Standard Wind DPR: Essential Contents

Similar documents
Example. Section: PS 709 Examples of Calculations of Reduced Hours of Work Last Revised: February 2017 Last Reviewed: February 2017 Next Review:

ADDENDUM # 3. To prospective Proposers on RFI # 55144: Solar Energy Development and Community Solar at JFK Long-Term Parking Lot:

Published: December 15, 2017 Revised: December 15, 2017

Public Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM

CALENDAR OF FILING DEADLINES AND SEC HOLIDAYS

Published: December 15, 2016 Revised: December 15, 2016

PUBLIC NOTICE Environmental Advisory Board Regular Meeting Wednesday, January 23, 2013 Masny Room, 7:00 PM AGENDA

EACH MONTH CUTTING EDGE PEER REVIEW RESEARCH ARTICLES ARE PUBLISHED

Objective. Commercial Sensitivities. Consistent Data Analysis Process. PCWG: 3 rd Intelligence Sharing Initiative Definition Document (PCWG-Share-03)

Auction Calendar 2017/2018 for Capacity Allocation Mechanism Network Code

IMPORTANT: PLEASE READ INSTRUCTIONS FIRST Deadline: January 31st (Annually)

ENMAX Generation Portfolio Inc.

Grid Code Planner EU Code Modifications GC0100/101/102/104

Computer Grade 5. Unit: 1, 2 & 3 Total Periods 38 Lab 10 Months: April and May

Session 2: CORSIA MRV System: Monitoring of CO 2 Emissions. ICAO Secretariat

National Load Despatch Centre Power System Operation Corporation

Physical Security Reliability Standard Implementation

MAP OF OUR REGION. About

Special Education Room and Board Reimbursement Claim User Guide

High Visibility Enforcement TN Grants Tip Sheets

Stat 428 Autumn 2006 Homework 2 Solutions

VTC FY19 CO-OP GOOGLE QUALIFICATIONS PARAMETERS & REIMBURSEMENT DOCUMENTATION HOW-TO

Scheduled Base Rental Revenue 919, , , ,027 1,013,613 1,038,875 1,064,831 1,091, ,637 1,099,323 1,132,302 1,166,272

Analysis/Intelligence: Data Model - Configuration

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation

MAP OF OUR REGION. About

HPE Secur & HPE Secur Cloud

DEVELOPMENT OF A TOOL FOR OFFSHORE WIND RESOURCE ASSESSMENT FOR WIND INDUSTRY

Information & Communication Technology Statistics 2017

Update : CalFresh Elimination of Change Reporting in CalFresh

MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY

NERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum

Introduction. Quick Steps to Submission. How to Read the ROC Meter. Important Things to Note. Queries. Sample Table for Recording your Readings

Building the Future. Energy Efficiency on Campus Real World Data. ERRAPPA Spill Prevention and Emergency Response/Contingency Plans 7/27/2017

MA SREC-II Extension Application Instructions

Hitachi-GE Nuclear Energy, Ltd. UK ABWR GENERIC DESIGN ASSESSMENT Resolution Plan for RO-ABWR-0027 Hardwired Back Up System

Western Spirit Clean Line Project. Non Tariff Interconnection Facilities Study

Grid Interconnection of Renewable Generation

Marketing Opportunities

VTC CO-OP GOOGLE QUALIFICATIONS PARAMETERS & REIMBURSEMENT DOCUMENTATION HOW-TO

Modifications to DSF 2 License Agreement and supporting documents

Standard Development Timeline

From: Laura Manz, Vice President of Market & Infrastructure Development

Project Presentation April, 2017

Guernsey Post 2013/14. Quality of Service Report

Q2. For the 6 dormitories that compose the Work Release Center, please provide items a,b,c, and d stated in question 1 (above). A2. See attached.

Introduction to Generation Availability Data System (GADS) Wind Reporting

Rocky Mountain Power Exhibit RMP (RTL-1) Docket No Witness: Rick T. Link BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Client Services Procedure Manual

Shared: Locations. Setup Guide. Last Revised: September 27, Applies to these SAP Concur solutions:

Municipal Broadband Project. City Council Meeting February 4, 2016

CPA PEP 2018 Schedule and Fees

Reston Town Center North Development. Community Update

Case3:12-cv VC Document32 Filed02/11/15 Page1 of 5 UNITED STATES DISTRICT COURT NORTHERN DISTRICT OF CALIFORNIA SAN FRANCISCO DIVISION

ADVANCED SPREADSHEET APPLICATIONS -PILOT EVENT-

Arrays. Arrays (8.1) Arrays. One variable that can store a group of values of the same type. Storing a number of related values.

