(a) Discourages obtrusive Telecommunication Facilities within or adjacent to Residential Areas, Heritage Areas and Environmentally Sensitive Areas;

CITY OF TORONTO TELECOMMUNICATION TOWER AND ANTENNA PROTOCOL (Industry Canada Local Land-use Authority Consultation)

Building Canada s Advanced Wireless Networks: The Future is Here Meeting with Markham Development Services Committee

DATE: April 8, 2013 REPORT NO. CD TYPE OF REPORT CONSENT ITEM [ ] ITEM FOR CONSIDERATION [ X ]

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF SEPTEMBER 25, 2012

February 10, Via . Fiona McDougall Planner Development Services 8645 Stave Lake St Box 20 Mission, BC V2V 4L9. Dear Ms.

CHAPTER WIRELESS TELECOMMUNICATION FACILITIES

ARLINGTON COUNTY, VIRGINIA

Submission to the Australian Government Consultation on Possible Amendments to Telecommunications Carrier Powers and Immunities.

Intent. Clarification (Planning) Change per PC work session on

Discussion Guide. Benvoulin Substation Project.

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of April 22, 2017

CHARTER TOWNSHIP OF ALLENDALE, OTTAWA COUNTY, MICHIGAN WIRELESS COMMUNICATION FACILITIES APPLICATION

The Board grants site licenses for utilities that do not interfere with the park function.

Wireless Telecommunications Facilities

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 20, 2014

STRATHCONA AREA TRANSMISSION UPGRADE PROJECT

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of January 28, 2017

Online Operations and Maintenance (O&M) Notification USER GUIDE

CONDITIONS OF SERVICE

17. Microwave Collocation 17.1 General

ATRIS User Guide. Table of Contents

Wireless Telecommunication Facility

CITY OF GRA DE PRAIRIE SUBDIVISIO A D DEVELOPME T APPEAL BOARD AGE DA

FR400 IC - Overview of Industry Canada Application and Certification Process

Alternative Site Analysis

ARLINGTON COUNTY, VIRGINIA

Cyber Security Reliability Standards CIP V5 Transition Guidance:

SAN IPSE CAPITAL OF SILICON VALLEY

Unofficial Comment Form

ARLINGTON COUNTY, VIRGINIA

RULES AND REGULATIONS OF THE BUICK CLUB OF AMERICA

Severn Trent Water. Telecommunications Policy and Access Procedure

TELECOMMUNICATIONS SPECIAL USE WIRELESS

RELIABILITY COMPLIANCE ENFORCEMENT IN ONTARIO

TELECOMMUNICATIONS ACCESS POLICY 2011

Vegreville Office Telecommunication Tower Replacement

Ells River Substation Telecommunication Tower

EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 15, 2012

Benbow 397S Substation Upgrade Needs Identification Document

Ch. 130f ODOR MANAGEMENT CERTIFICATION 7 130f.1. CHAPTER 130f. ODOR MANAGEMENT CERTIFICATION

Revisions to the Right-of-Way Management Ordinance for Wireless Providers Implementing SB1004

The University of British Columbia Board of Governors

ENMAX Generation Portfolio Inc.

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement

Exposure levels and good practice EMF policies for mobile networks

STRATEGY ATIONAL. National Strategy. for Critical Infrastructure. Government

The wireless world is changing. And so is your community.

Procedure for the Recognition of Foreign Testing Laboratories

Chapter 18 SaskPower Managing the Risk of Cyber Incidents 1.0 MAIN POINTS

Reliability Standard Audit Worksheet 1

Harbourside Commercial Park Inc. Crown Corporation Province of Nova Scotia Business Plan

ADVANCED CUSTOMER SUPPORT ORACLE STANDARD SYSTEM INSTALLATION ( OSSI ) with SITE AUDIT SERVICES EXHIBIT

Community Design Guidelines Document (CDG)

Water Distribution Level 1 January 8 12, 2018

NERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum

Ministry of Energy, Mines and Petroleum Resources. Guide to Acquiring Crown Petroleum and Natural Gas Tenures

POSITION PAPER. QUALITY CONTROL Prepared: TenneT team Reviewed: M. Müller Approved: F. Wester Release.

Contents. 1. Routing and Siting Process Routing and Siting Process Highlights Timeline Constraints Map

Information Bulletin

Development Application Notice Sign

Planning Department Civic Center North 470 South Allison Parkway Lakewood, Colorado TTY/TDD Lakewood.

