Government Of India Ministry of Power Central Electricity Authority New Delhi

Similar documents
State-wise Gross State Domestic Product by Industry of Origin (at Prices) % Share to Total State GSDP at Constant Prices

Monthly changes in the General Indices and CFPIs are given below: Monthly changes (%) in All India CPI (General) and CFPI: Dec over Nov.

Employer Registration Help File

Employer Registration

Connectivity for NeGP. Presented By: Anil Kumar Balani Director Department of Information Technology

National e-governance Plan: State Data Centre (SDC) DVL Narayana Rao, Additional Director, DeitY

FPS Automation. All India Transactions Portal for Centre ANNAVITRAN 2.1. Annavitran Portal - Version 2.1 Page 1 of 22

up of SPMU in States/UTs under NeGP A

MoH&FW, Govt. of India, New Delhi

The various functions of an energy control center can be enumerated as under: 1. Load forecasting 6. Automatic generation control

Handout on. Mobile Number Portability. For Sales Channels

FPS Automation. All India Transactions Portal for Centre ANNAVITRAN 2.1. Annavitran Portal - Version 2.1 Page 1 of 22

NIRMAL XBRL GENERATOR

Highlights of Telecom Subscription Data as on 28 th February, 2018

9.Telecommunication. India s first 3G mobile services by the state owned MTNL (Mahanagar Telephone Nigam Limited)

Mother and Child Tracking System. Achievements and Challenges

Role of MoWR under NHP Avanish Kant, Sr. Hydrogeologist

The modified file structure for the same is given in Annexure 1 of this circular for reference.

Material Handling Systems and Equipment Sectional Committee, MED 07

Telecom Regulatory Authority of India

USER MANUAL. Online Payment Form (User Interface) For. Rajiv Gandhi Institute of Petroleum and Technology, Raebareli. Version 1.0

Wood Based Industries MIS Uttar Pradesh Forest Department

Address and Tel.No. of the Director, Legal Metrology GOI

Material Handling Systems and Equipment Sectional Committee, MED 07

वधम न मह व र ख ल वववय लय न तक उप ध क यम B.A (First Year) थम वष ल क श सन स आ त"रक म $य कन ह त स य क य PA 01 and PA 02

INSTRUCTION MANUAL. Rajiv Gandhi Institute of Petroleum Technology, Jais ONLINE APPLICATION FORM FOR ADMISSIONS. Version 1.0. Designed & Developed By:

व ड ज एक स प म इनस क र प ट क -ब डड सक र य करन क ल ए

Controllers Address, Phone No., Fax No. &

ह म चल प रद श क न दर य व श व द य लय महत वप र ण स चन

स चन औ दस ज- म नक क क टल क प रस व

Develop a platform to enable Government, private and social organizations to integrate social and commercial goals for benefit of the rural citizens

BUREAU OF INDIAN STANDARDS

BUREAU OF INDIAN STANDARDS

USER MANUAL. Online Payment Form. For. Rajiv Gandhi Institute of Petroleum Technology, Jais. Version 1.0. Designed & Developed By:

User Guide. for. Control Table Management Web Application

NOTE: The technical content of document is not attached herewith / available on website. To get the document please contact:

प ज ड /PGD 13 (13360)

प ज ड /PGD 13 (13359)

GOVERNMENT OF INDIA MINISTRY OF COMMUNICATIONS DEPARTMENT OF TELECOMMUNICATIONS

National Informatics Centre, Pune

JSONRecharge API Document

USER MANUAL. Online Payment Form. For. Rae Bareli. Version 2.0. Designed & Developed By:

Highlights of Telecom Subscription Data as on 31 st October, 2018

Ceramic or glass insulator units for a.c. systems Definitions, test methods and acceptance criteria

प ज ड /PGD 13 (13355)

प ज ड /PGD 13 (13354)

Block-2- Making 5 s. १. ट ल ज कर and 10 s Use of a and an number names

POWER TRANSMISSION IN INDIA 2018

Mahatma Gandhi Institute For Rural Industrialization

SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM. Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India

BUREAU OF INDIAN STANDARDS

Madhya Pradesh Bhoj (Open) University, Bhopal

This booklet has been prepared with the support under the GoI-UNDP Disaster Risk Reduction Programme ( )

CLASS 11 HOLIDAY HOMEWORK. English PERIODIC TEST II PORTION HOLIDAY HOMEWORK

Madhya Pradesh Bhoj (Open) University, Bhopal

epaper dainik jagran D9C1977F14595A8FA013E206E Epaper Dainik Jagran 1 / 6

भ रत सरक र Government of India व य त म लय Ministry of Power उ तर प व य व य त स म त. North Eastern Regional Power Committee

A Background Note. Aadhaar - Issues and Implications

BUREAU OF INDIAN STANDARDS

INSTITUTE FOR PLASMA RESEARCH. An Aided Institute of Department of Atomic Energy, Government of India

""""FGJTCFWP"KPUVKVWVG"QH"VGEJPQNQI["

Creation of a Complete Hindi Handwritten Database for Researchers

GRAS Education and Training Services Pvt. Limited ( GRAS Academy ) In Partnership with National Skills Development Corporation (NSDC)

BUREAU OF INDIAN STANDARDS

व य पक पट ररच लन मस द

Tamil Nadu: Current Power scenario and projects in pipeline

Updated SCIM Input Method

ELECTION PERSONNEL DEPLOYMENT SYSTEM

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Draft Indian Standard METHODS OF TEST FOR RUBBER AND PLASTICS HOSES PART 5 DETERMINATION OF ABRASION OF LINING 2. PCD 29(10444) C/ ISO 4650 : 2012

Enquiry Generation Details

Marathi Indic Input 3 - User Guide

Table Joins and Indexes in SQL

Join Consecutive Terms Concatenation of consecutive terms is performed at two stages.

Mobile (Prepaid)Operator Margin Structure

CENTRAL PUBLIC PROCUREMENT PORTAL. System Administrators Guide for Tenders Meta Data transfer from Department Site to CPP Portal

Energy Efficiency Initiatives in Commercial Buildings. Bureau of Energy Efficiency Government of India

स चगक आईएसओ ववम ष ट ओ पर आध रर उपर क दस व ज क कन क स मग एमएचड स अन र ध पर प ककय ज सक ह

PG Diploma Programmes PROGRAMME SUMMARY & FEE STRUCTURE वषय न "म (Contents)

Telecom Regulatory Authority of India

Road Transport Computerisation in Manipur

It is an entirely new way of typing and hence please go through the instructions to experience the best usability.

व य पक पट ररच लन मस द

Sample Copy. Not for Distribution.

STEPS TO BE FOLLOWED BY ERO FOR IMPLEMENTATION OF ECI ERMS

क न द र य सम द र म त स ययक अन स ध न स स थ न

Samrudhi Computers, Ladnun

INDIAN AGRICULTURAL STATISTICS RESEARCH INSTITUTE LIBRARY AVENUE: NEW DELHI WALK- IN- INTERVIEW. Qualifications

Performance Evaluation of Search Engines for Hindi Language Information Retrieval

BUREAU OF INDIAN STANDARDS

ल उड पर ईम ल स य शन सव र स व, ए ट व यरस और ए ट प म म ड य ल क स थ क लए न वद न टस

CAPACITY BUILDING OF DISCOMS UNDER DEMAND SIDE MANAGEMENT SCHEME XII PLAN INITIATED BY

रण ल सर ष एव ब य मद क ववषय सममत एल टई लए,17 2) इल तनक एव स चन र य ग क वव पररषद एल टई लएसए क रध न सद य

Bid Sheet MSTC/BLR/MONITORING COMMITTEE /54/BANGALORE /17-18/9697 [148589] :35:00.0 :: :40:

(स म लसन ह ) भ रत य म नक ब य र पश च म क ष त र य क य लय प रय गश ल स दभ : प क ष क प र /प र म य /

Digital MLS. A Quick Start Guide for Respected Members of Legislative Assembly and Council to submit devices online into MKCL s Digital MLS

Simple Queries in SQL & Table Creation and Data Manipulation

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi

ड च लन और नय ण क लए स फ जर (प.एम.य) क अन य ग पर एक दवस य क यश ल

Transcription:

Government Of India Ministry of Power Central Electricity Authority New Delhi Power Sector July-217

