Network Configuration Document Selection for New Substations Framework

Similar documents
GUIDELINES FOR SHARED TRANSMISSION CONNECTIONS IN VICTORIA

ASSET RISK MANAGEMENT Criticality Framework

1. Project Description

IMP/ 001 / 014 Policy for the Protection of Distribution Networks

SP Energy Networks Business Plan

Equipment Strategy For High Voltage Circuit Breakers

RCP2 Portfolio Overview Document

Power System Operating Incident Report Trip of Calvale No.2 275kV busbar and Calvale-Halys 8810 and 8811 transmission lines on 30 March 2014

Final Determination: Criteria for Assessing Material Inter- Network Impact of Transmission Augmentations

TRIP OF CLARE SOUTH TOWNSVILLE SOUTH 132 KV TRANSMISSION LINE ON 24 JUNE 2015

Description of the Application Process for Small Embedded Generators

Equipment Strategy for Voltage Transformers Strategy

Benefits, offering and references

Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

EDS LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES

Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power Transformers

Description Activities Description. Co-ordination with GB System Operator. Co-ordination with other DSOs and Distribution Networks (including IDSOs)

STCP 04-3 Issue 005 Real Time Data Provision

Exercise 2. Single Bus Scheme EXERCISE OBJECTIVE DISCUSSION OUTLINE. The single bus scheme DISCUSSION

SE Engineering, PC strives to be a leader in the power system engineering field by providing our customers with the highest level of quality,

POWER SYSTEM DATA COMMUNICATION STANDARD

Switching Process and Rules Systems Operations Framework. Document Number:

OTAHUHU SUBSTATION DIVERSITY PROJECT: REVIEW OF THE CIRCUIT BREAKER CONFIGURATION PROPOSED BY TRANSPOWER

Digital substations. Introduction, benefits, offerings

POWER GRIDS. We are bridging the gap. Enabling Digital Substations.

Bus Protection Application Challenges

Standard for Connection of Embedded Generating Systems (>30 kw to 1,500 kw) to a Distributor s LV Network

MESP MODULAR SUBSTATION USER REQUIREMENTS

Power Transmission Division Link between power generation and distribution

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

Proposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time Study Models November 12, 2013

ABB Data Center Forum 2017

Busbar protection REB 670

Uncontrolled document when printed. Large Customer Connection Manual

Branch Procedure. Document No. Issue No. : : 29/06/ /06/2021 (Supersedes CEOP8012, Generation Connection: Protection Guidelines, Issue 4.

Cost and performance implications of infrastructure investment options in the Eskom Distribution network

Siemens FuseSaver New half-cycle circuit breaker for rural smart grids to minimize operating costs of feeder and spur lines

Disturbance Monitoring and

Standard Development Timeline

From: Laura Manz, Vice President of Market & Infrastructure Development

Connection Process: For Negotiated High Voltage Retail Customer Connections and Embedded Generators >30kW

MODERN-PLANNING TOOLS CONNECTED WITH GEOGRAPHIC INFORMATION SYSTEM IN UTILITY COMPANY

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

Verification of Utility Requirements on Modern Numerical Busbar Protection by Dynamic Simulation

EU DONOR FUNDED SMART GRID PROGRAMME

Feasibility Study on Load Flow and Short Circuit Project

Distributed bus protection application in a platform for process bus deployment in the SMART SUBSTATION

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E.

CRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS

High and Medium Voltage Substation Design, Testing and Maintenance. KSA, Jeddah, Holiday Inn Jeddah Gateway Hotel.