Document Change Control

REGULATORY FRAMEWORK FOR THE ACTIVITY OF MOBILE VIRTUAL NETWORK OPERATORS (MVNO)

511 Implementation Plan for Prince Edward Island

PRIVATE MOBILE CONNECTION (formerly COMMERCIAL CONNECTIVITY SERVICES (CCS)) AT&T VPN ACCESS ATTACHMENT

PRIVATE MOBILE CONNECTION (formerly COMMERCIAL CONNECTIVITY SERVICES (CCS)) AT&T VPN ACCESS ATTACHMENT

Network Configuration Document Selection for New Substations Framework

CITY MANAGER MEMORANDUM. The Honorable Mayor Partington and City Commissioners

QUALITY CONTROL Prepared: TenneT team Reviewed: M. Müller Approved: F. Wester

PROJECT SUPPORT STATEMENT VERIZON WIRELESS SITE NORTH BERKELEY INTRODUCTION & FACILITIY DESCRIPTION

EU Code of Conduct on Data Centre Energy Efficiency

Annexure: B INFORMATION. Responsible Executive Manager: Division/Unit Responsible for Formulation: Writer/s: Date + Number of Revision: Review Date:

Wireless Telecommunication Facility. Project Narrative

PARTICIPANT INVOLVEMENT PROGRAM

Standard Development Timeline

Standard Development Timeline

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

Stem Beach Solar 1041 Application

Physical and Environmental Security Standards

Telecom Decision CRTC

ADVANCED CUSTOMER SUPPORT ORACLE STANDARD SYSTEM INSTALLATION ( OSSI ) without SITE AUDIT SERVICES EXHIBIT

Operator Frequently Asked Questions

Notification Form. Code of Practice for Soil Amendments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

SGS INTRON CERTIFICATIE CERTIFICATION AND ATTESTATION REGULATIONS 2015 TABLE OF CONTENT

Canadian Anti-Spam Legislation (CASL) Campaign and Database Compliance Checklist

City of Sydney. Telecommunications and Radiocommunications Development Control Plan 2006

Stakeholder Engagement Summary Report

February 10, Via . Fiona McDougall Planner Development Services 8645 Stave Lake St Box 20 Mission, BC V2V 4L9. Dear Ms.

SECTION SPECIAL SYSTEMS. Website and Construction Cameras

Procedure to be Heard by the City of Forest Hills Board of Zoning Appeals

Security Standards for Electric Market Participants

INTERNATIONAL TELECOMMUNICATION UNION

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

NASA Policy Directive

Upcoming PIPEDA Changes What is changing and what to do about it

Transcription:

POLICY P-22 TELECOMMUNICATION FACILITIES SITING AND CONSULTATION POLICY Preamble It is recognized that while reliable and sophisticated telecommunication facilities are a benefit to the citizens of (CSRD), there is a need to address environmental, aesthetic, health and any other concerns of those who own property and/or live in close proximity to such facilities. The goal of Policy P-22 is to establish a process in which the CSRD facilitates, coordinates and influences the siting and appearance of new or replacement telecommunication facilities (including antenna, transmitters, receivers and devices) when such facilities are required on private and Crown lands within CSRD boundaries. The purpose of this policy is to: 1. Ensure that telecommunications proponents consult with each other prior the submission of a proposed site to address matters such as co-location and optimal site selection, and to involve local community, administrative and political representatives as part of this preliminary process; 2. Ensure that telecommunications structures and facilities required within the CSRD are located and designed in such a manner that they are sensitive to potential impacts on the surrounding community and are placed in appropriate locations; 3. Ensure that adequate public consultation is conducted by telecommunications proponents with all property owners affected by proposed structures and facilities. 4. Ensure that the CSRD facilitates this process and is able to gather enough information to provide a statement of concurrence or non-concurrence to Industry Canada at the end of the process regarding the siting of telecommunications facilities. Federal and Local Government Jurisdiction Federal Requirements The Canadian federal government has sole jurisdiction over inter-provincial or international systems of telecommunication and, through the Radio-communication Act, R.S.C., 1985, c. R-2, Industry Canada licenses the operation of telecommunication facilities and approves the towers used to support these facilities. Industry Canada, in its Client Procedures Circular CPC-2-0-03 (Radiocommunication and Broadcasting Antenna Systems, 2008), as amended or changed from time to time, has identified that tele-communications proponents are obligated to consider sharing existing infrastructure when installing new antennas (site sharing) and to consult with Land Use Authorities (LUAs) and the public. In addition, proponents must also fulfill other important obligations including: compliance with Health Canada guidelines for the protection of the general public; compliance with radio frequency immunity criteria; notification of nearby

