SCOPIA 100 Gateway Quick Start Version 5.6

Similar documents
SCOPIA 100 MCU Quick Start

Setting Up Your Cisco Unified Videoconferencing 3500 Gateway

Setting Up Your Cisco Unified Videoconferencing 3515 MCU

Installing the Cisco Unified Videoconferencing 3545 MCU

Scopia Management. User Guide. Version 8.2. For Solution

SCOPIA iview Management Suite. Installation Guide Version 7.5

RMX 1500 Quick Installation & Configuration Guide

48-Port 10/100/1000Base-T with 4 Shared SFP. Managed Gigabit Switch WGSW Quick Installation Guide

Functionality. About Cisco Unified Videoconferencing 3545 Gateway Products. About the Cisco Unified Videoconferencing 3545 PRI Gateway

RMX 4000 Installation & Configuration Guide

RMX 2000 Installation & Configuration Guide

Management Security Switch SGSD-1022 / SGSD-1022P SGSW-2840 / SGSW-2840P. Quick Installation Guide

Release Notes. LifeSize Networker. Release: v2.5.0

28-Port 10/100/1000Mbps with. 4 Shared SFP Managed Gigabit Switch WGSW / WGSW-28040P. Quick Installation Guide

48-Port 10/100Mbps + 4 Gigabit TP / 2 SFP. Managed Switch WGSW Quick Installation Guide

Release Notes. LifeSize Networker. Release: v2.0

Release Notes. Contents. Product Documentation. LifeSize Networker Release: v3.1.2

Codian IP VCR IP VCR 2200 Series

AG/SR 2330 Installation Reference

24-Port 100/1000X SFP + 4-Port 10G SFP+ Managed. Metro Ethernet Switch MGSW-28240F. Quick Installation Guide

RealPresence Collaboration Server (RMX) 4000 Quick Installation & Configuration Guide General Safety Precautions

8-Port 10/100Mbps + 2G TP/SFP Combo. Managed Industrial Switch ISW-1022M / ISW-1022MT / ISW-1022MP / ISW-1022MPT / ISW-1033MT

24-Port Gigabit with 4 Optional 10G Slots. Layer 3 Managed Stackable Switch XGS Quick Installation Guide

SCOPIA Elite 5000 Series MCU

Cajun P333R. Quick Start Guide. Unpack 1. Rack mount (optional) 2. Power up 3. Connect the cables 4. Configure 5. Run Web-based Manager (optional)

24-Port 10/100/1000Mbps with. 4 Shared SFP Managed Gigabit Switch

LifeSize Gateway User Guide

16/24/48-Port 10/100/1000T + 2/4-Port 100/1000X SFP Managed Switch GS T2S/GS T2S/GS T4S. Quick Installation Guide

16/24-Port 10/100/1000T 802.3at PoE + 2-Port 100/1000X SFP Managed Switch GS P2S GS P2S. Quick Installation Guide

Scopia TIP Gateway. Deployment Guide. Version 8.2. For Solution

Release Notes. Contents. Product Documentation. LifeSize Networker Release: v3.1.0

Deployment Guide for Avaya Scopia Add-in for IBM Lotus Notes

Avaya P133G2. Quick Start Guide. Unpack. Rack mount (optional) Power up 3. Connect the cables 4. Configure 5. Run Web-based Manager (optional)

D-Link (Europe) Ltd. 4 th Floor Merit House Edgware Road London HA7 1DP U.K. Tel: Fax:

24-Port Gigabit with 4 Optional 10G Slots. Layer 3 Managed Stackable Switch XGS / XGS Quick Installation Guide

L2+ Managed Gigabit Switch WGSW series

L2/L4 Managed Gigabit Ethernet Switch GS-4210 Ultra PoE Series

Release Notes for Avaya Scopia PathFinder Firewall Traversal

Intel. TeamStation. Upgrade Guide. System Version 4.0a IMPORTANT

User Guide for Avaya Scopia Control

DX Application Acceleration Platform Quick Start

IFS NS P-4S-2X Quick Start Guide

PictureTel LiveGateway Version 3.1 Online Installation Guide

Industrial 8-Port 10/100/1000T 802.3af/at PoE + 2-Port 100/1000X SFP Managed Switch with Wide Operating Temperature

