RST Standards Committee Friday 13 July 2018 Record of Decisions
|
|
- Julianna Marshall
- 5 years ago
- Views:
Transcription
1 T tandards Committee Friday 13 July 2018 ecord of ecisions Minutes of the previous meeting 18/T/07/218 pproval of the minutes of the meeting held on 18 May T C approved the minutes of the meeting held on 15 June 2018 subject to the amendments suggested. General 18/T/07/220 18/T/07/227 mendment to I 2543 T T C noted the mendment to I 2453 T. os T C noted the following: raft CC C o 07 June 2018 raft TOM C o 05 June 2018 raft PLT C o 07 June 2018 raft T C o 15 June 2018 T C noted the ecords of ecisions and the deferral of deviation application EV and agreed that the revised application did not need to be seen at T C. eviations against ailway Group tandards: ew applications 18/T/07/ EV orth est Electrification Programme (EP) Phase 4, Chorley tation ummary of pplication: etwork ail orthern Programmes are undertaking an electrification and linespeed improvement scheme on MVE1 and MVE2 (Manchester Victoria to Euxton Junction, known as 'Phase 4'). The track alignment through Chorley station was re designed in order to facilitate this, and the platform coping stones have been re aligned to provide compliant clearances and platform heights (X dimension) and offsets (Y dimension). The required construction tolerances were extremely challenging at this location (with a 1 mm design clearance to 890 mm Y offset). The proposal has been supported by the ystem eview Panel and in early engagement informal review with B panel. (subject to conditions) Hannah.Blackmore-Beckham@B.co.uk ejected / ot supported *n s suffix is applied when acting as a supporting Page 1 of 6
2 ecision: T C supported deviation application EV orth est Electrification Programme (EP) Phase 4, Chorley tation. T C also decided that if the offset of a new or rebuilt platform is greater than the standard dimension given in GIT7020, it does not need to be a supporting Committee for deviations against GIT /T/07/229 eviation pplication EV: Balise activation of automatic power control in place of magnet provision at Crossrail tunnel portals ummary of pplication: The tunnel portals where the Crossrail (Elizabeth Line) infrastructure interfaces with etwork ail are highly constrained sites. In particular, the Pudding Mill Lane portal, where the alignment has to avoid the iver Lea and its tributaries, the 12 and the ocklands Light ailway, has been particularly problematic. However, for safety of maintenance activity and integrity of operation, it is necessary to have a eutral ection in the 25kV Overhead Line Electrification (OLE) system at the infrastructure boundary, clear of the steep gradient at the portal and the switches and crossings joining Crossrail tracks to the existing route. Unfortunately, siting utomatic Power Control (PC) magnets to support this eutral ection has become problematic. ecision: T C deferred eviation pplication EV: Balise activation of automatic power control in place of magnet provision at Crossrail tunnel portals on the basis that it was deferred at EE C. T C decided they would see the deviation when it is ready for resubmission but would ideally like to see the deviation before it is presented to EE C. Changes to ailway Group tandards: ew Proposals 18/T/07/230 18/T/07/231 18/T/07/ ational Project T C approved the case for change ew I for bi Mode signage T C approved the proposal for change and decided the project should be given a high priority. The following organisation was identified for inclusion in the consultation: Hitachi T C decided that full industry consultation was necessary. 18 xxx Update I 2706 T T C approved the proposal for change. (subject to conditions) Hannah.Blackmore-Beckham@B.co.uk ejected / ot supported *n s suffix is applied when acting as a supporting Page 2 of 6
3 T C decided that the project should be given a medium priority and identified the no organisations/individuals that should be included in the consultation. The method of consultation was decided to be conducted within Committee. Changes to ailway Group tandards: Project updates 18/T/07/233 18/T/07/234 B tandards Programme T C noted the delivery and planning progress reported and decided that B s suggested forward programme correctly represents the Committee s current priorities c eview the requirements and guidance set out in GKT0075 issue four and GKG0675 issue four T C made the following decisions relating to the project c eview the requirements and guidance set out in GKT0075 issue four and GKG0675 issue four. It decided that the proposed new documents GKT0075 issue five, I 0734 CC issue one and I 0735 CC issue one deliver the intentions of the proposal for change. It decided that the proposed new documents GKT0075 issue five, I 0734 CC issue one and I 0735 CC issue one, are in a suitable state for consultation. T C supported consultation on the proposed withdrawal of GKT0075 issue four and its associated guidance GKG0675 issue four and their replacement by the new documents GKT0075 issue five, I 0734 CC issue one and I 0735 CC issue one. The following organisations were identified for inclusion in the consultation: Heritage ailway H1 and H2 Changes to ailway Group tandards: Final pproval 18/T/07/ eview the guidance for defective on train equipment in GOG3637 T C provided no comments on the proposed B responses to comments received during consultation. T C supported the proposed B responses to comments received during consultation and decided that the following documents proposed for publication and withdrawal deliver the project s intentions: I 3437 TOM, efective on Train Equipment, issue two GET8000 T5, Preparation and movement of trains: efective or isolated vehicles and on train equipment, issue nine C (subject to conditions) Hannah.Blackmore-Beckham@B.co.uk ejected / ot supported *n s suffix is applied when acting as a supporting Page 3 of 6
