Variance Project Black Flag Attachments:

Similar documents
ARLINGTON COUNTY, VIRGINIA

CITY OF FORT COLLINS TYPE 1 ADMINISTRATIVE HEARING FINDINGS AND DECISION. Ryan Sagar 1196 Grant Street, Suite 313 Denver, CO 80203

Request Conditional Use Permit (Colleges & Universities, public or private) Staff Planner Ashby Moss

ORDINANCE NO Section 1. Section of the Rochester Code of Ordinances is hereby amended and reenacted so as to read as follows:

ORDINANCE NO

EXTRA TERRITORIAL ZONING COMMISSION CASE ANALYSIS

ARTS DISTRICT 2018 E. 8 TH STREET, LOS ANGELES, CA

August 10, Sacramento County Planning and Community Development 827-7th Street Sacramento, CA Tricia Stevens, Principal Planner

User Guide to Mesquite s Citizen Access Portal (CAP) Planning and Zoning Division New Application

Q2: Who is responsible for the maintenance of these central mailboxes? A2: The Home Owner s Association.

4800 HARRY HINES BLVD Dallas, TX REDEVELOPMENT OPPORTUNITY in the na on s busiest medical district

ROCKSIDE WOODS BLVD. INDEPENDENCE, OHIO 44131

Planning Department Civic Center North 470 South Allison Parkway Lakewood, Colorado TTY/TDD Lakewood.

BUILDING STANDARDS INFORMATION BULLETIN 13-07

EXISTING STRUCTURE 2252 THIRD AVENUE

R1 Variation Zones. CODE AMENDMENT Q&A UPDATE October 6, 2016 CPC CA ENV ND. Department of City Planning

Applicant Type (Conditional Use Permit, Variance, Tract Map, etc.): Applicant: Address: Phone(s): Fax:

Facebook West Campus. Planning Commission Meeting February 25, 2013

Revisions to the Right-of-Way Management Ordinance for Wireless Providers Implementing SB1004

DATE: April 8, 2013 REPORT NO. CD TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ]

PUBLIC WORKS ORGANIZATIONAL CHART

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

TRAFFIC CONCURRENCY INFORMATION

Revised 2018 LESLIE KARR MANAGER, CURRENT PLANNING. Attachment. Dear Preliminary Plat Applicant:

Architectural Request Review Instruction Guide

Environmental Impact Questionnaire

ARLINGTON COUNTY, VIRGINIA

DELAWARE COUNTY SECONDARY ROAD DEPARTMENT POLICY AND PROCEDURE MEMORANDUM

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of April 22, 2017

CHAPTER WIRELESS TELECOMMUNICATION FACILITIES

PLANNING COMMISSION JUNE 7, 2018 PUBLIC HEARING

CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES

Unified Development Code. Public Workshop No. 3 November 7, 2017

APPLICATION No. To the ALBERTA ENERGY AND UTILITIES BOARD RE:

Stem Beach Solar 1041 Application

City Avenue District. City Avenue Rezoning Workshop January 25, :30 p.m. Board of Commissioners

6500 Harry Hines Boulevard Dallas, TX 75235

F O R S A L E 2 Acre Outparcel Four Lane Exposure Gateway Corridor to Downtown 0 Kathleen Road, Lakeland, Florida 33801

Buyer is responsible for any follow up required for land use/compatability concerns

City of Ames Street Banner Policy

Heavy Industrial / Corporate Office Campus

Board of Zoning Adjustments Staff Report Monthly Meeting Monday, August 13, 2018

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017

STAFF REPORT. Meeting Date: To: From: La Cienega Station. Subject: Attachments:

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

8505 Baycenter Road Jacksonville, FL

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

ASKING PRICE: $2,850,000 ($55.64 / SF) 635

A G E N D A OLD TOWN DESIGN REVIEW COMMITTEE APRIL 10, 2017

STAFF USE. Date: Name: Address: Name: Mailing Address: Fax #: Phone #: Owner Address: Owner Name: Owner Address: Owner Phone #:

FORM-BASED CODE WHY DOES THE ZONING CODE MATTER?

