $ $ $ $ $$$$$$$$!)*+,-.$

WIRELESS NETWORK: BID Montville Public Schools High School

Sales Alert. New Lines of High-Performance H.265 Megapixel IP Surveillance Cameras. Vicon Introduces

High Resolution Security Camera System

Nirvana Spa Relieves Surveillance System Stress with SurroundVideo Panoramic Megapixel Cameras from Arecont Vision

Emergency Dispatch Console Furniture

Highest Resolution. Video Products. Providing a 30% increase in resolution - over other analog solutions.

Taking analogue cameras to the max!

Maulana Abul Kalam Azad University of Technology, West Bengal

PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL NW Barry Road Kansas City, MO SUMMER HVAC

SHIED IP Camera RSCM-13701

Sales Kit IP Surveillance. April Copyright 2011 Micronet Communications, INC

FACILITY USER GUIDE. Colocation in Key Info s Agoura Court Data Center

Grant Parish School Board 512 Main Street P.O. Box 208 Colfax, LA 71417

MT. PROSPECT PARK DISTRICT REQUEST FOR PROPOSAL REQUEST FOR STATEMENTS OF INTEREST, QUALIFICATIONS, PERFORMANCE DATA AND COST PROPOSAL

Manage Your Home or Business Virtually Anywhere!

SECURITY CAMERAS 101

Highlights. Main Features. Product Images: BD-2402B1. 4CH 720p Video Security System with 1TB HDD and 2 720p Analog Cameras

CAMERAS 101 BEGINNER MODULE 3

SPECIFICATIONS FOR IP BASED CCTV SYSTEM CAMERAS

National Competitive Bidding (NCB) Single Stage Two Cover System

Hemaya Technical and Security Specification

ROAD MAINTENANCE DIVISION VIDEO SECURITY SYSTEM GORMAN YARD (RD 556A) GORMAN POST RD GORMAN, CA RFB-IS

Request for Proposals

Governing Standards. All wiring and components shall meet the applicable requirements of the NEC.

Address: 1820 NW 82 AVE Miami FL United States. Phone: /

VIGILANCE CAMERA RANGE

Bid # Security Equipment and Service Bid Tabulation

Value and Quality. Send an to Call us toll free:

A. The high quality, lightweight, varifocal manual iris lens shall be suitable for applications where scene and lighting requirements are consistent.

Catalog Address:4064,4th flr,pannalal Compound,Bhandup Ind Estate, Bhandup (W) Mumbai

KLR-View Pro Series. Digital Video Recording A S. Mingo Road, #188 Tulsa, OK

REQUEST FOR PROPOSAL (RFP)

ATTACHMENT 3 ZAB Page 1 of 8. The police department feels that the expanded use and hours are okay with the recommended security upgrades.

Rice University Security Camera

S/M/WBE PARTICIPATION GOOD FAITH EFFORT FORM

CENTRAL ELECTRONICS LIMITED Material management division

INVITATION FOR BIDS For RO PLANT #2 PLC SYSTEMS UPGRADE (CIP# WTR1702)

Request for Proposal: Friendsville Riverside Community Park Video Surveillance System Upgrade

CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL. Fiber Optic Project Charter Township of Shelby Fire Stations #2 #3 & #4 to Fire Station #1

HD-SDI Vandal Dome Camera

Thank you for your interest in bidding with Washington County Public Schools and we apologize for any inconvenience this may have caused.

Storage Total. Storage RAID5. # Cams S12M64 64GB - 4 S12M GB - 4 S12K1 1TB - 16 S12K2 2TB - 16 S12E2 2TB - 24 S12E4 4TB - 24 S12E6 6TB - 24

PRODUCT SURVEILLANCE

Analog High Definition Micro Dome Camera

ADDENDUM. IFB # V-1241 Security Surveillance System

Producing high quality video surveillance products for 25 years.

Hemaya Technical and Security Specification

QUICK INSTALLATION GUIDE. 4CH, 8CH & 16CH Surveillance System / NVR WiFi PoE Camera Kit

REQUEST FOR PROPOSAL (RFP) Network Infrastructure Upgrade School/Library Name: Westview School Corporation Issue Date: 2 /20/ #:

OUTDOOR SECURITY CAMERA WITH LED FLOODLIGHT

BID NOTICE FLORISSANT VALLEY FIRE PROTECTION DISTRICT

Your Vision. Contents. Analogue CCTV. Network CCTV. Recording Devices. vs2cctv.com. v1.01

Video Surveillance System-Basics

Request for Proposal Palos Heights School District 128 Network Infrastructure and WIFI E-Rate Form 470: Palos Heights, IL 60463

City of St. Louis. Treasurer's Office

Agenda. Camera Selection Parameters Focal Length Field of View Iris Aperture Automatic Shutter Illumination Resolution S/N Ratio Image Sensor Lens

REQUEST FOR PROPOSALS Rolling Plains Management Corporation Request for Proposal Cellular Phone Services

Built-in heater and anti-fog glass reduces condensation under any weather condition IP66 compliant Dark grey housing 5 year warranty

Request for Proposals 2015 Network/Wireless Upgrade & Expansion Riverton USD 404 Riverton, KS

FORENSIC SCIENCE PAPER No.7: Criminalistics and Crime Scene Investigation

Long Range Surveillance System

1. The camera shall be 20fps Resolution and be 25 fps resolution for advances picture quality supporting 25fps.

AV2825IR HD 1080p H.264 IP MegaView TM Day/Night w/ IR illuminator Camera AV2825DN HD 1080p H.264 IP MegaView TM Day/Night Camera Bid-Spec

Ref. No. : MDI/ CCTV Cameras /2017 Date: May,9,2017

This is with regard to your requirement for Document Imaging Services. A: You are not required to attend the bidder's conference on 4/18.

