GI/GN7633. Guidance on Lineside Signs. Rail Industry Guidance Note for GI/RT7033. Issue One: June 2015

Size: px
Start display at page:

Download "GI/GN7633. Guidance on Lineside Signs. Rail Industry Guidance Note for GI/RT7033. Issue One: June 2015"

Transcription

1 GN This document contains one or more pages which contain colour. Published by: Copyright 2015 Rail Safety and Standards Board Limited GI/GN7633 Issue One: June 2015 Rail Industry Guidance Note for GI/RT7033

2 Issue record Issue Date Comments One September 2015 Original document. Superseded documents Supply Provides guidance against the requirements in GI/RT7033, and additional guidance for lineside operational and lineside safety signs in the appendices. This Rail Industry Guidance Note does not supersede any other Railway Group documents. The authoritative version of this document is available at Enquiries on this document can be forwarded to Page 2 of 25

3 Contents Section Description Page Part 1 Introduction 4 G 1.1 Purpose of this document 4 G 1.2 The structure of this document 4 G 1.3 Copyright 4 G 1.4 Approval and authorisation of this document 5 Part 2 Guidance on Requirements for Lineside Operational Signs 6 G 2.1 Approved lineside operational signs 6 G 2.2 Physical requirements 6 G 2.3 Optical requirements 7 G 2.4 Introducing new designs of lineside operational signs 8 Part 3 Application of this Document Application - infrastructure managers Application - railway undertakings Health and Safety Responsibilities 14 Appendices Appendix A Document Template for Lineside Operational Signs 15 Appendix B Readability and Interpretability of Lineside Operational Signs 17 Appendix C Lineside Safety Signs 18 Appendix D Installation and Maintenance of Signs 20 Appendix E Trials for New Designs of Signs 21 Definitions 22 References 24 Figures Figure 1 Generic format of text using the Rail Alphabet typeface 6 Process for introducing new designs of signs 13 Figure A.1 Template for lineside operational signs 15 Figure B.1 Template for lineside safety signs 19 Page 3 of 25

4 Part 1 G 1.1 G G G G 1.2 G G G G G G G 1.3 G G G Introduction Purpose of this document This document gives guidance on interpreting the requirements of Railway Group Standard GI/RT7033 issue three Lineside Signs. This document also gives additional guidance for both lineside operational and lineside safety signs in the appendices. It does not constitute a recommended method of meeting any set of mandatory requirements. GI/RT7033 is also supported by another Rail Industry Guidance Note GI/GN7634 Index for Lineside Signs, and an online catalogue of lineside signs. The catalogue of lineside signs includes two groups of signs, namely mandatory lineside operational signs and nonmandatory lineside safety signs. GI/GN7634 sets out an index for all the signs in the catalogue of lineside signs. Requirements for the visibility of trackside control-command and signalling objects are set out in section of the CCS TSI. Requirements for the provision, visibility, readability, maintenance and testing of a specific set of European Rail Traffic Management System (ERTMS) trackside boards are set out in BS EN 16494:2015. The requirements in GI/RT7033 are national technical rules (NTRs) which are provided for the design of lineside operational signs for the Great Britain (GB) main line railway. It also contains a non-mandatory appendix relating to the design of lineside safety signs. The structure of this document All requirements from Railway Group Standard GI/RT7033 are reproduced with a grey background in this document. Guidance is provided as a series of sequentially numbered clauses prefixed G immediately below the greyed text to which it relates. Specific responsibilities and compliance requirements are laid down in the Railway Group Standard itself. The guidance given in Appendices A and B is applicable to lineside operational signs only. The guidance given in Appendix C is applicable to lineside safety signs only. The guidance given in Appendices D and E is applicable to both lineside operational and lineside safety signs. Copyright Copyright in the Railway Group documents is owned by Rail Safety and Standards Board Limited. All rights are hereby reserved. No Railway Group document (in whole or in part) may be reproduced, stored in a retrieval system, or transmitted, in any form or means, without the prior written permission of Rail Safety and Standards Board Limited, or as expressly permitted by law. members are granted copyright licence in accordance with the Constitution Agreement relating to Rail Safety and Standards Board Limited. In circumstances where Rail Safety and Standards Board Limited has granted a particular person or organisation permission to copy extracts from Railway Group documents, Rail Safety and Standards Board Limited accepts no responsibility for, nor any liability in connection with, the use of such extracts, or any claims arising therefrom. This disclaimer applies to all forms of media in which extracts from Railway Group Standards may be reproduced. Page 4 of 25

5 G 1.4 G Approval and authorisation of this document The content of this document was approved by Control Command and Signalling (CCS) Standards Committee on 22 January This document was authorised by on 21 April Page 5 of 25

