VTRAK E610f, J610s Quick Start Guide

Similar documents
VTRAK E-Class/J-Class Quick Start Guide

VTRAK M610i, M310i, M210i Quick Start Guide

VTRAK S3000 Quick Start Guide

VTRAK M610p Quick Start Guide

VTRAK M-Class QUICK START GUIDE. M500f, M500i, M300f, M300i, M200f, M200i. Version Promise Technology, Inc. All Rights Reserved.

VTrak A-Class Series. Product Manual. Version PROMISE Technology, Inc. All Rights Reserved.

Vess A3340 NVR Storage Appliance Quick Start Guide Version 1.0

Vess A3340s Vess A3340d

24-Port Gigabit with 4 Optional 10G Slots. Layer 3 Managed Stackable Switch XGS Quick Installation Guide

VTRAK 15110/12110/8110

24-Port Gigabit with 4 Optional 10G Slots. Layer 3 Managed Stackable Switch XGS / XGS Quick Installation Guide

VTRAK QUICK START GUIDE. Version Promise Technology, Inc. All Rights Reserved.

Installing and Managing the Switch

24-Port Gigabit + 4-Port 10G SFP+ Slot. Layer 3 Stackable Managed Switch XGS Quick Installation Guide

FASTTRAK SX4100 QUICK START GUIDE. Version Promise Technology, Inc. All Rights Reserved.

Management Security Switch SGSD-1022 / SGSD-1022P SGSW-2840 / SGSW-2840P. Quick Installation Guide

HAW-SIBU. Rack Installation Guide. Version 1.0.1

Before you begin. Unpack & Prepare. Install Hardware. Connect Drive Trays. Apply Power. Connect Data Hosts. Choose Management Method

Reinstalling the Operating System on the Dell PowerVault 745N

48-Port 10/100/1000Base-T with 4 Shared SFP. Managed Gigabit Switch WGSW Quick Installation Guide

VTRAK J300s QUICK START GUIDE

VTrak J5000 Series. Product Manual. 12G SAS JBOD enclosure. Version PROMISE Technology, Inc. All Rights Reserved.

Vess A-Series NVR Storage Appliance Vess A3340s Vess A3340d Product Manual Version 1.0

Juniper Secure Analytics Quick Start Guide

24-Port 10/100/1000Mbps with. 4 Shared SFP Managed Gigabit Switch

28-Port 10/100/1000Mbps with. 4 Shared SFP Managed Gigabit Switch WGSW / WGSW-28040P. Quick Installation Guide

8-Port 10/100Mbps + 2G TP/SFP Combo. Managed Industrial Switch ISW-1022M / ISW-1022MT / ISW-1022MP / ISW-1022MPT / ISW-1033MT

16/24/48-Port 10/100/1000T + 2/4-Port 100/1000X SFP Managed Switch GS T2S/GS T2S/GS T4S. Quick Installation Guide

L2+ 24-Port Gigabit Managed Switch with. Hardware Layer3 IPv4/IPv6 Static Routing GS S8C GS S8CR. Quick Installation Guide

IBM TotalStorage DS300 and DS400 Quick Installation Guide

16/24-Port 10/100/1000T 802.3at PoE + 2-Port 100/1000X SFP Managed Switch GS P2S GS P2S. Quick Installation Guide

48-Port 10/100Mbps + 4 Gigabit TP / 2 SFP. Managed Switch WGSW Quick Installation Guide

VTRAK QUICK START GUIDE. Version 1.4

Dell Storage Center. Getting Started Guide. SCv2000 and SCv2020 Storage System. Regulatory Model: E09J, E10J Regulatory Type: E09J001, E10J001

Quick Installation Guide D-Link ShareCenter Pro 1100

Hardware Installation Guide Installation (x3350)

apple Service Source Xserve RAID Xserve RAID and Xserve RAID (SFP) Updated: 25 May Apple Computer, Inc. All rights reserved.

N3220 Installation and Setup Instructions

Sun StorageTek SL24 Tape Autoloader Getting started

ULTRATRAK SERIES RM4000, SX4000, RM8000, SX8000, RM15000 USER MANUAL. Version 2.2

1 Getting Started Installing & Configuring

Installing the Cisco Unified Videoconferencing 3545 MCU

Before you begin. Unpack & Prepare. Install Hardware. Connect Drive Shelves. Apply Power. Connect Data Hosts. Connect Ethernet Cables

apple Service Source Xserve RAID 17 March Apple Computer, Inc. All rights reserved.