4 18/T/07/236 18/T/07/237 GET8000, electrified lines, issue five GIG3637, Guidance on efective on Train Equipment, issue two (withdrawal) T C supported I 3437 TOM issue two, subject to the conditions that etwork ail in the context of the statement of compatibility should be removed. The term certificate of compatibility only applies to grandfather rights vehicles; for other vehicles it should be changed to statement of compatibility. T C supported GET2000 T5 issue nine and GET8000 issue five, the Briefing ote and the Impact ssessment and disposition table for authorisation to publish. T C supported the withdrawal of GOG3637 issue two and noted the planned publication and withdrawal dates Up issue I 1702 PLT and GMT2400 to align with revised BI standards T C provided no comments to the response to comments received during consultation. It supported without modification the proposed responses to comments received during consultation. T C decided that the revisions of GMT2400 issue six and I 1702 PLT issue two deliver their intentions and supported the revisions of GMT2400 issue six for authorisation to publish ule Book eptember publication T C made the following decisions relating to project ule Book eptember publication: It provided no comments on the proposed responses to comments received during consultation. It supported without modification the proposed responses to comments received during consultation. T C supported that the proposed minor changes to GET8000 M1, GET8000 T2, GET8000 T10 ETM and 521, which were not issued for full industry consultation are consulted on within Committee. The consultation on the minor changes was undertaken within Committee and it was decided that the ational Operations Publications listed in the table on page 1 of the Case for Change delivers the project s intentions. T C supported the ational Operations Publication listed in the table on page 1 of the Case for Change, for authorisation to publish and supported the proposed withdrawal of ational Operations Publication which are listed for withdrawal. (subject to conditions) Hannah.Blackmore-Beckham@B.co.uk ejected / ot supported *n s suffix is applied when acting as a supporting Page 4 of 6
5 18/T/07/239 T C noted the planned publication, withdrawal and in force dates at paragraph 3.1 of the Case for Change and noted that the proposed changes to GET8000 M3 (18 902b) have been withdrawn and will be carried forward to the ule Book March 2019 publication project (19 901) ETC ational Onboard ubsystem equirements for ew Trains and etrofit T C consulted on I 0797 CC issue one and I 079 CC issue one and supported the publication of I 0797 CC issue one and I 0798 CC issue one. European delegate remits and funding for approval and reports for noting 18/T/07/240 CE TC 256 Plenary minutes T C noted the CE TC 256 Plenary minutes 18/T/07/241 18/T/07/242 18/T/07/243 E EU report pril 2018 T C noted the E EU report from pril 2018 IO TC 269 CG1 elegate eport T C noted the IO TC 269 CG1 elegate eport otes of IO TC 269 Plenary Meeting T C noted the notes of the IO TC 269 Plenary Meeting evelopment of Technical pecifications for Interoperability (TIs) and Euronorms (Es) 18/T/07/244 EU report of OI TI P o 06 T C noted the EU report of the OI TI P 06. esearch Updates 18/T/07/245 B & eport T C noted the B & report T C ubgroups 18/T/07/246 LOC&P + G TI MG T C noted the minutes of the LOC&P + G TI MG. (subject to conditions) Hannah.Blackmore-Beckham@B.co.uk ejected / ot supported *n s suffix is applied when acting as a supporting Page 5 of 6
6 OB 18/T/07/251 T C genda T C approved the proposal to align the agenda for T C with the project stages in the case for change template subject to the condition of a consistent approach being followed by all tandards Committees. ate of next meeting Friday 07 eptember 2018 (subject to conditions) Hannah.Blackmore-Beckham@B.co.uk ejected / ot supported *n s suffix is applied when acting as a supporting Page 6 of 6
PROCEDURE FOR THE DEVELOPMENT OF EURACHEM GUIDANCE. Contents
Approved 2018-05-17 PROCEDURE FOR THE DEVELOPMENT OF EURACHEM GUIDANCE Contents PROCEDURE FOR THE DEVELOPMENT OF EURACHEM GUIDANCE... 2 Purpose... 2 Scope... 2 Responsible organisation... 2 Eurachem Guidance
More informationPolicy. Business Resilience MB2010.P.119
MB.P.119 Business Resilience Policy This policy been prepared by the Bi-Cameral Business Risk and Resilience Group and endorsed by the Management Boards of both Houses. It is effective from December to
More informationMemorandum of Understanding
Memorandum of Understanding between the European Commission, the European Union Agency for Railways and the European rail sector associations (CER, EIM, EPTTOLA, ERFA, the ERTMS Users Group, GSM-R Industry
More informationTechnical checklist for Technical Specifications for Interoperability. Issue One
Technical checklist for Technical Specifications for Interoperability Issue One Approved by the Industry Standards Coordination Committee 23 July 2010 ISCC/009 Email: enquirydesk@rssb.co.uk www.rssb.co.uk
More informationLOUGHBOROUGH UNIVERSITY RESEARCH OFFICE STANDARD OPERATING PROCEDURE. Loughborough University (LU) Research Office SOP 1027 LU
LOUGHBOROUGH UNIVERSITY RESEARCH OFFICE STANDARD OPERATING PROCEDURE Loughborough University (LU) Research Office SOP 1027 LU Process for Writing Study Protocols for NHS Research Sponsored by Loughborough
More information2008 E-customs progress report
EUROPEAN COMMISSION DIRECTORATE-GENERAL TAXATION AND CUSTOMS UNION Customs Policy Customs policy and Electronic customs Taxud.c.1(2009)172599 2008 E-customs progress report Commission européenne, B-1049
More informationSubmission. to the. Australian Communications and Media Authority. on the. Planning for mobile broadband within the 1.