SCOPIA iview Management Suite

Release Notes for Avaya Scopia Web Collaboration Server

Service Bulletin Rev Firmware Upgrade for ACRC100 Series

Appliance Edition Getting Started Guide

Release Notes for Avaya Scopia Web Collaboration Server

Cisco TelePresence Video Communication Server. Getting started

Release Notes for Avaya Scopia Management Suite

GE-DSH-73/82 and 82-POE Managed Switch Installation Sheet

Cisco TelePresence Video Communication Server. Getting started

2011 Teltronics, Inc. All rights reserved.

Initial configuration Vega 400 E1/T1 (SIP)

Tzunami Deployer Hummingbird DM Exporter Guide

Hardware Installation Guide Installation (x3350)

Using the setup Command Facility

VG7000 Digital Gateway

T-BERD 5800 Network Tester ISDN Primary Rate Interface (PRI) Testing

MP-11x Fast Track Installation Guide MGCP, H.323 & SIP. Version 4.6 Document #: LTRT-61504

MultiModem rcell. Intelligent Wireless Router. Quick Start Guide

SCS1600/3200 Quick Start Guide

L2+ Managed LCD Switch GS T2XV(R) / GS T4XV(R) Quick Installation Guide

Step 3 - How to Configure Basic System Settings

Rapier Series Switch Quick Install Guide

Connecting PBX to BroadSoft's BroadCloud SIP Trunk using AudioCodes Mediant BRI/PRI Gateway

MOXA VPort 2110/2140/2141 Video Server Quick Installation Guide

24-Port Gigabit + 4-Port 10G SFP+ Slot. Layer 3 Stackable Managed Switch XGS Quick Installation Guide

Switched Rack Power Distribution Unit

DX 32xx and DX 36xx Quick Start

Avaya Aura Communication Manager Release 6.2 and Radvision SCOPIA Release 7.7 and 8.0 Interoperability Day 180 Solution Quick Setup

Dominion KX III User Station

SCS100/200/400 Quick Start Guide

Industrial 24-Port 10/100/1000Mbps Managed Gigabit. Switch (-40~75 degrees C) with 4 Shared SFP Ports IGSW-24040T. Quick Installation Guide

L2+ Managed Metro Ethernet Switch MGSW / MGSD Series

Administrator Guide. Version 1

Industrial L2/L4 Managed Gigabit Switch. With 4-Port 802.3at PoE+ IGS P4T/IGS P4T2S. Quick Installation Guide

Polycom RealPresence Capture Server - Appliance Edition Getting Started Guide

CallPilot Mini Quick Start Guide

Gigabit Ethernet Switch. Quick Installation Guide MS400834M

Acano solution. Acano X Series Server 1.6 Installation Guide. May E

SCOPIA Video Gateway for Microsoft Lync

L2+ Managed Gigabit/10 Gigabit Ethernet Switch GS-5220 Series

WinClient Remote Manager USER S MANUAL. Revision: WRM /10/22

Cisco TelePresence IP GW MSE 8350

RC-SV Configuration Guide (Rev 4)

L2+ 16-/24-Port Gigabit PoE. + 2-/4-Port 10G SFP+ Managed Switch. with LCD Touch Screen GS P2XV(R)/GS UP2XV(R)

IBM Systems. Quick start guide for IBM System p5 505 ( )

GW1000 User s Guide. Revision 1.04 Mar 30, 2008

XPress DR+W Quick Start Guide

Quick start guide for p5 520 ( )

Intel Server RAID Controller U2-1 Integration Guide For Microsoft* Windows NT* 4.0

L2+ Managed PoE Switch GS-5220 PoE Series

OPERATION MANUAL. MV-410HS Web Browser. Version Rev.2

Basic FXO Gateway Configuration

Total Control System Application Guide

UTM Content Security Gigabit Gateway CS-950

Powering On the Cisco VG224 Voice Gateway

Pre-Installation Information--S8700 IP Connect

Transcription:

SCOPIA 100 Gateway Quick Start Version 5.6

NOTICE 2000-2008 RADVISION Ltd. All intellectual property rights in this publication are owned by RADVISION Ltd and are protected by United States copyright laws, other applicable copyright laws and international treaty provisions. RADVISION Ltd retains all rights not expressly granted. This publication is RADVISION confidential. No part of this publication may be reproduced in any form whatsoever or used to make any derivative work without prior written approval by RADVISION Ltd. No representation of warranties for fitness for any purpose other than what is specifically mentioned in this guide is made either by RADVISION Ltd or its agents. RADVISION Ltd reserves the right to revise this publication and make changes without obligation to notify any person of such revisions or changes. RADVISION Ltd may make improvements or changes in the product(s) and/or the program(s) described in this documentation at any time. If there is any software on removable media described in this publication, it is furnished under a license agreement included with the product as a separate document. If you are unable to locate a copy, please contact RADVISION Ltd and a copy will be provided to you. Unless otherwise indicated, RADVISION registered trademarks are registered in the United States and other territories. All registered trademarks recognized. For further information contact RADVISION or your local distributor or reseller. SCOPIA Gateway version 5.6, June 2008 Publication 9 http://www.radvision.com 62782-00001 Rev A03

Quick Start WHAT S IN THIS GUIDE This Quick Start provides the basic steps required for getting your SCOPIA 100 Gateway up and running: The suggested order of operation is as follows: 1. Unpack and Verify the Equipment 2. Prepare a Checklist 3. Prepare the Site 4. Mount the SCOPIA100 Gateway Unit in a 19" Rack (Optional) 5. Assign an IP Address to the Gateway 6. Connect to the IP Network 7. Connect to the ISDN Network (PRI and BRI Gateways only) 8. Connect to the Serial Interface (Serial Gateways only) 9. Configure the Gateway 10. Make Trial Calls Note For more detailed information, see the SCOPIA 100 Gateway User Guide. UNPACK AND VERIFY THE EQUIPMENT The shipping box for a single SCOPIA 100 Gateway unit includes the following items: SCOPIA 100 Gateway unit Power cable (depending on customer location) Terminal cable LAN cable Rack mounting kit (two brackets and six screws) Four rubber feet SCOPIA 100 Gateway User Guide (in PDF format only) What s in this Guide 1

SCOPIA 100 Gateway Quick Start SCOPIA Gateway Release Notes Utilities and Documentation CD-ROM containing product documentation, utilities and online help files. PREPARE A CHECKLIST Before you start configuration, fill in the checklist below. ISDN NETWORK DIRECTORY NUMBERS (PRI AND BRI GATEWAYS ONLY) PRI/BRI Service Provider Service Provider: Type of service: PRI/BRI Directory Numbers How many Directory Numbers are there? Directory number range: -. For consecutive directory numbers, fill in the digits that indicate the range. 2 SCOPIA 100 Gateway Quick Start

ISDN NETWORK PHYSICAL INTERFACE (PRI GATEWAYS ONLY) Channel Rate PRI E1 56 Kbps 64 Kbps Port 1 T1 56 Kbps 64 Kbps PRI E1 56 Kbps 64 Kbps Port 2 T1 56 Kbps 64 Kbps Carrier/Switch Signaling Protocol PRI E1 Euro ISDN VN6 5ESS Port 1 T1 DMS100 Nat ISDN 5ESS 4ESS NTT Euro ISDN Hong Kong PRI E1 Euro ISDN VN6 5ESS Port 2 T1 DMS100 Nat ISDN 5ESS 4ESS NTT Euro ISDN Hong Kong Network Access PRI Port 1 TE NT PRI Port 2 TE NT Prepare a Checklist 3

Line Coding PRI E1 AMI CMI HDB3 Port 1 NRZ T1 B8ZS AMI-B7 NRZ PRI E1 AMI CMI HDB3 Port 2 NRZ T1 B8ZS AMI-B7 NRZ Line Framing PRI E1 CRC4 Double framing Port 1 Extended CRC4 T1 ESF no CRC ESF F4 ESF CRC6 JT F12 F72 PRI E1 CRC4 Double framing Port 2 Extended CRC4 T1 ESF no CRC ESF F4 ESF CRC6 JT F12 F72 4 SCOPIA 100 Gateway Quick Start

ISDN NETWORK PHYSICAL INTERFACE (BRI GATEWAYS ONLY) Carrier/Switch Signaling Protocol BRI DMS100 Nat ISDN 5ESS Port 1 5ESS PTP ETSI ETSI PTP VN6 Austel 1 KDD NTT Hong Kong BRI DMS100 Nat ISDN 5ESS Port 2 5ESS PTP ETSI ETSI PTP VN6 Austel 1 KDD NTT Hong Kong BRI DMS100 Nat ISDN 5ESS Port 3 5ESS PTP ETSI ETSI PTP VN6 Austel 1 KDD NTT Hong Kong BRI DMS100 Nat ISDN 5ESS Port 4 5ESS PTP ETSI ETSI PTP VN6 Austel 1 KDD NTT Hong Kong Prepare a Checklist 5

