Design Guidelines for SCADA & DSA

Similar documents
Specification Voltage Limiting Device

SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station

1. Project Description

Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power Transformers

ECS LUCY GEMINI 3 CONFIGURATION PROCEDURE

MESP MODULAR SUBSTATION USER REQUIREMENTS

MESP TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V DC TRACTION SYSTEM

Designing a new IEC substation architecture

Digital substations. Introduction, benefits, offerings

Branch Procedure. Document No. Issue No. : : 29/06/ /06/2021 (Supersedes CEOP8012, Generation Connection: Protection Guidelines, Issue 4.

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

EDS KV, GRID AND PRIMARY SYSTEM PROTECTION AND CONTROL SCHEMES

Title System Substation Commissioning Tests. Reference Number PCP 07 - (RIC Standard: EP SP)

ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEMS

Substation SCADA Monitoring

GRID/PRSHT/MU320/EN/1.2014/GBR/1894 ALSTOM All rights reserved.

Substation Automation Products. Bay control REC670/650 Relion 670 and 650 series

Equipment Strategy For High Voltage Circuit Breakers

POWER SYSTEM DATA COMMUNICATION STANDARD

ECP SECONDARY SUBSTATION COMMISSIONING PROCEDURE

MONITORING AND CONTROL REQUIREMENTS FOR DISTRIBUTED GENERATION FACILITIES

Ovation Ethernet Link Controller Module Data Sheet

MESP TECHNICAL SPECIFICATION FOR SCADA CABLING IN SUBSTATIONS

SCADA Protocols. Overview of DNP3. By Michael LeMay

EOS REMSDAQ CALLISTO NX TYPE E RTU

Sigbert Reimann, Remote Control Forum, Datum 9. October 2013 RTU - Review and News. ABB Network Management Forum December 10, 2013 Slide 1

Company Directive STANDARD TECHNIQUE: TP18A/1. Application of Connection Control Panels for Soft Intertrip and/or Voltage Constraint Schemes

Supplemental Information

Company Directive ENGINEERING SPECIFICATION EE SPEC: 136

Title Substations - Base Safety & Operating Standards. Reference Number POP 07 - (RIC Standard: EP SP)

Automate and Preserve Electromechanical Relay Investment Part 3 of 3 Using the Bitronics 70 Series to Improve Remote Monitoring and Control

ANCILLARY SERVICES BUSINESS MONITORING

EDS SCADA NUMBERING SYSTEM

Lecture 6 Substation Automation Systems

AUTOMATION OF POWER DISTRIBUTION USING SCADA

LM10 to MM200 Retrofit

Distributed Generation Requirements Update

Lecture 5 Substation Automation Systems. Course map

IDM DATA ACQUISITION SYSTEM

Multifunction Transducer MT440

1S20. Arc Fault Monitor Relay. Features. Introduction. ARC Fault Protection

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

Electrical Demand Specification (Reference SOP: )

Network Configuration Document Selection for New Substations Framework

EOS LUCY GEMINI 3 TYPE E RTU

IMP/ 001 / 014 Policy for the Protection of Distribution Networks

Equipment Strategy for Voltage Transformers Strategy

Title Power Supply Units for Signalling Equipment - DC (Regulated & Filtered) Units. Reference Number SPS 30 - (RIC Standard: SC SP)

OrionLX. An Overview of the OrionLX Product Line

AUTHORITY FOR ELECTRICITY REGULATION

Power Networks Demonstration Centre

Sensus T866 MicroRTU. Remote Input/Output Control. Applications. Reporting Methods DATA SHEET

SIGMA. Advanced Generator Protection and Control. Short Form Catalogue

NEO 3000 Substation System THE FAMILY OF EQUIPMENT DEDICATED FOR POWER UTILITIES. Energy Sector

Peter Overgaauw Pascal Stijns 27 Oct 2016 EXPERION PKS CONTROLS ELECTRICAL SYSTEMS TOO!