Submission to the Australian Communications and Media Authority on the Planning for mobile broadband within the 1.5 GHz mobile band Submission by: Australian Mobile Telecommunications Association and Communications
More informationINSPIRE status report
INSPIRE Team INSPIRE Status report 29/10/2010 Page 1 of 7 INSPIRE status report Table of contents 1 INTRODUCTION... 1 2 INSPIRE STATUS... 2 2.1 BACKGROUND AND RATIONAL... 2 2.2 STAKEHOLDER PARTICIPATION...
More informationNEWCASTLE CLINICAL TRIALS UNIT STANDARD OPERATING PROCEDURES
SOP details SOP title: Protocol development SOP number: TM 010 SOP category: Trial Management Version number: 03 Version date: 16 December 2016 Effective date: 16 January 2017 Revision due date: 16 January
More informationISA 800/805. Proposed changes to ISA 800/ 805 were limited in nature
ISA 800/805 Prof. Annette Köhler, IAASB Member and Drafting Team Chair Agenda Item 4 New York, USA June 16, 2015 Page 1 Proprietary and Copyrighted Information Background and Introduction Proposed changes
More informationGC0102 Mod Title: EU Connection Codes GB Implementation Mod 3
Stage 01: Modification Proposal Grid Code GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3 Purpose of Modification: This modification (3/4) will set out within the Grid Code the following
More informationChange Control Process for European ectd Standards Version 1.1. December 2006
Change Control Process for European ectd Standards Version 1.1 December 2006 Document Control Change Record Version Date Author(s) Comments 0.1 10 September, 2003 Miguel Bley Draft 0.2 11 September, 2003
More informationRST Standards Committee Chairman s presentation. Presented by Hugh O Neill 17 November 2016
RST Standards Committee Chairman s presentation Presented by Hugh O Neill 17 November 2016 1. Key issues from the last six months 1. Sanders Standard GMRT2461 issue 2 was published Jun 2016: 3 months early
More informationProject to establish National Incomes Register. Stakeholder testing plan
Project to establish National Incomes Register plan Incomes Register Project TESTING PLAN 1(21) REVISION HISTORY Version Date Description 1.0 25/10/2017 Document published. KEY TERMS AND THEIR DEFINITIONS
More informationCode Administration Code of Practice
Code Administration Code of Practice As part of the energy Codes Governance Review Ofgem proposed that a Code of Practice be established to facilitate convergence and transparency in code Modification
More informationNotes for authors preparing technical guidelines for the IPCC Task Group on Data and Scenario Support for Impact and Climate Analysis (TGICA)
Notes for authors preparing technical guidelines for the IPCC Task Group on Data and Scenario Support for Impact and Climate Analysis (TGICA) One of the core activities included within the mandate of the
More informationStandards for C-ITS ESF GmbH, Dr. Hans-Joachim Fischer Fichtenweg 9, D Blaubeuren, Germany
Introduction Standards for C-ITS ESF GmbH, Dr. Hans-Joachim Fischer Fichtenweg 9, D-89143 Blaubeuren, Germany http://fischer-tech.eu, HJFischer@fischer-tech.eu : document may be reproduced and distributed
More informationIT Governance ISO/IEC 27001:2013 ISMS Implementation. Service description. Protect Comply Thrive
IT Governance ISO/IEC 27001:2013 ISMS Implementation Service description Protect Comply Thrive 100% guaranteed ISO 27001 certification with the global experts With the IT Governance ISO 27001 Implementation
More informationPaper for Consideration by CHRIS. Cooperation Agreement Between IHO and DGIWG
CHRIS17-12.2A Paper for Consideration by CHRIS Cooperation Agreement Between IHO and DGIWG Submitted by: Executive Summary: Related Documents: IHB The IHO standards for digital hydrographic information
More informationSector Vision for the Future of Reference Standards
The Group of Representative Bodies (GRB) The Sector Forum Rail (SFR) Sector Vision for the Future of s Brussels, 13 th July 2018 Sector Vision for Future of s 13 th July 2018 Page 1 of 6 Scope of position
More informationEuropean Transport Policy: ITS in action ITS Action Plan Directive 2010/40/EU