Page 2 Telecommunication Facilities Siting and Consultation Policy P-22 broadcasting stations; Environment Canada considerations; and Transport Canada/NAV CANADA aeronautical safety responsibilities. Local Government Requirements Industry Canada is the final authority in the approval of telecommunications facilities. However, as part of the approval process, Industry Canada works with local governments (land use authorities) and telecommunication facility applicants to ensure that local concerns are addressed. By establishing Policy P-22, the CSRD has created a set of guidelines for which all telecommunications proponents must follow prior to the construction and operation of new telecommunication facilities in the CSRD. P-22 draws on requirements from CPC-2-0-03, the Crown's Land Use Operational Policy - Communication Sites, and incorporates these with additional CSRD requirements. POLICY The CSRD has set out a number of guidelines within this policy for the location, design and health, safety and environmental aspects of telecommunications facility sites. This policy also establishes the CSRD's process for public consultation. Telecommunication Facilities Excluded from CSRD and Public Review Proponents of telecommunication facilities are excluded from the requirement to consult with the CSRD and the public for installations with parameters categorizing them as excluded as per CPC-2-0-03. Notwithstanding these exclusions, proponents are encouraged to consult with the CSRD and public regarding any new or replacement telecommunication facilities which are proposed within a radius of five times the tower height from residential or environmentally sensitive areas (measured from the tower base or outside the perimeter of the supporting structure, whichever is greater). Part 1: Siting Telecommunications Facilities on Private Land 1. Description of Proposed Telecommunication Site/Facilities Unless the new or replacement telecommunication facility is excluded from review (see above), proponents will be expected to provide site and facility information to the CSRD and public in accordance with CPC-2-0-03. Proponents will also be expected to provide the following information: a. The proposed layout with a site map and to-scale-drawings showing the location of the proposed facilities, with a clear indication of any fencing, landscaping, tree removal, access roads, guy wires, power lines and any other associated works or structures. This should include elevation drawings and photographic simulations that clearly indicate how the proposed facilities and associated works will appear from adjacent properties and public roads; b. Proposed site area and setbacks from property lines;

Page 3 Telecommunication Facilities Siting and Consultation Policy P-22 c. A statement indicating that the proposed infrastructure is in accordance with Health Canada regulations; and d. A complete description of the facilities proposed to be installed, replaced, modified or activated, including steps taken to ensure compliance with all federal requirements. 2. Location Before building new telecommunications facilities, proponents are to first explore the following options, unless the CSRD prefers otherwise: a. Consider sharing an existing antenna system, modifying or replacing a structure if necessary; b. Locate, analyze and attempt to use any feasible existing infrastructure such as rooftops, water towers etc. Where applicable, provide an alternate site analysis, which includes consideration of co-location on an existing structure, with a qualified expert's explanation of why co-location is not possible. The following locations are preferred: c. Co-location on existing telecommunications towers, whether free-standing or located on roof-tops or wall-mounted, as well as other structures, including but not limited to overhead transmission towers, broadcast towers, utility poles and light standards; d. Industrial and commercial areas where appropriate; e. Agricultural areas where appropriate; f. Public and Institutional areas where appropriate; and g. Other non-residential areas where appropriate. The following locations are discouraged: h. Residential areas; and i. Environmentally sensitive areas (including but not limited to riparian areas, sensitive habitat areas, bird migration routes, and animal corridors). 3. Design and Visual Impact The CSRD will request that any application, particularly for significant structures (e.g., freestanding structures over 15m in height) consider the context of the environment within which the structure is proposed during the design and siting process. Significant structures should be designed, screened, and situated on the site in such a way as to minimize any potential detrimental effects on the neighbourhood or area within which they are proposed. The following should be considered in design and siting of both tower and antenna structures as