6 Part 2 G 2.1 Guidance on Requirements for Lineside Operational Signs Approved lineside operational signs Only lineside operational signs referenced in GI/GN7634 shall be installed, and only for those applications mandated in Railway Group Standards. G G G G G 2.2 G Rationale: Restriction to only the approved signs prevents the proliferation of different designs of signs conveying similar information, which could cause confusion and misinterpretation. The lineside operational signs that have been approved are shown in the catalogue of lineside signs. The applications of lineside operational signs are specified in the relevant Railway Group Standards that set out the need for the signs. The catalogue of lineside signs includes both lineside operational and lineside safety signs. An index for all signs in the catalogue is set out in GI/GN7634. The process for introducing new or modified designs of lineside operational signs into the catalogue is set out in GI/RT7033. Physical requirements Dimension tolerance Unless otherwise stated, the maximum tolerance of 1% to the dimension specified in the catalogue of lineside signs shall be applied, but subject to a maximum of ±10 mm. G G G G Rationale: Tolerance on the dimension allows minor deviation from the specified value at the manufacturing stage. The dimensions of signs are specified in the catalogue, to achieve consistency in the size and shape of signs. Smaller sizes of some signs are used in special circumstances, for example limited clearance in tunnels. Lettering and symbols Unless otherwise stated for individual lineside operational signs, the following typefaces shall be used: a) For those signs incorporating only digits or digits and capital letters as abbreviations, the digit typeface shall be BS 3693B:1964. b) The Rail Alphabet typeface shall be used, except where BS 3693B:1964 applies. G Rationale: These typefaces are specified for their readability, and to achieve consistency across the railway network. Page 6 of 25

7 G BS 3693B:1964 only contains definitions for digits. Although BS 3693B:1964 was withdrawn in 1992, the typeface specified is still being used for digits that are incorporated in those lineside signs that either: a) Contain only digits. Or b) Contain digits and capital letters as abbreviations. G G The Rail Alphabet typeface designed by Kinnear & Calvert for the British Railways Board in the 1960s is similar to a bold weight of Helvetica. The Helvetica Neue Bold typeface is to be used by lineside signs on ERTMS lines for degraded mode operation, as set out in BS EN 16494:2015. Layout of text The layout of text within a lineside operational sign shall be based on a grid system, as shown in Figure 1. a) The size of the grid is defined by the x -height of the main heading, denoted as a in Figure 1. The x -height being the height of a lower-case x. b) If hierarchical information is required, the x -height of the main heading shall be three units, and the qualifying text two units. Text of one unit in height shall be reserved for any limitations which need to be applied. c) The interlinear separation, denoted as b in Figure 1, shall be double the x -height of the text. d) Borders shall be the same thickness as the x -height of the main heading. a = x-height of the main heading b x-height of the qualifying text x-height of the limitation text G G 2.3 G Figure 1 Generic format of text using the Rail Alphabet typeface Rationale: The grid system allows for consistency of proportionality between the levels of hierarchical text. This emphasises the hierarchical level of text importance. Optical requirements Reflectivity The retroreflective material used for lineside operational signs shall have a coefficient of retroreflection equal to or greater than Class RA2, as set out in BS EN :2007 Table 4. G Rationale: Retroreflective signs are used to help drivers read them in low light levels. G BS EN :2007 Table 4 sets out performance requirements for Class RA2 retroreflective material, which is equivalent to the Class 1 material previously specified in the superseded standard BS EN 873-6:1983. Page 7 of 25

8 G Colour G G The optical properties for non-retroreflective white, red, yellow, blue, green, grey and black colour shall be as set out in BS EN :2007 Table The non-retroreflective purple shall be Pantone 260C The optical properties for retroreflective white, red, yellow, blue, green and grey colours shall be as set out in BS EN :2007 Table Retroreflective purple shall be achieved by overlaying a transparent Pantone 260C product on a white retroreflective product The optical properties for retroreflective yellow-green shall be as set out in BS 8408:2005 Tables 4 and 5. Rationale: The optical properties and colours are specified to prevent proliferation of different shades of colours being used. Colour for the rear of signs The rear of lineside operational signs shall be uniform, non-retroreflective grey. G G G G 2.4 G Rationale: The non-retroreflective grey colour is used for the rear of signs, as it is a neutral colour which reduces distraction. The rear surfaces of lineside operational signs should not cause confusion to drivers. There is no colour specification for rear surfaces of ERTMS trackside board in BS EN 16494:2015, although it recommends the use of uniform, non-reflective grey in accordance with the chromaticity requirements of BS EN :2007 Table 16 and luminance factor β 0.4. Introducing new designs of lineside operational signs Presentation and shape for new designs of lineside operational signs For new designs of lineside operational signs, one of the following shapes shall be used, either for the sign itself or as a symbol contained within a rectangular or circular shape: a) A circular sign or symbol to denote an instruction. Or b) A triangular sign or symbol, apex pointing upwards, to denote a warning. It is permissible to use a pentagon shape where multiple lines of lettering and / or digits are required. Or c) A rectangular sign or symbol for the display of information. G G Rationale: The purpose of a sign is reinforced through its shape, thereby enabling users to more readily interpret the information presented. Some existing warning signs, for example, Sign AD03m (permissible speed warning indicators) use an irregular pentagon shape. The irregular pentagon shape is in the form of a rectangle above a triangle with its vertex pointing downwards. The height of the rectangular section can vary to accommodate the texts. Page 8 of 25