////// SUBSTATIONS. Control command and local Scada

DS Agile C264. Grid Solutions. Dual-bay Modular Substation Controller. Multi-function Controller. Automation and Control. Advanced Communication

SCADA and Central Applications An introduction

Switching Process and Rules Systems Operations Framework. Document Number:

2 NOVATECH. This page is intentionally left blank.

NovaTech Orion I/O Overview

Netcon 100. Smart Platform for Distribution Automation. Control and monitoring solution for intelligent electricity distribution networks

Connection Process: For Negotiated High Voltage Retail Customer Connections and Embedded Generators >30kW

Substation monitoring and control

SCADA Training - T&D Automation

reliable company...caterpillar

Protection, Monitoring, and Control System for Distribution Substations ALARM HISTORY SYSTEM COMM. On-Line Documentation TRANSFORMER 12 MW

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation

EDS LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES

IntelliTeam II Automatic Restoration System

ICX-CMOS-E-2006 Electrical / I&C Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

Categorizing Cyber Systems

Power Meter PowerMonitor 500

Case Study: Implementation of 132kv Malegaon Sub-Station Using SCADA

g Energy Multilin Voltage Regulator Controller DGCV KEy BENEFITS APPLICATIONS FEATURES Metering & Monitoring Voltage Regulation Communications

Sigma XT Ancillary Board (K588)

TRIP OF CLARE SOUTH TOWNSVILLE SOUTH 132 KV TRANSMISSION LINE ON 24 JUNE 2015

Product Description. S&C IntelliNode Interface Module. Table of Contents. Instruction Sheet

Substation Automation Products. Line differential protection RED670 Relion 670 series

Connectix Specification Guide for Category 6 U/UTP and Optical Fibre Cabling System Architecture

Shabnam Rukhsar Electrical Engineering Department, Anjuman College of Engineering and Technology.India

C-Bus Network Bridge 5500NB. Series. Installation Instructions REGISTERED DESIGN REGISTERED PATENT

November 29, ECE 421 Session 28. Utility SCADA and Automation. Presented by: Chris Dyer

CONTENTS... 2 COMTROLL SAS. SURVEILLANCE AND AUTOMATION SYSTEM...

OPTIMUM ENERGY PTE LTD

FREQUENCY RESPONSE MONITORING (ANCILLARY SERVICES BUSINESS MONITORING)

HYBRID PV INVERTERS HySpirit Series. 4kW-10kW. Hybrid Inverter with Battery Backup Smart Energy for Smart Home

7SG18 Solkor N Numeric Differential Protection

Maxwell Dondo PhD PEng SMIEEE

Mehta Tech, Inc. TRANSCAN IED For Multi-Function, Multi-Speed Recording

REAL-TIME MONITORING DATA SPECIFICATION

October 05, ECE 421 Session 12. Utility SCADA and Automation. Presented by: Chris Dyer

DUKE ENERGY OHIO SMART GRID / GRID MODERNIZATION. Don Schneider GM, Smart Grid Field Deployment May 24, 2012

Smart Distribution Technology

Power Xpert Meter 350 (PXM350) three-phased DIN-rail multifunction meter

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9

Automation Services and Solutions

Our Customer Terms Page 1 of 18 Ethernet MAN section

VAMP 221. Table of Contents

Large Embedded Generators Register of Completed Projects

Transcription:

Design Guidelines for SCADA & 28 th February 2017 28 FEBRUARY 2017 ISSUE 4

PREPARED BY: PRINCIPAL ENGINEER SCADA & MANAGER AUTHORISED BY: MANAGER SECONDARY SYSTEMS DOCUMENT NUMBER: ISSUE 4 This plan is copyright. No part may be reproduced by any process without written permission, except as permitted under the copyright act. DISCLAIMER 1 Essential Energy may change the information in this document without notice. All changes take effect on the date made by Essential Energy. A print version is always an uncontrolled copy. Before using this document, please ensure that it is still current. 2 This document may contain confidential information. Restrictions on the use and disclosure of confidential information by employees are set out in your contract of employment. Restrictions on the use and disclosure of confidential information by contractors are set out in your contract of engagement with Essential Energy. Sub-contractors are bound by the confidentiality provisions set out in their contract with the contractor engaged by Essential Energy. 2013 Essential Energy Page 2 of 11