Executive Summary for the Month of July 217 Contents SN Section A - Highlights of Power Sector Page 1 Electricity Generation for July 217 (BU) 1A & 1B 2 Generating Capacity Addition for July 217 (MW) 2 3 List of Projects Commissioned in July 217 3 4 All India Installed Capacity (MW) Region-wise as on 31.7.217 3 5 All India Installed Capacity (MW) Sector-wise as on 31.7.217 4 6 Transmission Lines Added during July 217 (Ckms) 5 7 Transformation Capacity Addition during July 217 (MVA) 6 8 Power Supply Position (Energy & Peak) in July 217 7 9 Peak Shortage of Power Supply (MW) in Different Regions 8-9 1 All India PLF Sector-wise for July 217 1 11 T & D and AT & C Losses (%) 12 All India Village Electrification & Pumpsets Energised as on 31.7.217 13 Average cost of Power & Average Realisation 11 14 All India per capita consumption of Electricity (KWh) 15 All India Coal consumption for Power Generation (MT) Section B - Capacity Addition 1 Capacity Addition Targets and Achievements in 12th Plan 12 2 Capacity Addition Targets & Achievements during July 217 13 3 Installed Capacity in various Regions including their shares. 14-19 Section C - Transmission Lines 1 Programme and Achievements of Transmission Lines in July 217 2 2 List of Transmission Lines Commissioned/Ready for commissioning during July 217 Section D - Sub Stations 1 Programme and Achievements of Sub-Stations in July 217 21 2 List of Sub Stations commissioned/ready for commisssioning during July 217 Section E - Electricity Generation 1 Electricity Generation (MU) Targets and Achievements for 216-17 22 Section F - Power supply position 1 Power Supply Position (Provisional) for July 217 23 2 Peak Demand and Peak Met (Provisional) for July 217 24 3 Power Supply Position (Revised) for May 217 25 4 Peak Demand and Peak Met (Revised) for May 217 26 5 Notified Power cuts / Restrictions on Industries during July 217 27 6 Power Supply to Agricultural Sector during July 217 28 Section G - Growth of Power Sector 1 Growth of Installed Capacity since 6th Plan 29 2 Growth of Transmission Sector since 6th Plan 3 3 All India Yearly Coal consumption for Power Generation (Utilities) 4 All India Annual Per Capita Consumption of Electricity since 26 31 5 Average cost of power supply & Average realisation (Paisa/kwh) 6 Growth of Rural Electrification & Pump Sets Energisation 32 7 Status of Hydro Schemes Cleared by the CEA upto July 217 Section H - Rate of sale of power for the year 214-215 1 Rate of sale of power for the year 214-215 33-41

Section A - Highlights of Power Sector SN Contents Page 1 Electricity Generation (Conventional Sources) for July 217 (BU) 1 2 Generating Capacity Addition for July 217 (MW) 2 3 List of Projects Commissioned in July 217 3 4 All India Installed Capacity (MW) Region-wise as on 3.6.217 3 5 All India Installed Capacity (MW) Sector-wise as on 3.6.217 4 6 Transmission Lines Added during July 217 (Ckms) 5 7 Transformation Capacity Addition during July 217 (MVA) 6 8 Power Supply Position (Energy & Peak) in July 217 7 9 Peak Shortage of Power Supply (MW) in Different Regions 8-9 1 All India PLF Sector-wise for July 217 1 11 T & D and AT & C Losses (%) 12 All India Village Electrification & Pumpsets Energised as on 3.6.217 #### 13 Average cost of Power & Average Realisation 14 All India per capita consumption of Electricity (KWh) 11 15 All India Coal consumption for Power Generation (MT)

1. Electricity Generation for July, 217 (BU) Type Achievement Targets Achievement % Change Jul-16 Jul-17 Jul-17 w.r.t. 216 Thermal 75.25 84.38 78.44 Hydro 15.8 16.71 15.41 Nuclear 3.258 3.79 3.3 Bhutan Import 1.12.649 1.21 All India 94.62 15.529 97.898 3.48 ### BU 18. 16. 14. 12. 1. 98. 96. 94. 92. 9. 88. 94.62 Jul-16 15.529 Jul-17 Electricity Generation During April 216 to July 216 & April 217 to July 217 (BU) Type Thermal Hydro Nuclear Bhutan Import All India July '16 July '17 % Change 33.927 34.18 2.77 45.913 51.688 12.58 12.359 12.86-2.21 1.98 2.7 1.36 391.179 45.889 3.76 45. 4. 35. 3. 391.179 45.889 BU 25. 2. 15. 1. 5.. July '16 July '17 1A

Month Generation from Conventional Sources Generation (April, 217-July, 217) Generation from Renewable Sources Electricity Generation (Conventional & Renewable Sources) April, 217-July, 217 vis-à-vis April, 216- July, 216 Total Generation from Conventional Sources Generation (April, 216- July, 216) Generation from Renewable Sources Total Growth in Conventional Generation % Growth Growth in Renewable Generation Growth in Total Generation (MU) (MU) (MU) (MU) (MU) (MU) (%) (%) (%) Apr-17 13,16 6,932 11,92 99,345 5,82 14,427 3.84 36.4 5.42 May-17 17,295 8,666 115,961 99,93 6,82 16,723 7.4 27.7 8.66 Jun-17 97,525 1,228 17,753 97,326 8,118 15,444.2 25.99 2.19 Jul-17 97,912 11,9 19,812 94,66 9,554 14,16 3.49 24.56 5.43 Source-Wise All India Generation from Renwables Electricity Generation From Renewable (source wise) April-June, 217 vis-à-vis April-June, 216 For the Month of All Figure in MU Commulative value for the period June, 217 June, 216 June,217 June,216 Wind Solar Biomass Bagasse Small Hydro Others Total 7229.12 1797.33 292.69 276.31 567.1 65.21 1227.76 5844.6 919.61 348.29 332.13 657.91 15.59 8118.13 1582.6 5481.34 957.67 1295.54 179.2 145.8 2539.89 1228.89 2936.2 16.21 1963.31 182.47 47.68 19982.76 1B

2. Generating Capacity Addition for July, 217 (MW) Type Achievement Targets Achievement Jul-16 Jul-17 % Change w.r.t. 217 Thermal 5-1. Hydro 4 68.5 1. Nuclear. All India 54 68.5-1. 6 5 5,4. 4 3 2 # 1 Jul-16 1. Jul-17 Generating Capacity Addition during April '16 to July' 16 & April '17 to July' 17 (MW) Apr -16 to July-16 Apr -17 to July -17 % Change Thermal 2235 379 7 Hydro 15 136 1 Nuclear NA All India 234 3926. 68 45 4 3926. 35 3 25 234 2 15 1 5 1 Apr -16 to July-16 Apr -17 to July -17 2

(i) Thermal 3. List of Projects Commissioned During July 217 NIL (ii) Hydro NIL (iii) Nuclear NIL ### 4. All India Installed Capacity (MW) Region-wise as on 31.7.217 Thermal Nuclear Hydro RES Grand Total Region Coal Gas Diesel Total Northern 52649.2 5781.26. 5843.46 162. 19311.77 11712.92 9175.15 Western 7163.62 1159.41. 81223.3 184. 7447.5 18412.1 18922.63 Southern 43382.2 6473.66 761.58 5617.26 332. 11739.3 2689.91 92567.2 Eastern 27658.2 1.. 27758.2. 4834.12 993.74 33585.87 North-East 58.2 1771.5 36. 2387.7. 1282. 281.12 395.19 Islands.. 4.5 4.5.. 12.56 52.61 ALL INDIA 194432.88 25185.38 837.63 22455.88 678. 44614.42 5833.35 33153.65 35. 3. Total = 33153.65 33153.65 25. 2. 22455.88 15. 1. 5.. 44614.42 5833.35 4726 678. Thermal Nuclear Hydro RES Total Captive Thermal Nuclear Hydro RES Total Captive Note: Captive Genaration is not included in the total. RES as on 31.12.216. 3

5. All India Installed Capacity (MW) Sector-wise as on 31.7.217 Sector THERMAL Coal Gas Diesel Total Nuclear Hydro RES Grand Total State 6469.5 7113.95 363.93 72168.38. 29723. 1976.9 13868.27 Private 7442.38 158.6 473.7 8596.68. 324. 56326.45 144663.13 Central 557. 749.83. 6319.83 678. 11651.42. 81622.25 All India 194432.88 25185.38 837.63 22455.88 678. 44614.42 5833.35 33153.65 RES as on 31.12.216 All India Installed Capacity(MW) as on 31-7-217 (Sector-Wise) ## Central, 81622.25, 25% State, 13868.27, 31% State 13868.27 Private 144663.13 Central 81622.25 Private, 144663.13, 44% 4

6. Transmission Lines Added during July, 216 (Ckms) Voltage Level +/- 5 KV HVDC +/- 8 KV HVDC 765 KV 4 KV 22 KV All India Jul-16 Jun-17 486 59 977 388 48 447 1511 ckms 16 14 12 1 8 6 4 2 1511 447 July '15 1 July '16 Transmission Lines Added during Apr '15 to July '16 & Apr '16 to July '17 (Ckms) Voltage Level +/- 5 KV HVDC +/- 8 KV HVDC 765 KV 4 KV 22 KV All India Apr '15 - July '16 Apr '16 - July '17 142 1332 295 5843 1838 1191 619 8366 ckms 9 8 7 6 5 4 3 2 1 619 8366 Apr '15 to July16 Apr '16 to July '17 5

7. Transformation Capacity Addition During July, 217 (MVA) Voltage Level +/- 8 KV HVDC +/- 5 KV HVDC 765 KV 4 KV 22 KV All India Jul-16 Jul-17 3 3 226 326 78 485 64 6745 Transformation Capacity Addition during July 217 68 6745 66 64 MVA 62 6 64 58 56 Jul-16 Jul-17 All India Transformation Capacity Addition during Apr '16 to July '16 & Apr '17 to July'17 (MVA) Voltage Level +/- 8 KV HVDC +/- 5 KV HVDC 765 KV 4 KV 22 KV All India April' 16 to July '16 April '16 to July'17 15 9 7 975 1454 46 71 22675 35 7452 MVA 35 22675 April' 16 to July '16 1 April '16 to July'17 6

