More Questions from Inspectors Numerous PV Systems Pose Issues

Similar documents
Stalking the Elusive and Somewhat Strange PV System

FORM FOR PROPOSAL FOR 2014 NATIONAL ELECTRICAL CODE

Electrical Integration of PV Systems. Ridha Hamidi, Ph.D.

Microinverters And The Solar Industry

Want to make your inspectors happy?

Bulletin Installation of solar photovoltaic systems Rules , , , , and

Bulletin Installation of Solar Photovoltaic Systems Section 50; Rules: , , ; Tables 11 and 19 Issued July 2010

Rapid Shutdown Requirements for NEC 2017

Introduction to the Inspection Checklist for Rooftop Solar Photovoltaic (PV) Systems in Goshen, IN

FS Series PV Modules Reverse Current Overload

Application Techniques CENTERLINE 2100 Motor Control Centers

UL 508 A standard-compliant design of industrial control panel

Superseding SHEET NO. 34C-51 REVISED SHEET NO. 34C-51 Effective May 27, 2010 Effective December 3, 2011

Installation Instructions for Eaton Surge Protective Device XXCFXXX10-DIN and XXCFXXX10-DIN2

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

MICHIGAN DEPARTMENT OF TRANSPORTATION

SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD <S> <OM>

M215 (M215-60) Safety

Spring Test 9 due 05/11/2013

HUBBELL SPIKESHIELD Wired-In Branch Panels Surge Protective Device (SPD)


DANGER DANGER: is used in this manual to warn of high voltages capable of causing shock, burns, or death.

Electrical Components and Equipment for General Use Self Inspection Checklist

The purpose of this document is to specify the power requirements for Core Health and Fitness LLC equipment.

SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016

INSTALLATION, OPERATION AND MAINTENANCE MANUAL GE TRANQUELL Series Wall Mounted Low and Medium Exposure Surge Protective Devices (SPDs)

Surge Protective Devices Installation, Operation and Maintenance Manual. LoadTrack LTL

Eaton s Innovative Technology Surge Suppression Guideform Specification Low Exposure DIVISION 16 SECTION 16289

Eaton s Innovative Technology Surge Suppression Guideform Specification High Exposure DIVISION 16 SECTION 16289

R-LB R-LX Series Installation, Operation & Maintenance Manual

Spring Test 5 due 4/26/2013

M215 Microinverter Installation Planning

GE Digital Energy. Power Quality

Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System

GENERAL UL th EDITION BID SPEC: SURGE PROTECTIVE DEVICES Prepared by THOR SYSTEMS, INC.

DIVISION 16 SECTION Surge Protective Device Submittal (SPD)

M250 (M LL) Safety

PV Rapid Shutdown device

Installation Notes TII Model 341 Protector

NEC 2008 Code Changes Top 20 Revisions. By: Rafi Wartan, PE, LEED AP

Standards Update Notice (SUN) Issued: January 11, 2016

Solar Combiner Enclosure

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

M215-Z Safety Information (M LL-IG-ZC)

GENERAL UL th EDITION DESIGN-BUILD SPEC: SURGE PROTECTIVE DEVICES Prepared by THOR SYSTEMS, INC.

White Paper Surge Protective Devices in Automatic Transfer Switches

Remote Terminal Monitoring Protection Surge Protection for Quasi-Grounded Low Voltage dc Circuits

Site Preparation CHAPTER

ASCO 920 Remote Control (RC) Switches

White Paper October 2009

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285.

