Answer Modular Power. Page 1 of Rev V. Power Kits. Change of Height Harness. Receptical Covers

Similar documents
Privacy Wall - Power & Data Box (Field Installed) Modular & Hardwire Versions

Avenir & kick Powerway

Modular Table Power System Installation for Runner Non-folding Plug and Play Tables

V.I.A. - Monitor Shroud

Installing Simplex and Duplex Receptacles into: Series 9000 Structural Panel Series 9000 Energy Management Panel and Worksurface Avenir Power Panel

B Y R N E 8 - T R A C O V E R V I E W. 1) Introduction. 2) Universally Recognized. 3) Circuitry/Keying

Power/Data Instructions. Genius. Movable Walls. September

Virtual PUCK for media:scape Kiosk and Answer

KI WIREWORKS WIRE ELECTRICAL SYSTEM INTRODUCTION INFORMATION

SPECIAL APPLICATION MANUAL PART NUMBER: TNP121UL. Tilt N Plug Jr. Table Top Interconnect Box USER'S GUIDE

HomePro ZRF113. Z-Wave Radio Frequency (RF) Controlled, 120 VAC, Isolated Contact Fixture Module, Series 200, Release 2.2

DESCRIPTION PRODUCT CODE LIST PRICE DIMENSIONS/INCHES H L D

Morrison, Currents and Reff Raceways Morrison, Currents and Reff Raceways

Wireless Fixture Adapter (WFA100-SN) Installation Instructions

PRO-HC IRRIGATION CONTROLLER

ETC Installation Guide

CNK600 Cable-Nook Interconnect Box

Principal LED Street Stik Fluorescent Bulb Replacements

PV Rapid Shutdown device

lighting, electrics & communications

Haworth Power Technical Sheets January 2018

Manual. Network Expansion Port 2 NEP-2. English. Brands by Navico - Leader in Marine Electronics

BCM2 Series Branch Circuit Monitors Quick Setup Guide

Principal LED Qwik Stik Fluorescent Bulb Replacements

Satellite INSTALLATION GUIDE

CHANNEL LETTER LIGHTING UNIQUE LIGHTING SOLUTIONS RETROFIT INSTALLATION GUIDE

INSTRUCTION MANUAL DISTRIBUTION UNIT. Please read this manual thoroughly before use, and keep it handy for future reference.

Electrical Management System (EMS) EMS-HW30C & EMS-HW50C

Power Base AI. Power Base AI. Technical Sheets

Flat Screen Garage. Table System Planning Guide WORKING FOR YOU

Configurable Output Distribution. 120V / 208V / 240V 60Hz. User Manual English

Installation Guide. Retrofit Kit for USB Ready Intraoral Systems

PNP415/417 POP 'N PLUG WITH CUSTOM TABLETOP SURFACE USER'S GUIDE

Installation Job Aid for Ethernet Routing Switch 5900 Series

electrics PRODUCT MAP / TABLE OF CONTENTS ELECTRICS & COMMUNICATIONS OVERVIEW POWER ENTRY BASICS PANEL-MOUNTED WORKSTATIONS..

BoxLED DS Plus (Double Side) BX-DS-PL; BX12BA-W4F Signage Lighting System INSTALLATION GUIDE

Quick Start Guide.

888385_01 Install.book Page 1 Wednesday, November 11, :45 PM. SMDR6 Installation Guide

Wireless Sensor Adapter (WSA10) Installation Instructions

Instruction Manual. Electrical Management System (EMS) EMS-HW30C & EMS-HW50C

4100/ VDC Converter Installation Instructions

SMI-100 Stack Monitoring Interface Installation & Operation Manual

and Network Interface Modules Installation Instructions

Installation, Testing, and Operating Procedures 30 AMP PORTABLE AND PERMANENT SERIES GFCI SINGLE and MULTIPHASE

DOCKING STATION SPECIFICATIONS

Wireless General Purpose Adapter (WGA100) Installation Instructions

A-dec 584 Monitor Mount on a Central Cabinet

IIM Warwick Court. Williamsburg VA REV 5

QUICK SETUP GUIDE. BCM2 Series Branch Circuit Monitors. Safety Information. Equipment Maintenance and Service. Raritan DANGER!

SuperBus 2000 Phone Interface/Voice Module Installation Instructions

SURFACE CONTROLTrack INSTALLATION INSTRUCTIONS

lighting, electrics & communications

Installation Instructions

TURBO HD TVI Bullet & Turret Camera

Progressive Industries, Inc. EMS Electrical Management System

NUREVA SPAN SYSTEM INSTALLATION GUIDE

DATA DOUBLER. Apple Mac mini (2009)

CNK200 Cable-Nook Interconnect Box

HD40H(X) Performance Series Camera. User Guide

Before you get started

RV CONTROL AND MONITORING SYSTEM Installation and Operation Manual. Patent # US 9,679,735

Bluetooth Shielding Instructions

Neets Switching Relay - 2. Installation manual

Checker is the sensor. CheckMate is the software that runs on your PC. You use CheckMate to set up Checker mm mm 4.