Unified Office Gateway UMG Quick Installation Guide. Version: 1.0

24-Port 100/1000X SFP + 4-Port 10G SFP+ Managed. Metro Ethernet Switch MGSW-28240F. Quick Installation Guide

L2+ Managed Metro Ethernet Switch MGSW / MGSD Series

InfraStruXure Central Standard/Enterprise Installation/Start-Up Service Procedure

L2+ Managed Gigabit Switch WGSW series

64 Bays SAS to SAS/SATA JBOD Subsystem. User Manual. Revision 1.0

C5100 Computer Connections & Software Install Guide

L2+ Managed Gigabit/10 Gigabit Ethernet Switch GS-5220 Series

NetQoS Multi-Port Collector Setup Guide

L2/L4 Managed Gigabit Ethernet Switch GS-4210 Ultra PoE Series

Setting Up Your Cisco Unified Videoconferencing 3500 Gateway

Before you begin. Unpack & Prepare. Install Hardware. Connect Hardware. Apply Power. Choose Management Method. Install & Use SANtricity Software

L2+ Managed PoE Switch GS-5220 PoE Series

Installing SMS without a network

User Manual. Unpacking and Setup

Industrial 24-Port 10/100/1000Mbps Managed Gigabit. Switch (-40~75 degrees C) with 4 Shared SFP Ports IGSW-24040T. Quick Installation Guide

N3240 Installation and Setup Instructions

Sun StorageTek SL48 Tape Library Getting started

Unified Office Gateway UMG-1000 / UMG-1000W. Quick Installation Guide

Quick Install Guide. ibypass TM I2BP-4x Rev A 11/14

N3150 Installation and Setup Instructions

Quick Reference Manual

Power Xpert Meter 2000 Gateway Card Kit

L2+ 16-/24-Port Gigabit PoE. + 2-/4-Port 10G SFP+ Managed Switch. with LCD Touch Screen GS P2XV(R)/GS UP2XV(R)

Print Server. User s Manual. Rev. 01 (April, 2004) Made In Taiwan

Industrial 8-Port 10/100/1000T 802.3af/at PoE + 2-Port 100/1000X SFP Managed Switch with Wide Operating Temperature

Power Xpert Meter 2000 Gateway Card Kit

Fiery Installation Instructions for the WorkCentre 7300 Series

Power Xpert Meter 2000 Gateway Card Kit

Lab Router Configuration Using Setup Instructor Version 2500

L2+ Managed LCD Switch GS T2XV(R) / GS T4XV(R) Quick Installation Guide

VTRAK PRODUCT MANUAL J610S, J310S. Version 1.0

IFS NS P-4S-2X Quick Start Guide

Clustered Data ONTAP 8.2

Quick Installation Guide

Initial Configuration for the Switch

Industrial L2/L4 Managed Gigabit Switch. With 4-Port 802.3at PoE+ IGS P4T/IGS P4T2S. Quick Installation Guide

Configuring the Switch with the CLI-Based Setup Program

Deploy the ExtraHop Discover 3100, 6100, 8100, or 9100 Appliances

Getting Started. Overview of the Splash G3535

[ Quick Start Guide ]

Setting Up Your Cisco Unified Videoconferencing 3515 MCU

Configuring the Switch with the CLI-Based Setup Program

Industrial 4G LTE Cellular Gateway ICG-2420-LTE

Configuring the Switch with the CLI Setup Program

Multi-port Coax + 2-port 10/100/1000T + 2-port. 100/1000X SFP Long Reach PoE over Coaxial. Managed Switch LRP-822CS / LRP-1622CS

Clustered Data ONTAP 8.2

Dell PowerVault MD3460 Series Storage Arrays Deployment Guide

Deploy the ExtraHop Trace 6150 Appliance

SAS JBOD Installation Reference Guide Revision 1.0

Siemens Spares. Setting up security in STEP 7. Professional SIMATIC NET. Industrial Ethernet Security Setting up security in STEP 7 Professional

CA NetQoS Multi-Port Collector Setup Guide

XenData SXL- 4200N Archive System: Getting Started & Library Operation Basics. Document last updated: November 30, 2017.

SOFTWARE INSTALLATION GUIDE. EZSwitchSetup Software Installation Guide for Brocade G620

Deploy the ExtraHop Trace 6150 Appliance

Connect the first camera to the CH1 input. Follow the same steps to connect the other 3 cameras to the CH2, CH3, CH4 camera inputs

Transcription:

VTRAK E60f, J60s Quick Start Guide Version 0.8 008 Promise Technology, Inc. All Rights Reserved.