TRI-SERVICE ELECTRICAL WORKING GROUP (TSEWG) 07/16/08 TSEWG TP-3: SURGE PROTECTOR PERFORMANCE AND EVALUATION CRITERIA

Spring Test 16 due 06/14/2013

SolarEdge SolarEdge, Enphase Value Comparison July 8, 2011

M215 Safety (M LL-S22-IG / S23-IG / S24-IG)

TECHNICAL AND GENERAL BID REQUIREMENTS

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

920 Remote Control (RC) Switches

INSTALLATION, OPERATION AND MAINTENANCE MANUAL

Installation Guide for America Solar Wholesale Photovoltaic Modules

A Step Change in PV AFCI Technology

UL508Afor Panel Builders Getting Started

Installation and Operation Manual

INSTALLATION MANUAL SLI 50 INVERTER

Installing the Enphase IQ Combiner+

SECTION TRANSIENT VOLTAGE SURGE SUPPRESSION

Electrical Plan Review

Panelboard and switchboards series rating information manual

Sensacell Troubleshooting Guide

INTERCONNECTION STANDARDS FOR GENERATING FACILITIES (GF) CONNECTED TO THE FORT COLLINS DISTRIBUTION SYSTEM. July 2011 UPDATED STANDARDS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

Installation, Operation, and Service Manual SIEMENS HEALTHCARE INTEGRATED ELECTRICAL CABINET

Enphase S-Series Microinverter and Engage Cable Safety

MICHIGAN DEPARTMENT OF TRANSPORTATION

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

Quick Start Guide TS A

Photovoltaik ON GRID / OFF GRID

ADDENDUM NO. 1 ITB-DOT BAT. You are hereby notified that the above referenced Invitation to Bid (ITB) is modified as shown below:

SECTION VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD)

Specifications, Installation, and Operating Instructions

U.S. Virgin Islands Water and Power Authority

Lightning and Surge Protection of Photovoltaic Installations. Leutron GmbH 2013 Leinfelden-Echterdingen, Germany

GUIDE TO VERIFYING SURGE PROTECTIVE DEVICES INSTALLED IN LIGHTNING PROTECTION SYSTEM INSTALLATIONS ARE COMPLIANT WITH UL 96A.

Protection against electric shock

DECK All-In-One Enclosure. Quick Installation Guide for Field Installers

Pure sine wave inverter. Product Manual

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical

File E Project 91SC COMPONENT POWER SUPPLIES INFORMATION TECHNOLOGY EQUIPMENT INCLUDING ELECTRICAL BUSINESS EQUIPMENT

Model Number Electrical Compatibility Module Connector Type M LL-S22 M LL-S22-NA M LL-S23 M LL-S23-NA

File E Project 08NK November 24,2009 REPORT TRANSIENT VOLTAGE SURGE SUPPRESSORS (VZCA/VZCA7)

G320 I C R O I N V E R T E R U S E R M A N U A L

NEMA Standards Publication AB Establishing Levels of Selective Coordination for Low Voltage Circuit Breakers

Understanding SCCR. THE BEST ELECTRICAL CONTROLS BUSINESS ON THE PLANET! Unmatched Service Superior Product Quality Advantage Pricing

Installation and Operations Manual Micro-Inverter M S

Models beginning with 2M, 2L or 2X. Product Description. Technical Specifications. Installation Instructions. Series 2000 Multiple Meter Units (MMUs)

Ground Fault Current Protection Devices Prevent Costly Production Shutdowns

SECTION PANELBOARDS

PanelView Plus/VersaView CE Terminals and Display Modules

Installing the Enphase IQ Combiner+

ALLTEC PROTECTION PYRAMID TM FOR PHOTOVOLTAIC SOLAR FIELD

Transcription:

Perspectives on PV More Questions from Inspectors Numerous PV Systems Pose Issues by John Wiles 76 IAEI NEWS March. April 2012 www.iaei.org