8. Power Supply Position (Energy & Peak) in July 217 Region Energy (MU) Deficit (%) Requirement Availability July'16 June 17 July '16 July'17 Jun.16 Jun '17 Northern 3361 36,153 32788 35,639 -.8-1.4 Western 26951 26,521 26939 26,52.. Southern 23863 2,261 23863 26,654. 178.8 Eastern 11449 11,236 11398 11,224 -.4 -.1 North Eastern 136 1,397 126 1,351-3.5-3.2 All India 9663 11,971 96248 11,389 -.4 -.6 Power (MW) Region Deficit (%) Peak Demand Peak Met July 16 July 17 July 17 June'17 Jun16 Jun. '17 Northern 52151 53367 51658 52648 -.9-1.3 Western 38999 41225 3879 4118 -.7 -.1 ## Southern 36215 42267 36172 42267 -.1. Eastern 18211 1971 1875 1963 -.7. North Eastern 2474 257 2391 2429-3.4-3.1 All India 147453 155573 1483 153179.4-1.5 7

9. Peak Shortage of Power Supply (MW) in Different Regions Chandigarh Delhi Haryana HP J&K Punjab Rajasthan UP Utrakhand July '16 81 435 12 969 65 July '17 16 6 Northern States (MW) 529 July '17 131 July '16 131 12 969 8 4 81 529 435 12 65 Chandigar h Delhi Haryana HP J&K Punjab 6 Rajasthan MW UP Utrakhand ### Chattisgarh Gujarat MP Maharashtra Daman & Diu Dadar Nagar Haveli Goa July '16 39 12 17 July '17 25 25 9 47 Western States 17(MW) 1 July '17 July '16 MW 2 15 1 5 25 Chattisgarh 39 9 Gujarat 47 MP 12 17 Maharashtra 17 Daman & Diu Dadar Nagar Haveli 1 Goa AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep Southern State (MW) July '17 June '16 June '16 3 5 1 5 July '17 9 25 6 11 25 9 3 6 5 11 1 AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep 8

Bihar DVC Jharkhand Odisha West Bengal Sikkim A&N Island July '16 121 19 8 July '17 Eastern States (MW) 4 July '17 July '16 MW 15 1 5 Bihar 121 DVC Jharkhand Odisha 19 West Bengal Sikkim 4 8 A&N Island Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura July '16 1 44 North-Eastern States (MW) 1 1 1 6 July '17 1 3 3 2 2 4 5 4 2 1 Arunacha 1 l MW 3 Assam 3 Manipur 2 Meghala ya 2 Mizoram 1 4 Nagaland 1 5 Tripura 1 9

1. All India PLF* Sector-wise for July. 217 %PLF Sector June '16 July '17 Central 57.21 68.45 State 44.97 43.5 Private 5.32 5.32 ALL INDIA 53.72 54.32 Sector-Wise Plant Load Factor for Apr, 216 and July, 217 % PLF 8. 7. 6. 5. 4. 3. 2. 1.. 57.21 68.45 44.97 43.5 5.32 5.32 53.72 54.32 Central State Private ALL INDIA June '16 July '17 All India PLF Month-wise Month PLF 216 PLF 217 Apr 66.81 65.59 May' 62.15 64.39 June 73.24 7.15 July 67.21 68.45 All India PLF Month-wise 8 Axis Title 62.15 64.39 6 April Axis Title 216 217 * For Coal and Lignite based Power Plants 1

11. T & D and AT&C Losses (%) 21-11 211-12 212-13 213-14 214-15 T&D Losses 23.97 23.65 23.4 21.46 22.77(P) AT&C Losses 26.35 26.63 25.48 22.58 24.62(P) Note: As per PFC for utilities selling directly to consumers P: Provisional 12. All India Village Electrification & Pumpsets Energised as on 31.5.217 Total Number of Villages Villiages Electrified (Nos.) as on 31.7.17 597464 59394 * Pump sets Energised Pump sets Energised as on 31-7-17 as on 31-3-216 243418 2143721 Figures are based on the data available in DDUGJY website. % Villages electrified 99.25 *Disclaimer: The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as Indicated in all the reports. The data in the report prior to October, 215 was Updated every month based on the information received from states/distribution utilities as and when reported but the data for all the states for a particular month was generally not made available simultaneously to reflect the countrywide picture for a particular month. Number of total villages and number of electrified villages have also been adjusted for changes observed from Census 211 data. As such, each monthly report of Village electrification of CEA is independent of the earlier published reports ### Note: From the year 24-5 onwards Definition of Village Electrification:- A village would be declared Electrified if i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited locality as well as Dalit Basti / hemlet where it exists. (For electrification through Non-Conventional Energy Sources a Distribution Transformer may not be necessary) ii) Electricity is provided to Public places like Schools, Panchayat Office, Health Centre, Dispensaries, Community Centres etc. and iii) The number of households electrified should be at least 1% of the total number of households in the village iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be obtained. 13. Average cost of Power & Average Realisation Average Revenue Realization(paise/unit) Gap ACS- Year Gap ACS- ARR (on Gap ACS- Average cost of supply(acs) ARR( subsidy ARR (on (paise/unit) Without booked subsidyrece Without Subsidy Subsidy) Paise/unit basis) paise/unit ived basis) paise/unit 213-14 518 4 118 76 77 214-15 52 412 18 58 6 Source:- PFC Reports on the performance of State Power Utilities 14. All India per capita consumption of Electricity ( KWh) # 214-15 11 215-16 175* # (Gross Generation+Net Import) / Mid Year Population, * Provisional 15. All India Coal consumption for Power Generation (MT) 213-14 489.4 214-15 53.4 215-16 545.9* * Actual 11

Section B - Capacity Addition SN Contents Page 1 Capacity Addition Targets and Achievements in 12th Plan 12 2 Capacity Addition Targets & Achievements during June 217 and April 216 to July 217 13 3 Installed Capacity in various Regions including their shares. 14-19

1. Capacity Addtion Targets and Achievements in the 12th Plan (i) Targets (MW) Type/Sector Central State Private Total Thermal 14,878. 13,922. 43,54. 72,34. Hydro 6,4. 1,68. 3,285. 1,897. Nuclear 5,3... 5,3. Total 26,182. 15,53. 46,825. 88,537. (ii) Achievements upto Mar, 217 during the 12th Plan (MW) Type/Sector Central State Private Total Thermal 15,868.6 22,21.35 53,66.5 91,73.45 Hydro 2,584.2 2,276. 619. 5,479.2 Nuclear 2,... 2,. Total 2,452.62 24,477.35 54,279.5 99,29.47 Acievement % 78.12 157.61 115.92 112.5 Achievement of Capacity Addition during the Current Plan upto March 217 12th Plan Target 88,537 MW, Achieved so far 99,29.47 MW 9,. 8,. 7,. 6,. 5,. 4,. 3,. 2,. 1,.. 72,34. 1,897. 5,479.2 5,3. 2,. Thermal Hydro Nuclear Target Achievement 12

2. Capacity Addition Targets / Achievements During July 217 Schemes Sector (MW) Target Jul-17 April '17 - July 17 Deviation 217-18 Target* Achievement Target* Achievement (+) / (-) Central 488 488 91-397 Thermal State 3546 3846 66-3186 Pvt. 294 15 351 222-129 Total 11366 15 12236 379-8446 Central 8 58-58 Hydro State 3 2 2 398 4-358 Pvt. 25 217 96-121 Total 135 2 2 1195 136-159 Nuclear Central 5 Central 618 546 91-455 All India State 3846 2 2 4244 7-3544 Pvt. 3145 15 3727 2316-1411 ## Total 13171 2 17 13431 3926-955 Targets and Achievement during 217-18 Target 16 14 12,236 13,431 Achievement 12 1 MW 8 6 4 2 3,79 1,195 136 3,926 Thermal Hydro Nuclear Total Capacity Addition Targets/Achievements during the Month of June 217 MW 1 9 8 7 6 5 4 3 2 1 Targets and Achievement during July 217 2 15 2 Target Achievement Thermal Hydro Nuclear 13

Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Coal Gas Diesel Total State 17258. 2879.2. 2137.2. 8543.55 663.56 29344.31 Private 2276.83 558.. 23318.83. 252. 1149.36 3687.19 Central 1263.37 2344.6. 14974.43 162. 8266.22. 2486.65 Sub Total 52649.2 5781.26. 5843.46 162. 19311.77 11712.92 9175.15 State 2297. 2849.82. 25819.82. 548.5 311.18 31611.5 Private 32875.67 4676.. 37551.67. 447. 181.92 5699.59 Central 14317.95 3533.59. 17851.54 184. 152.. 21211.54 Sub Total 7163.62 1159.41. 81223.3 184. 7447.5 18412.1 18922.63 State 17832.5 791.98 287.88 18912.36. 11739.3 512.55 31163.94 Private 12124.5 5322.1 473.7 1792.3.. 26378.36 44298.66 Central 13425.2 359.58. 13784.6 332... 1714.6 Sub Total 43382.2 6473.66 761.58 5617.26 332. 11739.3 2689.91 92567.2 State 657. 1.. 667.. 3537.92 225.11 1433.3 Private 6281.38.. 6281.38. 291. 768.63 7341. Central 1486.64.. 1486.64. 15.2. 15811.84 Sub Total 27658.2 1.. 27758.2. 4834.12 993.74 33585.87 State 6. 492.95 36. 588.95. 422. 259.25 127.2 Private. 24.5. 24.5.. 21.88 46.38 Central 52.2 1253.6. 1773.62. 86.. 2633.62 Sub Total 58.2 1771.5 36. 2387.7. 1282. 281.12 395.19 State.. 4.5 4.5.. 5.25 45.3 Private...... 7.31 7.31 Central........ Sub Total.. 4.5 4.5.. 12.56 52.61 State 6469.5 7113.95 363.93 72168.38. 29723. 1976.9 13868.27 Private 7442.38 158.6 473.7 8596.68. 324. 56326.45 144663.13 Central 557. 749.83. 6319.83 678. 11651.42. 81622.25 Total 194432.88 25185.38 837.63 22455.88 678. 44614.42 5833.35 33153.65 Figures at decimal may not tally due to rounding off ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS (As on 31.7.217) (UTILITIES) Modewise breakup Ownership/ Sector Thermal Nuclear Hydro RES * (MNRE) Grand Total Abbreviation:- Note : - SHP=Small Hydro Project ( 25 MW), BP=Biomass Power, U&I=Urban & Industrial Waste Power, RES=Renewable Energy Sources 1. RES include SHP, BP, U&I, Solar and Wind Energy. Installed capacity in respect of RES (MNRE) as on 3.6.217 (As per latest information available with MNRE) *Break up of RES all India as on 3.6.217 is given below (in MW) : Small Hydro Power Wind Power BM Power/Cogen. Bio-Power Waste to Energy Solar Power Total Capacity 4384.55 3258.17 8181.7 114.8 13114.85 5833.35 A. Capacity Added during July, 217 MW B. Capacity Retired during July, 217 MW C. Capacity Removed due to July, 217 12 MW change to CPP from IPP during 1. U-4 of JOJOBERA TPS (12 MW) has been converted into CPP and the same capacity has been removed from Private Sector of Jharkhand. D. Net Capacity Added during July, 217 A-B-C -12 MW 14