Requests for Clarifications And Responses Order No. 754 Data Request The Study of Single Point of Failure

Network Asset Design Standard HV SUBSTATION FEEDER EXIT CIRCUITS ISOLATION POLICY

Call for Papers GCC POWER 2011 GCC Cigre s Leading Electric Power Conference & Exhibition In the Gulf Region

What You Should Know About Communication Systems: Business Strategies and Options

Asset Criticality Framework

Application Notes on Generator Protection Schemes

High-Reliability Fault-Clearing System solution. Application Guide. Outdoor Distribution (15.5 kv through 38 kv) S&C ELECTRIC COMPANY

Third Generation System of the Future

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

IEC Operator & Testing Interface (OTI)

SCHEDULE 22 COMMON CONNECTION CHARGING METHODOLOGY

Transmission or Distribution. Phil Collins March 18, 2005

Status and Next Steps NARUC Electricity Committee Hank Courtright, Senior VP July 15, 2014

Network Code on Operational Security. User s Group System Operations 06/11/2013

INTERCONNECTION FACILITIES STUDY REPORT

Submission to the International Integrated Reporting Council regarding the Consultation Draft of the International Integrated Reporting Framework

MTL8000-2/x Series Modular I/O

MMLB 01/MMLB 02 Multi-finger Test Plug/ Single-finger Test Plug Technical Data MMLB_EN_TD_A

INTERCONNECTION FACILITIES STUDY REPORT

Supplemental Information

Automation System Solutions

SRAS GUIDELINES FOR SYSTEM RESTART ANCILLARY SERVICES INCORPORATING: SRAS DESCRIPTION SRAS ASSESSMENT GUIDELINES SRAS QUANTITY GUIDELINES

Reliability Standard Audit Worksheet 1

Your partner in energy solutions. Systems Division. Automation & services. (Formerly Pauwels Canada Inc)

TENGIZ PROJECT - FIELD SUBSTATION REPLACEMENT

2 F undamentals of Protection Practice

ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEMS

Grid Solutions. SERVICES Optimizing Asset Reliability, Up-Time and Performance

ICB Industry Consultation Body

DTRV-EP. COMPLEX DIGITAL PROTECTION FOR 120 kv / MEDIUM VOLTAGE TRANSFORMERS. Application field

Our Power & Control line of Business offers solutions that safely distribute power to your home or business. Our product range includes Low/Medium

Standard Development Timeline

Hugo E. Meier, Heidelberg, Germany, June 2014 Integrator Partner Seminar2014 Substation automation trends

Data and Forecasting Summary

System Engineering, IT/OT Integration and the Smart Grid. Steve Apps Pr.Eng SAIEE Associate Director EON Consulting, South Africa

Company Directive STANDARD TECHNIQUE : NC2D/2. Relating to Specification of Connection Assets

PROTECTION REQUIREMENTS OF EMBEDDED GENERATORS < 5 MVA (LV + HV UP TO 22KV)

Commissioning Electrical Installations in Building Services Engineering

Specification Voltage Limiting Device

PG&E Transmission Interconnection Handbook

October 2017 INVESTING FOR THE FUTURE. NIE Networks summary business plans

A Framework to Approach Shared Use of Mining Related Infrastructure: ICT

ELECTRICITY SUPPLY SYSTEMS OF THE FUTURE

Power systems 5: Protection

SIPROTEC 5 Application Note

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure

EDS SCADA NUMBERING SYSTEM

CHAPTER 11 HOW TO ENHANCE THE RELIABILITY & POWER QUALITY OF ELECTRICITY SUPPLY

Transcription:

Network Configuration Document Selection for New Substations Current version: 20/06/2018 EXTERNAL USE Page 1 of 14

Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References... 3 1.4 Defined terms... 3 1.5 Monitoring and compliance... 3 1.6 Risk management... 4 2. Network Configuration... 5 2.1 Substation Layout Principles (110/132kV, 275kV, 330kV)... 5 2.2 110 / 132kV Standard Configuration... 5 2.3 110 / 132kV Increased Reliability Configuration... 5 2.4 110 / 132kV Minimum Configuration... 5 2.5 275kV and 330kV Standard Configuration... 7 2.6 275kV and 330kV Minimum Configuration... 7 2.6.1 Outages... 8 2.7 Connection to end-of-life assets... 8 2.8 Connection of Hub Substation... 8 3. Bus Bar Layout... 8 3.1 Air Insulated Substations... 8 3.1.1 High Reliability Configuration... 8 3.1.2 Less Critical Reliability Configuration... 11 3.2 Gas insulated Substations... 13 3.2.1 High Reliability Configurations... 13 3.2.2 Less Critical Reliability Configuration... 13 3.3 Alternative Technologies... 13 Current version: 20/06/2018 EXTERNAL USE Page 2 of 14