Photovoltaic (PV) systems prices continue to drop and inspectors are getting numerous requests for inspections. The questions that I receive indicate that this is new territory for many inspectors. These questions also indicate a few holes in the National Electrical Code, which we hope to plug in the 2014 NEC. Questions on Grounding Question: Does the NEC require that a grounding electrode conductor (GEC) and a grounding electrode (ground rod) be connected to the new transformerless inverters? See photo 1. Section 690.47 in the 2011 National Electrical Code (NEC) does not exactly address this issue. Answer: If the listed transformerless inverter (also called a non-isolated inverter) adheres to the requirements of Underwriters Laboratories Standard 1741 for PV inverters, the inverter will not even have a terminal for a grounding electrode conductor. These inverters are used with an ungrounded PV array. The UL standard requires a grounding electrode conductor terminal and the Code would require a grounding electrode conductor only when there is a bonding jumper in the direct current (dc) side of the inverter. In normal transformer-type of inverters (also called isolated inverters), this bonding jumper is part of the required 690.5 ground fault detection and interruption (GFDI) circuit. Transformerless inverters do not connect one of the dc circuit conductors in the PV array to ground (as allowed by NEC 690.35) and have no internal bonding jumper. Therefore, there will normally be no terminal to connect the GEC to and the NEC does not require a dc GEC. Unfortunately, Section 690.47 does not specifically say this, so a proposal has been submitted for the 2014 NEC that hopefully clarifies the issue. Here is the wording of that proposal for 690.47(B). Add a new third paragraph to 690.47(B) as follows: Ungrounded DC PV arrays connected to utilization equipment with common ac and dc equipmentwww.iaei.org March. April 2012 IAEI NEWS 77

Photo 1. Transformerless inverter. Looks like many other inverters that have transformers, but may not have a GEC terminal or a 690.5 Warning. Photo courtesy SMA Technologies grounding terminals shall be permitted to have dc equipment-grounding requirements met by the ac equipment-grounding system without the requirement for a dc grounding electrode conductor or grounding system. We have been asking PV installers to get that dc GEC connected to the inverter for many years. Now, on these new systems, it will no longer be required. But, be advised that not all inverter manufacturers, nor their certification agencies, will read all of the fine print in the 78 IAEI NEWS March. April 2012 www.iaei.org

standard and some transformerless inverters will have terminals or instructions for a GEC. This terminal will be, as it is in other inverters, connected internally to the dc and ac equipment-grounding conductor terminals. And, if desired, this terminal may be used with a GEC routed to a grounding electrode. This would essentially be a 250.54 optional grounding electrode and that electrode does not have to be bonded to any other grounding electrode. It is connected only to the equipment-grounding system in the inverter. The 690.47(B) proposal for the 2014 NEC indicates that since the ac and dc equipment-grounding conductor terminals are common in the inverter, the ac equipment-grounding system (grounded at the serviceentrance equipment) can be used to provide the array equipment-grounding function. However, this may route lightning induced surges on the array equipment-grounding system through the inverter and into the service equipment. Far-thinking PV installers may elect to install optional 250.54 grounding systems at the array and possibly also at the inverter to better protect against these surges. Question: What is the proper method of grounding the modules and microinverters that are not manufactured or certified/listed as an AC PV module? Photo 2. Microinverter with single grounding terminal for both equipment grounding and dc grounding electrode conductor connections. Photo courtesy Enphase. Answer: These microinverters are essentially small inverters. It is difficult to precisely define them as a unique device since they are continually getting larger (now 380+ watts) while some normal string inverters are down to 700 watts and below. The microinverter/ PV module combination has many of the characteristics of any other inverter when it comes to grounding. There are usually exposed metal surfaces on both the inverter and the module that must be grounded (i.e., connected to earth through an equipment-grounding conductor/system). The microinverter may cause the module to operate as an ungrounded module, as a positively grounded module (most common), or as a negatively grounded module. This form of grounding refers to how the dc circuit conductors are referenced to ground and is called system or functional grounding. When the module is operated in a grounded manner, there will be a dc bonding jumper inside the inverter and this fact will require that the inverter have a dc grounding electrode conductor terminal. The dc grounding electrode conductor (GEC) will have to be 6 AWG in exposed locations and at least 8 AWG inside conduit. It will have to be unspliced or irreversibly spliced from the microinverter all the way to the grounding electrode or the grounding bus bar in the equipment that has a connected grounding electrode. The inverter should also have an ac equipment-grounding conductor that will be routed with the ac output circuit conductors. With a dc input from the module, there should also be provisions to accept a dc equipmentgrounding conductor from the PV module. However, in many cases, a single external terminal on the microinverter can meet both the equipment-grounding terminal requirements (ac and dc) and the grounding electrode conductor terminal requirement. See photo 2 In general, the module will require an equipmentgrounding conductor attached to the frame following the instructions provided in the module instruction manual and sized per 690.45. In many cases this can be as small as 14 AWG. Of course, 690.46 may apply or the AHJ may require a larger conductor to provide greater mechanical integrity. In these cases, a 6 AWG conductor is frequently used. In some cases, an electrical connection (not just a mechanical attachment between inverter and module frame) between the module frame and the microinverter enclosure will enable a single equipment-grounding conductor to be used for both devices. Creative sizing (6 AWG) and routing of a single unspliced conductor can be used to meet all module and microinverter grounding requirements. Question: What type of grounding is required on modules with plastic frames (also known as industrial www.iaei.org March. April 2012 IAEI NEWS 79

