Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M

Similar documents
Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M

Please contact us if you have any questions about this document, or about our organization. Our Mission

FM Status Report July, 2018

Energy Action Plan 2015

CNM Master Plan. Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

Centre Lionel E. Lalonde Centre (Emergency & Protective Services Centre)

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013

50 Years of Facility Operations or Rebuilding from the inside out

Critical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded

Five-Year Capital Plan Request FY through FY

MOTT COMMUNITY COLLEGE. Procedure for Cellular Telephones

Maximizing the University s Physical Assets (Part I): Facility Condition Assessment

Physical Plant - Unit Action Plan

Construct Chiller Plant, Phase I

Office of Space Management. U-Space View Only Role User Guide

STRATEGIC ADVISORY AND CAPITAL IMPROVEMENT OVERSIGHT

Energy Management and Conservation Plan

John Strybos, PE OCTOBER 11, 2016

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona

IDEA Campus Energy UNIVERSITY OF MARYLAND Securing Our Networked Utility Infrastructure

ABM UK. Integrated Facilities Solutions

Why and How to Benchmark Building Energy Use in Office Buildings

Agenda Item No. AGENDA ITEM BRIEFING

MM5007 Planned Facility Screens Table of Contents

KCTCS Facilities Support Services and Capital Projects

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities

SCHOOL FACILITIES CERTIFICATION PROGRAM PROGRAM REQUIREMENTS

FULL AND PART TIME BUDGETED POSITION AUTHORIZATIONS FY 2019

FULL AND PART TIME BUDGETED POSITION AUTHORIZATIONS FY 2017

2017 Capital Improvement Budget Police Department

Property Maintenance & Operations Manual Training

Appendix Five-Year Facility Assessment 2009

OUTSOURCED FACILITIES MANAGEMENT SERVICES CAPE TOWN

Item IV Transfer of On-site Natural Gas Distribution System

City Hall Space Selection 15 Market Square. November 27, 2017

Improving Situational Awareness for Utilities Operators and Energy Managers

Business Opportunities with VISN 23 Capital Assets Management. Cynthia A. Doolittle, PE Capital Assets Manager Eagan, MN (VISN 23)

Organizational Structure of the Toronto Environment Office

8505 Baycenter Road Jacksonville, FL

BOARD APPROVES STATE FUNDING MATCH FOR CONSTRUCTION OF CAREER TECHNOLOGY CENTER

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY

DHS Overview of Sustainability and Environmental Programs. Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs

Position Title: H V A C T E C H N I C I A N. G.E.D. or High School Diploma required, an Associate s Degree is preferred.

Facilities Department Town of Duxbury, MA

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

Our portfolio of equipment includes 1,027 pieces of leased equipment and 9,963 of owned equipment for a total equipment count of 10,990.

Western Illinois University Quad Cities Facilities. Consolidated Fiscal-Year 2012 Annual Report and Fiscal-Year 2013 Planning Document

MEMORANDUM. Board Members Alaska Industrial Development and Export Authority

FY 12/13 Recommended Public Works Budget $4,472,871

Office of Space Management. U-Space User Guide. Version 1.5 March, 2011

Orange County Public Schools

FY Janette Pell Department Director. Information and Communications Technology. Administration and Finance

Buildings & Grounds Committee September 30, 2016 Update on Capital Improvement Projects

7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016

Educational Lincoln-Sudbury Regional High School

EVANSTON PUBLIC LIBRARY BOARD OF TRUSTEES FACILITIES COMMITTEE

FAIRBANK COMMUNITY CENTER FEASIBILITY STUDY PUBLIC FORUM- PROGRAMMING THE CENTER February 27, 2014

Mountain Lakes Infrastructure Projects and Investments. January 2017

TOWN OF CARY FULL AND PART TIME BUDGETED POSITION AUTHORIZATIONS FY 2012

Meter Reading Technology. AMR vs AMI

Facilities Advisory Committee Recommendations for 2014 Fall Requests. Presentation to the Administrative Council March 3, 2015

May Hands-on Guidance. Measurable Results. SUPPLIER EFFICIENCY PROGRAM

RCMP Capital Improvements

Washington Headquarters Services Defense Facilities Directorate

SERVICE LEVEL AGREEMENT

STRABAG Property and Facility Services

University of Pittsburgh

8505 Baycenter Road Jacksonville, FL

FACILITIES ADVISORY COMMITTEE SPACE MODIFICATION REQUESTS

Report to the Board. Steve Dickinson, Assistant Superintendent Administrative Services

