CLUSTER MAILBOX REPLACEMENT GPC EVALUATION

Similar documents
MAILBOX DESIGN CONCEPTS. October 8, 2015

Q2: Who is responsible for the maintenance of these central mailboxes? A2: The Home Owner s Association.

U. S. Postal Service National Delivery Planning Standards A Guide for Builders and Developers

ORDINANCE NO APPROVING A MAILBOX ORDINANCE FOR SHAWANO COUNTY

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

DELAWARE COUNTY SECONDARY ROAD DEPARTMENT POLICY AND PROCEDURE MEMORANDUM

Procedure to be Heard by the City of Forest Hills Board of Zoning Appeals

WATERFORD PATIO HOMEOWNERS ASSOCIATION. NEWSLETTER JULY 2016 Information for residents of Ivanhoe Waterford Patio Homeowners Association, Inc.

the City of Palm Bay Brevard County Florida held on November

4C Standard Horizontal Mailboxes - continued on pages 14-17

PROJECT DESCRIPTION. Solar RV/Boat Storage and Solar Self-Storage Pittsburg-Antioch Highway and Arcy Lane, Pittsburg, CA 8/30/2017

Canada Post Community Mailbox User Guide

Quail Ridge Homeowners Association, Inc.

EASTSIDE CITY OF BELLEVUE/ PRIVATE PRIVATE PRIVATE MULTI-PRIVATE MULTI-PRIVATE

4C Std Horizontal Mailboxes - cont. on pgs 14-19

Highlands Ranch Fire & Emergency Services Unification

LAKE CHAPMAN PLAZA, N Florida Ave, TWO BUILDABLE OUTPARCELS, 16333&16347 N Florida Ave For Restaurant, Retail, Office, Medical Use

Reston Town Center North Development. Community Update

AMERICAN PKWY. FOR SALE CLASS A OFFICE HEADQUARTERS 4800 American Parkway, Madison, WI

Shopping Center + Two Lots in Lutz, Fl $ 4,750,000

REGULAR MEETING AGENDA

NEW BUSINESS 1140 Lake Shore Blvd (L/LSHD)

4C Standard Horizontal Mailboxes

TOWN OF FARMINGTON FEE SCHEDULE 2017

Regular Monthly Meeting Caledonia Town Board May 11, 2017

TOWN OF FARMINGTON FEE SCHEDULE 2018 Adopted by Town Board Resolution #80 of 2018

1. Click Register for an Account at the top-right hand corner of the window.

REQUEST FOR PROPOSAL (RFP)

26 th Street North and Old Dominion Drive Master Planning Task Force

PROPERTY PROFILE GRC COMPLEX. South Fir Street - Medford

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of September 22, 2018

6 Delivery Services. 632 Mail Receptacles Customer Obligation Responsibilities Exception Receptacles Not Required

Summary Information. Demographic Profile

Extract From Economic Development Task Force Meeting EDTF#02-17 held April 12, 2017

8505 Baycenter Road Jacksonville, FL

(SEE SECTIONS VII AND VIII OF THE COVENANTS)

Environmental Impact Questionnaire

Chase Oaks HOA, Keller, Texas Quarterly Newsletter January 2017 Welcome to our Neighborhood!

2018 Capital Budget Presentation

NorthStar Bank Mobile Banking

COMMISSION POLICY POLICY #9.16

City Hall Space Selection 15 Market Square. November 27, 2017

bâü VÉÅÅâÇ àçm fñü Çz xw à ÉÇ

Department Highlights. Annie Rosenfeld, Director of Risk Management & Real Property- April 2018

ANNUAL ACCESSIBILITY STATUS REPORT

Report Templates in Action Webinar Questions

Call Us Visit Us Online. Florenc boxes.com Product Catalog Booklet. Cluster Box Units & Accessories

For Sale or Lease. I-20 Midway Commerce Center 30 Industrial Park Boulevard Trenton, South Carolina ±421,200 s.f. of Class A industrial space

