REQUEST FOR PROPOSAL:

Similar documents
Tarleton State University. Specifications

SPOS (Station Point of Sale) 200. SFTP (Station Fare Transaction Processor) 35. CQD (Card Query Device) 35. HCR (Handheld Card Reader) Cradles 120

Request for Proposal (RFP) Contents

COMPUTER NETWORK WIRING SYSTEMS FOR PLCs

Computer Network Design Guide Existing Systems 1 / 6

Target Interface / Construction Compliance Inspection Checklist

BROWARD COUNTY AVIATION DEPARTMENT INSIDE PLANT INFRASTRUCTURE SPECIFICATIONS

Copper Riser And Intrabuilding Cabling

CITY OF LOS ANGELES INFORMATION TECHNOLOGY AGENCY REQUEST FOR INFORMATION. January 21st, 2005 LEASING OF CITY ASSETS FOR TELECOMMUNICATION PURPOSES

REQUEST FOR PROPOSAL CITY OF WARRENSBURG 102 SOUTH HOLDEN STREET WARRENSBURG, MISSOURI 64093

Request for Proposal George West Independent School District ERate

The six major components of a structured wiring system are:

R Richton School District P. O. Box 568 Richton, Mississippi 39476

ATTACHMENT A Statement of Work

RFP No C047 Emergency Communication System. July 24, 2017

SECTION COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING

Request for Proposals. Information Technology Consultant and Network & Information Technology Support Services

Open Access. Definitions

3. If so, was this taken into consideration when designing the RFP?

SCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS

Dependencies on NETS. Presented by UCAR Technical Security

State of California Level3 Communications IFB STPD B Refresh Statewide Technology Procurement Division

Request for Proposals 2015 Network/Wireless Upgrade & Expansion Riverton USD 404 Riverton, KS

Office of the Chief Information Officer Technical Note: IT-960-TN14 Effective: 05/25/2006 Last Revised: 02/17/2012 Issuing Office: OCIO

SPECIFICATION STANDARD COPPER RISER AND INTRABUILDING CABLING

f) Telecommunications Equipment Rooms

Fiber Optic and CAT 5-6 Installer Premise Cabling

Questions and Answers DOH Security Surveillance System and Installation

Mayhew Technology Solutions

REVISION HISTORY DATE AMENDMENT DESCRIPTION OF AMENDMENT

Distributed Control System Design Standards

PoP ROOM: INSIDE AND OUTSIDE PLANT RULES & REGULATIONS

ADVANCED CUSTOMER SUPPORT ORACLE STANDARD SYSTEM INSTALLATION (OSSI) BASIC SERVICE EXHIBIT

2.3 SCOPE OF WORK MATRIX TO BE INCLUDED IN DISTRICT PROJECTS

Los Anseles W Department of 5* Water & Power

CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL. Fiber Optic Project Charter Township of Shelby Fire Stations #2 #3 & #4 to Fire Station #1

INTERIM COMMUNICATIONS INFRASTRUCTURE PLANNING GUIDELINES

Tender No: MUST/ 011/

Plug & Play Universal Low-Loss Systems A LANscape Pretium Solutions Product

Business Customer Demarcation Information

ADVANCED CUSTOMER SUPPORT ORACLE STANDARD SYSTEM INSTALLATION ( OSSI ) without SITE AUDIT SERVICES EXHIBIT

Grant Parish School Board 512 Main Street P.O. Box 208 Colfax, LA 71417

CAT RFP , Addendum 2 February15, 2013 Page 1

New Cisco MDS 9020 Fabric Switch offers 4, 2 and 1 Gbps Fibre Channel switch connectivity

Video Surveillance Backhaul. Simon Staddon

A. System design shall be completed by a Registered Communications Distribution Designer (RCDD).

Addendum #1 VOIP RFP Questions & Answers 12/13/17

ADDENDUM #1 RFP # , Districtwide Network Refresh Design

Seattle ITS Resiliency Project. ITS California Jason Cambridge September 19th, 2017

1 QUESTIONS/Answers PAGE 1 OF 10. Addendum 2 Request for Proposal FY Voice Data and Infrastructure Cable

TENDER DOCUMENT NATIONAL INSTITUTE OF PUBLIC FINANCE AND POLICY. New Delhi SUPPLY OF LAN EQUIPMENTS AND INSTALLATION OF LAN IN THE CAMPUS

General. Exterior Cameras. Camera Towers

Request For Proposals. Information Technology (IT) Services. General: The City of Bishop requests proposals from consultants to provide IT services.

v2.5 was updated May 10, v2.6 is an updated copy from March 1, 2017.