LOUISVILLE UTILITY AND PUBLIC WORKS ADVISORY GROUP UTILITY OPERATIONS REVIEW

Building 8: Office & Lab Space

XAVIER UNIVERSITY Building Access Control Policy

DWG ROOM ROOM SIGNAGE ROOM TYPE CODE AND DESCRIPTION REMARK Conference Service Exhibition Facility Service

Orange County Public Schools

FACILITY COMPONENTS - MIDDLE SCHOOL

Hurricane Florence Response and Recovery. October 18, 2018 Miles Lackey, Vice Chancellor of Business Affairs & CFO

Rosslyn Station New Entrance

Annual Accreditation Report

CASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO

October 13, From: Larry Snyder, Associate Director for Administrative Services. Subject: Solutions Center Facilities Emergency Response Plan

SYSTEM OFFICE SERVICES USER GUIDE Trinity Health. All Rights Reserved. 1

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY

Stryker Center Concept

KFS Training Manual Purchasing Basics

UF CEMP Support Group Annex: IT Group

Kentucky Community and Technical College System ESPC Initiative

Create a sustainable, high-performance university campus.

2009 Capital Projects Fund Assumptions November 3, 2008

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Vision Program Outline

STEVE TSHWETE LOCAL MUNICIPALITY

Kern Community College Safety, Repair & Improvement District Bond Oversight Committee

OSU Space Survey 2016 Kick-Off Meeting. March 7, 2016

City Reso-A Requests FY 2018 (City Council and Borough Presidents)

Let s face it addressing the growing list of deferred

Energy Performance Contracting

Traverse City Asset Management Plan

Campus IT Modernization OPERATIONAL CONTINUITY FLEXIBLE TECHNOLOGY MODERNIZED SYSTEMS

2012 Bond Planning. Facility Management CPAC Overview Presentation. Denver Public Schools. March 2012

Transcription:

Landscape 1,340 acres, 66 miles of sidewalks, 20 miles of roads Irrigation state of the art central control system; 70 systems, 8 fountains, 4 underground storage systems Stormwater management 119 sites, including 4 green roofs Main Campus Academic Building Inventory Over 14 M Gross Square Feet of space 7.7 M Net Assignable Square Feet 254 Buildings Average building age is 46 years Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M Space Conditions 2/3 of space in major state-supported buildings is in poor or fair condition 1/3 of state-supported space has not had major renovation for 40+ years 2

Reports to VP, Administration & Finance About 800 people work in FM 3

Facilities Management plans, designs, constructs, equips, maintains and operates buildings, infrastructure and grounds, and provides related services to support the University's mission of education, research and public service. 4

Academic & classroom facilities maintenance, management and repair Housekeeping Daily maintenance of buildings and infrastructure Special events/move support Energy management Facilities inventory and mapping Facilities master planning Landscape maintenance Grounds, Arboretum Recycling, waste management, pest control Project management Renovations and small projects Capital projects - College Park campus, client institutions Space and facilities budget allocation processes Winter weather management 5

Units Capital Budgeting Client Institution Project Management (>$1M) UMD Service Center provides project management services for Bowie, Frostburg, Salisbury, UMCES, UMD, UMES, UMUC and USM Facilities Planning In-House Design Services Technical & Administrative Support College Park Campus (UMD) Project Management (>$200K) Interactive Campus Map http://maps.umd.edu/map/ Facilities Master Plan https://www.facilities.umd.edu/sitepages/fpmasterplan.aspx Bill Olen, Executive Director 301-405-3470 wolen@umd.edu 8

Units Utilities Infrastructure Engineering Services Facilities Operations and Performance Billing and Energy Management E&E provides energy consulting services to Bowie, Frostburg, Salisbury, UMCES, UMES, UMUC and USM Overview of Services Combined Heat and Power Plant Operations and Management Distribution and Maintenance of High Voltage Electric Power Facilities Energy Systems Design and Commissioning Support Energy Management and Control System Support Water Resources Management Utility Billing and Invoicing In-house Engineering Services Utilities Management Mary-Ann Ibeziako, Director 301-405-3233 mibeziak@umd.edu 9