Los Angeles County One Gateway Plaza 2i3.g Tel Metropolitan Transportation Authority Los Angeles, CA metro.net

Downtown Lakeland Office Space For Lease

EL DORADO COUNTY SURVEYOR FEE SCHEDULE FOR SERVICES

Municipal Service Park 3 December Consolidation of City services to one centralized complex

CITY OF RICHARDSON BUILDING PERMITS CO STATUS PN-RBP4002 PERMITS PRINTED JAN 01, 2013 THRU JAN 15, 2013 REPORT PRINTED: JAN 16, 2013 PAGE 1

Approval of Navy Yard Chiller Joint Development Agreement

CITY OF RICHARDSON BUILDING PERMITS CO STATUS PN-RBP4002 PERMITS PRINTED JUL 16, 2014 THRU JUL 31, 2014 REPORT PRINTED: AUG 05, 2014 PAGE 1

Revised Dear Board of Zoning Appeals Applicant:

Memo to the Planning Commission HEARING DATE: JULY 9, 2015

CITY OF GRA DE PRAIRIE SUBDIVISIO A D DEVELOPME T APPEAL BOARD AGE DA

BEVRLYRLY STAFF REPORT. Meeting Date: August 4, 2015 Item Number: To: From:

PUBLIC HEARING STAFF REPORT

Downtown Boise Multimodal Center

GORE BUILDING. 238 N. Massachusetts Avenue, Lakeland, FL 33801

Accela Citizen Access

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

A TEA preferred vendor

CHARTER TOWNSHIP OF ALLENDALE, OTTAWA COUNTY, MICHIGAN WIRELESS COMMUNICATION FACILITIES APPLICATION

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

TELECOMMUNICATION FACILITIES SITING AND CONSULTATION POLICY

ARLINGTON COUNTY, VIRGINIA

the City of Palm Bay Brevard County Florida held on November

ORDNANCE NO. A municipal setting designation ordinance prohibiting the use of designated groundwater from

PLANNING COMMISSION WORK SESSION

Form-Based Codes: The Basics. Jorge E. Rousselin COA Planning and Development Review Urban Design

NEW BUSINESS 1140 Lake Shore Blvd (L/LSHD)

8505 Baycenter Road Jacksonville, FL

Reston Town Center North Development. Community Update

AGENDA ITEM # 1. CITY COUNCIL COMMUNICATION FORM

Access Field Entrance Other Constructed Yes (Type)

PREMIER DATA CENTER OPPORTUNITY ±64.31 ACRES OF LAND ENGLER BLVD AND HWY 212 Chaska, MN 55318

CITY MANAGER MEMORANDUM. The Honorable Mayor Partington and City Commissioners

July 1, 1999 PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA ENERGY DIVISION

Benbow 397S Substation Upgrade Needs Identification Document

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician.

A Natural Workspace. Tucked away among 35 wooded acres, located in the center of it all.

EASTSIDE CITY OF BELLEVUE/ PRIVATE PRIVATE PRIVATE MULTI-PRIVATE MULTI-PRIVATE

BOARD OF SUPERVISORS PUBLIC HEARING STAFF REPORT. Jennifer Hawkins, Image Brite Inc.

ENMAX Generation Portfolio Inc.

U. S. Postal Service National Delivery Planning Standards A Guide for Builders and Developers

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF SEPTEMBER 25, 2012

COUNCIL REPORT. Item Meeting date: August 13, 2018 Engineering & Public Works

Planning: Administrative Permits Instructions

County of Loudoun. Department of Planning and Zoning MEMORANDUM

4215 Exchange Ave, Vernon

ANRC II. Eligibility requirements Authority Requirements for accreditation Review of application...

M E M O R A N D U M. To: California State Lottery Commission Date: October 16, Item 9(c): Approval to Hire Project Management Consultant

SALE LEASE CALL CENTER

Transcription:

Variance 15-01 Project Black Flag Attachments: 1. Locator 2. VAR 15-01 Staff report 3. Variance Exhibit 4. Applicant s Statement

E Lookout Dr N Plano Rd 1402 E. Lookout Dr. N Greenville Ave Woodglen Dr Woodoak Dr 4 Project Black Flag 1402 E. Lookout Dr. Owens Blvd