SERIAL PORT PHYSICAL INTERFACE (SERIAL GATEWAYS ONLY) DTE/DCE Interface Configuration Options Interface Terminal Adaptor Options Signaling Protocol Options DTE Common RS-366 Manual Control Data Triggered KG-Device RS-366 Manual Control Data Triggered DCE Common RS-366 IP NETWORK CHECKLIST AUDIO PROTOCOLS Network Addressing Gateway IP address _. _. _. _ IP Mask (subnet mask) _. _. _. _ Gatekeeper IP address _. _. _. _ Default router IP address _. _. _. _ Preferred Audio Transcoding Priority Disable G.711 (ISDN/serial) < > G.723.1 (IP) G.728 (ISDN/serial) < > G.711 (IP) G.728 (ISDN/serial) < > G.711 (IP) for up to 256 Kbps PREPARE THE SITE When installing the Gateway, ensure that: An IP network port is available on the hub for the Gateway. There is a gatekeeper available to register the Gateway IP address and services. 6 SCOPIA 100 Gateway Quick Start

MOUNT THE SCOPIA 100 GATEWAY UNIT IN A 19" RACK (OPTIONAL) You can optionally mount the SCOPIA 100 Gateway unit in a standard 19-inch rack. Two mounting brackets and a set of screws are included in the SCOPIA 100 Gateway unit shipping box. Procedure 1. Disconnect all cables including the power cables. 2. Place the SCOPIA 100 Gateway unit right-side up on a hard flat surface, with the front panel facing you. 3. Position a mounting bracket over the mounting holes on each side of the SCOPIA 100 Gateway unit. Figure 1 Fitting a Bracket for Rack Mounting 4. Pass the screws through the brackets and tighten them into the screw holes on each side of the SCOPIA 100 Gateway unit using a suitable screwdriver. Mount the SCOPIA 100 Gateway Unit in a 19" Rack (Optional) 7

5. Insert the SCOPIA 100 Gateway unit into the 19- inch rack. 6. Fasten the brackets to the side rails of the rack. 7. Make sure that the air vents at the sides of the SCOPIA 100 Gateway unit are not blocked. ASSIGN AN IP ADDRESS TO THE GATEWAY The first time you install the Gateway, you assign an IP address using a terminal cable connection. This allows you to access the boot configuration menu of the Gateway. At power-up, the Gateway goes through the following boot phases: Auto-boot The embedded operating system initializes and displays basic information. Configuration menu A six-second countdown allows you to enter the configuration menu. Initialization The Gateway completes its boot sequence and is ready for operation. Note You can only perform serial port configuration of the Gateway at startup, during a short period indicated by a six-second countdown. Once the initialization phase is complete, the only way you can enter the configuration menu is by restarting the Gateway. 8 SCOPIA 100 Gateway Quick Start

CONNECT TO A PC You make the serial connection by connecting a PC terminal equipped with a terminal emulation application to the front panel serial port of the Gateway. Procedure 1. Run a terminal emulation application (such as HyperTerminal) on the PC. 2. Configure the communication settings for the PC serial port as follows: 9600 Baud rate 8 data bits 1 stop bit No parity No flow control 3. Connect a terminal cable to the PC terminal. Use the supplied terminal cable to connect the other end to the Gateway serial port on the front panel. 4. Start the terminal emulation application on the PC. 5. Turn on or reset the Gateway. 6. The following command prompt displays: Press any Key To start configuration... Assign an IP Address to the Gateway 9

7. Press any key during the six-second countdown to enter the configuration menu. The network configuration Main menu displays as shown at Figure 2. If you do not press a key before the countdown ends, the Gateway continues its initialization and you can only configure the Gateway by pressing the Reset button on the front panel. Press any Key To start configuration... Main menu Enter <N> to configure default network port values Enter <P> to change the configuration software password Enter <A> to display advanced configuration menu Enter <Q> to quit configuration menu and start GW Figure 2 Network Configuration Main Menu Warning Configuration of any of the parameters other than <N> should not be performed by an unauthorized person. 10 SCOPIA 100 Gateway Quick Start