Contents 1 INTRODUCTION... 4 2 CHALLENGES... 5 3 SCADA SYSTEM DETAILS... 5 3.1 Master Station/... 5 3.2 Communications... 5 3.2.1 Medium... 5 3.2.2 Protocols... 6 3.3 Australian Energy Market Operator (AEMO)... 6 3.4 RTU Remote Terminal Unit... 6 3.5 Enclosures... 6 3.6 HMI Human Machine Interface... 7 3.7 Convention of Direction... 7 3.8 Hardware Control... 7 3.9 Transducers... 8 3.10 Cable Wiring... 8 3.11 Q/A Documentation... 8 3.12 Input/ Output Points... 8 3.13 IED Devices... 9 3.14 Auxiliary Equipment... 9 3.15 DC Supplies... 9 3.16 Communication Equipment... 10 3.17 UPS/Inverters... 10 4 DISTRIBUTION SYSTEM AUTOMATION ()... 10 4.1 Communications... 10 4.2 Q/A Documentation... 10 4.3 Input/ Output Points... 10 4.4 Protocol... 10 5 HISTORICAL DATA... 10 6 KEY TERMS AND DEFINITIONS... 11 7 REFERENCES... 11 8 REVISIONS... 11 Page 3 of 11

1 INTRODUCTION These guidelines are designed to cover all requirements that need to be satisfied to ensure Essential Energy s minimum standards for SCADA & Systems are met while maintaining the technical currency of these systems. As a result, some items may appear in these Guidelines that are not relevant to a particular Project. These guidelines and associated drawings shall cover Essential Energy s minimum requirements but shall not exclude any area because of the use of this specification. If a requirement is not covered by these guidelines but is crucial to the correct functioning of the SCADA & Systems then approval for the design, implementation or inclusion of the requirements shall be sought from Essential Energy. Where it is desired by the contractor to deviate from the requirements of these guidelines, written approval from the SCADA & Manager must be obtained. Any request for deviations must be fully documented and contain substantiating proof of performance to the recommended standard. Essential Energy reserves the right to decline the offer and insist on the nominated method. The SCADA systems deployed shall be configured in such a way as they become an overlay to the stations so affected. In no way shall the failure of an RTU on site or a collapse of the platform used to communicate with these remote sites effect the performance and control of the sites in question. It is accepted that there may need to be minor local issues to contend with such as alarms or Automatic Voltage Regulation which would need immediate intervention, but the basic premise is that the site will still function normally without communication or RTU functions available on site. Essential Energy s SCADA & Systems design policy and procedures will need to accommodate the above philosophy but still deliver common standards for all projects. The guideline will need to consider the needs of all other sections and include those requirements in the design of SCADA & Systems. This document should not exclude any new technology or device that is compatible with Essential Energy s SCADA & Systems requirements. Existing and additional requirements may be either modified or incorporated as necessary, based on the merits of individual circumstances or at the discretion of SCADA & Manager. However, they should be consistent with the latest industry best practice. Page 4 of 11