European Transport Policy: ITS in action ITS Action Plan Directive 2010/40/EU Hermann Meyer, CEO ERTICO IMPACTS, Barcelona, 31 March 2011 This presentation is mainly based on charts which were already
More informationHIPAA FINAL SECURITY RULE 2004 WIGGIN AND DANA LLP
SUMMY OF HIP FINL SECUITY ULE 2004 WIGGIN ND DN LLP INTODUCTION On February 20, 2003, the Department of Health and Human Services ( HHS ) published the final HIP security standards, Health Insurance eform:
More informationPower Measurements. Technology Consulting
Technology Consulting William H. Hardy, PhD 565 Glen Abbey Blvd Knoxville, TN 37934 Cell: (865) 279-1090 www.powermeasurements.com Bill.Hardy@PowerMeasurements.com ANSI Standards Update June 2012 The Presenter
More informationMarket Participant Client Platform
PUBLIC IESO_ISTD_0017 Market Participant Client Platform Information Technology Standard Issue 2.0 This document is intended to clearly and concisely present the standards and guidelines for the upgrade
More informationBCS Specialist Certificate in Change Management Syllabus
BCS Specialist Certificate in Change Management Syllabus Version 2.0 April 2017 This qualification is not regulated by the following United Kingdom Regulators - Ofqual, Qualification in Wales, CCEA or
More informationFirst Set of Standards for the grid. ISGF Webinar : 11th July 2013 Dinesh Chand Sharma Director Standardization, Policy and Regulation
First Set of Standards for the grid ISGF Webinar : 11th July 2013 Dinesh Chand Sharma Director Standardization, Policy and Regulation 1 Outline EU Standards office in India - Project SESEI First Set of
More informationVdTÜV Statement on the Communication from the EU Commission A Digital Single Market Strategy for Europe
Author Date VdTÜV-WG Cybersecurity October, 3 rd 2015 VdTÜV Statement on the Communication from the EU Commission A Digital Single Market Strategy for Europe VdTÜV e.v. welcomes the Communication on a
More informationInternational Civil Aviation Organization. COM Co-ordination Meeting. 6 7 March 2013, Kunming, China
CCM-WP/5 Agenda Item 5 06/03/13 International Civil Aviation Organization COM Co-ordination Meeting 6 7 March 2013, Kunming, China Agenda Item 5: Letter of agreement for technical and operational trial
More informationThird public workshop of the Amsterdam Group and CODECS European Framework for C-ITS Deployment
Third public workshop of the Amsterdam Group and CODECS European Framework for C-ITS Deployment 14 February 2017 Amsterdam Gerhard Menzel European Commission - DG MOVE EU Policy Tools Large-scale deployment
More informationPost-accreditation monitoring report: British Computer Society (BCS) September 2006 QCA/06/2926
Post-accreditation monitoring report: British Computer Society (BCS) September 2006 QCA/06/2926 Contents Introduction... 3 Regulating external qualifications... 3 About this report... 3 About British Computer
More informationInter American Accreditation Cooperation. IAAC, IAF and ILAC Resolutions Applicable to IAAC MLA Peer Evaluations
IAAC, IAF and ILAC Resolutions Applicable to IAAC MLA Peer Evaluations CLASSIFICATION This document is classified as an IAAC Mandatory Document. AUTHORIZATION Issue Nº: 07 Prepared by: MLA Committee and
More informationSevern Trent Water. Telecommunications Policy and Access Procedure
Severn Trent Water Telecommunications Policy and Access Procedure Contents STW Telecommunications Policy: 5-12 Health and Safety: 13-18 Access Procedures:19-30 2 STW LSH Sites Access Policy [Controlled
More informationElectronic File Location. CCMS ref: Version History
Electronic File Location CCMS ref: 64153205 Version History Issue Date Comments 1.0 14/06/13 Initial draft for internal review and comment 1.1 24/09/13 Updated for further internal review 1.2 21/11/13
More information1- ASECAP participation
EETS POSITION PAPER ASECAP is the European Association of Operators of Toll Road Infrastructures, whose members networks today span more than 50,266 km of motorways, bridges and tunnels across 22 countries.