Calendar Excel Template User Guide

ARLINGTON COUNTY, VIRGINIA

CHIROPRACTIC MARKETING CENTER

Standard COM-002-2a Communications and Coordination

ADB s Energy Program in Myanmar

Wyoming Test of Proficiency and Progress (WY-TOPP)

Audit Report. Mineral Products Qualifications Council (MPQC) 31 March 2014

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

Minnesota Hosting Capacity Analysis

Mocuba The First Utility Scale PV Project in Mozambique

A Case Study on Using a Nacelle Lidar for Power Performance Testing in Complex Terrain. Megan Quick December 11, 2013

LC 67 PacifiCorp s Compliance Filing New Wind and Transmission Projects Quarterly Update

National Grid UK Electricity Transmission plc NATIONAL SAFETY INSTRUCTION

Board of Directors Meeting. April 27, 2017

COMMITTEE FOR PROPRIETARY MEDICINAL PRODUCTS (CPMP) GUIDELINE ON REQUIREMENTS FOR PLASMA MASTER FILE (PMF) CERTIFICATION

CAW Clean Wind Energy Project

ENTSO-e Operational Security Network Code. OS Code Objectives. Update for JESG meeting 20 th Feb 2013

Appendix 1 Interconnection Request INTERCONNECTION REQUEST

hereby recognizes that Timotej Verbovsek has successfully completed the web course 3D Analysis of Surfaces and Features Using ArcGIS 10

DOE INFORMATION DATA BASE REQUIREMENTS: VOLUME II - AUTOMATED STAFF INFORMATION SYSTEM

Freedom of Information Act 2000 reference number RFI

Small Hydro Regulatory and Permitting Requirements California

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement

3.0 ENERGY Intro, modules and step-by-step guide ENERGY Fundamentals in Calculations ENERGY Calculation Methods...

PG&E Transmission Interconnection Handbook. Update Section Date Added Figure G5-1 Simplified Flow Chart of Pre- Section G5 Aug.

BSCP128 Production, Submission, Audit and Approval of Line Loss Factors Version 3.0. Balancing and Settlement Code. BSC Procedure DRAFT

Important updates to Business Applications competencies

BSCP128 Production, Submission, Audit and Approval of Line Loss Factors Version 3.0. Balancing and Settlement Code. BSC Procedure DRAFT

Organizing and Summarizing Data

Green Power Connection TM. Solar Stakeholder Collaborative for Maryland

Standard CIP Cyber Security Critical Cyber As s et Identification

Energy Engineering: Tools and Trends

CS378 -Mobile Computing. Content Providers

July 30, Q2 Quarterly Report on Progress in Processing Interconnection Requests; Docket No. ER

RFC Editor Reporting April 2013

Modifications to Mail Processing Equipment (MPE) License Agreements and supporting documents

Self-Certification Tutorial. Version 1.0 April 2013

Proposed Clean and Redline for Version 2 Implementation Plan

Standard CIP-006-4c Cyber Security Physical Security

Validation Report 11 September 2007

A RESOLUTION IN THE COUNCIL OF THE DISTRICT OF COLUMBIA. July 10, 2013

STATE OF MINNESOTA PUBLIC UTILITIES COMMISSION

ISTQB Certified Tester Advanced Level. Release Plan CTAL Version 1.1

Doses Administered Reporting User Instructions

Transcription:

Standard Wind DPR: Essential Contents [Note: The below provided sections and the sub points indicated in the table have to be mandatorily provided by the Wind Project Developers while submitting the Detailed Project Report (DPR). The Wind Project Developers are requested to submit the table along with reference page number against each of the sub-points along with the DPR] Section 1. Checklist In this section the project developer shall confirm that the following documents/information are provided in the DPR: Registration Letter from NRED The wind power project is registered for [insert] MW with New and Renewable Energy, GoMP. This DPR is for [insert] MW. In case part capacity has been applied earlier as a separate DPR, attach execution permission for part capacity if same has been granted by Commissioner, NRE. Capacity utilization factor is > = 20% as per WRA Complete copy of WRA report Micro-siting layout of WTGs on topology map and coordinates in form of longitude and latitude (UTM) WTGs selected for the project are included in RLMM issued by NIWE Transmission/Grid connection approval For Forest Land: Copy of 1 st and 2 nd stage clearance 1 For Revenue Land: Letter of allotment from concerned collector 2 For Private Land: Copy of sale deed 3 Is DPR Filing as per default timeline defined in wind policy (Select as appropriate: Yes/No) If no, provide letter of extension from NRED 4 PERT chart including the major project activities 2. Salient Features Project capacity (MW) Land type, Village, coordinates (longitude/latitude) Nearest town, railway station and airport Nearest connecting state/national highway Page Reference 1 Fill NA, if not applicable 2 Fill NA, if not applicable 3 Fill NA, if not applicable 4 If DPR is filed timely; say NA

WTG type and make Connecting substation and voltage Annual Energy Production per WTG (MkWh) Capacity Utilisation Factor (%) Provide above details (Format [1]) 3. Clearances/Mandatory Approvals Registration Letter from NRED (Attach as Appendix [1]) In case part capacity has been applied earlier as a separate DPR, attach execution permission for part capacity if same has been granted by Commissioner, NRE. (Attach as Appendix [2]) Consent for final coordinates in registration letter as per final micro-siting (Attach as Appendix [3]) Transmission/Grid connection approval (Attach as Appendix [4]) NIWE Certification for WTGs (RLMM) (Attach as Appendix [5]) Information on land to be covered under section [6] and Appendix [8] 4. WRA and Micro-siting Details Mast Information: Coordinates (Log./Lat.) and locations (Village, Tehsil and District of the Mast Date of installation Mast Height Years of measurement Technical standards followed for Mast commissioning and monitoring Fill above details (Format [2]) Complete WRA Report (Attach as Appendix [6]) Monthly mean wind speed data (Format [3]) Tools used for assessment of Annual Energy Production Power Curve (Format [4]) Annual wind-rose diagram Monthly and Annual Energy Production details (Format [5]) Capacity Utilization Factor (should be >=20%) (Format [5]) Micro-siting Details Micro-siting layout on topology map (Attach as Appendix [7]) longitudes and latitudes of proposed WTGs (Format [1]) 5. Equipment WTG make

