Cable Routing Procedures for Dell PowerEdge FX2/FX2s Systems

Similar documents
Cable Routing Procedures for Dell PowerEdge T320 & T420 Systems

Cable Routing Procedures for Dell PowerEdge R630 Systems

Cable Routing Procedures for Dell PowerEdge T710 Systems

MECHANICAL AND THERMAL CONSIDERATIONS FOR RACK DEPLOYMENT OF THE DELL POWEREDGE M-SERIES. One Dell Way Round Rock, Texas

Mounting and Cable Routing Procedures for Dell Digital KVM s (1082DS, 2162DS, 4322DS)

Using Dell Repository Manager to Find Newer Updates from the Dell Online Repository

Accelerating storage performance in the PowerEdge FX2 converged architecture modular chassis

Dell EMC Enterprise Systems Rail Sizing and Rack Compatibility Matrix

DellEMC TM Enterprise Systems Rail Sizing and Rack Compatibility Matrix

2U, 4U, and 7U Systems

Using Dell Repository Manager to Update Your Local Repository

Rack Installation Instructions

Using Dell Repository Manager to Create a Deployment Media (Bootable ISO) to Perform Systems Updates

Rack Installation Instructions

Rack Installation Instructions

NetShelter SX Cable Management. Organize large volumes of cables from networking switches and patch panels

Dell Server Migration Utility (SMU)

4-Post and Universal Telco Frame (UTF) Rack Mount Kit Installation Instructions

System Storage EXP3000 Rack Installation Instructions

Dell IT Assistant Migration To OpenManage Essentials

Eaton Heat Containment System (HCS) Installation Guide

APC Open Frame Rack Networking Solutions

A Comparative Study of Microsoft Exchange 2010 on Dell PowerEdge R720xd with Exchange 2007 on Dell PowerEdge R510

Dell XPS 14z Owner s Manual

Dell OpenManage Cluster Configurator on Dell PowerEdge VRTX

Heat Containment System (HCS)

Dell PowerEdge C410x. Technical Guide

Lifecycle Controller Part Replacement

1. Unpacking the System

Configuring Alert Actions in OpenManage Essentials

Lifecycle Controller Part Replacement

Dell SC7020 Storage Controller Getting Started Guide

Panduit PreConfigured Industrial Distribution Frame (IDF) Installation Instructions Part Numbers ZDF48-RA and ZDF48-EA ZDF48-6RA and ZDF48-6EA

E1135C PDU and Pod Upgrade Procedure

Rack Installation Guide

Dell OptiPlex SFF AIO Stand. User s Guide. Model: IKAIO-01 1 /13

Dell PowerEdge R720xd with PERC H710P: A Balanced Configuration for Microsoft Exchange 2010 Solutions

This Datasheet for the IC697CHS790. Rack, 9 Slots, Rear Mount.

Business Intelligence on Dell Quickstart Data Warehouse Appliance Using Toad Business Intelligence Suite

APC by Schneider Electric Solutions for Cisco Unified Computing System (UCS) Blade Applications

Dell Inspiron N5110 Service Manual

Installing a Power over Ethernet injector

PowerEdge FX2 - Upgrading from 10GbE Pass-through Modules to FN410S I/O Modules

Netfinity White Paper Netfinity Technology Center

SNOWBOARD RACK KIT P/N APPLICATION BEFORE YOU BEGIN KIT CONTENTS. Instr Rev Page 1 of 25

PLC Racks IC697CHS782/783

Dell MD1280 Storage Enclosure Getting Started Guide

Instructions for SVC-KIT-0020

Microsoft SQL Server 2012 Fast Track Reference Architecture Using PowerEdge R720 and Compellent SC8000

Analyzing Patent Data in Dell Quickstart Data Warehouse Appliance Using Toad Business Intelligence Suite

Dell Storage NX Windows NAS Series Configuration Guide

vstart 50 VMware vsphere Solution Specification

How to Sell APC s Cisco Approved Solution for Nexus 7018

Understanding Discovery and Inventory of Dell Devices

Serial ATA Hot Swap Drive Cage Upgrade Kit for: Intel Server Chassis SC5200 Intel Server Chassis SC5250-E

PACSystems* RX3i IC695ACC650

INFOBrief. Dell PowerVault 112T DDS4, DLT VS80, or DLT VS160 Tape Rack Enclosure. Key Points

NEC Server Rack Configuration Guide

ASSEMBLY INSTRUCTIONS, ELO SELF SERVICE STAND

Dell Storage with Microsoft Storage Spaces Configurations and Solution IDs

APC APPLICATION NOTE #146

Oracle <Insert Picture Here>

INFOBrief. Dell PowerVault 114T DAT72, DLT VS160, SDLT 320, LTO-1, and LTO-2 Tape Rack Enclosure. Key Points

