Installation Instructions Rock-Ola Ecast B75B Motherboard Upgrade Kit Kit #26683901 This kit will not support the Ecast Rock-Ola COIM Board. If your Rock-Ola core computer has the Ecast Rock-Ola COIM board installed you must order the AMI Hardware conversion kit # 26683413. Tools Required #2 Phillips Head Screwdriver, 3/16 and ¼ Nut Drivers. Parts Included with this Kit Item # Part Number Description Quantity 1 40924214 B75B Motherboard 1 2 40980802 Bracket SATA Mounting Adapter 1 3 22219001 SATA Hard Drive (US) 1 4 34037946 Harness ATX Power Adapter 1 5 22132287 Harness Front Panel Rock Ola (B75B) 1 6 22132280 Cable Assembly COM to I/O 1 7 22132252 Cable HD SATA/DATA 1 8 22132253 Cable HD SATA Power 1 9 21965501 Velcro Hook 1 10 21965502 Velcro Loop 1 11 80351604 Screws #4-40 x ¼ Phillip 4 12 21581803 Switch Momentary (Not Shown) 1 These Instructions 1 2 3 4 5 6 7 8 9 10 11 Figure 1 Page 1 of 5
Note: Installation of this kit will disable your serial credit card reader (if installed). If you require a credit card reader, please call AMI Tech Support at 877-ROC-N-ROL to order a new USB Encrypted Card Reader Kit for your jukebox. 1. Turn the jukebox off and unplug it from the wall outlet. 2. Unplug all the harness connections to the CPU Core Assembly and remove the core from the jukebox. 3. Transfer the CPU core assembly to a suitable work surface. Remove the Ecast hard drive from the CPU core computer. This hard drive will not be reused. Please return it to AMI. 4. Remove the (4) #6-32 phillips screws holding on the top cover of the CPU computer assembly. Lift the cover up and rotate to a upright position as shown in figure 2. 5. Disconnect all the electrical connections to the Rock-Ola COIM board and the Rock-Ola motherboard. None of these harnesses will be reused. Disconnect the IDE cable and the ATX power connection. 6. Remove the (6) screws mounting the motherboard to the CPU chassis. The motherboard and front panel will not be reused. COIM Board ATX Power IDE Cable Motherboard Front panel Figure 2 7. Before installing your B75B Motherboard confirm the J1 jumper pins 1 and 2 are shorted if you are converting a 19 touchscreen. If you are converting a 15 touchscreen the J1 jumper pins 2 and 3 on the B75B motherboard must be shorted. See Figure 3. J1 Header Figure 3 Page 2 of 5
8. Insert the new B75B front panel into the CPU core assembly opening and mount the new B75B motherboard (Item #1) with (4) of the screws removed in step #6. B75B Motherboard Connections 9. Locate the Rock-Ola Front panel harness (Item #5) labeled 22132287 connect the (10) pin housing to the F Panel header of the B75B motherboard. Attach the two white wires to the 21581803 Momentary Switch (item #12) polarity is not important. See Figure 4. 10. Locate the COM to I/O cable Assembly (Item #6) labeled 22132280 connect the 10 pin housing to the COM1 header of the B75B motherboard as shown in Figure 4. 11. Connect the 20 pin ATX power supply connector to the B75B motherboard. Locate the ATX 4 Pin Adapter Harness labeled 34037946 (Item #4). Connect the (4) pin female housing to the (4) pin male housing of the ATX power supply. Connect the remaining (4) pin male housing of the adapter harness to the B75B mother board as shown in Figure 4. 12. Connect the SATA/DATA Hard Drive cable (Item #5) to the SATA connector as shown in Figure 4. Connect the HD SATA Power Cable (Item #4) to a (4) pin ATX power supply connector. Com1 header F Panel header Momentary Switch 20 Pin ATX Power B75B Motherboard SATA/DATA Cable 4 Pin ATX Power Figure 4 Page 3 of 5
AMI I/O board Connections 13. Connect the 18 pin housing of the F Panel harness to the AMI I/O board insuring the red wire is in pin number 1. 14. Connect the other side of the COM to I/O cable to the 10 pin header of the AMI I/O board. With the red stripe positioned as shown in Figure 5. 15. Connect a (4) pin ATX power supply connector to the AMI I/O board AMI I/O board Front Panel harness ATX Power connection COM to I/O cable red stripe Figure 5 16. Carefully route the SATA/DATA and SATA power cables along with the switch connected to the front panel harness thru the access slots for the hard drive. Secure the switch using the Velcro (Items #9 and 10) in a convenient location on the core chassis. 17. Dress the harnesses to avoid any pinch points or fan interference. Install the computer core cover using the same screws removed in Step # 4. 18. Secure the SATA hard drive 22219001 (Item #3) to the SATA Mounting Adapter Bracket 40980802 (Item #2) using the (4) #4-40 x 1/4 screws 80351604 (Item #11). Hard Drive #4-40 ¼ Screws two on either side Adaptor Bracket Figure 6 Page 4 of 5
19. Install the adapter bracket and hard drive assembly to the Rock-Ola Computer Core Chassis with (4) #6-32 x ¼ screws ST-06348 (Item #10). Connect the SATA power cable and the SATA/Data Cable to the hard drive. 20. Double check that all harnesses are properly connected and all mounting screws are tight. Reinstall the Computer Core back into the jukebox. Reconnect all harnesses to the AMI View I/O board and touch screen cables removed in Step #4. Power up Testing 21. Plug the jukebox back into the wall outlet then power up the jukebox to ensure the jukebox UI comes up. This will take some time and may include one or more reboots. If the B75B motherboard does not start up press the momentary switch installed in step #9. 22. In order for the jukebox to connect to the AMI network, the MAC address of the computer core must be entered into the AMI database and the jukebox will have to be added to your operating contract. This will require a phone call to the AMI Tech Support line, 1-877-ROC-N-ROL (1-877-762-6765). 23. The MAC address is found on a Service Mode screen. 24. If the jukebox is not in the Service Mode, push the Activate Service Screen switch. 25. Push the red Calibrate Touch Screen button and calibrate the touch screen. 26. Touch Diagnostics then touch System Information. The MAC address will be displayed in the third block down from the top right. 27. To help the AMI Tech Support technician configure your jukebox in the AMI system, please have the jukebox model and serial number along with the MAC address when you call. 28. After Tech Support has entered the MAC address of the jukebox, you will need to enter the Trigger Code. 29. From the main menu in the Service Mode, touch System Setup then touch Enable/Extend Features. 30. Using the on-screen keypad, enter the trigger code found on the Trigger Code Card then touch the Send Code button. 31. In order for the coin switches to work properly, you will have to adjust the coin setup on the Cash Management Song Pricing screen. For View kits that were installed in old Rowe CD jukeboxes with 4 coin acceptors, use the coin setup shown in Figure 7. Otherwise, use the Diagnostics Credit Devices screen to discover which inputs are used for which coins then configure the coin setup accordingly. Figure 7 Page 5 of 5