EXTRA TERRITORIAL ZONING COMMISSION CASE ANALYSIS

UE CONNECTION APPLICATION - POLE to PIT (Underground Electricity Supply)

8505 Baycenter Road Jacksonville, FL

COMMERCIAL SITE AT GENERATION PARK

Approval of Navy Yard Chiller Joint Development Agreement

ORDINANCE NO Section 1. Section of the Rochester Code of Ordinances is hereby amended and reenacted so as to read as follows:

Hamlet Board Meeting. August 27/18. 3:00 pm RM office

Applicant Type (Conditional Use Permit, Variance, Tract Map, etc.): Applicant: Address: Phone(s): Fax:

LAKE CHAPMAN PLAZA, N Florida Ave, TWO BUILDABLE OUTPARCELS, 16333&16347 N Florida Ave For Restaurant, Retail, Office, Medical Use

Getting Started with Stormwater Asset Management

bâü VÉÅÅâÇ àçm fñü Çz xw à ÉÇ

An Post Getting it sorted.

Office for Capital Facilities Guidance Document

Municipal Service Park 3 December Consolidation of City services to one centralized complex

17. Microwave Collocation 17.1 General

(Don t google the website - - it doesn t come up; instead, you have to type in the text yourself for the above link)

AGENDA ITEM # 1. CITY COUNCIL COMMUNICATION FORM

User Guide to Mesquite s Citizen Access Portal (CAP) Planning and Zoning Division New Application

Facebook West Campus. Planning Commission Meeting February 25, 2013

GRC COMPLEX F O R S A L E. CONTACT: Robert Boggess. 65,723± sq ft Cold Storage. 21,600± sq ft Freezer Storage. 29,149± sq ft Dry Storage

Instructions for using Adobe Reader

Pepperell Center Data Center Offering. Pepperell Center. Data Center Offering. Pepperell Mill Campus 40 Main Street Biddeford, Maine.

NVMS Frequently Asked Questions

Flash Decisions: Which Solution is Right for You?

FINANCE MANAGER. Accounting Manual Finance Manager.

MINOR DEVELOPMENT PERMIT CHECKLIST RESIDENTIAL DETACHED GARAGE 481 SQ. FT. 767 SQ. FT.

Vancouver Terminal Grain Storage Project. Feedback Form Inside. Community Engagement. October 1 19, 2012 PROJECT OV ERVIE W

May 11, 2009 USPS Price Change Endicia Makes It Easy

DATE: June 16, 2014 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

KANABEC COUNTY HIGHWAY DEPARTMENT Chad T. Gramentz, P.E. County Engineer 903 Forest Avenue East Mora, MN

HARRISON STREET SUBSTATION UPGRADE AND MODERNIZATION. Presentation to ANC 3E April 13, 2017

Estimating with Microsoft Excel

August 10, Sacramento County Planning and Community Development 827-7th Street Sacramento, CA Tricia Stevens, Principal Planner

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities

A G E N D A. 1. Greetings and Introductions Review Agenda

Site Selection Rubric Summary Rock Creek School Replacement PAA Project # /9/2017

ARLINGTON COUNTY, VIRGINIA

Stanford. Budget Management Variance Reporting. Variance Reporting Process Guide. What. Who. Why. When. Prerequisites:

BUILDINGS AND FACILITIES

US BANK CENTRE US BANK CENTRE RENO RENO, NEVADA -EXECUTIVE SUMMARY- INSTITUTIONAL SALES NORTHWEST REGION

CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES

Building for Sale American Parkway Madison, WI. Key Commercial Real Estate LLC

PUBLIC WORKS ORGANIZATIONAL CHART

Adopted by La Mesa City Council July 9, 2013 Resolution

Metro Vancouver Stanley Park Water Supply Tunnel Public Engagement & Next Steps. Park Board Committee Meeting Monday, January 15, 2018