State Delhi Haryana Himachal Pradesh Jammu & Kashmir Punjab Rajasthan Uttar Pradesh Uttarakhand Chandigarh Central - Unallocated Total (Northern Region) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTHERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 31.7.217) RES (MNRE) Grand Total State 135. 18.4. 1935.4... 1935.4 Private 869.22 18.. 977.22.. 56.27 133.49 Central 3821.18 27.1. 428.19 12.83 723.9. 4854.11 Sub-Total 4825.4 2115.41. 694.81 12.83 723.9 56.27 7823. State 272. 15.. 287.. 184.51 59.3 413.81 Private 48.78.. 48.78. 2. 192. 4472.78 Central 1269.32 535.61. 184.94 1.94 663.7181. 2569.58 Sub-Total 87.1 685.61. 8755.72 1.94 1948.21 251.3 1156.16 State..... 594.6 256.61 851.21 Private..... 98. 579.43 1559.43 Central 17.74 62.1. 232.75 28.95 1223.88. 1485.58 Sub-Total 17.74 62.1. 232.75 28.95 2798.48 836.4 3896.22 State. 175.. 175.. 123. 18.3 1513.3 Private...... 51.36 51.36 Central 463.15 129.7. 592.23 67.98 148.98. 179.19 Sub-Total 463.15 34.7. 767.23 67.98 2278.98 159.39 3273.58 State 263. 15.. 278.. 257.23 127.8 5478.3 Private 5115.5.. 5115.5. 288. 14.8 6444.3 Central 871.8 264.1. 1135.9 196.81 923.42. 2255.32 Sub-Total 8616.58 414.1. 93.59 196.81 3781.65 1168.6 14177.65 State 585. 63.8. 6453.8. 187.96 23.85 7565.61 Private 3882... 3882.. 14. 6362.24 1348.24 Central 1153.91 221.1. 1375.1 556.74 739.1. 267.76 Sub-Total 1885.91 824.9. 1171.81 556.74 193.97 6386.9 2584.61 State 5923... 5923.. 724.1 25.1 6672.2 Private 8714.33.. 8714.33. 842. 2297. 11853.33 Central 3315.25 549.49. 3864.74 289.48 1664.93. 5819.15 Sub-Total 17952.58 549.49. 1852.7 289.48 3231.3 2322.1 24344.68 State..... 1252.15 62.87 1315.2 Private 99. 45.. 549.. 88. 452.94 189.94 Central 332.5 69.66. 41.71 31.24 475.54. 98.49 Sub-Total 431.5 519.66. 95.71 31.24 1815.69 515.81 3313.45 State........ Private...... 17.32 17.32 Central 34.86 15.3. 49.88 8.1 11.71. 159.6 Sub-Total 34.86 15.3. 49.88 8.1 11.71 17.32 176.92 1198.83 291.5. 1489.88 237.3 71.95. 2428.87 State 17258. 2879.2. 2137.2. 8543.55 663.56 29344.31 Private 2276.83 558.. 23318.83. 252. 1149.36 3687.19 Central 1263.37 2344.6. 14974.43 162. 8266.22. 2486.65 Grand Total 52649.2 5781.26. 5843.46 162. 19311.77 11712.92 9175.15

15 State Goa Daman & Diu Gujarat Madhya Pradesh Chhattisgarh Maharashtra Dadra & Nagar Naveli Central - Unallocated Total (Western Region) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN WESTERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 31.7.217) RES (MNRE) Grand Total State.......5.5 Private. 48.. 48....71 48.71 Central 451.12 22.2. 473.32 26... 499.32 Sub-Total 451.12 7.2. 521.32 26...76 548.8 State........ Private...... 1.46 1.46 Central 122.96 48.4. 171.36 7... 178.36 Sub-Total 122.96 48.4. 171.36 7.. 1.46 188.82 State * 523. 2177.82. 747.82. 772. 8. 8187.82 Private 7765.67 396.. 11725.67.. 677.37 18496.4 Central 312.9 424.. 3436.9 559... 3995.9 Sub-Total 167.76 6561.82. 22569.58 559. 772. 6778.37 3678.95 State 48... 48.. 173.66 83.96 5867.62 Private 5574. 1.. 5674... 3453.93 9127.93 Central 272.7 257.. 2977.7 273. 152.. 477.7 Sub-Total 12374.7 357.. 12731.7 273. 3223.66 3537.89 19766.25 State 328... 328.. 12. 11.5 3411.5 Private 723... 723... 421.81 7651.81 Central 1628.44.. 1628.44 48... 1676.44 Sub-Total 12138.44.. 12138.44 48. 12. 432.86 12739.3 State 138. 672.. 1152.. 2884.84 28.12 14144.96 Private 1236. 568.. 12874.. 447. 744.67 2761.67 Central 4219.43 2513.. 6732.43 69... 7422.43 Sub-Total 2695.43 3753.. 3658.43 69. 3331.84 7648.79 42329.6 State........ Private...... 2.97 2.97 Central 169.21 71.4. 24.61 9... 249.61 Sub-Total 169.21 71.4. 24.61 9.. 2.97 252.58 1994. 197.59. 2191.59 228... 2419.59 State 2297. 2849.82. 25819.82. 548.5 311.18 31611.5 Private 32875.67 4676.. 37551.67. 447. 181.92 5699.59 Central 14317.95 3533.59. 17851.54 184. 152.. 21211.54 Grand Total 7163.62 1159.41. 81223.3 184. 7447.5 18412.1 18922.63

16 State Andhra Pradesh Telangana Karnataka Kerala Tamil Nadu NLC Puducherry Central - Unallocated Total (Southern Region) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN SOUTHERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 31.7.217) RES (MNRE) Grand Total State 441. 235.4. 4645.4. 1673.6 89.5 648.5 Private 3873.88 3694.12 36.8 764.8.. 6321.19 13925.99 Central 167.6.. 167.6 127.27.. 1734.87 Sub-Total 9891.48 3929.52 36.8 13857.8 127.27 1673.6 641.69 2269.36 State 482.5.. 482.5. 238.93. 6463.43 Private 839.45 95.88. 179.33.. 1868.17 3658.5 Central 1878.12.. 1878.12 148.73.. 226.85 Sub-Total 68.7 95.88. 775.95 148.73 238.93 1868.17 12148.78 State 52.. 127.92 5147.92. 3599.8 155.33 893.5 Private 1958.5. 25.2 1983.7.. 7478.48 9462.18 Central 2429.2.. 2429.2 698... 3127.2 Sub-Total 947.7. 153.12 956.82 698. 3599.8 7633.81 21492.43 State.. 159.96 159.96. 1881.5 145.2 2186.48 Private 615. 174.. 789... 193.7 982.7 Central 118.18 359.58. 1467.76 362... 1829.76 Sub-Total 1723.18 533.58 159.96 2416.72 362. 1881.5 338.72 4998.94 State 432. 524.8. 4844.8. 223.2 122.7 7169.98 Private 4837.67 53.1 411.7 5752.47.. 1516.74 16269.21 Central 4389.52.. 4389.52 1448... 5837.52 Sub-Total 13547.19 127.18 411.7 14986.7 1448. 223.2 1639.44 29276.71 State........ Private........ Central 1... 1.... 1. Sub-Total 1... 1.... 1. State. 32.5. 32.5... 32.5 Private.......8.8 Central 248.4.. 248.4 86... 334.4 Sub-Total 248.4 32.5. 28.9 86...8 366.98 1664... 1664. 45... 2114. State 17832.5 791.98 287.88 18912.36. 11739.3 512.55 31163.94 Private 12124.5 5322.1 473.7 1792.3.. 26378.36 44298.66 Central 13425.2 359.58. 13784.6 332... 1714.6 Grand Total 43382.2 6473.66 761.58 5617.26 332. 11739.3 2689.91 92567.2 17