WTG model Rated capacity (MW) Hub Height (m) Blade Length and Pitch Diameter (m) Cut-in speed (m/s) Cut-out speed (m/s) Generator type and voltage Provide above details in Format [6] 6. Power Evacuation Location of pooling sub-station Capacity of pooling sub-station Location of Grid Sub-station Connecting Voltage Level Provide above details in Format [7] Detailed drawing of evacuation Plan (Attach as Appendix [8]) 7. Land Details Type of Land (Forest/Revenue/Private) For Forest Land: Copy of 1 st and 2 nd stage clearance 5 For Revenue Land: Letter of allotment from concerned collector 6 For Private Land: Copy of sale deed 7 Provide above details as Appendix [9] 8. Project Implementation Plan Timeline Check Is DPR Filing as per default timeline defined in wind policy If no, provide letter of extension from NRED (Attach as Appendix [10]) 8 Implementation Schedule and Methodology PERT chart including the major project activities (Appendix [11]) Methodology for Project implementation and monitoring Technical Standard followed for project design and Implementation 9. Appendices Appendix 1: Registration Letter from NRED Appendix 2: Attach execution permission for part capacity if same has been granted by Commissioner, NRE. 5 Fill NA, if not applicable 6 Fill NA, if not applicable 7 Fill NA, if not applicable 8 If DPR is filed timely; say NA

Appendix 3: Consent for final coordinates in registration letter as per final micro-siting Appendix 4: Transmission/Grid connection approval Appendix 5: NIWE Certification for WTGs Appendix 6: Complete WRA Report Appendix 7: Micro-siting layout on topology map Appendix 8: Detailed drawing of evacuation Plan Appendix 9: For Forest Land: Copy of 1 st and 2 nd stage clearance, For Revenue Land: Letter requesting allotment from concerned collector, For Private Land: Copy of sale deed Appendix 10: Provide letter of extension from NRED (if DPR is filed after the period of default timeline as per wind policy) Appendix 11: PERT chart including the major project activities

Format 1: Salient Features and Location Details Generic Details WTG Details Connectivity Operational Parameters Energy Generation Project capacity (MW) Registration number of NRED Nearest town Nearest railway station Nearest airport Nearest state/national highway WTG make and model Rated Capacity Connecting Substation Connecting Voltage (KV) Expected Annual Energy Generation (MkWh) at P-50 CUF (%) Annual Free Electricity per WTG (MkWh) Location Details of WTGs SALIENT FEATURES Land Type WTG Location Number Longitude (UTM) Latitude (UTM) Select either of Private/ Govt./ Forest District Tehsil Village Khasra Number 1 2 3 4 5 6 7 8 9 Add as required

Format 2: Wind Mast Details Location of the Mast (Village, Tehsil, District) Coordinates of the Mast (Long./Lat.) Date of installation Mast Height Years of measurement Technical Standards followed for Mast Commissioning and monitoring WIND MAST DETAILS

Format 3: Monthly Mean Wind Speed Data MONTHLY MEAN WIND SPEED DATA Month Mean wind speed data at [xx]m height (m/s) January February March April May June July August September October November December May June

Format 4: Power Curve POWER CURVE Wind speed (m/s) Power output (kw) Power coefficient C P

Format 5: Monthly and Annual Energy Production Software/Tools used ANNUAL ENERGY PRODUCTION DETAILS AT P-50 LEVEL Annual average wind speed used (m/s) Input data used Surface Roughness Wake coefficient Turbine model Air density (kg/m 3 ) Other parameters (please mention) Losses, uncertainties and errors considered Monthly Mean Energy Generation per WTG (MWh) AEP calculated WTG availability (%) Grid availability (%) Anemometry (%) Topographical (%) Power Curve (%) Wind speed variability (%) Wake loss model (%) Extrapolation (%) January February March April May June July August September October November December AEP per WTG (MWh) Total annual AEP(MWh) Capacity Utilization Factor (%) Availability (%) Uncertainties (%)

Format 6: Equipment Details EQUIPMENT DETAILS WTG make WTG model Rated capacity (MW) Hub Height (m) Blade Length and Pitch Diameter (m) Cut-in speed (m/s) Cut-out speed (m/s) Generator type Generator Rating Generator voltage (KV)

Format 7: Evacuation of Power EVACUATION OF POWER Location of pooling sub-station Capacity of pooling sub-station Location of Grid Sub-station Connecting Voltage Level (kv)