lighting, electrics & communications

ON-FLOOR WIREWAY PRICELIST AUGUST 1, 2017

Phase Loss Protection Upgrade. Phase Loss Protection Upgrade. In this bulletin:

5 B&W Rear View System Camera

Installing the Enphase Envoy-S Metered

SM (SURFACE MOUNTED) WIREWAY: I SERIES

Instruction / Installation Sheet DataComm Electronics WH Recessed Pro-Power Kit with Duplex Receptacle and Straight Blade Inlet

If technical support is required, please contact Advent Technical Support at

Broadband Automatic Disconnect Switch. User Manual

Now with Picture Memory

On-Line CardioTheater Instruction Manual for Amplifier Models 800 and 1600 (wired)

NANOPTIX HEAVY DUTY KIOSK REGULAR CUTTER PRINTER Thermal Print Mechanism Replacement

Height Strip Covert Camera 장경석. NOTES 1.MODEL: HCE-N41KNF3SH(960H height-strip) Instruction Manual. 148+/-5)mm. 105(+/-5)mm A4 SCALE DO NOT SCALE

Ratchet-Pro Slide Cover

lighting, electrics & communications

Wireless Adapter (WA100-PM) i. Installation Instructions

lighting, electrics & communications

CU USB-Extender-Rx (USB and DVI Extender) Version: 0.3 Date:

LED Gooseneck light FEATURES AND BENEFITS: ORDERING MATRIX: LED GOOSENECK LIGHT:

Enphase S-Series Microinverter and Engage Cable Safety

PM Series Power Meter

hp uninterruptible power system r12000 xr models installation instructions

LVN5200A-R2, rev. 1, Hardware Installation Guide

2 Mesa Ethernet Dock User s Manual

Mini Strip Covert Camera

Emerald Cubicle System. Spec Sheet. Emerald 39,52, 65 H. skutchi.com cubicles.cc. Vol DESIGNS. inc.

Brivo ACS Installation Guide August 2001

SySTIUM TECHNOLOGIES. Assembly Guide. Model 133i

Handset Charging Rack OpenStage WL 3 / OpenStage WL3 Plus. Installation Guide A31003-M2000-J

PowerLogic ION7300 Series

Installation Job Aid for VSP 4450GTX-HT- PWR+

Wa r n i n g-wa r n i n g-wa r n i n g

ON-FLOOR WIREWAY U.S. LIST PRICING POWER AND TELECOM SOLUTION FOR TOP-OF-FLOORING INSTALLATION ON-FLOOR WIREWAY FEATURES

Installation and Maintenance

Upgrade Instructions. P/N Revision A. October Printer Terminal Holder * *

M250 (M LL) Safety

Transcription:

Answer Modular Power Change of Height Harness Power Kits Receptical Covers NOTE: Unused modular electrical connector openings are not required to be capped. NOTE: The electrician can cut conduit and wire to length if needed. New York Power In Feed - Floor Standard Power In Feed - Floor Pass Thru Power If you have a problem, question, or request, call your local dealer, or Steelcase Line 1 at 888.STEELCASE (888.783.3522) for immediate action by people who want to help you. (Outside the U.S.A., Canada, Mexico, Puerto Rico, and the U.S. Virgin Islands, call: 1.616.247.2500) Or visit our website: www.steelcase.com 2014 Steelcase Inc. Grand Rapids, MI 49501 U.S.A. Printed in U.S.A. WARNING : ALL ELECTRICAL INSTALLATIONS SHOULD BE PERFORMED BY A QUALIFIED PERSON IN ACCORDANCE WITH CODES AND REGULATIONS APPLICABLE AT THE INSTALLATION SITE. CIRCUITS SHOULD BE CHECKED FOR PROPER VOLTAGES. ALL SOURCES OF POWER SUPPLY MUST BE DISCONNECTED PRIOR TO ANY SERVICING OR INSTALLATION. Page 1 of 9

Power Kit 1 1. Power Kit 2. Slide end of power kit into vertical junction, Then slide back into other vertical junction. NOTE: RETAINER CLIPS ARE ATTACHED TO ALL WIDTHS OF POWER KITS. 2 3. Engage power tray latch. 4. Connect end of power whip to the next power block. 5b 5. Route powerway conduit around junction glides at the base to the next panel (5a), or through power trays and vertical junction (5b), or staying within the base trim area (5c). 5a 4 NOTE: RETAINER CLIPS ARE ATTACHED TO ALL WIDTHS OF POWER KITS. NOTE: WIRE TIE THE CONDUIT TO THE VERTICAL JUNCTION SO THE BASE TRIM WILL INSTALL EASILY. 5a Wire Tie Conduit 5b 5c 3 Page 2 of 9