VTrak Quick Start Guide VTrak Setup Task List Task : Unpacking the VTrak (below) Task : Mounting VTrak in a Rack (page 3) Task 3: Making Management and Data Connections (page 5) Task 4: Powering On the System (page 8) Task 5: Initial Setup (page 9) Task 6: Configuring the VTrak (page ) For complete information about your VTrak E60f and J60s subsystems, see their respective VTrak Product (user) Manuals on the Software CDs. Task : Unpacking the VTrak The VTrak box contains the following items: VTrak Unit Quick Start Guide Left and right center-mount brackets Left and right mounting rails RJ-to-DB9 serial data cable.5m (4.9 ft) Power cords () CD with SNMP files, Product (user) Manual and Quick Start Guide Warning The electronic components within the VTrak disk array are sensitive to damage from Electro-Static Discharge (ESD). Observe appropriate precautions at all times when handling the VTrak or its subassemblies. Caution At least two persons are required to safely lift the VTrak subsystem from the box and place it into a rack. Important Use the following categories of network cables with VTrak: Cat 6, preferred Cat 5E, minimum

Task : Mounting VTrak in a Rack Task : Mounting VTrak in a Rack The E60f/s subsystem installs to the rack using the supplied mounting rails. You can also use your existing rails. Figure. VTrak mounted in a rack with the supplied rails Drive bay ( of 6) Handles mount outside the rack post Mounting rails (included) mount outside the rack post To install the VTrak subsystem into a rack with the supplied mounting rails:. Check the fit of the mounting rails in your rack system.. Adjust the length of the mounting rails as needed. 3. Attach the mounting rail assemblies to the outside of the rack posts, using the attaching screws from your rack system. See Figure. Be sure the support is on the bottom facing inward. 3 Cautions At least two persons are required to safely lift, place, and attach the VTrak subsystem into a rack. Do not lift or move the VTrak subsystem by the handles, power supplies or the controller units. Hold the subsystem itself. Do not install the VTrak subsystem into a rack without rails to support the subsystem. Only a qualified electrician who is familiar with the installation procedure should mount and install the VTrak subsystem. Be sure all switches are OFF before installing the VTrak subsystem or exchanging components.

VTrak Quick Start Guide 4. Square the rail assemblies in the rack. 5. Tighten the adjustment screws and the attaching screws. 6. Place the VTrak subsystem onto the rails. 7. Secure the VTrak subsystem to the rack through each handle, using the attaching screws from your rack system. Figure. Rack mount assembly diagram Rack front post Rack back post Rail attaching screw (not included) Rail attaching screw (not included) Front rail Rear rail Flange Support Inside of post Rail adjustment screw Rail adjustment screw Inside of post 8. Remove the drive carriers from their packing and install them into the drive bays of the VTrak enclosure. See Figure. 9. Plug in the power supply cords. 4

4 500 8 N 4 500 8 N Task 3: Making Management and Data Connections Task 3: Making Management and Data Connections VTrak models have two RAID controllers. Each controller has an Ethernet (RJ45) Management Port connector that enables you to monitor the VTrak over your network using the WebPAM PROe Software. VTrak supports HTTP, HTTPS, and Telnet protocols. The VTrak RAID controllers have two 4-Gb Fibre Channel (FC) connections for the data ports. See Figure 3. You can configure your VTrak for: Storage Area Network (SAN) Direct Attached Storage (DAS) JBOD Expansion using a SAS data connection Figure 3. VTrak RAID controller connectors Fibre Channel data port Fibre Channel data port RJ Serial Connector FC FC 4 4 Mgmt UPS 500 8 N SAS expansion port (to JBOD) Management port FC 4 FC Mgmt UPS FC 4 FC Mgmt UPS VTrak 5

FC 4 FC 4 Mgmt 500 8 N UPS FC 4 FC 4 Mgmt 500 8 N UPS VTrak Quick Start Guide Configuring a Storage Area Network A storage area network (SAN) requires: A Fibre Channel switch A Fibre Channel HBA card in the Mac Pro A network switch To establish the data path: Connect one of the Fibre Channel data ports on the VTrak controller to your Fibre Channel switch. To establish the management path:. Connect the Management port on the VTrak controller to your network switch. Figure 4.. Connect each Mac Pro s NIC to your network switch. Figure 4. SAN data and management connections Network Switch Management cables FC Switch Mac Pro Fibre Channel data cables VTrak 6