120Ra-1 Pentium III Processor Installation Insert

Print Mechanism Maintenance Kit

TABLE OF CONTENTS SECTION 1 TABLETOP CONFIGURATION SECTION 2 TABLETOP CONFIGURATION ACCESSORIES SECTION 3 SLIDE CONFIGURATION

G12/G12x USER S MANUAL

Series 3700 Screw Terminal Assemblies Installation Instructions

Consolidating OLTP Workloads on Dell PowerEdge R th generation Servers

3M Indoor Protected Building Entrance Terminal 4588V-QCS Series

Server Rack Cabinet Compatibility Guide

OCM5 Splitters and Pass-Through Modules for CSX-3 Cabinets

DNS-2608 Enterprise JBOD Enclosure User Manual

Microsoft SQL Server 2012 Fast Track Reference Configuration Using PowerEdge R720 and EqualLogic PS6110XV Arrays

Dell SCv3000 and SCv3020 Storage System Getting Started Guide

Dell PowerEdge FD332. Owner's Manual. Regulatory Model: E02B Regulatory Type: E02B003

Data Center Enclosures Best Practices. Maximize the Efficiency of the Enclosure within a Data Center

SCv360 Expansion Enclosure

Performance and Energy Efficiency of the 14 th Generation Dell PowerEdge Servers

for Power Energy and

WARNING ELECTRICAL SHOCK HAZARD

Dell OpenManage Power Center s Power Policies for 12 th -Generation Servers

Thank you for purchasing this Factory Service Manual CD/DVD from servicemanuals4u.com.

InfraStruXure Central Standard/Enterprise Installation/Start-Up Service Procedure

Enhancing Security with PowerConnect 5.0 Part I - Private VLAN

Compaq Ultra-Dense Server Deployment in Telecommunications (Telco) Racks

Managing and Monitoring a Virtualization Environment Using OpenManage Essentials

RACKS AND CABLE MANAGEMENT

CD-ROM Box Enclosure

HP ProLiant MicroServer

RittalXpress TS IT Enclosure Assemble-to-Order Program

Vertiv VR Rack 1.0 GENERAL

Dell XPS L702X Service Manual

Quick Start. This document describes how to install the Juniper Networks PTX5000 Packet Transport

641G-001A PRINTER KIT INSTRUCTIONS

19" TiRAX cabinet system. from page 3. 19" NETcell cabinet system from page 31. Open 19" racks from page 43

Vertiv Local Rack Access 18.5" LED LCD Console

Dell SC5020 and SC5020F Storage Systems Getting Started Guide

Assembly Instructions

Project Olympus Chassis Mechanical Specification

Transcription:

Cable Routing Procedures for Dell PowerEdge FX2/FX2s Systems This Dell Technical White Paper explains the best practices for routing and securing the cables exiting the back of the FX2/FX2s systems. Rail Solutions Engineering April 2015 1

This document is for informational purposes only and may contain typographical errors and technical inaccuracies. The content is provided as is, without express or implied warranties of any kind. 2015 Dell Inc. All rights reserved. Dell and its affiliates cannot be responsible for errors or omissions in typography or photography. Dell, the Dell logo, and PowerEdge are trademarks of Dell Inc. Other trademarks and trade names may be used in this document to refer to either the entities claiming the marks and names or their products. Dell disclaims proprietary interest in the marks and names of others. April 2015 Rev 1.2 2

Contents Introduction... 4 Section 1: Cabling a PowerEdge FX2/FX2s on sliding rails with a SRB (Strain Relief Bar)... 4 1.1. Installing the SRB to the rails... 4 1.2. Connecting the cables to the system... 5 1.3. Routing the power cables through the strain reliefs... 6 1.4. Securing the cables to the SRB... 6 Section 2: Creating cable service loops in the rack... 8 Section 3: Cabling a PowerEdge FX2/FX2s system on static rails... 9 Section 4: Cabling Sleds with Front I/O.... 10 Figures 3