1. Introduction 1.1 Purpose This framework directs the network and busbar configurations and consequent layout which are to be used for Powerlink substations. Any network and busbar configurations not provided for in this will be treated as non-standard and will require recommendation from Group Manager Technology and Planning and approval by the Executive Manager Delivery and Technical Solutions. 1.2 Scope The requirements of this framework apply to all new substations and additions/reconfigurations of the network. Busbar configurations Where a full rebuild of an existing substation is necessary, the busbar configuration shall be in accordance with this framework. Where a partial replacement or addition is required, the existing substation busbar configuration will be assessed on a case by case basis taking present and future customer/network requirements into consideration before recommending a suitable configuration to Executive Manager Delivery and Technical Solutions. Network configuration Where there is a new addition or reconfiguration of the network required, the network configuration shall be in accordance with this framework. Where replacement of the existing assets is required and it may be beneficial for the network utilisation to do so, consideration will be given to change the network configuration in accordance with this framework. 1.3 References Document code Electrical Safety Act Electrical Safety Regulation NER Work Health and Safety Act Document title Electrical Safety Act 2002 (Qld) Electrical Safety Regulation 2013 (Qld) National Electricity Rules Work Health and Safety Act 2011 (Qld) 1.4 Defined terms Terms AEMO RIT-T Definition Australian Energy market Operator Regulatory Investment Test for Transmission 1.5 Monitoring and compliance The implementation of this framework is monitored through asset lifecycle: 1. Planning and Investment Through feedback from existing customers and potential proponents. Through design reviews and ensuring the appropriate busbar configuration is included in the project scope report. Seeking feedback from designers with regards to the level of difficulty for substation expansions or modifications and complexity of the protection systems. Current version: 20/06/2018 EXTERNAL USE Page 3 of 14

2. Operation, Maintenance & Refurbishment All aspects of maintainability are assessed and feedback provided to ensure that any replacement or augmentation project considers any required improvements. All feedback is collected and considered when reviewing this Functional Policy to ensure identified improvements and innovative solutions are included. 3. End of Life (Dispose or Replace) Prior to initiation of replacement and augmentation projects the existing network and busbar configuration is assessed taking into consideration existing and new customer requirements, stability of the network and maintainability of the equipment. The busbar and network configurations are captured in multiple drawings but also in the Transmission Network Database and Energy Management System. 1.6 Risk management In accordance with the Corporate Risk Matrix, this provides an overview of the network and busbar configurations to manage safety, network operations, financial, stakeholder and legal and compliance risks associated with the electricity transmission network. The safety and network operation risks are associated with having sufficient and adequate distances to maintain and operate electrical equipment and having sufficient redundancy to allow required maintenance outages without impacting network customers. The financial and stakeholder risks are associated with the cost of investment, its impact on the cost of electricity, its impact on existing and new customers and government obligations. Legal and compliance costs are associated with meeting all conditions of the National Electricity Rules, Transmission Authority Licence, Work Health and Safety Legislation and customer connection agreements. Before any recommendations are made to change from this framework document, assessment is required by subject experts on network configuration (including network stability) and busbar configuration. Current version: 20/06/2018 EXTERNAL USE Page 4 of 14