2 CHALLENGES All relevant staff associated with the design, installation and commissioning of the SCADA & Systems will carry out works in accordance with this procedure, Australian Standards and other relevant Standards, Technical Guides and any other interrelated Essential Energy policies or procedures. The development of SCADA & Systems must deliver achievable outcomes that are balanced with: Employee Safety Public Safety Environmental Considerations Quality Performance Maximising Reliability Maximising efficiency of the Transmission and Distribution Network Monitoring and control of System Assets. This procedure will be revised at least annually, or as directed by the SCADA & Manager, to ensure the contents are consistent with industry best practice. The Manager SCADA & is responsible for the revision and updating of the document, and will consult widely with all interested parties, both internal and external to the organisation, when carrying out the review. 3 SCADA SYSTEM DETAILS 3.1 Master Station/ Essential Energy s SCADA and Master Station is PowerOn Fusion. A GE product, that serves as a complete Network Management System of which SCADA &, forms an important part. 3.2 Communications Essential Energy s SCADA & communications is IP based apart from a few legacy sites which are earmarked for upgrade. By using IP technology Essential Energy is able to take advantage of the benefits this technology brings across our vast region. 3.2.1 Medium A number of communications mediums are used or deployed throughout Essential Energy, ranging from direct radio links, fibre-optics to microwave links, NextG modems are also used in some cases where other options are unavailable or as a back-up to the primary communications systems. Copper landlines are not to be used due to safety issues surrounding EPR. The actual link used is largely dependent upon bandwidth required, the area in which it is being deployed, the distance the signal needs to traverse, the terrain and the distance from the nearest nodal point. Page 5 of 11

Two communications paths are also required in our Zone Substations where the primary voltage is 132kV or the site is monitored by AEMO to gain redundancy. 3.2.2 Protocols Essential Energy uses the DNP3 Protocol at Level 2 compliance. The DNP3 protocol has been developed specifically for SCADA in the Utilities industry and is recognised as being the most suitable for the remote environment Essential Energy covers. Essential Energy uses DNP3 over IP based technology to communicate to SCADA & RTUs. Essential Energy has some legacy protocols in use but these are being phased out over time. 3.3 Australian Energy Market Operator (AEMO) Essential Energy has an ICCP link to AEMO. This link is used to pass network related data as requested by AEMO. Essential Energy collects the network data via its SCADA system, once in the system the relevant data points are identified and passed through a protocol convertor into the ICCP format and transmitted to AEMO. 3.4 RTU Remote Terminal Unit There are two major suppliers for RTUs being utilised within Essential Energy, both of which exhibit high reliability with excellent performance and development support. These are: Schneider - Serck Magna series CGI (formerly Logica) MD300 and MD311. Selection of RTU type for a new or upgrade install is at the discretion of the SCADA & Manager and generally regionally based. Essential Energy has a number of legacy devices that are being phased out over time. Although the above RTU s are currently Essential Energy s preferred RTUs, this should not preclude other vendor s products from future developments. Distinct advantages would need to be found for creating an extra, preferred vendor of SCADA RTU equipment. The make-up of I/O, comms modules etc are dependent on site specific requirements. In Zone Substations where the primary voltage is 132kV or the site is monitored by AEMO, the RTUs will be installed as a Primary RTU with a redundant Secondary RTU to achieve redundancy. 3.5 Enclosures The standard RTU cabinet footprint throughout Essential Energy is 800mm Wide by 600mm deep by 2000mm high. It is preferred that allowance be made for two (2) standard RTU cabinets for sites with a large I/O count. Adequate clearance for reasonable access for staff to work in and around these cabinets is to be provided. Page 6 of 11

3.6 HMI Human Machine Interface It is required to have a HMI installed at each Zone Substation. The type of HMI used is dependent on the type of RTU that is used at each site and will be nominated by Essential Energy. The HMI uses Touch Screen technology and is to be DC powered and use a solid state hard drive so that there are no moving parts. The HMI is installed for operator safety, centralised control within the substation and ease of local switching. HMI s are not to be used as a substitute for localised control (i.e. replace local/remote switches or trip/close buttons), and are to be regarded as REMOTE CONTROL. HMIs are to be located away from switchgear or other equipment that may endanger an operator in the event of a failure. 3.7 Convention of Direction A convention of direction for the indication of Current, Real and Reactive Power flow is to be followed to ensure that a standard convention is used throughout Essential Energy for both Master Stations and HMI s. The direction of current flow from a source (generator) into and through a substation is taken as positive (+). If the flow of current is outwards from a substation along a sub-transmission feeder (i.e. supply to a downstream radial substation) the direction of current flow for that feeder is taken as negative (-). 3.8 Hardware Control For safety and reliability reasons, the following hardware shall be controlled via SCADA: CB Auto-Reclose Control Single AR schemes where it is not available in the protection relay. If AR routine is located in SCADA, then protection-initiated points are to be hardwired to RTU Local/Remote switch SEF Control Trip/Close control Feeder & Transformer Auto Change Over Voltage regulation of the transformers Indication and control to be hardwired to the RTU for Control routines run via SCADA. At all times, interposing control output relays are to be used to meet load requirements. Note: The features listed above are controlled by SCADA RTUs but their functionality is controlled by the Principles of Substation Design. Page 7 of 11