CITY PLAN COMMISSION BACKGROUND INFORMATION February3, 2015 Variance 15-01 SUMMARY Owner: Applicant: Project Name: Location: Request: Dallas DCA, LLC Brad Moss, Kimley-Horn & Associates, Inc. Project Black Flag 1402 E. Lookout Drive The property is located at the southeast corner of Plano Road and Lookout Drive. This is a request for approval of a variance to the City of Richardson Subdivision and Development Code, Chapter 21, Article III, Section 21-52(i), Off-street Parking, for a reduction in the parking ratio for a data center. The property owner requests a reduced parking ratio of 1 space for every 5,000 square feet instead of 1 space for every 1,000 square feet of building area designated for a data center use (the City s standard ratio for warehouse use). CPC Action: Recommendation to the City Council The City Plan Commission may recommend approval of the request as presented, recommend approval with conditions or recommend denial. City Council Meeting: February 23, 2015 Notification: Correspondence: This request is not a public hearing and specific notification is not required by State law. As courtesy, adjacent property owners affected by the variance request received written notification. No written correspondence has been received to date. Page 1 of 3 Ds:dev/files/site plan/e. lookout/1402 (project blck flag)/var/1501 and 1502/var 1501 background info

DEVELOPMENT SUMMARY Land Area: Zoning: 14.93-acres (620,287 square feet) I-M(1) Industrial District Ordinance: 228-A Special Conditions: Adajacent Land Use/Zoning: North (across Lookout Drive) East South None Vacant meat processing plant/i-m(1) Industrial District Undeveloped/I-M(1) Industrial District Single Family Residential (Owens Park)/R-1100-M Residential District West (across Plano Road) Office/Medical Rehabilitation Hospital/I-M(1) Industrial District BACKGROUND INFORMATION Staff Background: A data center is a facility used for housing a large amount of electronic equipment, typically computers and communication equipment. Data centers contain a set of routers and switches that transport traffic between the servers and the outside world. The City of Richardson does not have a specific parking ratio for a data center and typically this use is parked as warehouse at a ratio of 1 space for every 1,000 square feet of building area. On December 2, 2014 KDC received approval from the City Plan Commission to construct a 129,150 square foot data center; 119,720 square feet (93%) of data center and 9,430 square feet (7%) of office. By code, 130 parking spaces are required at a ratio of 1 space/1000 square feet of warehouse (equipment and storage) and 1 space/ 300 square feet of office; the approved site plan provides 134 parking spaces. In speaking with staff, KDC chose to move forward to receive approval of the site plan in compliance with the parking regulation so construction could begin while they applied for the variance. KDC Page 2 of 3 Ds:dev/files/site plan/e. lookout/1402 (project blck flag)/var/1501 and 1502/var 1501 background info

understands that should the variance be denied, the parking must be constructed in accordance with the approved site plan. The applicant states typically data centers maintain a very low percentage of occupants, usually within the office area, and a few visitors and contractors. The data center and support space are deemed to be a lights-out facility that utilizes staff from the office area. It is anticipated the Project Black Flag facility will have a maximum of 20 employees for the daytime shift, which is the maximum number of employees. The facility is secured, so visitors must schedule an appointment to gain entrance. Typically there are no more than 5 visitors, including contractors, during the day shift. The requested parking ratio for the project requires 56 parking spaces: Office 9,430 SF/300 = 32 spaces Data Center 119,720 SF/5000 = 24 spaces The proposed parking ratio exceeds 200% of the actual maximum expected occupancy (20 employees and 5 visitors/contractors), and provides an additional 31 spaces. Corgan has been involved with three data center projects, and has fashioned the proposed parking ratio of 1/5000 square feet of building area for a data center, which is consistent with their Digital Realty Trust Marsh Lane Data Center in the City of Carrollton, TX. There has been one (1) previous request to reduce the parking ratio for a data center. In July of 2007, The City granted a parking variance to Digital Realty Trust Data Center Park to allow a parking ratio of 1 space/3000 square feet of data center. Page 3 of 3 Ds:dev/files/site plan/e. lookout/1402 (project blck flag)/var/1501 and 1502/var 1501 background info