FC 4 FC 4 Mgmt 500 8 N UPS FC 4 FC 4 Mgmt 500 8 N UPS Task 3: Making Management and Data Connections Configuring Direct Attached Storage Direct attached storage (DAS) requires: Two Fibre Channel HBA cards in the Host PC or Server A network switch To establish the data path: Connect one of the Fibre Channel data ports on the VTrak controller to your Fibre Channel switch. To establish the management path:. Connect the Management port on the VTrak controller to your network switch. See Figure 5.. Connect the Mac Pro s NIC to your network switch. Figure 5. DAS data and management connections Network Switch Management cables Fibre Channel data cables Mac Pro VTrak 7

FC 4 FC 4 Mgmt 500 8 N UPS 500 8 N FC 4 FC 4 Mgmt 500 8 N UPS 500 8 N VTrak Quick Start Guide Task 4: Powering On the System There is a specific sequence to follow when you power on your VTrak and Mac Pro system. Figure 6. VTrak and Mac Pro power on sequence Power on your system components in the following sequence:. VTrak J60s subsystems. VTrak E60f subsystem 3. Mac Pro 8

Task 5: Initial Setup Task 5: Initial Setup VTrak Default Network Settings Component Default Setting Virtual Management Port IP address 0.0.0. RAID Controller IP address 0.0.0. RAID Controller IP address 0.0.0.3 Subnet Mask 55.0.0.0 You must change these network settings so the VTrak works on your network. The setting change requires a serial connection from your computer to the VTrak. Your computer activates the Command Line Interface (CLI) on the VTrak to make the required changes. Setting up a Serial Connection There are two methods to make the initial network settings: Xserve Server Requires ZTerm software Mac Pro Requires ZTerm software and USB-to-DB9 adapter Xserve Server Before you begin:. Go to http://homepage.mac.com/dalverson/zterm/ and download the ZTerm terminal emulation software. Install ZTerm onto your Xserve server.. Find the RJ-to-DB9 serial cable that ships with the VTrak. Attach the RJ end of the serial cable to the RJ serial connector on one of the VTrak controller modules. See Figure 3. Attach the DB9 end of the serial cable to the serial connector on the Xserve. Figure 7. Xserve Server serial connector DB-9 serial connector Xserve Server 9

VTrak Quick Start Guide To set up a serial connection with VTrak:. On your Xserve, double-click the ZTerm desktop icon (right). The Local window opens on the desktop.. From the ZTerm dropdown menus, choose Settings > Connection. Set the Data Rate to 500 and click the OK button. 3. Press Enter once to launch the CLI. The CLI opens in the Local window. The prompt should look like this: administrator@cli> If you see a Login prompt, type administrator and press Enter. Then at the Password prompt, type password and press Enter. 4. Go to Making Settings on VTrak on page. Mac Pro Before you begin:. Go to http://homepage.mac.com/dalverson/zterm/ and download the ZTerm terminal emulation software. Install ZTerm onto your Mac Pro.. Obtain a USB-to-DB9 adapter. Install the software for the USB-to-DB9 adapter onto your Mac Pro. Figure 8. An example of a USB-to-DB9 adapter DB9 end USB end 3. Find the RJ-to-DB9 serial cable ships with the VTrak. Attach the RJ end of the serial cable to the RJ serial connector on one of the VTrak controller modules. See Figure 3. 0

Task 5: Initial Setup Attach the DB9 end of the serial cable to the DB9 connector on the USB-to- DB9 adapter. See Figure 8. Attach the USB end of the USB-to-DB9 adapter to a USB port on the Mac Pro. To set up a serial connection with VTrak:. On your Mac Pro, double-click the ZTerm desktop icon (right). The Local window opens on the desktop.. From the ZTerm dropdown menus, choose Settings > Connection. Set the Data Rate to 500 and click the OK button. 3. Press Enter once to launch the CLI. The CLI opens in the Local window. The prompt should look like this: administrator@cli> If you see a Login prompt, type administrator and press Enter. Then at the Password prompt, type password and press Enter. 4. Go to Making Settings on VTrak, below. Making Settings on VTrak. Type the following string to set the system date and time, then press Enter. administrator@cli> date -a mod -d 008/07/5 -t 4:50:05 In the above example, the date and time are included as examples only. Use yyyyy/mm/dd for the date and a 4-hour clock for the time.. Type the following string to set the Virtual Management Port IP address and other settings, then press Enter. administrator@cli> net -a mod -t mgmt -s "dhcp=enable" 3. To verify the settings, type net and press Enter. administrator@cli> net =========================================== CId Port Type IP Mask Gateway Link =========================================== Mgmt 9.68.0.85 55.55.55.0 9.68.0. Up Note that the IP address described above belongs to the VTrak subsystem, not to one of the RAID controllers. The IP address and subnet mask shown here are examples only.