Stem Beach Solar 1041 Application

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

WELCOME TO DEER LAKE HOMEOWNERS ASSOCIATION, INC. INCLUDE YOUR ADDRESS ON THE CHECK. DO NOT SEND POST-DATED CHECKS. THEY WILL NOT BE ACCEPTED

Division C Land Development Division

Cellphone Provision Policy

PROSPECTUS ALTERATION PHILLIP BURTON FEDERAL BUILDING & U.S. COURTHOUSE SAN FRANCISCO, CA

2017 Tuscany Hills H.O.A.

Transcription:

Mailbox Evaluation.docx 5/18/18 5:51 PM CLUSTER MAILBOX REPLACEMENT GPC EVALUATION There are 2 Wants: Mailboxes exist for almost all Members who want one but they are old, unattractive and do not meet TD vision A small number of members (estimated at 15?) cannot get a cluster mailbox because their lot is not located in an open mailbox space and the USPS refuses to re-sequence The GPC task Force has spent the last two years trying to find a cost-effective solution and has proposed various alternatives to the USPS. The only alternative they will consider is installation of a mailbox for every property. The task force has evaluated this project using established GPC criteria - Has the asset reached the end of its useful life Cluster mailboxes are unsightly, but maintenance costs are low and there is no indication that they are nearing the end of their serviceable life. Members have reported wet mail and frozen doors but this is partly due to lack of a roof rather than the condition of the mailboxes. Do we expect to see growth in demand Trend is toward more vacation homes. Fewer Members are making Tahoe Donner their primary residence. TD currently has 1000 vacant mailboxes but not always in the right sequence. Member benefit Members would no longer have to endure the sight of our old mailboxes and 15 members would be able to get a mailbox on the hill Cost $1.2 million to install 6,473 mailboxes in one location and another $500K to put a roof over them. For every mailbox that fills a need we buy 432 mailboxes that are not needed. Is activity available in Truckee Yes, PO Box or Office Boss What is the useful life of the project We already, pay bills, bank, shop and read newspapers online Postal Service has delivered the mail through sleet and snow but they may not survive the Internet. Have heard that USPS is looking at use of technology to eliminate home delivery. If they don t figure it out soon, Google or Amazon may beat them to it. It could be that mailboxes will go the way of the encyclopedia. The HOA is not responsible for providing a cluster mailbox for every property, just like it isn t responsible for insuring that every property has good cell service, high speed internet or that your street is plowed by 7AM on powder days. The GPC does not recommend replacement of cluster mailboxes at this time.

Mailbox Consolidation TAHOE DONNER ASSOCIATION Option 5; 6,496 mailboxes in (406) units (at Zurich and Northwoods)