2. Network Configuration 2.1 Substation Layout Principles (110/132kV, 275kV, 330kV) Below are listed standard network configurations. Application of any other network configuration will need to be assessed against a number of criteria including but not limited to: Impact on network stability during planned and unplanned contingencies Impact of outages on new and existing customers Complexity of protection systems High level investment cost Maintainability Expandability Customer requirements Additionally, for connections to Powerlink s network, the following criteria must be met in the configuration of the connection: No credible outage on a customer s network should result in an outage of the shared network to which it is connected. 110kV and 132kV connections within 5km of an existing substation will be connected back to the nearby substation. Powerlink s experience has shown this to provide the lowest combination of cost, complexity and operability. 275kV and 330kV connections within 10km of existing substations will be connected back to the nearby substation. Powerlink s experience has shown this to provide the lowest combination of cost, complexity and operability. Some layouts may already exist in the Powerlink network that differs from those listed in this but these resulted from the network s development over time. 2.2 110 / 132kV Standard Configuration The standard configuration used for 110kV and 132kV networks is a U bus or folded bus configuration. This consists of two busbars, with a bus coupler breaker, and breakers on each transformer / feeder or reactive plant element. Where two elements provide connection to the same location or function, then they should be connected to opposing bus bars. Further information on the folded bus configuration is provided in section 3.1.2. 2.3 110 / 132kV Increased Reliability Configuration Where a number of single or multiple connections exist, it may be preferable to utilise a disconnector selectable arrangement to increase the operational reliability of the substation. Each transformer or feeder is established utilising a disconnector to each busbar, and a bus coupler breaker is required. Reactive plant elements are able to be connected to a single bus bar. The use of this configuration will be assessed on a case by case basis. Disconnector selectable configuration will only be considered where it is cost effective against a folded bus arrangement. 2.4 110 / 132kV Minimum Configuration The minimum acceptable configuration for a 132kV connection is a tee. A tee connection creates a threeended feeder, increasing the complexity of protection systems and maintenance requirements. A tee connection is permissible on the 132kV network provided it can meet the following: Current version: 20/06/2018 EXTERNAL USE Page 5 of 14

The connection must be able to be readily isolated from the Powerlink network with an isolation point (including circuit breaker) The feeder must have duplicate high speed communications available to facilitate duplicate differential protection. The overall length of the entire tee connection must not exceed 30% of the overall feeder length, or 30km, whichever is the lesser. Where the length of the tee exceeds 300m, then the isolation point (including circuit breaker) is to be installed adjacent to the feeder. Where the length of the tee exceeds 30km, or where multiple transformers are installed on the tee, then it will be necessary to install circuit breakers at the remote end substation. Four ended (double-tee) connections will only be considered where duplicate high speed communications is available to all sites on the feeder, and where the secondary systems can be upgraded to duplicate differential protection. Where existing network connections prevent the installation of a tee to the 132kV network, then the minimum configuration acceptable is a folded bus arrangement. Where connection to multiple 132kV feeders is required, then the minimum configuration acceptable is a folded bus arrangement. Figure 1 Current version: 20/06/2018 EXTERNAL USE Page 6 of 14

Figure 2 Figure 3 Single tee connection with two transformers 2.5 275kV and 330kV Standard Configuration The standard configuration for a 275kV or 330kV substation is a breaker and a half arrangement, comprising two busbars with 275kV diameters for connection of elements. This configuration provides high reliability, allows for maintenance outages and maximises operational flexibility. Further information on the breaker and a half configuration is provided in section 3.1.1. 2.6 275kV and 330kV Minimum Configuration The minimum acceptable configuration for a 275kV or 330kV connection is a mesh arrangement, consisting of two busbars, one fully populated CB ½ diameter, and one single CB diameter. Additional connections, such as those for an additional transformer, can be in the form of extension of the partially populated diameter, or may be as single bus connections. Current version: 20/06/2018 EXTERNAL USE Page 7 of 14