State Bihar Jharkhand West Bengal DVC Odisha Sikkim Central - Unallocated Total (Eastern Region) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN EASTERN REGION Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 31.7.217) RES (MNRE) Grand Total State 21... 21... 7.7 28.7 Private 281... 281... 224.52 55.52 Central 2939.33.. 2939.33. 11.. 349.32 Sub-Total 343.33.. 343.33. 11. 295.22 3835.54 State 42... 42.. 13. 4.5 554.5 Private 73... 73... 23.27 753.27 Central 748.74.. 748.74. 61.. 89.74 Sub-Total 1898.74.. 1898.74. 191. 27.32 2117.6 State 552. 1.. 562.. 986. 91.95 6697.95 Private 2331.38.. 2331.38.. 332.69 2664.7 Central 76.77.. 76.77. 41.. 117.77 Sub-Total 8612.15 1.. 8712.15. 1396. 424.64 1532.78 State........ Private........ Central 7535.4.. 7535.4. 186.2. 7721.24 Sub-Total 7535.4.. 7535.4. 186.2. 7721.24 State 42... 42.. 261.92 6.3 2488.22 Private 2939... 2939... 188.15 3127.15 Central 1633.9.. 1633.9. 89.. 1722.9 Sub-Total 4992.9.. 4992.9. 215.92 194.45 7338.27 State..... 36. 52.11 412.11 Private..... 291.. 291. Central 87.3.. 87.3. 64.. 151.3 Sub-Total 87.3.. 87.3. 715. 52.11 854.14 111.83.. 111.83. 85.1. 1186.84 State 657. 1.. 667.. 3537.92 225.11 1433.3 Private 6281.38.. 6281.38. 291. 768.63 7341. Central 1486.64.. 1486.64. 15.2. 15811.84 Grand Total 27658.2 1.. 27758.2. 4834.12 993.74 33585.87 INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN NORTH-EASTERN REGION 18 State Assam Arunachal Pradesh Meghalaya Tripura Manipur Nagaland Mizoram Central - Unallocated Total (North- Eastern Region) Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 31.7.217) RES (MNRE) Grand Total State 6. 323.45. 383.45. 1. 3.1 513.46 Private. 24.5. 24.5.. 15.88 4.38 Central 279.2 435.56. 714.58. 331.23. 145.81 Sub-Total 339.2 783.51. 1122.53. 431.23 45.89 1599.65 State...... 14.61 14.61 Private.......27.27 Central 24.7 46.82. 71.52. 97.45. 168.97 Sub-Total 24.7 46.82. 71.52. 97.45 14.87 273.84 State..... 322. 31.3 353.3 Private.......1.1 Central 3.4 19.69. 14.9. 65.19. 25.28 Sub-Total 3.4 19.69. 14.9. 387.19 31.4 558.32 State. 169.5. 169.5.. 16.1 185.51 Private...... 5.9 5.9 Central 37.4 436.95. 474.35. 62.38. 536.73 Sub-Total 37.4 66.45. 643.85. 62.38 21.1 727.33 State.. 36. 36... 5.45 41.45 Private.......3.3 Central 31.4 71.57. 12.97. 88.93. 191.9 Sub-Total 31.4 71.57 36. 138.97. 88.93 5.48 233.38 State...... 3.67 3.67 Private.......5.5 Central 21.4 48.93. 7.33. 53.37. 123.7 Sub-Total 21.4 48.93. 7.33. 53.37 31.17 154.87 State...... 41.47 41.47 Private.......1.1 Central 2.7 4.46. 61.16. 34.19. 95.35 Sub-Total 2.7 4.46. 61.16. 34.19 41.57 136.92 75. 63.62. 138.62. 127.26. 265.88 State 6. 492.95 36. 588.95. 422. 259.25 127.2 Private. 24.5. 24.5.. 21.88 46.38 Central 52.2 1253.6. 1773.62. 86.. 2633.62 Grand Total 58.2 1771.5 36. 2387.7. 1282. 281.12 395.19

State Andaman & Nicobar lakshadweep Total (Islands) INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATES/UTS LOCATED IN ISLANDS Ownership/ Sector INCLUDING ALLOCATED SHARES IN JOINT & CENTRAL SECTOR UTILITIES Thermal Modewise breakup Coal Gas Diesel Total Nuclear Hydro (Renewable) (As on 31.7.217) RES (MNRE) Grand Total State.. 4.5 4.5.. 5.25 45.3 Private...... 6.56 6.56 Central........ Sub-Total.. 4.5 4.5.. 11.81 51.86 State........ Private.......75.75 Central........ Sub-Total.......75.75 State.. 4.5 4.5.. 5.25 45.3 Private...... 7.31 7.31 Central........ Grand Total.. 4.5 4.5.. 12.56 52.61 19

Section C - Transmission Lines SN Contents Page 1 Programme and Achievements of Transmission Lines in July. 217 and during April 216 to July. 217 2 2 List of Transmission Lines Commissioned/Ready for commissioning during July. 217

1. Programme and Achievementsof Transmission Lines in July 217 and during April 216 to July 217 (Figs. in ckms) Voltage Level /Sector Programme July '17 Apr '16 to July 17 217-18 Programme Achievement Programme Achievement +/- 8 kv HVDC Central Sector State Sector Total +/- 5 kv HVDC Central Sector JV/Private Sector Total 765 kv Central Sector 3665 486 159 714 State Sector 416 335 JV/Private Sector 846 188 846 283 Total 4927 188 486 15 1332 # 4 kv Central Sector 4851 766 56 1621 State Sector 5157 697 157 311 3431 JV/Private Sector 1416 177 54 786 791 Total 11424 874 977 4357 5843 22kV Central Sector 763 342 State Sector 5972 342 48 3133 1186 JV/Private Sector 5 Total 6735 342 48 3475 1191 Grand Total 2386 144 1511 8837 8366 Transmission Works (22 kv and above) for Transmission Lines As on

Section D - Sub Stations SN Contents Page 1 Programme and Achievements of Sub-Stations in May. 217 and during Apr 216 to July. 217 2 List of Sub Stations commissioned/ready for commisssioning during July. 217 21

1. Programme & Achievement of sub- stations in June 217 and during April 216 to Jujy 217 (Fig. in MVA) Voltage Level /Sector Programme Jul-17 Apr '16 - July '17 217-18 Programme Achievement Programme Achievement ± 8 kv HVDC Central Sector 3 15 3 15 State Sector JV/Private Sector Total 3 15 3 15 765 kv Central Sector 175 3 3 45 State Sector 25 JV/Private Sector 15 15 Total 19 3 45 7 4 kv Central Sector 626 63 163 63 3815 State Sector 13215 1 7435 8895 JV/Private Sector 133 63 815 183 Total 285 63 326 888 1454 22 kv Central Sector 33 State Sector 1843 82 485 518 71 JV/Private Sector Total 11173 82 485 518 71 Grand Total 53978 295 6745 2156 35

Transmission Works (22 kv and above) for Sub-Stations Commissioned/Ready for commissioning During July-217 Sl No Name of Sub Stations Voltage Ratio Executin g Agency 1. 2. 3. 4. 5. 765 kv CENTRAL SECTOR 1 Hyderabad (Maheshwaram) (GIS) S/S-(ICT-I) 765/4 PGCIL 15 2 Vindhyachal Pooling Station 765/4 PGCIL 15 TOTAL CENTRAL SECTOR 3 TOTAL 765 kv 3 4 kv CENTRAL SECTOR 3 Betul (GIS) S/S 4/22 PGCIL 63 4 Gurgaon S/s 4th-ICT (Aug.) (under NRSS-XXXII) 4/22 PGCIL 5 5 Itarsi S/S 4/22 PGCIL 5 TOTAL CENTRAL SECTOR 163 STATE SECTOR 6 Ghani s/s (PTR-II) 4/22 APTRANSCO 5 7 Dhuri (New) (Addl.) 4/22 PSTCL 5 TOTAL STATE SECTOR 1 TOTAL 4 kv 263 23 kv STATE SECTOR 8 Eachangadu S/S 23/11 TANTRANSCO 3 9 Valayapatty 23/11 TANTRANSCO 8 TOTAL STATE SECTOR 11 TOTAL 23 kv 11 22 kv STATE SECTOR 1 Peeragarhi (Addl.) 22/33 DTL 1 11 Karnal s/s 22/33 HVPNL 5 12 Panchgaon S/S 22/33 HVPNL 1 13 Mhaisal s/s (Addl-2) 22/33 MSETCL 25 14 Mahilpur (Addl) 22/66 PSTCL 1 TOTAL STATE SECTOR 375 TOTAL 22 kv 375 4 kv PRIVATE SECTOR 15 Gonda AIS 4/22 SEUPPTCL 63 TOTAL PRIVATE SECTOR 63 TOTAL 4 kv 63 GRAND TOTAL 6745

Section E - Electricity Generation SN Contents Page 1 Electricity Generation (MU) Targets and Achievements for 217-18 22