More informationFrom: Jean Johnson Sent: Wednesday, July 12, :06 PM To: Jean Johnson Subject: FW: Draft CEA-2013 (STB Energy Consumption) - IP statement/thomson
Page 1 of 5 From: Jean Johnson Sent: Wednesday, July 12, 2006 7:06 PM To: Jean Johnson Subject: FW: Draft CEA-2013 (STB Energy Consumption) - IP statement/thomson Jean From: Sipher Tom [mailto:tom.sipher@thomson.net]
More informationEUROPEAN COMMISSION Enterprise Directorate-General
EUROPEAN COMMISSION Enterprise Directorate-General Services, commerce, tourism, e-business & IDA E-business, ICT industries and services Brussels, 21 October 2003 DG ENTR-D4 M 338 - EN Standardisation
More informationREPORT ON THE ESTABLISHMENT OF THE INTERNATIONAL FORUM OF USERS OF SATELLITE DATA TELECOMMUNICATION SYSTEMS (SATCOM FORUM)
WORLD METEOROLOGICAL ORGANIZATION ARGOS JOINT TARIFF AGREEMENT THIRTY FIFTH SESSION GENEVA, SWITZERLAND 26-28 OCTOBER 2015 INTERGOVERNMENTAL OCEANOGRAPHIC COMMISSION (OF UNESCO) JTA-35/ Doc. 11 (29.07.2015)
More informationStandard Operating Procedure. Preparation, Review and Approval of Clinical Research Standard Operating Procedures and Work Instructions
Standard Operating Procedure SOP number: SOP full title: SOP-JRO-35-001 Preparation, Review and Approval of Clinical Research Standard Operating Procedures and Work Instructions SOP effective: 11 July
More informationCertification Standing Committee (CSC) Charter. Appendix A Certification Standing Committee (CSC) Charter
Appendix A A1 Introduction A1.1 CSC Vision and Mission and Objectives Alignment with Boundaryless Information Flow: Our vision is a foundation of a scalable high integrity TOGAF certification programs
More informationRESPONSE TO 2016 DEFENCE WHITE PAPER APRIL 2016
RESPONSE TO 2016 DEFENCE WHITE PAPER APRIL 2016 HunterNet Co-Operative Limited T: 02 4908 7380 1 P a g e RESPONSE TO 2016 DEFENCE WHITE PAPER APRIL 2016 Project Manager Marq Saunders, HunterNet Defence
More informationEA-7/05 - EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits
Publication Reference EA-7/05 EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits PURPOSE This document has been prepared by a task force under the direction of the European Cooperation
More informationCENTRAL MARKS DEPARTMENT-III
CENTRAL MARKS DEPARTMENT-III Our Ref: CMD-III: 16/IS 616 13-09-2017 Subject: Guidelines for implementation of revised IS 616:2017/IEC 60065:2014 superseding IS 616:2010/IEC 60065:2005 -Audio, Video and
More informationLONG-RANGE IDENTIFICATION AND TRACKING SYSTEM TECHNICAL DOCUMENTATION (PART II)
E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 ax: +44 (0)20 7587 3210 LONG-RANGE IDENTIICATION AND TRACKING SYSTEM TECHNICAL DOCUMENTATION (PART II) MSC.1/Circ.1294/Rev.5 17 January
More informationFIRE REDUCTION STRATEGY. Fire & Emergency Services Authority GOVERNMENT OF SAMOA April 2017
FIRE REDUCTION STRATEGY Fire & Emergency Services Authority GOVERNMENT OF SAMOA April 2017 FIRE REDUCTION STRATEGY Fire & Emergency Services Authority GOVERNMENT OF SAMOA April 2017 2 1. Introduction The
More informationBEREC Public debriefing
BEREC Public debriefing from the 31th BEREC plenary meetings Sébastien Soriano, BEREC Chair 2017 Elisabeth Dornetshumer, Co-Chair of the Roaming Expert Group Michiel van Dijk, Co-Chair of the Net Neutrality
More informationIRIS Quick guide to registration
21 June 2018 EMA/416538/2018 Information Management Division IRIS Quick guide to registration Version 1.2 1. Purpose and context... 2 1.1. Purpose of this Quick Guide... 2 1.2. Context... 2 2. How to know
More informationCOAR Interoperability Roadmap. Uppsala, May 21, 2012 COAR General Assembly
COAR Interoperability Roadmap Uppsala, May 21, 2012 COAR General Assembly 1 Background COAR WG2 s main objective for 2011-2012 was to facilitate a discussion on interoperability among Open Access repositories.