2.6.1 Outages Access to customer outages should be such that there is not a significant impost on the backbone shared network. That is, disconnectors should be installed to facilitate the outage without needing to take the shared network element out of service. 2.7 Connection to end-of-life assets If a customer proposes to connect to the existing network assets which are identified to be reaching the end of their service life within the next 10 years (in the latest Asset Management Plan), then the customer will be provided with information and high level estimated costs involved with either extending asset lives (if feasible) or estimated cost of the assets replacement. In addition, an alternative connection point will be suggested for customer consideration. Where assets have been identified as reaching their end of life within the next 10 years, Powerlink will undertake to provide information on the likely configuration and what the impact on the connection might be. Considerations include changes in fault level, thermal capacity or availability of assets. This may not be the direct asset being connected to, but where assets being removed may result in changes to the wider network impacting on the connection. Where the expected end of service life for the asset is not identified in the 10 year Asset Management Plan, then it will be assumed that the customer will accept outages in the future to allow for life extension or asset replacement. Additionally, Powerlink is required to undertake analysis and consultation (in the form of a RIT-T) where changes in the network result in significant impacts to any market participant. 2.8 Connection of Hub Substation Where multiple parties are connecting in close proximity, Powerlink may consider the connection of multiple parties to a single substation to minimise connection costs and potential impact on the other parts of the network. 3. Bus Bar Layout The following busbar configurations and consequent layouts will be used for Powerlink substations. Due to inherent differences in reliability and availability between air insulated substation (AIS) equipment and gas insulated substation (GIS) equipment, it is appropriate that busbar layouts for each equipment type be considered separately. In addition the positioning of gas barriers in GIS equipment is defined to the extent of minimising affected plant during isolation and repair. 3.1 Air Insulated Substations 3.1.1 High Reliability Configuration AIS substations required to supply loads which call for high reliability and availability shall be laid out in a breaker and a half configuration (see Figures 4 and 5). Substations serving major customers and/or an integral part of the transmission network are examples that may require this busbar configuration. Whilst this arrangement allows flexibility for operations and maintenance it is also the higher cost option due to the number of primary plant items. This category includes main grid substations 275kV and above. Generally 110kV or 132kV substations would not fit this category though possible exceptions are the replacement of legacy substations at power stations or specific customer loads that require high-reliability (generally by negotiation with the customer). The relative positioning of feeder and transformer bays within the substation is determined on a case by case basis for each site. However consideration needs to be given to the criticality of through-flow versus load when Current version: 20/06/2018 EXTERNAL USE Page 8 of 14

positioning bays within diameters and on busbars. Similarly, potential maximum busbar currents should be considered when positioning loads and sources. Figure 4: Typical Breaker and a Half Configuration (through-flow interconnection not critical) Minimum Configuration Figure 5: Typical Breaker and a Half Configuration (through-flow interconnection critical) Where breaker and a half substations are to be developed in stages or the ultimate size is small, there is a minimum build configuration to ensure adequate reliability and availability. This may vary depending on the function of the substation and its connections. Examples of minimum breaker and a half substation configuration are provided as follows: Spare Diameter (future 2 nd cut-in) Part Diameter (future 2 nd cut-in) Powerlink DNSP Figure 6: Breaker and a Half Layout (through-flow interconnection not critical) Current version: 20/06/2018 EXTERNAL USE Page 9 of 14

Powerlink DNSP Spare Diameter (future 2 nd cut-in) Future 2 nd cut-in maintaining interconnection Interconnecting Feeder during initial staging Figure 7: Breaker and a Half Layout (through-flow interconnection critical) Powerlink Customer Figure 8: Breaker and a Half Layout (feeders from different sources with Customer connection) Figure 9: Breaker and a Half Layout (feeders form same source - more than 2 Transformers) In some cases where customer accepts lower reliability and is still requesting to connect to 275kV and 330kV network, and where this arrangement will not compromise reliability of the regulated network, Powerlink will consider a meshed configuration as in the example shown below. Figure 10: Meshed Configuration Current version: 20/06/2018 EXTERNAL USE Page 10 of 14

3.1.2 Less Critical Reliability Configuration For substations where reliability is not as critical a U bus or folded bus configuration is preferred (see below). Bulk supply and small customer substations are examples of substations where a U bus configuration is preferable. This category would include most 110kV and 132kV substations, except for those supplying major customer loads (separately negotiated). Figure 11: Typical U Bus Configuration (Folded Bus) Where a third transformer (and/or third feeder where all three feeders are from the same source) is required for a highly reliable connection, it is to be made bus CB selectable (Figure 7). Where high reliability is not requirement and will not have impact on regulated network, an alternative connection can be made by agreement. Figure 12: U Bus Layout (more than 2 feeders from the same source and/or more than 2 Transformers) Current version: 20/06/2018 EXTERNAL USE Page 11 of 14