Page 4 Telecommunication Facilities Siting and Consultation Policy P-22 well as auxiliary buildings: a. Screening of facilities by using existing vegetation, landscaping, fencing, or other means in order to blend with the built and natural environments. b. Design and colour should be sensitive to the style of architecture in the neighbourhood or surrounding vegetation/ forest cover. c. Situate as near as possible to similarly-scaled structures. d. Locate towers and minimize tower height where possible to avoid Transport Canada and/or NAV Canada requirements for painting and lighting. Lighting should be shielded from neighbouring properties. e. Where located in proximity to bird migration routes, guy wires should be made more visible (e.g. through sleeves) to prevent birds from colliding into them. f. All possible measure shall be taken to minimize vegetation removal and disturbance to the natural environment. g. Stealth and/or monopole structures should be used to better integrate form with existing built environment. Where co-location on a single structure is desired, opportunities to design equipment within a single stealth structure may be investigated. h. Access to facilities should be possible without unduly interfering with traffic flow or without unduly creating safety hazards. i. Motorized generators are discouraged as a source of electricity for telecommunication facilities. Where feasible, it is preferred that facilities be connected to the electrical grid. 4. Health and Safety Levels of radiofrequency transmission will be in accordance to all federal health standards, as changed from time to time. 5. Preliminary Consultation Proponents must contact the CSRD before making any final site selection decisions in order to discuss their plans with staff. The Manager of Development Services is the designated contact person to deal with telecommunication facilities. It important that proponents submit a description of proposed telecommunication site/facilities to the CSRD early in the consultation process (as per Part 1, Section 1 of this policy) so that sufficient time remains to complete all consultation steps. Following the submission of a complete application package to the CSRD, proponents will have 120 days to conclude the consultation process. 6. Public Consultation Notification Proponents of telecommunication facilities are required to notify the public (at their own cost) in accordance with CPC-2-0-03 and Part 1, Section 1 of this policy. Additionally, notices shall be be mailed or otherwise delivered as appropriate to all owners and

Page 5 Telecommunication Facilities Siting and Consultation Policy P-22 tenants deemed affected by the proposed telecommunication facility. Proponents must contact land owners and residents located within a radius of five times the tower height, measured from the tower base or outside the perimeter of the supporting structure, whichever is greater. Prior to delivering letters or placing newspaper notices, proponents shall consult with the CSRD to review its notification plan. All notices shall advise the public to copy any comments to the CSRD. Engagement - Proponents of telecommunication facilities are required to engage with the public in accordance with CPC-2-0-03. Notwithstanding the above mentioned requirements, the CSRD's Development Services Department may modify these criteria on a site by site basis, given local factors. 7. Concluding Consultation Where a proponent has met the CSRD's public consultation requirements, the Electoral Area Director for the area within which the proposed telecommunications facilities are to be located, in consultation with Development Services staff, will determine whether staff will write a letter of concurrence or whether the proposal will be brought forward to the CSRD Board for consideration. All letters of concurrence or non-concurrence will provide the decision rationale and shall be sent to the proponent (with a copy to Industry Canada) within 21 business days of the decision outcome. Letters of Concurrence are valid for six months from the date they are signed and shall only pertain to the proposal at the time that consultation requirements were satisfied. Any subsequent amendments to the proposal will require new a Letter of Concurrence. The outcome of any decision pertaining to telecommunication proposals will be included as a Development Services information item in the subsequent CSRD Board agenda. Part 2: Siting Telecommunications Facilities on Crown Land The CSRD Board has accepted the provincial Land Use Operational Policy - Communication Sites as its consultation policy for proposed telecommunication antenna and infrastructure located on Crown lands. Although a formal application is only submitted to the Province of British Columbia, proponents are required to contact the CSRD beforehand to discuss their plans. In addition to the requirements set out in Land Use Operational Policy - Communication Sites, proponents are also required to address the following: 1. Description of Proposed Telecommunication Site/Facilities Unless the new or replacement telecommunication facility is excluded from review (see exclusions above), proponents will be expected to provide site and facility information to the CSRD and public in accordance with CPC-2-0-03. Proponents will also be expected to provide the following additional information: a. A proposed site plan and to-scale-drawings showing all of the proposed facilities, with a clear indication of any fencing, landscaping, tree removal, and any other associated works or structures. This should include elevation drawings and photographic