GV-SD3732-IR (33x) 3 MP H.265 Low Lux WDR Pro Outdoor IR IP Speed Dome

HIGH COURT OF HIMACHAL PRADESH,SHIMLA HHC/GAD/Security/ Dated: Shimla, 9 th September,2013

Your Security Cameras with Professional Management

SECTION SPECIAL SYSTEMS. Website and Construction Cameras

vs Other CCTV cameras Multimedia & Communication Technology

Request for Proposals (RFP) IT Infrastructure Upgrade & Storage Solution January 26, 2017 Proposal Deadline: February 8, 2017

STATE OF ALASKA RFP NUMBER 2514H005 AMENDMENT NUMBER TWO

The Setup Wizard. System Language. Disable or enable the Setup Wizard. Configure Password. General Configuration. Daylight Savings & Internet Time

Safety is your concern... Security is our commitment...

FE8172/72V Product Announcement

Datasheet. High-Definition IP Surveillance Cameras. Camera Models: UVC-G3-AF, UVC-G3-DOME, UVC-G3-MICRO, UVC-G3-PRO NVR Model: UVC-NVR-2TB

CQUniversity Security and. CCTV Standards

CATEGORY 2 WIRELESS, WIRING, AND NETWORK EQUIPMENT FOR NEW CONSTRUCTION E-RATE RFP

TABLE OF CONTENTS. I. Purpose and Scope... 2 II. Standards... 3

Network Infrastructure, Desktop, and Server Support Service Level Agreement

8 Channel 5MP Extreme HD Video Security DVR with 2 TB HDD and 8 x 5MP Wired Infrared Cameras with L 2 Color Boost Technology

HD-CVI Camera User s Manual

NO BELLS, NO WHISTLES. JUST EFFECTIVE CCTV, HONESTLY PRICED.

Avaya Case Study. Challenge. Solution. Benefits. 75% cost savings 150 foot zoom capability Increased campus safety

GV-SD2322-IR (22x) Outdoor Low Lux IR IP Speed Dome

Policies & Procedures Effective Date: January 24, Key Control

REQUEST FOR QUOTE (RFQ):

Total Cost of Ownership (TCO)

Transcription:

Proposal for Services Security Camera Replacement Must be received by 10:00 a.m. on March 30, 2018 Services to be provided at Shiloh Towers 1525 27 th St. Zion, IL A Mandatory Pre-bid Meeting will be held on March 23 2018 at 11am Bidders are advised that attendance at the pre-bid meeting is strongly recommended. NO SPECIAL ARRANGEMENTS WILL BE MADE FOR THOSE NOT ATTENDING. Contractor proposal must be submitted using this LCHA provided Contractor Bid Sheet. Contractor may include additional documentation as they feel appropriate. LCHA is contracting for a system upgrade to existing CCTV system. Requested specification is listed below with sample gear types. The quote is to be this exact equipment or comparable equivalent. Also requested is a primary services contract for the maintenance of installed equipment as needed. All services and pricing must be listed. All existing equipment is to be carefully removed and returned to LCHA procurement staff or through separate proposal contractor may offer trade in value under this project. Any damaged areas during removal should be repaired to like new as necessary. The focus is to be based on the following major areas of enhancement to the existing infrastructure of the system using the following. The installation of upgraded interior and\or outdoor camera equipment with-in the housing development, including any needed cabling or wiring. The upgrade of recording equipment and security of the recording equipment in the office. The addition of cameras to the appropriate non-covered areas of the facility as listed. The ability of remote viewing capability and future expansion of the system. This project as proposed is to be a complete turn-key project fully contracted under the General Contractor

Outdoor Cameras Requested is also to add 6(six) outdoor cameras for door and parking area coverage. Exact locations will be discussed during the walkthrough. Exterior building mounts around the property may be utilized if applicable. The proposed service provider is to add new cameras with units equipped to handle viewing needs day and night. The requested replacement cameras are to be equal or greater than the following specification: 4(Four) Cameras: o 2.43 Megapixel HD 1080 Bullet Cameras. 2.8mm-12mm Fixed Lens, Color True Day / Night Matrix Infrared LED s, weatherproof, white metal housing, Heater. IP66 Outdoor Rated, Sony HD Chip Set 2(Two) Cameras: o 2.43 Megapixel HD 1080 Long Range Bullet Cameras. 2.8mm-12mm Varifocal Lens, Color True Day / Night Matrix Infrared LED s, weatherproof, white metal housing, Heater. IP66 Outdoor Rated, Sony HD Chip Set Interior Cameras Included in this proposal is the addition or replacement of cameras to the Lobby, Elevators, Community room, Maintenance shop and all common areas. The new cameras shall be equivalent 3MP HD High resolution with extended night vision, wide angle, have digital zoom and be in vandal resistant dome. As needed New wire will need to be run to each camera and interfaced to the Network Video Recorder. Power loss is to be protected through the UPS. Locations are listed for coverage areas, contractor proposal to detail quantity of equipment needed for full coverage of all areas. The requested replacement cameras are to be equal or greater than the following specification

