www.aamgroup.com/bim HIGH-DEFINITION SURVEY AND BIM PRESENTATION FOR BIM-MEP AUS Matt Rumbelow, B.Arch AAM BIM Coordinator
ABOUT AAM Reality Captured. Certainty Delivered Reality Captured. Certainty Delivered
ABOUT AAM Reality Captured. Certainty Delivered One of the World s Largest whole-spatialsolution providers 500 staff Satellite imagery Aerial photo Aerial LiDAR Pictometry GIS services High-Definition Surveying Terrestrial Laser Scanning Mobile Laser Scanning and Mapping Automated Monitoring Land, Engineering and Industrial Survey Multi-award winning, including the 2010 JK Barrie award the highest award possible in the spatial sciences. 3
HIGH-DEFINITION SURVEYING Broadly describes: As-built surveying using Terrestrial and Mobile Laser Scanning Safe, Rapid Acquisition technology 3D modelling including BIM Visualisation of Buildings, Plant and Structures Redevelopment, Rejuvenation and Design 4
HIGH-DEFINITION SURVEYING The types of instrumentation: Terrestrial Laser scanners (<±5mm) Mobile Laser Scanners (<±20mm) Automated Monitoring Solutions (<±0.010mm/m) Precise total stations (<±3mm) Laser trackers (<±0.010mm) Articulated arms (<±0.050mm) Precise levels (<±1mm) Cameras for visualisation High-End Processing and Modelling Software 5
WHERE AAM CAN HELP REJUVENATION FOUNDATION LIVE CASE STUDY IMPLEMENTATION CONSTRUCTION
8 NICHOLSON STREET (Case Study) DEXUS Owned Property currently under rrejuvenation HASSELL architects who are updating building use layout ARUP upgrading the MEP across the building Scan for MEP allows for accurate geometry of existing MEP objects in order to ensure accuracy of the new designs RVT and IFC import and export possible Working with existing BIM (updating to match point cloud) provides you benefits in certainty for design and construct Time is saved in project through not having to remodel survey information 7
8 NICHOLSON STREET 8
DARLING HARBOUR IMAX PRECINCT Project Background > Development of Revit Model for use as foundation for redevelopment project > Requires information on Fly-overs, pedestrian and road accessways > Performed discretely and with minimal impact to public 9
DARLING HARBOUR IMAX PRECINCT AAM Solution > Production of a Revit model of IMAX building and precinct. > Information in Revit to allow for detailed decision-making in Planning Stage > Will form the basis of new design and construction models in the future of the project > Easily Transferrable into other software packages > AutoCAD > Microstation > Drawing Sets 10
DARLING HARBOUR IMAX PRECINCT Client Benefits > Discrete and Rapid Field Acquisition > Accurate Foundation BIM for reliable dimensioning, clearance measurements and building positioning > Information in one place for decision making > Forms Basis of all future works in the precinct > Capable of being updated further as needed by client request 11
1 BLIGH ST, SYDNEY Building started as a BIM Project is elliptical converted into approx. 60 arc-centre points Quality Engineering Surveying Set-out Surveying for Construction As-Built Surveying for verifying the Constructed Building closely reflects the Design AAM were primary Surveyors on this project Completed 2011
UTS CHAU-CHAK WING - SYDNEY Building started as a BIM Quality Engineering Surveying Set-out Surveying for Construction As-Built Surveying for verifying the Constructed Building closely reflects the Design AAM are primary Surveyors on this project In-Progress 2014
K2VI INTRODUCTION AAM s K2Vi platform can be used as a platform to manage external links to BIM s The Brisbane City Council Planning team use 3D modeling for master planning, concept planning, consultation and site analysis including shadow, view-shed and visibility. This can be used effectively by Councils, Universities and Developers/Property Management to give tiered detail for BIM in context of the surrounding environment 14
K2VI AND BIM LINKING BIM Linking example - http://youtu.be/9aamu6ms01i
CONCLUSION: WHERE AAM CAN BEST HELP FOUNDATION Providing accurate Foundation BIM Support Engineers, Architects, Project Managers CONSTRUCTION Set-Out from Existing BIM As-Built and Verification (Quality Control/Assurance) IMPLEMENTATION Supporting Maintenance and Repair Decision-Making Consultancy REJUVENATION Decision-Making Consultancy Advising and Preparing for future works
REALITY CAPTURED. CERTAINTY DELIVERED. Thank you www.aamgroup.com/hds 17