Page 6 Telecommunication Facilities Siting and Consultation Policy P-22 simulations that clearly indicate how the proposed facilities and associated works will appear from adjacent properties and public right-of-ways; b. Proposed site area and setbacks from property lines; c. A statement indicating that the proposed infrastructure is in accordance with Health Canada regulations; and d. A complete description of the facilities proposed to be installed, replaced, modified or activated, including steps taken to ensure compliance with all federal requirements. 2. Location Before building new telecommunications facilities, proponents are to first explore the following options, unless the CSRD prefers otherwise: a. Locate, analyze and attempt to use any feasible existing infrastructure such as rooftops, water towers etc. An alternate site analysis, which includes consideration of co-location on an existing structure, with a qualified expert's explanation of why co-location is not possible. The following locations are preferred: b. Co-location on existing telecommunications towers, whether free-standing or located on roof-tops or wall-mounted, as well as other structures, including but not limited to overhead transmission towers, broadcast towers, utility poles and light standards; c. Industrial and commercial areas where appropriate; d. Agricultural areas where appropriate; and e. Other non-residential areas where appropriate. The following locations are discouraged: f. Residential areas; and g. Environmentally sensitive areas (including but not limited to riparian areas, sensitive habitat areas, bird migration routes, and animal corridors). 3. Design and Visual Impact The CSRD will request that any application, particularly for significant structures (e.g., freestanding structures over 15m in height) consider the context of the environment within which the structure is proposed during the design and siting process. Significant structures should be designed, screened, and situated on the site in such a way as to minimize any potential detrimental effects on the neighbourhood or area within which they are proposed.

Page 7 Telecommunication Facilities Siting and Consultation Policy P-22 The following should be considered in design and siting of both tower and antenna structures as well as auxiliary buildings: a. Screening of facilities by using existing vegetation, landscaping, fencing, or other means in order to blend with the built and natural environments. b. Design and colour should be sensitive to the surrounding vegetation/ forest cover. c. Situate as near as possible to similarly-scaled structures. d. Locate towers and minimize tower height where possible to avoid Transport Canada and/or NAV Canada requirements for painting and lighting. Lighting should be shielded from neighbouring properties. e. Where located in proximity to bird migration routes, guy wires should be made more visible (e.g. through sleeves) to prevent birds from colliding into them. f. All possible measure shall be taken to minimize vegetation removal and disturbance to the natural environment. g. Stealth and/or monopole structures should be used to better integrate form with existing built environment. Where co-location on a single structure is desired, opportunities to design equipment within a single stealth structure may be investigated. h. Access to facilities should be possible without unduly interfering with traffic flow or without unduly creating safety hazards. i. Motorized generators are discouraged as a source of electricity for telecommunication facilities. Where feasible, it is preferred that facilities be connected to the electrical grid. 4. Health and Safety Levels of radiofrequency transmission will be in accordance to all federal health standards, as changed from time to time. 5. Preliminary Consultation Proponents must contact the CSRD before making any final site selection decisions in order to discuss their plans with staff. The Manager of Development Services is the designated contact person to deal with telecommunication facilities. It is important that proponents contact the CSRD early in the consultation process in order to discuss the requirements of this policy. Following the submission of a complete application package to the CSRD, proponents will have 120 days to conclude the consultation process. 6. Public Consultation Notification Proponents of telecommunication facilities are required to notify the public (at their own cost) in accordance with CPC-2-0-03 and Part 2, Section 1 of this policy. Additionally, notices shall be be mailed or otherwise delivered as appropriate to all owners and tenants deemed affected by the proposed telecommunication facility. Proponents must contact

Page 8 Telecommunication Facilities Siting and Consultation Policy P-22 land owners and residents located within a radius of five times the tower height, measured from the tower base or outside the perimeter of the supporting structure, whichever is greater. Prior to delivering letters or placing newspaper notices, proponents shall consult with the CSRD to review its notification plan. Engagement - Proponents of telecommunication facilities are required to engage with the public in accordance with CPC-2-0-03. Notwithstanding the above mentioned requirements, the CSRD's Development Services Department may modify these criteria on a site by site basis, given local factors. 7. Concluding Consultation Where a proponent has met the CSRD's public consultation requirements, the Electoral Area Director for the area within which the proposed telecommunications facilities are to be located, in consultation with Development Services staff, will determine whether staff will write a letter of concurrence or whether the proposal will be brought forward to the Board for consideration. All letters of concurrence or non-concurrence will provide the decision rationale and shall be sent to the proponent (with a copy to Industry Canada) within 21 business days of the decision outcome. Letters of Concurrence are valid for six (6) months from the date they are signed and shall only pertain to the proposal at the time that consultation requirements were satisfied. Any subsequent amendments to the proposal will require new a Letter of Concurrence. The outcome of any decision pertaining to telecommunication proposals will be included as a Development Services information item in the subsequent CSRD Board agenda. MAY 2012