VTrak Quick Start Guide Important Remember this IP address. You will use this IP address to log into WebPAM PROe, see page 3. 4. Type the following string to set the RAID Controller IP addresses and other settings, then press Enter. You must set each Controller separately. administrator@cli> net -a mod -t mgmt -m -c -s "dhcp=enable" administrator@cli> net -a mod -t mgmt -m -c -s "dhcp=enable" 5. To verify the maintenance mode settings, type net -m and press Enter. administrator@cli> net -m CtrlId: Port: Type: Management Ethernet IPType: IPv4 IP: 9.68.0.0 IPMask: 55.55.55.0 MAC: 00:0:55:AE:0:AE DNS: 0.0.0.0 Gateway: 9.68.0. DHCP: Disabled The IP address and subnet mask shown here are examples only. To exit ZTerm, press Command Q. Task 6: Configuring the VTrak You can configure your VTrak system automatically by means of a script available on the Apple website. Preparing Your Script To prepare your configuration script:. Double-click this link http://support.apple.com/kb/ht00. The scripts are listed under Configure via script.. Carefully read the descriptions and choose the script that matches your application. Click the script name to choose it. 3. Highlight the entire script from #Begin Copy through #End Copy, then press Command-C to copy it. 4. Open TextEdit and press Command-V to paste the script into a new file. 5. From the dropdown menu, choose Format > Make Plain Text. Be sure you convert the configuration script to a plain text file.

Task 6: Configuring the VTrak 6. Choose File > Save As, name the script file, and click the Save button. Your configuration script is ready to import into WebPAM PROe. Logging into WebPAM PROe To log into WebPAM PROe:. Open Safari.. In the address field, type in the IP address of the VTrak Management port. See step 3 under Making Settings on VTrak on page. WebPAM PROe uses an HTTP connection................http:// Enter the VTrak s Management Port IP address.... 9.68.0.85 Together, your entry looks like this example: http://9.68.0.85 7. When the log-in screen (Figure 9) appears: Type administrator in the User Name field. Type password in the Password field. Click the Login button. The User Name and Password are case sensitive. 8. Click the Login button. Figure 9. WebPAM PROe log-in screen 3

VTrak Quick Start Guide Checking Your Physical Drives The configuration script only works when all of your physical drives are unconfigured. If you are setting up your VTrak system for the first time, all of your drives will be unconfigured. To check your physical drives:. In Tree View, click the VTrak icon, Enclosures icon, Enclosure icon, and Physical Drives icon.. Under the Information tab, check Operational Status and Configuration. If Operational Status is OK and Configuration is Unconfigured, your physical drives are ready to run the configuration script. Figure 0.Physical drive information If you have created any disk arrays, logical drives, or spare drives, you must delete them before you run the script. Be sure you back-up your important data first, then delete the disk arrays and logical drives. See the VTrak Product (User) Manual on the Software CD for instructions. 4

Task 6: Configuring the VTrak Importing and Running Your Script To import and run your configuration script:. In Tree View, click the Administrative Tools icon, then click the Import link. Figure. The Import link under Administrative Tools. In the Import File dialog box, choose Configuration Script from the Type dropdown menu. Figure.Importing a Configuration Script 3. In the Import File dialog box, click the Choose File button and navigate to the folder where you saved the configuration file. Click the configuration file and click the Choose button. 5

VTrak Quick Start Guide Figure 3.Choosing the configuration file 4. In the Import File dialog box, click the Submit button. Figure 4.Clicking the Submit button 5. In the Import File dialog box, click the Next button. Figure 5.Clicking the Next button 6. In the Warning box, click the OK button. 6

Task 6: Configuring the VTrak Figure 6.Clicking the OK button The configuration script takes about 30 to 45 seconds to upload and run. When the script is done, new disk arrays and logical drives appear in Tree View. Figure 7.An example of Tree View after running a configuration script The exact appearance of Tree View depends upon how you set up your system and which script you chose. Your VTrak system is now configured and ready to use. 7

VTrak Quick Start Guide 8