CONFIGURING AN IP ADDRESS Procedure 1. At the colon type N. The Default Network Port Values screen (Figure 3) displays. Enter IP Address for Interface No. 1 Without leading zeros < 172.27.20.194>: Enter Default Router IP Address Without leading zeros < 172.27.37.254>: Enter IP Mask Without leading zeros < 172.27.37.254>: Updating NVRAM Updating BOOT LINE PARAMS with new IP Figure 3 Default Network Port Values Screen 2. Type the IP address, default router IP address and IP subnet mask as shown in Figure 3. Press Enter to proceed from one parameter to the next. 3. Press Enter to finalize the new settings. The Gateway returns to the network configuration Main menu displayed at Figure 2. 4. At the colon type Q to quit the network configuration Main menu and start the Gateway. If you have changed any of the settings in the network configuration Main menu (IP address, default router IP address or IP subnet mask) typing Q resets the Gateway with the new settings. Assign an IP Address to the Gateway 11

CONNECT TO THE IP NETWORK CONNECT TO THE ISDN NETWORK (PRI AND BRI GATEWAYS ONLY) CONNECT TO THE SERIAL INTERFACE (SERIAL GATEWAYS ONLY) Use the supplied LAN cable to connect the Ethernet IP network port on the front panel of the Gateway to a 10/100Base-T IP network connection on your network hub. Use the appropriate cables to connect the PRI/BRI ISDN ports to your PBX or direct PRI/BRI line connection. Line cables are attached to the Gateway via a DB-60 connector that provides the serial line connection for the Gateway serial ports. The cables are Y-type with split leads at the remote end. On one side is either a V.35, RS-449 or EIA-530 connector. On the other side is an RS-366 connector. Gateway terminal adapter cables have either a DTE or a DCE interface. The Gateway can identify which type of cable has been connected to its DB-60 serial ports. Cable configuration settings are automatically displayed in the Physical Interface section of the Port tabs. The automatically configured settings are shown in DTE/DCE Interface Configuration Options on page 6. Note If the Physical Interface section of the Port tabs is displayed while you are connecting a cable to the Gateway, exit the screen and then return to see the displayed cable configuration settings. CONFIGURE THE GATEWAY Once you have assigned an IP address to the Gateway, you can use the web interface to configure and monitor the Gateway. Procedure 1. In your web browser, enter the IP address or device name of the Gateway. For example: http://125.221.23.44 Press Enter to display the Login screen. 12 SCOPIA 100 Gateway Quick Start

CHECK THE NETWORK ADDRESS SETTINGS 2. Enter your user name and password and click OK to proceed to the configuration page. The default user name is admin and the default password is null. The configuration interface displays. Use the web interface to check that the network addresses you set in the previous step were properly recorded by the Gateway. Procedure 1. In the sidebar, click the Device button to display the Device configuration tabs. 2. Check the settings in the Addressing tab to ensure that the network addressing parameters you entered earlier (see Procedure on page 11) were properly recorded in the Gateway. SET THE GATEKEEPER ADDRESS Before you can work with the Gateway, you must set a gatekeeper IP address with which the Gateway registers. 1. In the Gatekeeper section of the Gateway interface Settings tab, enter the gatekeeper IP address in the Gatekeeper Address field. 2. Click Upload in the toolbar and wait for the Gateway to reset itself. 3. Log out by clicking the Logout button in the sidebar. Note To review the settings, log in to the Gateway web interface again. Configure the Gateway 13

SET GATEWAY SERVICES The Gateway is pre-programmed with a number of default service prefixes used in outgoing calls. You can modify the existing prefixes to suit your network environment or define new services and add them to the list. Before setting a Gateway service, consider the following: Ensure that the service prefix numbers are not identical to the first digits of any of your IP network endpoint phone numbers or aliases. Note that changing a service prefix or adding a new service may require resetting the Gateway. Procedure SET GATEWAY PORT PARAMETERS 1. In the Gateway interface Services tab, click Add to add a new service, or select a service and click Edit to modify that service. 2. Type in the prefix number for this service, select the call type, bit rate, and ISDN ports for this service. Click Upload to send the new parameters to the Gateway. PRI Ports Configure your Gateway PRI port. If your Gateway supports two PRI ports, configure a single port first. When the first port is configured, you can use the Same as Port checkbox to duplicate settings from one PRI port to the other. Procedure 1. In the Gateway interface PRI Port tabs Basics section, enable the port and define the phone numbers for this port. 2. In the Physical Interface, Advanced ISDN, Call Policies and Supported Services sections, define the settings you want for this port. Follow your checklist to help organize the settings. 14 SCOPIA 100 Gateway Quick Start