Cameras: o 2.43 Megapixel HD 1080P Dome Cameras. 2.8mm-12mm Varifocal Lens, Color True Day / Night Matrix Infrared LED s, weatherproof, white metal housing, Heater. IP66 Outdoor Rated, Sony HD Chip Set Locations Lobby [weatherproof/vandal proof dome] Hallway coverage for all lobby areas [weatherproof/vandal proof dome] Equipment room [weatherproof/vandal proof dome] By outside entrance doors [weatherproof/vandal proof dome] Community room [weatherproof/vandal proof dome] Maintenance Shop [weatherproof/vandal proof dome] Elevator interiors- use wireless transmitters and receivers for each car and as needed for signal coverage (vandal proof dome) Outdoor parking lot coverage for wide areas including but not limited to entrances and any hidden areas [weatherproof/bullet cameras]. The cameras shall provide day/night functionality with wide dynamic range to give visibility of objects in both dark and light areas of a scene. Network Video Recorder New 32 Channel Universal HD 1080P DVR, 30 FPS Realtime Embedded LINUX Operating System, H.264 Technology- Max Display Resolution: 1920x-Full 1080P 16 Channel Audio Ports, PTZ Function, Video out Back-up to flash Dr, or External Harddrive Remote Access on Smart Phone and web, CMS Software 24 Terrabyte Hard Disc Drives (4TB x 6) Westen Digital Purple Surveillance HDD s A 750VA Smart-UPS with surge protection is requested to back up all systems and is to be mounted to the rack and protected with the equipment.

Additional Equipment As needed directional antennas As needed cabling and wires minimum CAT6 or better As needed wire molding painted to match the surrounding areas Outdoor weatherproof Gang Boxes with Covers Metal Gang Boxes, Covers, Mounting hardware Remote Viewing and Future Expansion The equipment must have video management software. Any licensing must be defined in the bid request. The equipment listed for this facility must allow for the expansion of the system at this location in the future, but also provides the capacity to integrate with future systems at other locations with-in Lake County. The ability to view the system off-site and the capacity to view multiple systems with the same client software is required. Alternate #1 Equipment must be tested for full functionality and training is to be provided to LCHA Management staff as designated. All areas of work must be cleaned. Please include turnaround time estimate for complete job. Total $ Mandatory 10% Construction Contingency $. Must be filled in as a separate item to the proposed total or the bid will be rejected. Total w/contingency$ o Installation of 6 (six) additional 2.43 Megapixel HD 1080P Dome Cameras in hallways on floors 2-7. Including new wiring or wireless to each camera and interfaced to the Network Video Recorder. Total$

Primary Services Contract Primary services contract for time and material for a service period May 1, 2018 April 2019 with an option of four (4) 1-year extensions. The service provided is optioned through May 2024. Quote to be based on hourly rate and include details for: 1. Hourly and material rates for all services anticipated to be used in the annual contract. 2. All holidays that will be billed at a higher rate and the hourly rate associated with the holiday. 3. Any additional charges for special request projects and response time for special requests Attach contractor proposal and any terms 1. Proposed Contractor Acknowledgement of terms and specifications a. Contractor. b. Authorized Representative. c. Signature. d. Date. e. Each page must be acknowledged in the designated field at the footer. 2. Primary Contacts/Notice Addresses Lake County Housing Authority Keon Jackson Director of Asset Management 33928 N. US Highway 45 Grayslake, Illinois 60030 Phone: 847-223-1170 x 2240

3. Term Negotiated calendar days to complete work after contract is signed as per contractor proposal. All work is to done during normal business hours of Monday- Friday 8:00am to 4pm. Pursuant to Section 15 of the Substance Abuse Prevention on Public Works Projects Act, 820 ILCS 265/1 et seq., a copy of the Contractor s written substance abuse prevention program must be submitted prior to the commencement of the Work If subcontractors are to be used they must be listed on the bid form. The general contractor or prime contractor must complete at least 12% of the project by himself or his employees. The job may not be subcontracted more than 88%. If subcontractors are used each subcontractor must submit proof to demonstrate the subcontract relationship (contract, incorporation papers, etc) and a Certificate of Insurance covering general liability and workers compensation for the subcontractor and employees. a. The subcontractor shall follow the same wage requirements as above for employees. b. If subcontractors hire other subcontractors, all requirements apply. All work to be done up to code. All work to be done in a workmanlike manner $100 daily fines for late work start dates or surpassing contract timeframe. 4. The key Please contact primary contact. 5. Total Cost should include the prevailing wage for labor and Davis Bacon.