More informationPolicy on the Standardisation of Documentation
Policy on the Standardisation of Documentation Policy Number Target Audience Approving Committee IMTD001 CCG Board members and staff CCG Executive Date Approved November 2013 Last Review Date July 2016
More informationWelcome & Housekeeping. Marie-Christine Haubert
1. Welcome & Housekeeping Marie-Christine Haubert 1 2. Opening Remarks Marie-Christine Haubert 3. Security Intelligence Presentation Bernard Pilon 2 4. Canada-United States Regulatory and Perimeter Security
More informationSession 4. Workshop on the implementation of ISO standard for ICSRs. Testing with EMA new process
Session 4 Testing with EMA new process Workshop on the implementation of ISO standard for ICSRs Presented by Tom Paternoster-Howe on 4 March 2016 Data Standardisation and Analytics An agency of the European
More informationIDA Organic Farming Global Implementation Plan
TAC 2001-06-27 DOC 05.1 IDA Organic Farming Global Implementation Plan 1. DESCRIPTION OF THE NETWORK OR NETWORKS INTENDED TO BE ESTABLISHED UNDER THE PROJECT 1.1 Objectives The objectives of the Organic
More informationAutomatic Number Plate Recognition (ANPR) ANPR Strategy Infrastructure Development
Automatic Number Plate Recognition (ANPR) ANPR Strategy 2016-2020 Infrastructure Development Version 1 July 2017 Document Control Change Control Version Date Change Author 0.1 1 June 2016 Initial draft
More informationThis document is a preview generated by EVS
INTERNATIONAL STANDARD ISO 17090-1 Second edition 2013-05-01 Health informatics Public key infrastructure Part 1: Overview of digital certificate services Informatique de santé Infrastructure de clé publique
More informationEuropean Standards- preparation, approval and role of CEN. Ashok Ganesh Deputy Director - Standards
European Standards- preparation, approval and role of CEN Deputy Director - Standards 1 European Standarization why?, 2010-10-14 CEN-CENELEC 2010 2 What standards do enhance the safety of products allow
More informationThe UK and enabling Accessibility
e-government Unit The UK and enabling Accessibility Tom Adams Senior Digital Media Consultant e-government Unit tom.adams@cabinet-office.x.gsi.gov.uk EPAN e-government Working Group Lancaster House London
More informationGlobal Specification Protocol for Organisations Certifying to an ISO Standard related to Market, Opinion and Social Research.
CONTENTS i. INTRODUCTION 3 ii. OVERVIEW SPECIFICATION PROTOCOL DOCUMENT DEVELOPMENT PROCESS 4 1. SCOPE 5 2. DEFINITIONS 5 3. REFERENCES 6 4. MANAGEMENT STANDARDS FOR APPROVED CERTIFICATION BODIES 6 4.1
More information(Presented by the secretariat) SUMMARY
INTERNATIONAL CIVIL AVIATION ORGANIZATION WESTERN AND CENTRAL AFRICA OFFICE Twenty Fourth Meeting of the AFI Satellite Network Management Committee (SNMC/24) (Abuja, Nigeria, 14-18 November 2016) Agenda
More informationProtocol for Quality Assurance of IDI s Global Public Goods
Protocol for Quality Assurance of IDI s Global Public Goods Definition IDI s Global Public Goods (GPGs) are products and tools created by the IDI for contributing to global knowledge creation, capacity
More informationMEETING: RSSB Board Meeting DATE: 03 November 2016 SUBJECT: Rail Industry Cyber Security Strategy SPONSOR: Mark Phillips AUTHOR: Tom Lee
MEETING: RSSB Board Meeting DATE: 03 November 2016 SUBJECT: Rail Industry Cyber Security Strategy SPONSOR: Mark Phillips AUTHOR: Tom Lee 1. Purpose of the paper 1.1 The purpose of this paper is to seek
More informationElectronic Commerce Working Group report
RESTRICTED CEFACT/ECAWG/97N012 4 December 1997 Electronic Commerce Ad hoc Working Group (ECAWG) Electronic Commerce Working Group report SOURCE: 10 th ICT Standards Board, Sophia Antipolis, 4 th November
More informationCertificate of Acceptance
Specific Conditions The following Conditions are specific to the approved product/s contained within this Certificate. These conditions must be adhered to in addition to the Network Rail General Conditions
More informationCertification for Meaningful Use Experiences and Observations from the Field June 2011
Certification for Meaningful Use Experiences and Observations from the Field June 2011 Principles for Certification to Support Meaningful Use Certification should promote EHR adoption by giving providers
More informationReport from UN-GGIM: Europe A year in review
Report from UN-GGIM: Europe A year in review Carol Agius UN-GGIM: Europe Joint UN-GGIM: Europe ESS meeting on the Integration of Statistical and Geospatial Information March 2017 The aim of UN-GGIM: Europe