3. If your Gateway supports two PRI ports, enable the second PRI port and define the phone numbers used for that port. 4. Check the Same as Port checkbox to duplicate the settings from the first PRI port in each of the remaining sections: Physical Interface, Advanced ISDN, Call Policies and Supported Services. BRI Ports Configure your Gateway BRI port. When the first port is configured, you can use the Same as Port checkbox to duplicate settings from one BRI port to the other. Procedure 1. In the Gateway interface BRI Port tabs Basics section, enable the port and define the phone numbers for this port. 2. In the Physical Interface, Call Policies and Supported Services sections, define the settings you want for this port. Follow your checklist to help organize the settings. 3. Check the Same as Port checkbox to duplicate the settings from the first BRI port in each of the remaining sections: Physical Interface, Call Policies and Supported Services. Serial Ports Configure your Gateway serial ports. When the first port is configured, you can use the Same as Port checkbox to duplicate settings from one serial port to the other. Configure the Gateway 15

Procedure 1. In the Gateway interface Port tabs Basics section, enable the required port. 2. In the Physical Interface, Call Policies and Supported Services sections, define the settings you want for this port. Follow your checklist to help organize the settings. 3. Enable additional ports as required. 4. Check the Same as Port checkbox in the Physical Interface section to duplicate the settings from the first serial port in each of the remaining sections: Physical Interface, Call Policies and Supported Services. SAVE THE CONFIGURATION The Export button on the toolbar allows you to save the Gateway configuration parameters as an *.ini file to your local hard disk or to any network directory that you choose. Procedure 1. In the toolbar, click Export to display the Windows File Download dialog box. 2. Check the Save this file to disk option. Click OK to display the Windows Save As dialog box. 3. In the File name text box, type a file name for this configuration setup. For example, GW1_NEW 4. Select a location to save the file to and click Save. MAKE TRIAL CALLS As a final step, make a few trial calls following the dialing sequences described in this section. Calls are made between the IP network and the ISDN network. The ISDN network is connected directly to the PRI Gateway or to an Imux that gives the Serial Gateway access to the ISDN network. 16 SCOPIA 100 Gateway Quick Start

When a call is connected, the front panel ACT LED lights up. If you are not able to complete the trial calls, refer to the Troubleshooting chapter in the SCOPIA 100 Gateway User Guide. Dialing Example 1 Voice calls (PRI and BRI Gateways only) From an IP phone on the IP network, dial the Gateway service prefix for voice calls and the destination phone number. 912015294300 9 is the Gateway service prefix for voice calls. 12015294300 is the destination phone number including the area code. Dialing Example 2 2B video calls (PRI and BRI Gateways only) A 2B video call from an IP network terminal to an H.323 endpoint on another IP network or to a terminal on the ISDN network. Both B channels have the same number. 821816455318* 82 is the service prefix for a 2B video call. 1816455318 is the destination phone number including the area code. * is the second number delimiter. The second number delimiter tells the Gateway to dial the destination phone number a second time. Dialing Example 3 2B video calls (PRI and BRI Gateways only) A 2B video call from an IP network terminal to an H.323 endpoint on another IP network or to a terminal on the ISDN network. The B channels have different numbers (or your endpoint does not have two phone number fields). 821816455318*1816455319 82 is the service prefix for a 2B video call. 1816455318 is the destination phone number including the area code. Make Trial Calls 17

* is the second number delimiter. 1816455319 is the second B channel number including the area code. Dialing Example 4 384 Kbps bonded call From a videoconferencing endpoint on the IP network, dial the Gateway prefix for 384 Kbps bonded calls and the phone number of the destination Gateway or H.320 room system. 86745501 86 is the Gateway service prefix for 384 Kbps bonded calls 86745501 is the phone number of the destination terminal. 18 SCOPIA 100 Gateway Quick Start