SPECIAL SPECIFICATION 1303 Lifelink

The Riser as a Contract Document. Peter Sharp, RCDD

Government of Prince Edward Island Structured Cabling Standards August 24, 2009

SECTION FARE COLLECTION SYSTEM

1000Base-SX / LX to 10/100/1000Base-T 802.3at PoE Industrial Media Converter

E- Rate RFP Entity # Funding Year #

Eligible Fiber Options for the E-rate Program

Newark, Delaware Architectural Engineering Senior Thesis Portfolio

Request for Proposal

ADVANCED CUSTOMER SUPPORT ORACLE STANDARD SYSTEM INSTALLATION ( OSSI ) with SITE AUDIT SERVICES EXHIBIT

Peter Sharp RCDD IBI Group

Chapter 4: Network Access. Introduction to Networks v5.1

PANGEN INDUSTRIAL AUTOMATION SYSTEM WARRANTY

MT. PROSPECT PARK DISTRICT REQUEST FOR PROPOSAL REQUEST FOR STATEMENTS OF INTEREST, QUALIFICATIONS, PERFORMANCE DATA AND COST PROPOSAL

Fiber or Copper Which Costs More? Daniel Harman Aug 2006

Great Northern Corporation Request for Proposal for Network Server Installation and Service

REQUEST FOR PROPOSAL (RFP) TELECOMMUNICATIONS SERVICES

The City of Mississauga may install Closed Circuit Television (CCTV) Traffic Monitoring System cameras within the Municipal Road Allowance.

Connecticut Department of Department of Administrative Services and the Broadband Technology Opportunity Program (BTOP) 8/20/2012 1

Wireless Mesh Infrastructure Networks for Supporting Water Districts Data, SCADA and Video Requirements

City of Winter Garden REQUEST FOR PROPOSAL RFP CR Mail and Fulfillment Services LEGAL ADVERTISEMENT CITY OF WINTER GARDEN

{(. }.) Ordinance Fact Sheet 'P..o... ~~

PERFORMANCE OF THE ELECTRICITY DIVISION FOR FINANCIAL YEAR 2006/2007 AND FOCUS FOR FINANCIAL YEAR 2007/2008

Arizona Sports Foundation WEBSITE MAINTENANCE & REDESIGN RFP

SYLLABUS. Departmental Syllabus. Communication Fundamentals ELET0206. Departmental Syllabus. Departmental Syllabus. Departmental Syllabus

LACCD IT Design Standards

Open IX Data Center Technical Standards

Siemon PON Fiber Cabling Solutions

ROUND ROCK INDEPENDENT SCHOOL DISTRICT Data Center Co-Location Request for Proposal (RFP) Number PE15-116

Qs & As from CSD RFP pre-submission conference

Classroom WiFi Network Infrastructure Plan

OVERARCHING SECURITY CONSULTING SERVICES SAWS Solicitation No. R JAM. ADDENDUM NO. 1 February 28, 2018

CONTRACT AWARD TO UDC, INC. FOR FIBER MANAGEMENT SOFTWARE IMPLEMENTATION AND DATA MIGRATION SERVICES

Gigabit Ethernet Wireless Backhaul and Mobile Solution for. The City of Temple, Texas. Alan DeLoera, Director of Technology City of Temple, Texas

Hitachi Visualization Predictive Crime Analytics

Request for Proposals (RFP) IT Infrastructure Upgrade & Storage Solution January 26, 2017 Proposal Deadline: February 8, 2017

Network Construction Guide Specification Telecommunications Infrastructure Standards V 2.6

Municipal Broadband Project. City Council Meeting February 4, 2016

THE CORPORATION OF THE CITY OF STRATFORD

SUSQUEHANNA COMMUNITY SCHOOL DISTRICT BID REQUEST FOR THE INSTALLATION OF FIBER OPTIC CABLE CAPABLE OF A 10 GIGABIT

It is acceptable to place all required information in the main element (such as G4010) and delete the sub-elements provided in this template.

Hosted VoIP Unified Communications Service

CCBC is equipped with 3 computer rooms, one at each main campus location:

SECURITY PLAN. Library Bar 630 W. 6 th Street, Suite 116A Los Angeles, California 90017

STATE-APPROVED HIGH SCHOOL EQUIVALENCY ASSESSMENTS

6. Are you looking for color screen or touch screen features on any of the phones?

Transcription:

REQUEST FOR PROPOSAL: FIBER CABLING INSTALLATION TO CONNECT SIX ADDITIONAL VIEWING STATIONS AT THE EMERGENCY OPERATION CENTER (EOC) WITH THE REGIONAL VIDEO COMMAND CENTER (RVCC) VIDEO FEED I. DESCRIPTION AND BACKGROUND The Los Angeles Police Department ( LAPD ) and Information Technology Agency ( ITA ) are seeking a Contractor to install fiber optic cabling throughout the Los Angeles Emergency Operations Center ( EOC ) for the purpose of connecting new workstations to the Regional Video Command Center System ( RVCC System ) video feeds. The Contractor will provide all labor and materials for this project. The RVCC System is a twenty-four hour, seven days per week operation establishing a system for numerous video surveillance feeds from critical infrastructures in the greater Los Angeles region to enhance awareness and responsiveness to potential homeland security threats and natural disasters. The primary viewing location for the RVCC System is LAPD s Real-Time Analysis and Critical Response ( RACR ) Division. The RVCC System features a dedicated, fault tolerant microwave network for backhauling of video traffic, a single scalable video management system with five (5) years of central storage, control of multiple video feeds from several sources, deployment of 15 wireless surveillance cameras (two with additional video analytics) with edge storage, and video feeds from the Los Angeles International Airport, the Port of Los Angeles and the Port of Long Beach. II. OVERVIEW This project is to support the expansion of the RVCC System to include six (6) new viewing stations: 1. EOC Room 156 2. EOC Room 153 3. EOC Manager 4. EOC Los Angeles World Airport (LAWA) 5. Room 255, Los Angeles Fire Department Operations 6. Room 221, Los Angeles Fire Department Equipment Room In order to connect these viewing stations to the RVCC System video feeds, new fiber optic cabling and Cisco Switches must be installed at the EOC. For this project, the Contractor will only be responsible for the fiber cabling portion,