More informationDIRECTORS OF METHODOLOGY/IT DIRECTORS JOINT STEERING GROUP 18 NOVEMBER 2015
DIME/ITDG SG November 2015 DIRECTORS OF METHODOLOGY/IT DIRECTORS JOINT STEERING GROUP 18 NOVEMBER 2015 Item 03 of the agenda ESS Vision 2020: ESS.VIP VALIDATION 1. Purpose of the document ESS Vision 2020:
More informationENISA s Position on the NIS Directive
ENISA s Position on the NIS Directive 1 Introduction This note briefly summarises ENISA s position on the NIS Directive. It provides the background to the Directive, explains its significance, provides
More informationRevision of ISO ISO TC69 Ballot CD1 Major revisions agreed by TC69/WG9 Proposed changes not accepted Next steps
Revision i of ISO 13528: Statistical Methods for PT by Interlaboratory Comparison Eurachem PT Conference 4 October, 2011 Daniel Tholen, M.S. American Proficiency Institute (API) Revision of ISO 13528 ISO
More informationTerms of Reference. Certificate for Quality in Internationalisation
Terms of Reference Certificate for Quality in Internationalisation Terms of Reference CeQuInt - 2012-3149 / 001-001 Copyright 2015 European Consortium for Accreditation in Higher Education ECA OCCASIONAL
More informatione-ready Building Next Generation IT infrastructures ϕ The Cabling Partnership Mike Gilmore Managing Director, e-ready Building The Cabling Partnership
eready Building THE ONESTOP SHOP Telecommunications equipment and telecommunications cabling Specification for installation, operation and maintenance THE ONESTOPSHOP FOR INSTALLATION Q.A. Mike Gilmore
More informationPrivacy Impact Assessment
Automatic Number Plate Recognition (ANPR) Deployments Review Of ANPR infrastructure February 2018 Contents 1. Overview.. 3 2. Identifying the need for a (PIA).. 3 3. Screening Questions.. 4 4. Provisions
More informationMEASURES TO ENHANCE MARITIME SECURITY. Cyber risk management in Safety Management Systems. Submitted by United States, ICS and BIMCO SUMMARY
E MARITIME SAFETY COMMITTEE 101st session Agenda item 4 26 March 2019 Original: ENGLISH Pre-session public release: MEASURES TO ENHANCE MARITIME SECURITY Cyber risk management in Safety Management Systems
More informationTHE ENGINEER S LICENSING GUIDANCE DOCUMENT
THE ENGINEER S LICENSING GUIDANCE DOCUMENT Safety Regulation Group CAA Personnel Licensing Department ELGD 2007 Civil Aviation Authority 2007 ISBN 978 011790 762 1 All rights reserved. No part of this
More informationGI/GN7633. Guidance on Lineside Signs. Rail Industry Guidance Note for GI/RT7033. Issue One: June 2015
GN This document contains one or more pages which contain colour. Published by: Copyright 2015 Rail Safety and Standards Board Limited GI/GN7633 Issue One: June 2015 Rail Industry Guidance Note for GI/RT7033
More informationEUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL SUMMARY OF RESPONSES (SOR) DOCUMENT FOR THE
EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL SUMMARY OF RESPONSES (SOR) DOCUMENT FOR THE Draft Specification for Airspace Management (ASM) Support System Requirements supporting the
More informationUL 489 DIN rail branch circuit breakers
UL 9 DI rail branch circuit breakers FAZ-A circuit breakers Product Overview UL 9 DI rail branch circuit breakers FAZ-A circuit breakers PRODUCT OVERVIEW Optimum and efficient protection Optimum product
More informationRemit Issue April 2016
1 Introduction Remit Issue 02 18 April 2016 1.1 This document defines the scope, purpose and working arrangements for the High Integrity Systems Group. High integrity systems are playing an increasingly
More informationIT GOVERNANCE AND CORPORATE STRATEGY
IT GOVERNANCE AND CORPORATE STRATEGY Lawrence Ribeiro October 2014 Agenda n What is IT governance? n What are the results of IT governance? n IT governance and Enterprise Architecture n IT governance solution
More informationEUROPEAN MEDICINES AGENCY (EMA) CONSULTATION
EUROPEAN MEDICINES AGENCY (EMA) CONSULTATION Guideline on GCP compliance in relation to trial master file (paper and/or electronic) for content, management, archiving, audit and inspection of clinical
More informationINAB Mandatory and Guidance Documents Policy and Index
INAB Mandatory and Guidance s Policy and Index This publication is aimed at assisting in determining what documents are relevant to various organisations and at providing contact points for accessing such
More informationRevised November EFESC Handbook
Revised November 2015 EFESC Handbook 1 Table of Contents EFESC Handbook... 1 Table of Contents... 2 Handbook EFESC... 4 1 Background and objectives... 4 1.1 Sectoral developments... 4 1.1 Objectives...
