UNDERGROUND CONSTRUCTION MANUAL ack to MAIN INDEX Go to SECTION INDEX
CONSTRUCTION DESCRIPTION DWG CONSTRUCTION DESCRIPTION DWG Construction code guide - Underground service from overhead system 53 SERVICE U/G ROM O/H CONSTRUCTION SPTPIL PX Underground from overhead system 6mm 4 core Cu cable - material Underground from overhead system 6mm 4 core Cu cable 507/ 507/ SPTUMS Underground unmetered supply from overhead system - material Underground unmetered supply from overhead system Underground unmetered supply from overhead system Underground unmetered supply from overhead system Unmetered supply from pillar - material Unmetered supply from pillar 5303/ 5303/ 5303/3 5303/4 537/ 537/ 5.03.05 C D 3.08.4 9.04.7 3..00 T.org INDEX ILE: 5 56 5098 D
UNDERGROUND ROM OVERHEAD - CONSTRUCTION CODE Code shown within dashed box appears on relevant construction detail drawings in this manual. A SPT PIL/6CU/P/AC SERVICE SUITS SERVICE CALE MAINS CONDUCTOR SPT = Service pole termination 6CU = 6mm Cu 4 core 6CUI = 6mm Cu 4 core insect protected AC = LVAC 95mm Al = Aluminium conductors Cu = Copper conductors DESTINATION CALE GUARD PIL = LV Pillar UMS = Unmetered Supply CONSTRUCTION DOES NOT INCLUDE P = Polymeric Guard M = Metal Guard Omit for UMS Services Conduit or horizontal bends, if required (but includes vertical bends at pole & pillar) Polymeric cable protection cover Caution tape orange Cable Additional cable support saddles for poles greater than 9.5m in length EXAMPLE:- SPTPIL/6CU/P/AC = Service pole termination, LV pillar, suits 6mm Cu 4 core cable, Polymeric cable guard, LVAC 95mm mains conductor. 3..04 C.08.4 //03 CONSTRUCTION CODE GUIDE UNDERGROUND ROM OVERHEAD SYSTEM ILE: 5 56 53 53 C
MATERIAL - POLE TERMINATION ASSY 55-4 5-530- 530-6 530-7 53-53- 53-6 Clamp cable to wood pole DESCRIPTION Termination outdoor 6mm LV Connector I.P.C. 5/95mm main to 6/35mm tap Connector tap-off bare aluminium mains Connector tap-off bare copper mains Saddle (0mm) to wood pole Saddle (5mm) to wood pole (insect protected cable) racket cable support to x-arm Premises R.P. Street Alignment Underground Service OOTPATH Overhead Mains Direction of traffic flow QTY 53- Guard polymeric (small) to wood pole 53-6 Guard metal to wood pole 558-0 Conduit bend L.D. 80 dia. 450R 90 TYPICAL LOCATION: Cable shall cross footpath at right angles to R.P. Street Alignment. Locate pillar centrally about Real Property oundary Real Property oundary AR 4 8 6 ASSOCIATED DRAWINGS DRAWING NOTES:.. 3. 4. 5. 6. 7. 8. 9. 0. 504 56 TITLE LV Construction - Cross road pillar Trenching - N Region 563 Trenching - NQ Region 564 Trenching - MK Region 565 Trenching - CA Region 566 Trenching - W Region 567 Trenching - SW Region 54/3 Construction Practices - Conduit ducting and protection 587 Trenching - Service conduit bend location at pillar Customers mains and installation including conduit bend into pillar are the responsibility of the customer and shall be installed by the customers electrical service provider in accordance with AS 3000 - SAA wiring rules. Conduit bend at pillar location, including a minimum of.0m of conduit into the customer s property, shall be installed prior to pillar installation. Location and height of the meter box shall be in accordance with Ergon Energy requirements. The service provider shall ensure water does not flow from the pillar into the customers premises. Seal outlet of conduit at the customers premises and provide a drain to outside of wall if necessary. Not to be used on S.W.E.R. installations. Locate cable on opposite side of pole to oncoming traffic where possible. Do Not Obstruct climbing access. Polymeric cable guard is not to be used in areas: subject to grass fire where metal bladed brush cutter may be used where there is a high likelihood of impact. Refer Earthing Section of the Overhead Construction Manual for minimum separation requirements between metal cable guard and communication assets. Where polymeric cable guard is used, an M.E.N. earth is to be installed at the pole unless existing on an adjacent pole. 3..04 C 4..05 D 3.3.09 0//0 D. M K. c C.Lindsay UNDERGROUND ROM OVERHEAD SYSTEM 6mm 4 CORE Cu CALE - MATERIAL 507 ILE: 5 56 507 D
LVAC Mains Refer Note 9. Assy 5-53- or at 750 crs typical Metal guard shall be earthed. Ref. Overhead Construction Manual EARTHING for pole & cable guard earthing details. 53- or 6 Assy 530-530-6 or 7 LV Mains 50 Assy 5-50 Assy 53-6 53- or 53- or at 750 crs typical 55-4 (insect protected cable) 6mm 4C Cu Refer 53- or XLPE cable Note 9. 55-4 (insect protected cable) TERMINATION TO OPEN WIRE 80 dia L.D. rigid orange UPVC conduit, Refer regional polymeric cable protection cover and trenching detail caution tape orange installed to Regional R.P. Street Trenching detail. 400 Alignment Cross road Min pillar Kerb 00 Min Caution tape orange Polymeric Cable Protection Cover Customer s mains and conduit to be provided by the customer. Refer notes to 4. 80 dia, 90 450 rad. bend at pole, pillar and change of direction. Construction Type TERMINATION TO LVAC Cross road pillar - PX Pole termination & cable guard - SPTPIL 3..04 C 4..05 D 3.3.09 7//0 D. M K. c C.Lindsay UNDERGROUND ROM OVERHEAD SYSTEM 6mm 507 ILE: 5 56 507 4 CORE Cu CALE / DISC D