Match Receptacle Back Color to Block Color for proper keying. USB RECEPTACLE OR Communication/Data Port Template RECEPTACLE FLEX RECEPTACLE 1. Install receptacles into power block. OR 2. Place Communication and Receptacle Templates. Steelcase Part No. T500940SR. (Customer Service) 3. Attach skin to frame. press against template to make impression. Remove skin and template. NOTE: This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC rules. These limits are designed to provide reasonable protection against harmful interface when the equipment is operated in a commercial environment. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense. Receptacle Template CAUTION Receptacle Templates should always be used when marking receptacle locations on the back of panel skins. If the templates are not used, then cut opening 1-1/2" x 3-5/8", allowing clearance for the mounting screws. Failure to do so may result in serious injury due to fire or electrical shock. Impression NOTE: Be sure electrical products are in final position before making Impressions Page 3 of 9

Tip: Use a sharp knife to cut skin. 4 5 4. Cut skin back where impressions are. Be careful not to cut through the material. 5. Remove inside pieces exposing the material. 6. Cut an "X" from corner to corner. 7. Pull material through hole and secure with tape. 6 7 8. Position skin and attach receptacle covers. NOTE: When replacing the panel skin, make sure that the face plate mounting screws do not make contact with the foil backing of the panel skin. CAUTION When mounting the face plates: Use only the short screws (6-32 x 3/4") for the receptacles, and Use only the long screws (6-32 x 1-1/4") for data jacks. Receptacle opening must be 1-1/2" x 3-5/8". Use template to mark opening. Failure to use the proper screws could result in serious injury due to fire or electrical shock. Location of Communication/Data Ports 8 Long Screws (Data/Communication) Short Screws (Receptacles) Page 4 of 9

Change of Height 1. Run the power whip through the frame beam. 3 2. Connect the power whip to the powerblock. 2 3. Tie up conduit with cable tie. 1 NOTE: RETAINER CLIPS ARE ATTACHED TO ALL WIDTHS OF POWER KITS. Page 5 of 9

Standard Power In Feed - Floor Wrong 1. Install the floor power infeed into the receptacle opening of the power block..015 Min. 2. Route base power-in harness through the backside of the base trim knockout before hard wiring. 3. Hardwire the harness to junction box. 4. Attach jumper cover. WARNING: Do not connect to source of supply until fully installed in furniture. All sources of power supply must be disconnected prior to any servicing or installation. Correct NOTE: Match Receptacle Back Color to Block Color for proper keying. 2 NOTE: RETAINER CLIPS ARE ATTACHED TO ALL WIDTHS OF POWER KITS. NOTE: THE QUALIFIED ELECTRICIAN CAN CUT THE POWER IN HARNESS TO LENGTH (WIRE END), MAKING SURE THE UL LABEL IS INSTALLED ON HARNESS. 1 4 3 Page 6 of 9

New York Power In Feed - Floor 1. Attach the harness to the next power block down. 2. Insert wires from harness into the junction box. Make wire connections and assemble junction box. 1 NOTE: THE QUALIFIED ELECTRICIAN CAN CUT THE POWER IN FEED HARNESS TO LENGTH (WIRE END), MAKING SURE THE UL LABEL IS INSTALLED ON HARNESS. 2 Page 7 of 9

Pass Thru Power 1. Feed pass thru power harness from panel to panel and connect. Page 8 of 9

3+1 Powered by Separate Panels 3+1 Powered by Single Panel L1/L2/L3 Neutral (White) LINE 1 (Black) LINE 2 (Red) LINE 3 (Blue) LINE 4 (Pink) L1/L2/L3 Neutral (White) L4 Neutral (Gray) WIRING SCHEMATICS: Line 4 (Pink) L4 Neutral (Gray) NOTE: L-4 may be connected to P-1, P-2, or P-3. NOTE: L-4 should alternate between P-1, P-2, and P-3 to balance circuit loading. ELECTRICAL DATA: 2+2 Powered by Separate Panels 2+2 Powered by 3-Phase Single Panel 2+2 Powered by Split-Phase Panel 120 V 60 HZ 20 Amp USA & CANADA Wiring schematics must be followed to prevent overloading of the neutrals. L1/L2 Neutral (White) System Ground (Green) Line 4 (Pink) P-1 P-2 Line 4 (Pink) WARNING: Risk of Fire or Electric Shock: This office furnishing system may be connected to more than one source of supply. All sources must be disconnected prior to any servicing. No single circuit may be powered by more than one source. Line 4 (Pink) L3/L4 Neutral (Gray) NOTE: Line 3 or 4 should alternate between phases to balance circuit loading. L1/L2 Neutral (White) L3/L4 Neutral (Gray) System Ground (Green) NOTE: L-4 should alternate between P-1 and P-2 to balance circuit loading. L1/L2 Neutral (White) L3/L4 Neutral (Gray) System Ground (Green) 3 SepN Powered by Separate Panels 3 SepN Powered by Single Panel 3 SepN Powered by Split-Phase Panel L1 Neutral (White) L2 Neutral (Gray) L3 Neutral (White/Gray) Isolated Ground (Green/Yellow) L1 Neutral (White) L2 Neutral (Gray) L3 Neutral (White/Gray) P-1 P-2 L1 Neutral (White) L2 Neutral (Gray) L3 Neutral (White/Gray) Page 9 of 9