each module and the maximum series fuse. Each string of modules can, under worst-case conditions of sunlight, generate 1.25 x I sc of current into a fault in a parallelconnected string of modules. If we have n strings connected in parallel, then n-1 strings can send fault current into a faulted string. The total fault current would be (n-1) x 1.25 x I sc. That fault current must be less than the rating of the module protective fuse marked on the back of the module. If the fault current were greater than the value of the module protective fuse, then the module and its cable could be damaged where there was no fuse. A little PV math shows that: (n-1) x 1.25 x I sc < F where F is the value of series fuse marked on the back of the module. If we solve this for n, the total number of strings in parallel, we get: n< (F+1.25 x I sc )/(1.25 x I sc ) Example 1: Module W has an F of 15 amps (pretty common) and an Isc=8 amps. Photo 3. Dc-to-dc converter. Photo courtesy Tigo Energy composites) and these new dc-to-dc converters that are attached to the module outputs that have plastic enclosures? See photo 3 Answer: My favorite type a question an easy one. If there are no exposed metal parts on a module, a microinverter, or a dc-to-dc to dc converter, there will be no requirement for an equipment-grounding conductor and probably no place to attach such a conductor. However, we may get a plastic encased dc-to-dc inverter or a microinverter that has a dc grounding electrode conductor requirement and there will be a terminal for that conductor. The manual for these certified/listed products will have the instructions for this connection. Questions on Overcurrent Protection Question: When do multiple strings of modules require a fused combiner box or a set of fuses inside the inverter? Answer: The number of strings of PV modules that can be connected in parallel without a fused combiner is determined by the short-circuit current (I sc ) rating of n<(15+1.25 x 8)/(1.25 x 8) = 25/10 = 2.5, and the total number of strings (n) for this module can be 2.5; and since n has to be a whole number, two strings of modules can be connected in parallel. Example 2: Module Y has F = 20 and Isc = 3. n < (20+1.25 x 3)/(1.25 x 3) = 23.75/3.75 = 6.33 and six strings of these modules can be connected in parallel. For many PV modules in the 180 300 watt range, only two strings can be connected in parallel because of these constraints. Question: Can two sets of 15 microinverters be connected in parallel without overcurrent devices? Answer: In short No. The microinverters are tested and certified/listed to be used as a set with the cable or wiring harness provided with them. The instruction manual will specify how many microinverters can be connected to the factory cable and the rating of the required circuit breaker for that set on a single cable. This is consistent with NEC 705.12(D)(1) that requires a dedicated circuit breaker for utility-interactive inverters. 80 IAEI NEWS March. April 2012 www.iaei.org