Minimum Configuration The standard minimum connection for a non-bussed arrangement for up to two transformers is as shown in Figure 13. This arrangement is an interim configuration before developing into a bussed configuration as dictated by regulated or non-regulated drivers and can be applied to 110, 132, 275 and 330kV substations assuming that distance between circuit breaker and transformer is no longer than 30 km and the circuit breaker exist at the far end and there are LV transformer circuit breakers... Figure 13: Transformer ended Layout (feeders from the same source) The standard minimum connection for a prescribed (highly reliable), 2 feeder, 2 standard sized transformer connection (bussed) is for 5 CBs as shown in Figure 14. For negotiated customer connections 3CBs (to include feeder CBs) is acceptable where both feeders are from the same source as shown in Figure 15. Figure 14: Simple U Bus Layout (feeders form different sources) Figure 15: U Bus Layout (feeders from same source) with no transformer breakers If the connection is to one of the older substations which already have isolator (disconnector) bus selectability this arrangement may be maintained only in the cases where a low impedance protection arrangement already exists. This arrangement is shown in Figure 16. Low impedance protection is more expensive so this arrangement is not the most economical solution. It also relies on auxiliary switch positions so it is less reliable and maintenance costs are increased. Figure 16: Isolator Selectable U Bus Current version: 20/06/2018 EXTERNAL USE Page 12 of 14

3.2 Gas insulated Substations 3.2.1 High Reliability Configurations Gas barriers shall be provided such that any faulty circuit breaker can be removed and replaced without having to interrupt the associated element (for example feeder or transformer) from service. GIS substations required to supply loads which call for a high reliability and availability shall be laid out in a breaker and a half configuration, electrically configured as for AIS (see Figure 4). Substations serving major customers are examples that may require this busbar configuration. This arrangement allows flexibility for operation and maintenance however it is also the higher cost option due to the number of primary plant items. This category includes main grid substations 275kV and above. Generally 110kV or 132kV substations would not fit this category though possible exceptions are the replacement of legacy substation at power stations or specific customer loads that require high-reliability (negotiated separately). Minimum Configuration For high reliability network requirements, connections are as per the AIS configurations of Figures 6 and 7. Where high reliability is not paramount, configuration shown on Figure 8 can be applied. 3.2.2 Less Critical Reliability Configuration For substations where reliability is not as critical a bus disconnector selectable configuration is preferred (see Figure 17). Bulk supply and small customer substations are examples of substations where this configuration is preferable. The isolator selectable configuration is preferred for GIS over the U bus as it allows continued operation of all circuit elements with a busbar out of service and removal and replacement of a faulty circuit breaker without disruption to other circuit elements. This category includes 110kV and 132kV substations where GIS is an economic solution. 3.3 Alternative Technologies Figure 17: Typical Bus Disconnector Selectable Configuration Due to physical restrictions at some sites, alternative technologies from air insulated substations (AIS) will need to be considered. This version includes recommended busbar configurations for gas insulated substations (GIS). Additional considerations for GIS include positioning of gas barriers to ensure that any failed equipment components can be replaced with minimum disruption to remaining circuits and connections. This busbar configuration framework is summarised in the following tables: Current version: 20/06/2018 EXTERNAL USE Page 13 of 14

Table 1: General Policy Voltage Application Recommended Configuration 275kV &330 kv Main grid and major customers Breaker and half for both AIS and GIS 132kV & 110kV Sub-transmission U bus for AIS & bus disconnector selectable for AIS where low impedance protection exists Table 2: Specific Case Exceptions Bus disconnector selectable for GIS Voltage Application Recommended Configuration 275kV &330 kv All voltage levels All voltage levels Lesser availability acceptable, customer typically. Transformer ended feeders. Lesser availability acceptable, customer typically. Lesser availability acceptable, customer typically. Lesser availability acceptable, customer typically. Meshed configuration for AIS only Transformer ended feeders. Teed feeder arrangement can NOT be combined with transformer ended feeders. 132kV & 110kV Customers that require high reliability Breaker and half for both AIS and GIS Current version: 20/06/2018 EXTERNAL USE Page 14 of 14