More informationCOPUOS Scientific and Technical Subcommittee Activities. Working Group on the Long-term Sustainability of Outer Space Activities
COPUOS Scientific and Technical Subcommittee Activities Working Group on the Long-term Sustainability of Outer Space Activities March 27, 2018 Guidelines prepared by 4 expert groups 2012(11) - 2014: Expert
More informationECC Recommendation (15)02
ECC Recommendation (15)02 Guidelines for Major changes to National Numbering and Dialling Plans concerning E.164 Numbers Approved 23 April 2015 ECC/REC/(15)02 Page 2 INTRODUCTION This Recommendation supersedes
More informationR UNIT 2. Transmission Media DPW
UT 2 Transmission Media Topics in this Unit merican ational tandards nstitute ()/ Telecommunications ndustry ssociation (T) 568 standard nternational Organization for tandardization (O)/ nternational lecrotechnical
More informationSCHEME OF DELEGATION (Based on the model produced to the National Governors Association)
SCHEME OF DELEGATION (Based on the model produced to the National Association) THE PURPOSE OF A SCHEME OF DELEGATION: A scheme of delegation (SoD) is the key document defining which functions have been
More informationINAB Mandatory and Guidance Documents Policy and Index
INAB Mandatory and Guidance s Policy and Index This publication is aimed at assisting in determining what documents are relevant to various organisations and at providing contact points for accessing such
More informationCover note on XEVMPD substance controlled vocabulary following the quality control exercise
5 April 2018 EMA/93253/2014, Rev. 1 1 Information Management Cover note on XEVMPD substance controlled vocabulary following the quality control 1 MDMS contact point was replaced by EMA Service Desk. 30
More informationGaia CPD Portal 25/11/2014. Bernard Dady
Gaia CPD Portal USER GUIDE V1 Bernard Dady What do you want to do? 1. Briefing for senior leaders 2. Briefing for CPD managers and admin support 3. Search for courses 4. Make a request for CPD or training
More informationRecording and Reporting of High Voltage and Low Voltage Switching
1 SCOPE This document details the procedures to be adopted prior to, during, and on completion of Switching operations, and details the manner in which HV and LV Switching shall be recorded in order to
More informationCALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL
ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 978 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE MP 1.1 Objective
More informationAdministrative Guideline. SMPTE Metadata Registers Maintenance and Publication SMPTE AG 18:2017. Table of Contents
SMPTE AG 18:2017 Administrative Guideline SMPTE Metadata Registers Maintenance and Publication Page 1 of 20 pages Table of Contents 1 Scope 3 2 Conformance Notation 3 3 Normative References 3 4 Definitions
More informationLEADER ICT System Technical Guidance for Local Authorities on Article 48 Checks
LEADER ICT System Technical Guidance for Local Authorities on Article 48 Checks Glossary Abbreviation CRM CRO DRCD EOI LAG LCDC LDC LDS LFP Promoter ROS RDP TCAN TRN Definition Customer Relationship Management
More informationContent of mandatory certificates
Chapter: 2.5.1 Conformity assessment procedures; General rules Text:... Key words: certificate, certificate of competence, 1. Purpose The purpose of this recommendation is to provide guidance on the minimum
More informationTransport Network ITS Spatial Data Deployment Platform
Transport Network ITS Spatial Data Deployment Platform TN-ITS and JRS meeting 18 June 2014 The core concept (1/2) TN-ITS is about the exchange of static map information from the Road Sector, it is not
More informationOASIS PKI Action Plan Overcoming Obstacles to PKI Deployment and Usage
OASIS PKI Action Plan Overcoming Obstacles to PKI Deployment and Usage Steve Hanna, Co-Chair, OASIS PKI Technical Committee Internet 2 Members Meeting April 19, 2004 Agenda OASIS PKI Technical Committee
More informationAn assessor walk through guide to ICT Mark visit assessment using the NaaceSRF online tool
An assessor walk through guide to ICT Mark visit assessment using the NaaceSRF online tool There are five stages to the process: Process and stages Responsibility of School applies School School Admin
More informationMEMORANDUM OF UNDERSTANDING FOR THE INTERCONNECTION OF THE AUTOMATED SYSTEMS OF AAA AND BBB
FOR THE INTERCONNECTION OF THE AUTOMATED SYSTEMS OF AAA AND BBB -2- Effective date: 17 SEP 2009 Pages: 2 of 24 Preface This document defines the Memorandum of Understanding that will allow AAA and BBB
More informationGerald McQuaid, Chairman ETSI TC LI. ETSI All rights reserved
ETSITC TC LI STANDARDS OVERVIEW Gerald McQuaid, Chairman ETSI TC LI ETSI 2014. All rights reserved 9 th ETSI Security Workshop, 15 16 January 2014 Lawful Interception (LI) & Data Retention (DR) Delivery
More information12 Approval of a New PRESTO Agreement Between York Region and Metrolinx
Clause 12 in Report No. 7 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on April 20, 2017. 12 Approval of a New PRESTO
More informationBackground Document for Agenda Item 3: Briefing from the Secretariat on launch of the Green Coalition on the Belt and Road Initiative
United Nations Environment Programme 25 September 2018 Subcommittee Meeting of the Committee of Permanent Representatives 4 October 2018, 9:30 a.m. to 4:30 p.m. United Nations Office at Nairobi Gigiri
More informationBritish Safety Council Centre Portal User Guide
British Safety Council Centre Portal User Guide Centre Portal User Guide V1.00 Page 1 of 33 Contents Page How to use this Guide 3 Logging into the British Safety Council Centre Portal 4 First Time Users
More informationDynamic Network Analyser
INTANCE PRODUCT DATA HEET Dynamic Network Analyser Dynamic Network Analyser For an independent EN54-13 Life safety Communication Network layer Overview The, Dynamic Network Analyser for Ring Topology Networks,
More information