Question: How does the short-circuit current from a PV module affect the output current of the connected dc-to-dc converter? How is the PV module open circuit voltage used to calculate the voltage rating of any combiner or inverter downstream. Answer: This new technology of dc-to-dc converters and other PV module power processors has evolved in numerous configurations. Some converters are required on the output of every PV module; some are required on only a few modules. Most are connected in series, but some are connected in parallel. Some of the devices are smart and must be used with dumb inverters. All of these devices must be certified/listed to UL Standard 1741. There are and will be too many variations to address the specific connection requirements of each product in the NEC directly. The outputs of these devices are decoupled from their inputs, so PV module short-circuit currents and voltages cannot directly be used to meet any Code requirements that are associated with the circuits connected to the output of these devices. Essentially the installers and the inspectors will have to rely on 110.3(B) where these certified/listed devices must be installed following all instructions provided with the product and all labels on the product. A proposal for the 2014 NEC will reinforce this requirement in Article 690. Questions on Large Systems Question: What needs to be addressed concerning the ground-fault protective device connected to the inverter output to meet the exception on 690.64(B)(3)/705.12(D) (3)? The exception requires that loads be protected from all sources of ground-fault currents. Answer: This particular area is beyond the scope of the NEC. The load circuits must be protected from ground faults originating from the utility service and also from ground-fault currents originating from the load-side connected PV inverter. The fault currents reaching the load circuits will be shared between these two sources. It would take engineering analysis to determine how the two sources will share the fault currents under various situations and how the settings of each ground fault device will be determined. Question: The service disconnect is at 12 kv (12.47 kv) for a large facility and the PV system will be connected at 480 volts on a feeder. For this load-side connection, how do we apply 705.12(D)(2) to determine conductor and busbar ampacities when transformers are involved? Answer: The voltage ratio of the transformer is used to adjust the various overcurrent device ratings and ampacities to an equivalent set of numbers at a single voltage, either at the 12 kv or the 480 V level. For example, a 25-amp fuse on the 12 kv side of the transformer would translate to about a 650-amp (25 x 12470/480) overcurrent device when referenced to the 480 V feeder. Then the requirements of 705.12(D) may be applied. In these large facilities, keep in mind that the PV inverter output connection to the existing system must be made at the end of a feeder or busbar opposite the utility feed end before the 120% allowance can be used. If the sum of the overcurrent devices exceeds 120% of the ampacity of the feeder or the rating of the busbar, or the PV connection cannot be properly located, a 100% factor must be used. Any circuits (conductors and busbars) not protected by a single overcurrent device that may carry current from the PV system may have to be increased in size. Keep those questions coming. The holes in the 2014 NEC have not yet been addressed and that Code is more than two years away. For Additional Information See the web site below for a schedule of presentations on PV and the Code. The Southwest Technology Development Institute web site maintains a PV Systems Inspector/Installer Checklist and all copies of the previous Perspectives on PV articles for easy downloading. A color copy of the latest version (1.91) of the 150-page, Photovoltaic Power Systems and the 2005 National Electrical Code: Suggested Practices, written by the author, may be downloaded from this web site: http://www.nmsu.edu/~tdi/photovoltaics/ Codes-Stds/Codes-Stds.html And yes, it may be updated to the 2008 and 2011 Codes sometime this year. John Wiles works at the Institute for Energy and the Environment (IEE) (formerly the Southwest Technology Development Institute) at New Mexico State University. IEE has a contract with the US Department of Energy to provide engineering support to the PV industry and to provide that industry, electrical contractors, electricians, and electrical inspectors with a focal point for Code issues related to PV systems. He serves as the secretary of the PV Industry Forum that submitted 54 proposals for the 2011 NEC. He provides draft comments to NFPA for Article 690 in the NEC Handbook. As an old solar pioneer, he lived for 16 years in a stand-alone PV-power home in suburbia with his wife, two dogs, and a cat permitted and inspected, of course. The PV system on his home is a 5 kw (dc) utilityinteractive system with a full-house battery back up. This work was supported by the United States Department of Energy under Contract DE-FC 36-05-G015149 www.iaei.org March. April 2012 IAEI NEWS 81