Operation, maintenance and renewal of facilities and infrastructure Piped Services Electrical Services Structures HVAC Utility distribution systems Small Renovations Typically <$200K Do not require design or additional approvals (e.g., FIC) 24/7 Incident Response Unit (co-reports to OFA) Jack Baker, Executive Director 301-405-3205 jbaker@umd.edu 11

Administrative Services Special Services Moves of offices, laboratories, furnishings and equipment Special event setup and equipment rentals Recycling - collection and program management recycle@umd.edu Solid Waste collection recycle@umd.edu Arboretum, Landscape and Horticultural Services Tree Management and Maintenance Arboretum/Botanical Garden Management and Maintenance Snow/Weather emergency management Command Center 301-405-8304 Area Maintenance Liaison between building occupants and FM; completes a wide range of service requests Classroom Maintenance Daily maintenance of classrooms and lecture halls Housekeeping Daily cleaning and waste management Harry Teabout III, Executive Director 301-405-5625 hteabout@umd.edu 7

Work Management System Automated system for processing work tasks, billing, space data and warehouse data Customer Response Center Around-the-clock operation - processes service requests, handles emergency calls, coordinates FM communication, monitors HVAC/fire alarm systems, and coordinates outages and road closures Financial Management Provides financial and business operations support - invoice processing, project financial records and reconciliation, handles customer inquiries Parts Warehouse Orders, supplies, and delivers parts and materials for FM and UMD departments FM Fleet Maintains vehicles assigned to FM staff Ken Riebert, Director 301-405-3205 kriebert@umd.edu 10

RESPONSIBLE AREAS FREQUENCY TASKS PERFORMED As a Green Seal Certified organization, we provide the GS-42 Environmental Cleaning Standard of Care Common/Public Areas Classrooms Lecture Halls Seminar Rooms Teaching Labs Study Rooms Restrooms Clinics Kitchens Entryways Vestibules Lobbies Corridors Stairways Elevators Gymnasiums Locker Rooms Daily Trash/Recycling Removal Dusting Vacuuming Wet Mopping/Auto Scrubbing Auto Scrubbing Disinfecting of Restrooms Administrative Areas (key access) Offices Conference Rooms Some Research Labs Weekly Recycling Removal Dusting Vacuuming Wet Mopping Restricted Areas ( off master ) Upon Request Reimbursable Research Labs, offices, etc. Projects Floors are scrubbed/refinished or Common/Public Areas Annually shampooed (during either the summer or winter breaks) Paying Customers As per MOU As agreed upon/mou 14

To request maintenance service or completion of a small project Call 301-405-2222 or request online at www.facilities.umd.edu To request a larger project (<$1M) Complete Request for Facilities Management Services (RFMS) form www.facilities.umd.edu/sitepages/worequest.aspx Performance Goals Service requests Emergency - < 24 hours Urgent - 3 days Routine - 30 days Small projects not requiring design First contact with requestor in 3 days Project completion - 90 days after scope, funding and contracting are in place FM Area Maintenance Technicians are our first responders Academic Facilities Officers and key FM staff should be on a first-name basis 15

Project Value $ > 200K Phase Project identification through approvals to design start Design start to ready to advertise for award Project Value $ > 1M Phase Total Project identification through approvals to design start Design start to ready to advertise for award Project Value $ > 5M Phase Total Project identification through approvals to design start Design start to ready to advertise for award Project Value $ > 50M Phase Total Project identification through approvals to design start Design start to ready to advertise for award Total Duration Up to 6 months 2-3 months Up to 9 months Duration More than 6 months 6 months One year or more Duration More than one year Up to one year More than one year Duration More than one year Up to two years Two or more years Construction award and construction duration vary depending on the size and complexity of the project 16

FM s goal is to deliver service to you Faster, with the same quality of service With more and better customer communication throughout the process Safely 17

Charles R. (Bob) Reuning, P.E. Associate Vice President, Chief Facilities Officer 2310C Service Building, College Park MD 20742-6021 301-405-6214 (Office) 301-448-7817 (Mobile) creuning@umd.edu FM Administrative Offices Service Building Severn Building Wye Oak Building Customer Response Center 301-405-2222 Website www.facilities.umd.edu 18