including labor and all materials (see estimated material breakdown below). The selected contractor will be responsible for the scope of work below. III. SCOPE OF WORK Under the direction of ITA, the selected contractor will provide all labor and materials necessary for: 1. Installation of 24-strand single-mode fiber optic cable between two communication rooms in the EOC Rooms 104 and 215 using existing cable trays and conduits where available. 2. Terminating these fiber strands with fiber connectors on the fiber connector panels on fiber enclosures at both ends. 3. Testing to ensure quality continuity of all fiber strands from end-to-end. The contractor will conduct insertion loss test, Optical Time-Domain (OTDR) test and an end-to-end laser test to confirm circuit continuity and provide to the City Engineers a copy of the test results. ITA staff will oversee the contractor s work and install all fiber patch cords for proper network connectivity. The contractor will provide the fiber and copper patch cords, but these will be turned over to ITA for installation. EOC Floor Plans Please see attached EOC floor plans. Material Breakdown Below is a list of all material to be provided by the contractor for this project: - 500 24-Strand Single mode fiber optic cable, plenum rated - 2, 12 port SC/SM Duplex connector panel corning - 48, SC/SM Fiber optic connector - 500, 1 Innerduct, plenum rated - 4, 12-Fiber Fan-out kit - 2, ¾ Black tape - 11 Ty-wraps - 5, Single-mode fiber optic jumper, FC/SC 3 meters long - 2, Single-mode fiber optic jumper, FC/SC 5 meters long - 2, Single-mode fiber optic jumper, FC/SC 10 meters long - 2, Single-mode fiber optic jumper, FC/SC 12 meters long - 2, Single-mode fiber optic jumper, LC/SC 3 meters long - 4, Single-mode fiber optic jumper, LC/SC 5 meters long

- 5, CAT-6A Data patch cords, Green, 4 ft. long - 10, CAT-6A Data patch cords, Green, 7 ft. long - 10, CAT-6A Data patch cords, Green, 10 ft. long - 10, cat-6a Data patch cords, Green, 20 ft. long Estimated Number of Hours for Completion It is estimated that that approximately 80 man-hours will be required to complete the installation of the fiber cabling. IV. REQUIRED EXPERTISE/EXPERIENCE The contractor must have at least two years of experience installing and testing fiber cable plant. V. BUDGET The contract for this project is to not exceed $11,000. This budget is based on the approximately 80 man-hours that have been estimated as necessary to complete installation of the cabling. VI. PERFORMANCE PERIOD All work related to this project must be completed by April 15, 2014. VII. PROPOSAL REQUIREMENTS: Proposals must include the following information: 1) A description of the Proposer s experience installing and testing fiber cable plant, including: a. A list of the Proposer s past projects demonstrating this experience; b. A short description of the extent and nature of the services rendered for these projects, including dates and project length; c. Names and contact information for the projects clients. 2) A description of the Proposer s relevant education, training, certifications, etc.

3) An executive summary of the relevant background and experience of the Proposer and the Proposer s legal business status, address, telephone number, fax number and email address. 4) List of any and/all municipalities and/or public safety agencies that the Proposer has worked with in the past. 5) Fee structure including the Proposer s hourly rate and proposed flat fee for this project. 6) An estimated length of time necessary for the Proposer to complete EOC fiber optic cabling (based on Proposer s availability, crew size, etc.). VIII. SUBMISSION REQUIREMENTS: Proposers are required to submit electronic copies of proposals via email no later than 3:00 P.M. ON FEBRUARY 14, 2014 (Pacific Time). Electronic copies shall be sent to: rolando.reyes@lacity.org The subject line of the email should include the following: EOC Fiber Optic Cabling Timely submission of the proposal is the sole responsibility of the Proposer. The City reserves the right to determine the timeliness of all submissions. Late proposals will not be reviewed. Selected Contractor will be required to comply with City contracting standards and submit all requisite documents upon contract execution. To view the requirements visit www.labavn.org go to Department Websites, Bureau of Contract Administration then Forms. CONTACT PERSON: Questions regarding this RFP shall be directed to Rolando R. Reyes at rolando.reyes@lacity.org.