3.9 Transducers The outputs of Transducers used with RTUs should be Current based. There is a move by industry towards 4-20mA outputs. Essential Energy has in the past used a variety of output types but where possible 4-20mA output should be used. An accuracy Class of 0.2% should be a minimum requirement. The Auxiliary Supply can be either passive or active. Current Transducers are to be passive and mean sensing. A.C. Voltage Transducers used for indication can be either passive or active (using the same voltage as being measured) and should be True RMS. A.C. voltage transducers used for voltage regulation in the SCADA RTU shall be of a narrow band to increase accuracy and will be True RMS. Eg. where measuring 110 VAC the band would be 80 130 VAC (95 125 VAC is preferred if voltage levels permit). Watts & VARS Transducers should be 3 Phase 3 wire unbalanced. They can be Uni or Bidirectional, as the situation requires. All Transducers should be able to be both DIN rail and surface mounted and comply with all relevant Australian and International Standards. 3.10 Cable Wiring Stranded multi-cored cable is to be used between RTU s and field equipment and is to be of suitable size and rating for its purpose. For sites upgrading to a CGI RTU that use a Weidmuller termination block it is essential that Pirelli 12 pair cable Type P2012CS cable or equivalent be used. 3.11 Q/A Documentation Standard Quality Assurance Documentation has been developed which includes a checklist following the commissioning process leading to the substation SCADA being handed to the System Control for operational use. 3.12 Input/ Output Points The RTU shall be programmed to perform the following functions: CB Trip and Close Local / Remote Supervisory Status CB Auto Reclose SEF Protection Operation Indication Auto Close features (for standby equipment) Capacitor / Reactive Plant Control Automatic & Manual Voltage Regulation & Control Site Alarms Intruder / Fire Alarms Load Control where applicable Page 8 of 11

Indication of Protection relays operated and / Or Failed Indication of CB or other device status Indication of distance-to-fault Analogue indication of feeder currents, voltage levels, Real and reactive power, temperatures, tap positions. Indication of transformer taps performed, CB operations performed and maximum demand of transformer and feeder currents. Some of these features may be site-specific. In other words, they may not be available for every site, since not all sites are in need of displaying these features nor are they capable of (e.g. distance-to-fault). Where the SCADA RTU performs a control routine such as voltage regulation indication will be hardwired directly to the RTU and not via a programmable protection relay using serial communications. 3.13 IED Devices IED I/O points are to be programmed to a standard that is constant for each type of device. Any deviation from a set standard I/O listing for an IED must be must in consultation with the SCADA Manager. Interrogation and settings changes to the protection relays shall be done outside of the normal SCADA Communication channels. This is in an effort to stabilise and optimise the SCADA Communications Platform at all times. Programming and implementation of IED Protection devices are the responsibility of the Protection Coordination Group. Refer to CEOP8002 Protection Guidelines. 3.14 Auxiliary Equipment Auxiliary equipment must not be installed in such a manner as to make vulnerable the critical operation of the SCADA system. 3.15 DC Supplies Separate battery chargers and banks for SCADA equipment can be used to supply auxiliary power to the RTU. The decision to use a DC-DC converter will be assessed on a site-by-site appraisal using the following guide. If two sets of 110VDC battery banks are available then either: one 48VDC supply from DC converters where only one 48VDC supply is required; or one 48VDC supply from DC converters and the other from separate 48VDC battery bank where two 48VDC supplies are required. If one 110VDC battery bank is available then one 48VDC supply from separate 48VDC battery bank is to be installed. If the site is of less than 8MVA capacity and not of a strategically significant nature to the network, a cost justification can be done in consultation with the Protection, Design Services and the SCADA groups, as to whether a DC converter may be connected to the 110VDC. A second 48VDC supply will be installed on all AEMO monitored sites and sites that are supplied at 132kV. At other sites where the ZSS is of a strategically significant nature the Page 9 of 11