Memorandum CORGAN ASSOCIATES, INC. 401 NORTH HOUSTON STREET DALLAS, TX 75202 TEL 214 748 2000 FAX 214 653 8281 www.corgan.com To Susan M. Smith, AICP Date 26 December 2014 Assistant Director of Development Services 411 W. Arapaho Road City of Richardson, TX 75080 Prepared by Lance Lewis Regarding Variances 15-01 (Off-street parking) 15-02 (Screening) Project Black Flag 1402 E. Lookout Drive VAR 15-01 Section 21-52 (Off-street parking). On December 2, 2014, KDC received site plan approval from the City Plan Commission for the development of a 129,150 square foot data center; this includes approximately 9,430 square feet (7%) of office. The City does not have a specific parking ratio for a data center, so this use utilizes the parking ratio of a showroom or warehouse. As required by Code, 130 parking spaces are required at a ratio of 1 parking space for every 1,000 square feet. The project actually provides 134 parking spaces including 4 accessible spaces. In speaking with staff, KDC chose to move forward to receive approval for the site plan in compliance with the parking regulation so construction could begin while they applied for the proper variance. KDC understands that should the variance be denied, the parking must be constructed in accordance with the approved site plan. Data centers maintain a low percentage of occupants, typically within the office area, and have a small number of additional spaces for visitors and contractors. The data center and support space are deemed to be a lights-out facility that utilizes staff from the office areas. Corgan has been involved with other data center facilities across the country, including several data centers within Richardson and surrounding cities, and typically parking is provided for the office area of these facilities with a small percentage of parking spaces provided for visitors and contractors. The following are examples of approved parking ratios for data center facilities: Cornerstone Data Center City of Roanoke, TX Office Data Center 1 space / 300 SF 1 space / 3,000 SF Digital Realty Trust Marsh Lane Data Center City of Carrollton, TX Office 1 space / 300 SF Data Center 1 space / 5,000 SF G:\DOCS\14198\0000\B - Design and Documentation\B-05 - Government-Authorities Correspondence\B-05.01 - Life Safety AHJ Code Requirements Correspondence\Parking Variance\CAI00005_mem Parking Variance 2015 0126.DOC

2 Digital Realty Trust Data Center Park Richardson, TX Office 1 space / 300 SF Data Center 1 space / 3,000 SF It is anticipated the Project Black Flag facility will have a maximum of 20 employees for the daytime shift, which represents the maximum number of employees; there are other shifts, so there may be limited overlap of employees at shift change. The facility is secured, so visitors must schedule an appointment to gain entrance. Typically there are no more than 5 visitors, including contractors, during the day shift. KDC is requesting a parking ratio for this project as follows: Office 1 space / 300 SF 9430 SF / 300 =32 spaces Data Center 1 space / 5,000 SF 119,720SF / 5000 =24 spaces Total: 56 spaces The proposed parking ratio exceeds 200% of the actual maximum expected occupancy (20 employees and 5 visitors/contractors), and provides an additional 31 spaces. VAR 15-02 Section 21-47 (Screening and open space) The City requires a minimum six (6 ) foot high masonry wall where a nonresidential use backs or sides upon a residential district. In accordance with this provision, the approved site plan provides an eight (8) foot high masonry wall, approximately 35 from the residential alley. The location of this screening wall is due to a dedicated 30 Texas and Power Light easement that is parallel to the alley. KDC saw this as an opportunity to soften the visual appearance of the required screening wall for the adjacent residents, and a variety of canopy trees, ornamental trees, and shrubs are provided on the alley side of the wall. There is a variable width ATMOS easement that runs north/south along Plano Road. During negotiations regarding the placement/construction of the required screening wall, ATMOS determined any permanent fence is not permitted within this easement, stating the wall would be detrimental to the safety of the high-pressure natural gas transmission and distribution main pipelines (see attached letter). KDC is requesting a variance to eliminate the required masonry screening wall within the ATMOS easement, approximately 73 from the west property line. The elimination of this portion of the required screening wall directly affects the westernmost residential lot along Woodoak Drive. As a courtesy, representatives for KDC met with the Owens Park Homeowners Association to discuss the requested two variances, and from this meeting were able to receive support (see attached letter from HOA and affected resident). KDC appreciates the City s support of our various developments through the years, and respectfully requests approval of the two variances. End of Memorandum G:\DOCS\14198\0000\B - Design and Documentation\B-05 - Government-Authorities Correspondence\B-05.01 - Life Safety AHJ Code Requirements Correspondence\Parking Variance\CAI00005_mem Parking Variance 2015 0126.DOC