1. Electricity Generation (MU) Targets and Achievememts for 217-18 Thermal Programme Achievement* % Ach. Programme Achievement* % Ach. Central Sector 339,749. 27,653. 27,766.65 1.41 111,697. 115,261.38 13.19 State Sector 339,494. 26,823. 21,46.72 8.1 113,37. 14,74.81 91.8 Pvt.IPP Sector 344,239. 28,387. 27,66.42 97.25 114,898. 114,38.29 99.25 Pvt.UTL Sector 18,546. 1,516. 1,68.8 16.12 6,329. 6,734.47 16.41 Hydro Total 1,42,28. 84,379. 78,442.59 92.96 346,294. 34,18.95 98.21 Central Sector 55,28. 7,9. 7,622.51 17.51 23,112. 25,41.12 19.94 State Sector 73,5. 7,389. 5,438.9 73.61 23,776. 19,398.84 81.59 Pvt.IPP Sector 11,917. 2,1. 2,26.65 15.8 5,642. 6,369.26 112.89 Pvt.UTL Sector 1,45. 13. 15.32 115.63 49. 59.93 14.7 Nuclear Sector Target (217-18 July '17 April '16 to July '17 Total 758,71.9 16,79. 15,418.38 41.83 53,2. 51,688.15 97.49 Central Sector 4,972. 3,796. 3,27.29 79.75 14,95. 12,86.62 8.85 Total 4,972. 3,796. 3,27.29 79.75 14,95. 12,86.62 8.85 Bhutan Import 5,. 649. 1,21.46 157.39 1,662. 2,7.56 12.79 Central Sector 435,749. 38,539. 38,416.45 99.68 149,759. 152,758.12 12. State Sector 412,499. 34,212. 26,899.62 78.63 137,146. 123,473.65 9.3 Pvt. Sector 376,152. 32,133. 31,572.19 98.25 127,359. 127,651.95 1.23 Total 1,229,4. 15,533. 97,99.72 92.78 415,926. 45,891.28 97.59 * Provisional based on actual-cum-assesment All India Energy Generation During April 216 to July 217 (MU) Programme 45 4 35 346294 3419 415926 45891 Achievement 3 25 2 15 1 5 532 51688 1495 1287 Thermal Hydro Nuclear Total Renewable Energy Generation Figs in MU Achievement Cummulative Cummulative Achievement Achievement Jun-17 Jun-16 Upto Jun-17 Upto Jun-16 6933.29 582 6935.12 582.44 22

Section F - Power supply position SN Contents Page 1 Power Supply Position (Provisional) for July. 217 and April 217 to July. 217 23 2 Peak Demand and Peak Met (Provisional) for July. 217 and Apr 216 to July 217 24 3 Power Supply Position (Revised) for June 216 25 4 Peak Demand and Peak Met (Revised) for June 216 26 5 Notified Power cuts / Restrictions on Industries during July 217 27 6 Power Supply to Agricultural Sector during July 217 28

ऊज + 5व6य त आप :त+ ;थ:त =रप ट+ (प व +वल कन) /Energy Power Supply Position Report (Provisional) र Hय/State आ कड़ मलयन य नट न ट / Figures in MU net ज ल ई, 217 /July,217 अ ल,217 - ज ल ई,217/ April,217 to July,217 ऊज आवयकत ऊज उपलधत ऊज प त म कम ऊज आवयकत ऊज उपलधत ऊज प त म कम ण ल / System Energy Requirement Energy Supplied Energy not Supplied Energy Requirement Energy Supplied Energy not Supplied / Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) च ड गढ़/ Chandigarh 189 189. 675 667 9 1.3 )द+ल, / Delhi 3,475 3,472 2.1 12,819 12,89 1.1 ह1रय ण / Haryana 5,7 5,7. 18,574 18,574. )हम चल 6द श / Himachal Pradesh 8 789 11 1.4 3,126 3,16 19.6 ज<म कम र / Jammu & Kashmir 1,518 1,214 34 2.1 6,115 4,883 1,232 2.1 प ज ब / Punjab 7,286 7,286. 21,272 21,272. र जDथ न / Rajasthan 5,243 5,219 25.5 22,79 21,948 131.6 उ र 6द श / Uttar Pradesh 1,774 1,612 162 1.5 42,74 42,175 53 1.2 उ र ख ड / Uttarakhand 1,167 1,157 1.8 4,667 4,65 17.4 उ र / Northern Region 36,153 35,639 514 1.4 132,32 13,84 1,948 1.5 छ सगढ़ / Chhattisgarh 1,924 1,924. 8,672 8,671 1. ग जर त / Gujarat 7,425 7,425. 36,617 36,617. मLय 6द श / Madhya Pradesh 4,56 4,56. 2,17 2,17. मह र NO / Maharashtra 11,579 11,579. 51,593 51,542 51.1 दमन और )दउ / Daman & Diu 28 28. 838 838. द दर व नगर हव ल, / Dadra & Nagar 52 52. 2,28 2,28. Haveli ग व / Goa 322 322. 1,364 1,364. प चम / Western Region 26,521 26,52. 121,283 121,231 52. आUV 6द श / Andhra Pradesh 4,728 4,726 1. 19,118 19,19 9. त ल ग न / Telangana 4,896 4,895 1. 18,24 18,198 5. कन टक / Karnataka 5,432 5,43 1. 22,74 22,66 7. क रल / Kerala 1,941 1,936 5.3 8,377 8,366 11.1 तमल न ड / Tamil Nadu 9,446 9,444 2. 37,488 37,477 11. प ड च र, / Puducherry 223 222.2 936 935 1.1 लY- प / Lakshadweep # 4 4 16 16 द!ण / Southern Region 26,665 26,654 11. 16,196 16,152 45. _बह र / Bihar 2,261 2,253 9.4 9,131 8,878 253 2.8 द म दर घ ट, नगम / DVC 1,723 1,72 3.2 6,998 6,983 14.2 झ रखeड / Jharkhand 612 612. 2,58 2,574 6.3 ओgडश / Odisha 2,383 2,383 1. 9,728 9,726 2. प चम ब ग ल / West Bengal 4,22 4,22. 18,52 18,45 7.4 स lकम / Sikkim 36 36. 145 145. अ डम न-नक ब र/ Andaman- Nicobar # 28 28 111 111. प व% / Eastern Region 11,236 11,224 12.1 47,12 46,756 346.7 अoण चल 6द श / Arunachal Pradesh 61 6 1 1.8 247 243 4 1.7 असम / Assam 929 89 39 4.2 3,165 3,9 156 4.9 मpणप र / Manipur 62 61 1 2.2 247 242 5 2.1 म घ लय / Meghalaya 117 117. 494 494. मज़ रम / Mizoram 38 37 1 2.7 162 158 4 2.3 न ग लsड / Nagaland 67 66 1 1.7 265 261 4 1.6 _tप र / Tripura 122 121 2 1.3 864 85 14 1.6 उ र-प व% / North-Eastern Region 1,397 1,351 45 3.2 5,444 5,257 187 3.4 स*प ण+ भ रत / All India 11,971 11,389 583.6 412,58 49,48 2,578.6 # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability. 23

अRधकतम 5व6य त आप :त+ ;थ:त =रप ट+ (प व +वल कन) /Peak Power Supply Position Report (Provisional) आ कड़ म ग व ट न ट / Figures in MW net र Hय/State ज ल ई, 217 /July,217 अ ल,217 - ज ल ई,217/ April,217 to July,217 अuधकतम म ग अuधकतम उपल ध म ग कv प त म कम अuधकतम म ग अuधकतम उपल ध म ग कv प त म कम ण ल / System Peak Demand Peak Met Demand not Met Peak Demand Peak Met Demand not Met / Region ( MW ) ( MW ) ( MW ) ( % ) ( MW ) ( MW ) ( MW ) ( % ) च ड गढ़/ Chandigarh 318 318. 356 356. )द+ल, / Delhi 6,127 6,121 6.1 6,553 6,526 27.4 ह1रय ण / Haryana 9,539 9,539. 9,539 9,539. )हम चल 6द श / Himachal Pradesh 1,346 1,346. 1,377 1,377. ज<म कम र / Jammu & Kashmir 2,643 2,114 529 2. 2,768 2,214 554 2. प ज ब / Punjab 11,681 11,681. 11,681 11,681. र जDथ न / Rajasthan 9,795 9,795. 1,347 1,347. उ र 6द श / Uttar Pradesh 18,74 17,394 1,31 7. 18,827 18,61 766 4.1 उ र ख ड / Uttarakhand 1,971 1,971. 2,27 2,27. उ र / Northern Region 53,367 52,648 719 1.3 56,119 54,89 1,229 2.2 छ सगढ़ / Chhattisgarh 3,732 3,527 25 5.5 3,888 3,887 1. ग जर त / Gujarat 11,773 11,764 9.1 15,695 15,695. मLय 6द श / Madhya Pradesh 7,29 7,243 47.6 8,42 8,42. मह र NO / Maharashtra 19,37 19,29 17.1 22,542 22,494 48.2 दमन और )दउ / Daman & Diu 322 322. 342 342. द दर व नगर हव ल, / Dadra & Nagar 79 79. 79 79. Haveli ग व / Goa 559 558 1.2 559 558 1.2 प चम / Western Region 41,225 41,18 45.1 49,86 49,788 72.1 आUV 6द श / Andhra Pradesh 7,942 7,933 9.1 8,2 8, 2.2 त ल ग न / Telangana 9,318 9,318. 9,318 9,318. कन टक / Karnataka 8,956 8,956. 9,992 9,987 5.1 क रल / Kerala 3,657 3,452 25 5.6 3,889 3,862 27.7 तमल न ड / Tamil Nadu 14,669 14,663 6. 15,1 14,975 26.2 प ड च र, / Puducherry 382 371 11 2.9 388 387.1 लY- प / Lakshadweep # 8 8 9 9 द!ण / Southern Region 42,267 42,267. 42,77 42,535 235.5 _बह र / Bihar 3,929 3,929. 4,394 4,131 263 6. द म दर घ ट, नगम / DVC 2,696 2,696. 2,696 2,696. झ रखeड / Jharkhand 1,15 1,15. 1,228 1,228. ओgडश / Odisha 4,37 4,37. 4,227 4,227. प चम ब ग ल / West Bengal 7,853 7,853. 7,853 7,853. स lकम / Sikkim 11 11. 11 11. अ डम न-नक ब र/ Andaman- Nicobar # 58 54 4 7 58 54 4 7 प व% / Eastern Region 19,71 19,63 9. 19,255 19,191 64.3 अoण चल 6द श / Arunachal Pradesh 132 131 1.8 145 145.2 असम / Assam 1,675 1,645 3 1.8 1,744 1,645 99 5.7 मpणप र / Manipur 161 158 3 1.9 163 161 2 1.2 म घ लय / Meghalaya 35 33 2.7 35 34 1.3 मज़ रम / Mizoram 84 82 2 2.4 86 85 1.8 न ग लsड / Nagaland 14 136 4 2.9 147 146 1.4 _tप र / Tripura 271 266 5 1.8 34 34.1 उ र-प व% / North-Eastern Region 2,57 2,429 78 3.1 2,57 2,429 78 3.1 स*प ण+ भ रत / All India 155,135 154,32 833.5 159,816 158,393 1,423.9 # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability 24