Introduction This white paper covers recommended cable routing procedures for the Dell PowerEdge FX2/FX2s systems in the following racks: PowerEdge 2410, 4210 PowerEdge 2420, 4220, 4820 (including wide and deep versions) PowerEdge Energy Smart 4020S, 4620S AR3100X717, AR3104X717 (Dell branded APC racks) If you are using the sliding rails with the included strain relief bar (SRB), following these procedures will allow you to extend the system from the rack for service without powering down or disconnecting the cables. If you are not using the SRB, or are using the static rails, following these procedures will ensure secure attachment and strain relief of the cables behind the system. This white paper will cover basic guidelines on how to route cables within the rack. For additional guidelines on how to route cables within the rack, refer to the Dell Best Practices Guide for Rack Enclosure white paper. Section 1: Cabling a PowerEdge FX2/FX2s on sliding rails with a SRB (Strain Relief Bar) This section details how to cable the PowerEdge FX2/FX2s systems on sliding rails using a SRB. If you are cabling the system on static rails, refer to Section 3. Follow the instructions contained in the Rack Installation Instructions in the sliding rail kit to install the server into the rack. Once installed, use these instructions to install the cables. All illustrations in this document were created using a PowerEdge FX2 system. NOTE: PowerEdge FX2/FX2s systems are not compatible with any other Dell rails or SRBs including previous generation rails and SRBs. 1.1. Installing the SRB to the rails Attach the SRB to the back of the rails as described in the Rack Installation Instructions provided in the sliding rail kit. The SRB has two depth positions: Position 1 for deep racks and Position 2 for shallow racks. It is easier to attach cables to the back of the system with the SRB in position 1 as shown in Fig. 1. The SRB can be moved to position 2, if required, after cables have been attached to the system. 4

Adjustable depth SRB 1.2. Connecting the cables to the system Connect all applicable cables to the rear of the system and verify that all connections are secure. Place cables across the top of the SRB. See Figure 2. System with cables installed 5

1.3. Routing the power cables through the strain reliefs After you have installed the SRB and cables, route the power cables through the strain reliefs located on the power supply handles as shown in Figure 3. Note: only one power cable is shown. Repeat the cable routing for the lower power cable. Routing power cables through the strain reliefs 1.4. Securing the cables to the SRB The SRB has two depth positions: Position 1 for deep racks (1070mm and above) and Position 2 for shallow racks (1000mm). Before securing the cables to the SRB, verify that the rear door can close. If necessary, adjust the SRB to Position 2. Secure the cables to the SRB with the hook-and-loop straps included with the sliding rail kit. Thread the straps through the holes on the SRB and around the cable bundles. A suggested method of routing the straps is shown in Figure 4. 6

Suggested hook and loop strap routing on SRB A completed assembly is shown in Figure 5. Note that cables exiting multiple components can be combined into one bundle when securing to the SRB. System with cables secured to SRB NOTE: The SRB must be removed from the rails to enable replacement of any of the rear components of the system (power supply, PCIe, or Fab A modules) 7

Section 2: Creating cable service loops in the rack NOTE: Cable service loops must be created if access to the hot plug fans is required while the system is in the rack. If hot plug access to the fans is not required, the system can be installed on static rails, or installed on sliding rails and cabled without the SRB. See Section 3 for details. 1. After cables have been secured to the SRB, create a service loop with the cable bundle(s) behind the system with enough slack to allow the system to fully translate out to the service position. See Figure 6. Multiple service loops can be created. For example: one service loop for power cables and one (or more) for data. 2. Cycle the system out of the rack to verify that enough slack is in the service loop. It is strongly recommended that one person, at the front of the rack, pull the system out of the rack with a second person, behind the rack, feeding the cables forward in order to avoid cables binding. System with cables secured to SRB in rack 8

If multiple FX2/FX2s systems are being installed in a rack, the cable service loops will stack on top of one another and may prevent the rack rear door from closing. To remedy this, the following techniques may be applied: Install systems with sufficient rack U space between them. Vary the locations that cable bundles are secured to the crossbar on adjacent systems. Leave at least 2U of empty space between systems and tuck the cable bundles in the empty space. Section 3: Cabling a PowerEdge FX2/FX2s system on static rails NOTE: If the system is installed on static rails, the system must be powered down and all cables disconnected before it can be extended out of the rack. NOTE: The SRB is compatible only with the sliding rails, not the static rails. 1. Follow the instructions contained in the Rack Installation Instructions found in the static rail kit to install the server into a four-post rack. 2. Connect all applicable cables to the rear of the system and verify that all connections are secure. 3. While minimizing stress on the cable connectors, create cable bundles and secure them to the frame of the rack as shown in Figure 8. Cabling a system installed in static rails 9

Section 4: Cabling Sleds with Front I/O. NOTE: Some sleds offered with FX2/FX2s have data cables that connect to the front of the sled. For most racks, the rack front door will need to be removed when front I/O cables are installed. For Dell branded racks AR3100X717 and AR3104X717, the front mounting flanges can be adjusted rearward to allow the front door to remain installed. However the following trade-offs must be considered: Air recirculation internal to the rack is enabled if the front mounting flanges are moved rearward by any amount. APC recirculation prevention kit (AR7708) is recommended. Both rear PDU banks will be fully blocked. Recommended cable routing for front I/O cables: route cables to the side of the rack using hook and loop fasteners, and then vertically to the switch. 10