decision to have a second DC supply is to be made in consultation with Design Services and the SCADA & groups at the project planning stage. If a DC-DC converter is used it will be of a brand nominated by Essential Energy. The SCADA DC battery supply will be sized sufficiently to supply the communications and SCADA equipment for an AC outage of up to eight hours. 3.16 Communication Equipment Communication equipment located at a SCADA site is to be regarded as critical equipment. In view of this communication equipment are to be directly supplied from the SCADA or Station battery system. 3.17 UPS/Inverters UPS/Inverters associated are not to be used to supply the SCADA RTU or communications equipment. 4 DISTRIBUTION SYSTEM AUTOMATION () Distribution System Automation () comprises automated devices located outside the substation on the distribution network. devices may include but is not limited to: Automated reclosers Line Fault Indicators Gas switches. 4.1 Communications Communications to devices is generally via NextG modems connected to the Telstra network via Essential Energy s private VPN. Due to geographic limitations other means of communications will be considered. 4.2 Q/A Documentation Standard Quality Assurance Documentation has been developed which includes a checklist following the commissioning process leading to the substation SCADA being handed to the System Control for operational use. 4.3 Input/ Output Points A standard set of I/O points is used on a device specific basis. 4.4 Protocol DNP3 Level two is the protocol used to communicate to devices. 5 HISTORICAL DATA Essential Energy uses the following proprietary software to access historical data stored by PowerOn Fusion: Webview Page 10 of 11

PowerOn Fusion Report Manager. 6 KEY TERMS AND DEFINITIONS Auto/Non-Auto: Auto/Non-Auto is terms to be used to describe the state of functions controlled via SCADA. Auto is to mean the function is enabled and Non-Auto is to mean the function is disabled. Contractor: The contractor shall mean the person, firm, company or corporation who has been engaged by Essential Energy. Essential Energy: Shall mean Essential Energy or a person nominated by Essential Energy Drawings: Drawings and detailed drawings shall mean, all drawings indicated by a drawing number and any drawings referenced to by that drawing or any drawing referenced to by a referenced drawing. : Distribution System Automation. Engineer: The person or persons appointed by Essential Energy to supervise the works. EPR: Earth Potential Rise. FI: Frequency Injection. HMI: Human Machine Interface (also called MMI Man Machine Interface or GUI Graphical User Interface). IED: Intelligent Electronic Devices such as smart protection relays. I/O: Input/ Output to and from the RTU. Can be physically connected, and or from a Data connection i.e. IED s Master: Essential Energy SCADA or Load Control Master Station. POF: PowerOn Fusion, Essential Energy s distribution management System RTU: Remote Terminal Unit, either dedicated equipment or PLC performing SCADA functions. SCADA: Supervisory Control and Data Acquisition. Site: Any location where RTU, or Load Control equipment as defined exists or is proposed. 7 REFERENCES CEOP8002 Protection Guidelines CEOP8032 Design Guidelines for Transmission and Zone Substations All appropriate Australian Standards. All appropriate ESAA Publications All appropriate Electricity Council of NSW Publications All appropriate Codes of Practice All appropriate RTU manuals Includes RTU specific documents and manufacturers manuals 8 REVISIONS Issue Number Section Details of Changes in this Revision 2 All Updated template in-line with Essential Energy re-branding 3 All Complete rewrite and update 4 All Annual Review Page 11 of 11