ऊज + 5व6य त आप :त+ ;थ:त =रप ट+ (स श Rधत) /Energy Power Supply Position Report (Revised) र Hय/State आ कड़ मलयन य नट न ट / Figures in MU net ज न, 217 /June,217 अ ल,217 - ज न,217/ April,217 to June,217 ऊज आवयकत ऊज उपलधत ऊज प त म कम ऊज आवयकत ऊज उपलधत ऊज प त म कम ण ल / System Energy Requirement Energy Supplied Energy not Supplied Energy Requirement Energy Supplied Energy not Supplied / Region ( MU ) ( MU ) ( MU ) ( % ) ( MU ) ( MU ) ( MU ) ( % ) च ड गढ़/ Chandigarh 179 17 9 5. 486 478 9 1.8 )द+ल, / Delhi 3,359 3,356 3.1 9,344 9,336 8.1 ह1रय ण / Haryana 4,574 4,574. 12,874 12,874. )हम चल 6द श / Himachal Pradesh 754 753 1.2 2,326 2,317 9.4 ज<म कम र / Jammu & Kashmir 1,493 1,191 32 2.2 4,597 3,669 928 2.2 प ज ब / Punjab 5,446 5,446. 13,986 13,986. र जDथ न / Rajasthan 5,565 5,558 7.1 16,836 16,729 17.6 उ र 6द श / Uttar Pradesh 11,111 1,963 148 1.3 31,93 31,563 368 1.2 उ र ख ड / Uttarakhand 1,193 1,192. 3,5 3,493 7.2 उ र / Northern Region 33,672 33,22 47 1.4 95,88 94,446 1,434 1.5 छ सगढ़ / Chhattisgarh 1,966 1,966. 6,748 6,748. ग जर त / Gujarat 9,4 9,4. 29,192 29,192. मLय 6द श / Madhya Pradesh 4,734 4,734. 15,61 15,61. मह र NO / Maharashtra 11,714 11,714. 4,14 39,963 51.1 दमन और )दउ / Daman & Diu 26 26. 63 63. द दर व नगर हव ल, / Dadra & Nagar 51 51. 1,526 1,526. Haveli ग व / Goa 318 318. 1,42 1,42. प चम / Western Region 28,839 28,839. 94,762 94,71 52.1 आUV 6द श / Andhra Pradesh 4,364 4,364. 14,391 14,383 8.1 त ल ग न / Telangana 3,893 3,892. 13,37 13,33 4. कन टक / Karnataka 4,958 4,957. 16,642 16,636 6. क रल / Kerala 1,93 1,929 1.1 6,436 6,429 6.1 तमल न ड / Tamil Nadu 8,999 8,998 1. 28,42 28,33 9. प ड च र, / Puducherry 233 233. 714 713.1 लY- प / Lakshadweep # 4 4 12 12 द!ण / Southern Region 24,377 24,374 3. 79,531 79,497 34. _बह र / Bihar 2,427 2,366 61 2.5 6,87 6,626 244 3.6 द म दर घ ट, नगम / DVC 1,755 1,753 3.2 5,274 5,263 11.2 झ रखeड / Jharkhand 631 631. 1,968 1,962 6.3 ओgडश / Odisha 2,289 2,289. 7,344 7,343 2. प चम ब ग ल / West Bengal 4,767 4,753 15.3 14,3 14,23 7.5 स lकम / Sikkim 35 35. 19 19. अ डम न-नक ब र/ Andaman- Nicobar # 28 28 83 83. प व% / Eastern Region 11,94 11,825 79.7 35,866 35,532 334.9 अoण चल 6द श / Arunachal Pradesh 6 59 1 1.9 186 183 3 1.7 असम / Assam 832 799 34 4.1 2,236 2,119 117 5.2 मpणप र / Manipur 61 6 1 2.1 185 181 4 2.1 म घ लय / Meghalaya 124 124. 377 377. मज़ रम / Mizoram 38 37 1 2.8 124 121 3 2.2 न ग लsड / Nagaland 7 68 1 1.6 198 195 3 1.6 _tप र / Tripura 252 249 3 1.2 742 73 12 1.7 उ र-प व% / North-Eastern Region 1,438 1,396 42 2.9 4,48 3,96 142 3.5 स*प ण+ भ रत / All India 1,23 99,636 594.6 31,87 38,91 1,995.6 # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability. 25

अRधकतम 5व6य त आप :त+ ;थ:त =रप ट+ (स श Rधत) /Peak Power Supply Position Report (Revised) आ कड़ म ग व ट न ट / Figures in MW net र Hय/State ज न, 217 /June,217 अ ल,217 - ज न,217/ April,217 to June,217 अuधकतम म ग अuधकतम उपल ध म ग कv प त म कम अuधकतम म ग अuधकतम उपल ध म ग कv प त म कम ण ल / System Peak Demand Peak Met Demand not Met Peak Demand Peak Met Demand not Met / Region ( MW ) ( MW ) ( MW ) ( % ) ( MW ) ( MW ) ( MW ) ( % ) च ड गढ़/ Chandigarh 356 356. 356 356. )द+ल, / Delhi 6,553 6,526 27.4 6,553 6,526 27.4 ह1रय ण / Haryana 8,912 8,912. 8,912 8,912. )हम चल 6द श / Himachal Pradesh 1,377 1,377. 1,377 1,377. ज<म कम र / Jammu & Kashmir 2,768 2,214 554 2. 2,768 2,214 554 2. प ज ब / Punjab 11,24 11,24. 11,24 11,24. र जDथ न / Rajasthan 1,347 1,347. 1,347 1,347. उ र 6द श / Uttar Pradesh 18,827 18,61 766 4.1 18,827 18,61 766 4.1 उ र ख ड / Uttarakhand 2,27 2,27. 2,27 2,27. उ र / Northern Region 56,119 54,89 1,229 2.2 56,119 54,89 1,229 2.2 छ सगढ़ / Chhattisgarh 3,388 3,23 184 5.4 3,888 3,887 1. ग जर त / Gujarat 15,695 15,695. 15,695 15,695. मLय 6द श / Madhya Pradesh 7,64 7,61 3.4 8,42 8,42. मह र NO / Maharashtra 2,623 2,52 13.5 22,542 22,494 48.2 दमन और )दउ / Daman & Diu 342 342. 342 342. द दर व नगर हव ल, / Dadra & Nagar 771 771. 771 771. Haveli ग व / Goa 465 464 1.2 558 557 1.2 प चम / Western Region 47,324 47,34 29.6 49,86 49,788 72.1 आUV 6द श / Andhra Pradesh 8,2 8, 2.2 8,2 8, 2.2 त ल ग न / Telangana 7,229 7,27 22.3 9,9 9,1 8.1 कन टक / Karnataka 8,648 8,612 36.4 9,992 9,987 5.1 क रल / Kerala 3,597 3,597. 3,889 3,862 27.7 तमल न ड / Tamil Nadu 14,316 14,274 42.3 15,1 14,975 26.2 प ड च र, / Puducherry 38 379.1 388 387.1 लY- प / Lakshadweep # 9 9 9 9 द!ण / Southern Region 38,912 38,844 68.2 42,77 42,535 235.5 _बह र / Bihar 4,394 4,131 263 6. 4,394 4,131 263 6. द म दर घ ट, नगम / DVC 2,518 2,518. 2,684 2,684. झ रखeड / Jharkhand 1,228 1,228. 1,228 1,228. ओgडश / Odisha 3,929 3,929. 4,227 4,227. प चम ब ग ल / West Bengal 7,782 7,768 14.2 7,82 7,793 27.3 स lकम / Sikkim 78 78. 91 91. अ डम न-नक ब र/ Andaman- Nicobar # 58 54 4 7 58 54 4 7 प व% / Eastern Region 19,255 18,987 268 1.4 19,255 19,191 64.3 अoण चल 6द श / Arunachal Pradesh 124 123 1.7 145 145.2 असम / Assam 1,744 1,623 121 6.9 1,744 1,623 121 6.9 मpणप र / Manipur 156 155 1.6 163 161 2 1.2 म घ लय / Meghalaya 272 272. 34 34.1 मज़ रम / Mizoram 82 77 5 6. 86 85 1.8 न ग लsड / Nagaland 147 146 1.4 147 146 1.4 _tप र / Tripura 34 34.1 34 34.1 उ र-प व% / North-Eastern Region 2,499 2,387 112 4.5 2,499 2,391 18 4.3 स*प ण+ भ रत / All India 155,547 153,179 2,368 1.5 159,816 158,393 1,423.9 # Lakshadweep and Andaman & Nicobar Islands are stand- alone systems, power supply position of these,does not form part of regional requirement and availability 25