MATERIAL - POLE TERMINATION NOTES: ASSY 507-3 530- DESCRIPTION Cartridge fuse link 3A HRC Connector I.P.C. 5/95mm main to 6/35mm tap QTY. Customers mains and installation including conduit and mains connection box are the responsibility of the customer and shall be installed by an approved contractor or Ergon Energy in accordance with AS/NZS 3000 - wiring rules.. Customer is responsible for seeking permission from road authority and various 530-6 Connector tap-off bare aluminium mains service authorities to install or cross services in the footpath allocations. 530-7 53-53-6 558-3 Connector tap-off bare copper mains Saddle (0mm) to wood pole racket cable support to x-arm Terminator conduit PVC flexible 0mm AR AR 3. Consumers terminal box shall be located on the side of the pole which is least hazardous to maintenance personnel (normally facing building line). 4. Customer asset shall be installed minimum 3m from pole. 5. An MEN earth is to be installed at the pole unless existing on an adjacent pole. 6. Customer is responsible for seeking permission from road authority 558-4 Conduit PVC flexible 0mm AR to install assets in the road reserve. 597-597- racket (service fuse) to wood pole use holder 00A (service) to bracket 7. Excessive excavation at the pole base may disturb pole foundation. Avoid excavating in areas shown. 604-5 AR Cable insulated 6mm C Cu KER Direction of traffic flow Avoid excavating in areas shown hatched (refer note 7) 45 o Customer s mains alignment Consumer terminal box. as per note. Location as per note 3. Customer s asset. Location as per note 6. 45 o Direction of O/H mains PLAN - ROUTE O SERVICE PLAN 6.5.6 3.08.4 UNDERGROUND UNMETERED SUPPLY ROM OVERHEAD SYSTEM - MATERIAL ILE: 5 56 5303 5303
Limit of Ergon Energy responsibility Consumers mains connection box & galv. mounting bracket Refer note 558-3 & 558-4 Consumers terminal box (optional) refer sheet 4 for details 3500 max. Consumers rigid PVC conduit 700 min. 400 min. 500 max. Consumers protective guard Non-conductive attached at min. points. Consumer s switchboard.s.l 00 min. in accordance with QECMM & AS/NZS 3000 Unmetered Equipment Consumers marker tape Consumers protective cable cover (to extend beyond flexi) 600 min. lexible conduit to extend 000 min. from pole Separate (MEN) earth electrode to AS/NZS 3000 5.5.6 3/08/4 UNDERGROUND UNMETERED SUPPLY ROM OVERHEAD SYSTEM ILE: 5 56 5303 5303
Assy 530- Locate service fuse as per Overhead Construction Manual dwg Assy 530-6 or 7 Assy 597- Locate service fuse as per Overhead Construction Manual dwg 045. Assy 558-4 Assy 597- Assy 53- @ 500CRS Assy 597- Assy 53- @ 500CRS Assy 507-3 Assy 558-4 Wood Pole Assy 597- Assy 507-3 Assy 604-5 Assy 530- Wood Pole OPEN WIRE LV AC Construction Type SPTUMS 5.5.6 3/08/4 UNDERGROUND UNMETERED SUPPLY ROM OVERHEAD SYSTEM ILE: 5 56 5303 3 5303 3
use Main switch Consumer to supply & install weather proof box, Clipsal adaptable box type 65/4 or equivalent Neutral link ox predrilled to accept flexible conduit terminator 0mm Assy 558-3 Assy 558-4 To customer installation To overhead mains CONSUMERS TERMINAL OX - OPTIONAL 6.5.6 3/08/4 UNDERGROUND UNMETERED SUPPLY ROM OVERHEAD SYSTEM ILE: 5 56 5303 4 5303 4
MATERIAL - PILLAR TERMINATION ASSY DESCRIPTION 507-3 Cartridge fuse link 3A HRC QTY NOTES:. Customers mains and installation including conduit and mains connection box are the responsibility of the customer and shall be installed by an approved contractor or Ergon Energy in accordance with AS/NZS 3000 - wiring rules.. Customer is responsible for seeking permission from road authority and various service authorities to install or cross services in the footpath allocations. 3. Customer is responsible for seeking permission from road authority to install assets in the road reserve. 4. Customer s switchboard shall be located on the opposite side to oncoming traffic. (Least harzardous to maintenance personnel). 5. Customer mains and conduits shall be a minimum: - 300 mm from Ergon Energy high voltage cable or conduit. - 00 mm from Ergon Energy low voltage cable or conduit. Direction of traffic flow Pillar KER Customer Switchboard Customer s mains alignment as per note. Customer s asset. Location as per note 3. PLAN - ROUTE O SERVICE 07.04.7 UNMETERED SUPPLY ROM PILLAR MATERIAL ILE: 5 56 537 537
LV Pillar Connect neutral Assy 507-3 to top tunnel Consumer s switchboard in accordance with QECMM & AS/NZS 3000 Unmetered Equipment Caution tape Service conduit bend Separate (MEN) earth electrode to AS/NZS 3000 07.04.7 UNMETERED SUPPLY ROM PILLAR ILE: 5 56 537 537