History of GPC Task Force Options, 9/19/2016 Meeting Minutes 1. Option 1: Tahoe Donner to continue adopting the maintenance duties of all USPS mailboxes within TDA, repairing and replacing boxes where necessary. Pros: Lowest cost option Cons: Existing boxes do not meet USPS specification standards, so newer and larger replacement boxes may shift entire rows, as necessary to fit within allocated spaces. Mail would still get wet during storms, and snow removal around boxes requires extensive labor during winter months. Estimated Budget: Annually utilizing a percentage of the currently allocated $440K Replacement Reserve Fund. 2. Option 2: Replace existing 2,630 mailboxes with 2,630 new mailboxes, and distribute them at (6) year around amenities, mounted on existing exterior walls that are protected by overhead roof eaves. The three new empty TDA lots could be repurposed to include dog park, shuttle parking, or green space, etc. Pros: Provides six areas for mail delivery at existing amenities, utilizes existing roof structures and parking areas, most cost effective option that includes new mailboxes in a protected area. Estimated Budget: Funded by Replacement Reserve Funds at approximately $200K. 3. Option 3: Replace existing 2,630 mailboxes with 2,630 new mailboxes, consolidated under (3) roofed structures located at Zurich, Hansel, and Alder Creek. As accepted in other communities, mail delivery requires homeowners to provide their own mailboxes, and those who have a PO box, pay approximately $60 annually. To avoid USPS re sequencing challenges, additional mailbox capacity should be included in the new clusters, and property owners who opted out of the original purchase could buy a box in the future. These boxes would be also be located in the clusters, but would be treated as PO boxes and numbered sequentially, as they are at any post office. Pros: Only those who wish to have a mailbox would pay for one, and no cost would be incurred by the majority of the members that don t intend to receive mail at Tahoe Donner. Estimated Budget: Funded by a combination of Replacement Reserve and Development Funds at approximately $1MM. 4. Option 4: Replace existing 2,630 mailboxes with approximately 6,500 new mailboxes, consolidated under (3) roofed structures located at Zurich, Hansel, and Alder Creek, including motion activated solar lighting, and sufficient paved parking stalls. The mailbox cluster at maintenance yard would be eliminated because an overhead structure can t be built in the Town right of way. Each cluster would contain about 2,167 mailboxes, and be roofed similar to Northstar mailboxes. Pros: Forward planning eliminates future potential modifications to mailbox number, layout locations, roof structure, and parking areas. Cons: Highest cost option for a decreasingly desired delivery option Estimated Budget: Funded by a combination of Replacement Reserve and Development Funds at over $2MM.

Existing Mailboxes are consolidated at (4) locations within Tahoe Donner; Zurich Hansel Alder Creek Maintenance Facility

For Board consideration on 5/26/2018 Option 5: Install 6,496 new mailboxes at the Zurich site, then remove all 2,630 mailboxes at existing mailbox locations. Multiple improvements are required with the following preliminary cost estimates; $10,000 =Membership Communication/Outreach/Coordination $25,000 =Environmental Studies $35,000 =Engineering $25,000 =Permitting $775,000 =6,496 mailboxes & locks, in (406) units (includes 2 oversized parcels each) $320,000 =Construction: Site Grading Storm Water Retention Concrete foundations New asphalt driveway and parking Installation of mailboxes and keying Phase 2 parking lot Signage and landscaping $10,000 =Existing Mailbox removal and site stabilization at all four existing locations $1,200,000 =Subtotal Estimate $500,000 =Future Overhead Roof Structures with Lighting $1,700,000 =Total Estimated Project Cost

Existing Mailboxes and Driveway at Northwoods/Zurich Mailbox Cluster

17455 Northwoods Blvd. (Zurich Mailboxes) 5.41 Acres Elevation: 6,299 Existing Use: Member Mailboxes Existing Zoning: Recreation

Existing Mailboxes and Driveway within lot boundary at Northwoods/Zurich

Existing Mailboxes and Driveway are highlighted on the existing lot Site grading and drainage improvements would be required for storm water management and retention

Snow Storage Area is delineated on the down slope section of the lot, allowing for efficient equipment circulation and storm water management

Phase 1 driveway and parking is installed and preparations for construction efforts are made

New Concrete foundations/pads are constructed, with 6,496 Mailboxes installed while existing mailboxes remain active and utilized by membership. Additional space is available on the NE pad to accommodate future growth or services. Upon mailbox completion, new driveway is paved and striped with directional arrows for efficient thoroughfare.

Upon key distribution and USPS loading of the new 6,496 Mailboxes, old mailboxes and driveway are removed. Phase 2 parking is paved and striped to coordinate with Phase 1 driveway

Should roof structures eventually be approved by the GPC and Board, they can be constructed at a later date, as new foundations would accommodate roof design. This minimizes member impact and future construction costs.

Schematic of new cluster mailboxes under optional roofing with overhead lights 1,152 mailboxes can fit within a 25 x 50 footprint

Examples of Mail Delivery within North Tahoe Region.