ज ल ई, 217 म[ इ ड;^ज पर 5व6य त कट त क 5ववरण / Notified Power Cuts/Restrictions on Industries during July,217 र Hय / / State/ Region ऊज +/म ग कट त / Energy/Demand Cut उ र / Northern Region च ड गढ़/ Chandigarh* )द+ल, / Delhi ह1रय ण / Haryana )हम चल 6द श / Himachal Pradesh No Notified Cuts No Notified Cuts No Notified Cuts ज<म कम र / Jammu & Kashmir* प ज ब / Punjab र जDथ न / Rajasthan उ र 6द श / Uttar Pradesh उ र ख ड / Uttarakhand No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts प चम / Western Region छ सगढ़ / Chhattisgarh ग जर त / Gujarat मLय 6द श / Madhya Pradesh मह र NO / Maharashtra ग व / Goa No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts द!ण / Southern Region आUV 6द श / Andhra Pradesh त ल ग न / Telangana कन टक / Karnataka क रल / Kerala तमल न ड / Tamil Nadu प ड च र, / Puducherry प व% / Eastern Region _बह र / Bihar झ रखeड / Jharkhand ओgडश / Odisha प चम ब ग ल / West Bengal No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts No Notified Cuts * Data not received. 25

ज ल ई, 217 क ष क व त आप त क ववरण / Power Supply to Agricultural Sector during July,217 र Hय / / State/ Region औसत व त आप त घ ट म / Average Hours of Supply उ र / Northern Region च ड गढ़/ Chandigarh* )द+ल, / Delhi ह1रय ण / Haryana There is no agricultural load in Delhi. 9:21 hrs/day )हम चल 6द श / Himachal Pradesh HPSEBL has only 2% agriculture consumers and uninterrupted power is being supplied to agriculture sector ज<म कम र / Jammu & Kashmir* प ज ब / Punjab र जDथ न / Rajasthan उ र 6द श / Uttar Pradesh उ र ख ड / Uttarakhand 8:48 hrs/day 6:45 hrs/day 19:8 hrs/day 23:56 hrs/day प चम / Western Region छ सगढ़ / Chhattisgarh 18 hrs/day ग जर त / Gujarat 8 hrs/day मLय 6द श / Madhya Pradesh मह र NO / Maharashtra ग व / Goa Three-Phase Supply(Irrigation)- 9:39 hrs /day, Three-Phase (Mixed) Supply - 23:11 hrs /day 9 hrs/day No restriction द!ण / Southern Region आUV 6द श / Andhra Pradesh 7 hrs/day. त ल ग न / Telangana 9 hrs/day. कन टक / Karnataka क रल / Kerala तमल न ड / Tamil Nadu प ड च र, / Puducherry 6 hrs/day No Restrictions 9 hrs/day (6 hrs during day time and 3 hrs during night time) No Restrictions प व% / Eastern Region _बह र / Bihar झ रखeड / Jharkhand ओgडश / Odisha प चम ब ग ल / West Bengal About 18 hrs/day About 2 hrs/day 24 hrs/day About 23 hrs/day * Data not received. 26

Section G - Growth of Power Sector SN Contents Page 1 Growth of Installed Capacity since 6th Plan 29 2 Growth of Transmission Sector since 6th Plan 3 3 All India Yearly Coal consumption for Power Generation (Utilities) 4 All India Annual Per Capita Consumption of Electricity since -26 31 5 Average cost of power supply & Average realisation (Paisa/kwh) 6 Growth of Rural Electrification & Pump Sets Energisation 32 7 Status of Hydro Schemes Cleared by the CEA in July. 217 Jun-17

Plan / Year 1. Growth of Installed Capacity Since 6th Plan (In MW) Thermal Nuclear Hydro RES (MNRE) Total Coal Gas Diesel Total End of 6th Plan 2631.83 541.5 177.37 2729.7 195 1446.2 42584.72 End of 7th Plan 41237.48 2343. 165.9 43745.57 1565 1837.63 18.14 63636.34 End of 8th Plan 54154.48 6561.9 293.9 611.28 2225 21658.8 92.1 85795.37 End of 9th Plan 6213.88 11163.1 1134.83 74428.81 272 26268.76 1628.39 1545.96 End of 1th Plan 71121.38 13691.71 121.75 8614.84 39 34653.77 776.6 132329.21 End of 11th Plan 11222.38 18381.5 1199.75 13163.18 478 3899.4 2453.45 199877.3 End of 12th Plan 194432.88 25185.38 837.629 22455.88 678 44614.42 5833.35 33153.65 Captive Generation Capacity in Industries having demand of 1 MW and above, grid interactive (as on 31-3-16) = 48279 MW* *Provisional All India Generating Installed Capacity ( MW ) (As on 31.7.217 ) ## Total Installed Capacity 33153.65 MW Coal Gas Diesel Nuclear Hydro Res Coal Gas Diesel Nuclear Hydro Res Total 194432.88 25185.38 837.629 678. 44614.4 5833.345 229251.74 29

2. Growth of Transmission Sector Since 6th Plan Transmission System Type Voltage (KV) level Unit Ach. At the end of 6th Plan Ach. At the end of 7th Plan Ach. At the end of 8th Plan (as on 31.3.1997) Ach. At the end of 9th Plan (as on 31.3.22) Ach. as on 31.3.27 (End of 1th Plan) Ach. as on 31.3.212 (End of 11th Plan) Ach. as on 31.7.217 Target 31.3.217 (End of 12th Plan) AC Transmission lines 765 ckm 116 2184 525 32572 3225 4 ckm 629 19824 36142 49378 75722 16819 16363 144819 22 ckm 465 59631 796 96993 114629 13598 164459 1798 Total ckm 5234 79455 115742 147531 192535 24849 36661 34849 HVDC ckm 1634 4738 5872 9432 15556 16872 Total (AC+HVDC) ckm 5234 79455 117376 152269 19847 257481 376217 364921 765 MVA 25, 1745 174 AC Substations Transformation Capacity 4 MVA 933 2158 4865 638 92942 151,27 255347 19627 22 MVA 37291 53742 84177 116363 156497 223,774 319968 299774 Total AC MVA 46621 75322 12542 176743 249439 39981 749815 66981 HVDC MW 52 82 975 21 225 AC+HVDC 46621 75322 12542 181943 257639 49551 77815 69231 Inter-regional transmission Capacity MW 145 2775 7655 6555 3

3. All India yearly Coal Consumption for Power Generation (Utilities) Jun-17 YEAR Coal Consumption Million Tonnes 24-5 278. 25-6 281. 26-7 32. 27-8 33. 28-9 355. 29-1 367. 21-11 387. 211-12 417.56 212-13 454.6 213-14 489.4 214-15 53.4 215-16 545.9* * Actual 4. All India Annual per Capita consumption of Electricity Since 26 Year Per Capita Consumption ( kwh)# 25-6 631.4 26-7 671.9 27-8 717.1 28-9 733.5 29-1 778.6 21-11 818.8 211-12 883.63 212-13 914.41 213-14 957 214-15 11 215-16 175* # (GrossGen.+ Net Import) / Mid-year population, *Actual 5. Average cost of power supply & average realization ( paise/kwh ) Year cost of supply (paise/unit) Realization(paise/unit) Including Agriculture Only Agriculture 24-5 254 29 75.68 25-6 26 221 76.36 26-7 276 227 74.23 27-8 293 239 77.27 28-9 34 263 87.13 29-1 355 268 88.7 21-11 398 33 119.75 211-12 455 33 135.14 212-13 51 376 148.67 213-14 518 175 214-15 52 Source:- PFC Reports on the performance of State Power Utilities 31

# Plan Year 1997-98 1998-99 1999-2-1 21-2 9th Plan 22-3 23-4 24-5 25-6 26-7 1th Plan Cumu. upto End of 1th Plan 6. Growth Of Rural Electrification & Pumpsets Energisation. Villages Electricfied (Nos.) 327 278 293 1218 4111 1349 2626 2781 3884 12632 22594 44517 482864 # Pump Sets Energised 28464 367244 297594 3116 31674 157636 65195 322968 3312 397343 61175 2314176 15455554 1.4.7 to 31.3.8 5743 412667 1.4.8 to 31.3.9 8629 49915 1.4.9 to 31.3.1 3726 557976 1.4.1 to 31.3.11 4678 8499 1.4.11 to 31.3.12 9769 652913 11th Plan 74575 2963615 Cumu. upto End of 11th Plan 557439 18423975 Cummulative up to end of 12th Plan 59394* 2143721 # No. of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification since 24-5 * Disclaimer: The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as Indicated in all the reports. The data in the report prior to October, 215 was Updated every month based on the information received from states/distribution utilities as and when reported but the data for all the states for a particular month was generally not made available simultaneously to reflect the countrywide picture for a particular month. Number of total villages and number of electrified villages have also be en adjusted for changes observed from Census 211 data. As such, each monthly report of Village electrification of CEA is independent of the earlier published reports 7. Status of Hydro Schemes Cleared by the CEA in July 217 Sl. No. Name of Scheme Executing Agency Installed Capacity (MW) Nil Cost (Rs. crore) Date of Clearance 32