9 G Use of colour for new designs of lineside operational signs For new designs of lineside operational signs: a) A red border shall be used to denote an instruction; the instruction shall appear as black pictogram / text on a white background. b) A yellow border shall be used to denote a warning; the instruction shall appear as black pictogram / text on a white background. c) A black border shall be used for the display of information; the instruction shall appear as black pictogram / text on a white background. G G G Rationale: The colour used for the borders, pictogram / text and background of a sign reinforces its purpose. Good contrast between the colour of the background, border, pictogram and text of a sign, facilitates its readability. Guidance on the combinations of contrast colours for safety signs is given in BS ISO :2011 section 5. Language Lineside operational signs shall be in the English language where text is used. G G G No guidance is associated with the above text. Process for introducing new designs of lineside operational signs The process for introducing a new design of lineside operational sign intended for national application is shown in Figure G 1. The shapes with a grey background are relevant to the steps set out in of GI/RT7033. GI/RT7033 issue three Process for introducing new designs of lineside operational signs The following process shall be followed to introduce new designs of lineside operational signs: a) A deviation application against this document, for a trial of the new design of sign and, if the application of the sign is within the scope of an existing standard, a separate deviation against the relevant standard, shall be submitted in accordance with the Railway Group Standards Code. b) The deviation application shall include artwork clearly denoting the dimension, shape, colour and layout, as set out in Appendix A. G G G Rationale: Management of the introduction of new lineside operational signs is necessary to maintain the consistency of form and presentation of signs on the network. Rationale: A trial of new designs of a lineside operational sign is used to establish the effectiveness of the sign. The result from a trial provides supporting evidence for the proposal for standard change. Rationale: The separate deviation application against a relevant standard for the operational needs of a sign is required to confirm the purpose and use of the sign in the contexts of the relevant standard. The deviations applications should cross-reference each other, and the same reference number with sub numbers / letters could be considered for the two applications to indicate their association. Page 9 of 25

10 G G The process for a deviation application is set out in the Railway Group Standards Code section 7. Further guidance is provided on the website It is assumed that a variety of designs of the sign have been evaluated, and limited variations are shortlisted before the deviation application. The deviation application for a trial of a new design of sign should include: a) Details of the proposed sign, including artwork(s) for the design(s) of the sign, and the proposed requirements on readability and positioning of the sign. b) The reason why the new sign is required. c) The duration of the deviation, which should accommodate the duration of the trial and the duration for a potential proposal for change period, so that the sign does not have to be covered up or removed immediately after the trial. d) An outline plan of how the proposed trial is to be conducted, including locations. e) Predictions of any safety and performance impact. f) The success criteria for the trial. g) A list of the affected parties consulted and any documented feedback. G Further guidance on undertaking trials is given in Appendix E of this document. c) On completion of the trial, if it is decided to proceed with the introduction of the new design nationally, a proposal for the use and design of the sign shall be submitted in accordance with the Railway Group Standards Code. G G Rationale: A change to a Railway Group Standard can only be progressed after approval from the relevant standards committee has been obtained. On completion of the trial, if it is decided to proceed with the introduction of the new design for either national or geographically limited applications, evidence that supports the introduction of the new design of the sign should be submitted to the relevant standards committee(s). G For a new design of sign intended for national application, the supporting evidence should be submitted, together with the proposal for change application. If the proposal for change is approved, a new deviation certificate would be issued, with limitation on the duration extended to, until the requirement mandating the use of the sign is updated in the relevant standard. G For a new design of sign not intended to be applied nationally, the supporting evidence should be submitted to the relevant standards committee(s) for its decision on a new deviation certificate being issued with the limitation on the duration removed. G The process for a proposal for change to a Railway Group Standard is set out in the Railway Group Standards Code section 6. Further guidance can be found on the website G The proposal for change should include: a) Details of the proposed changes, including proposed requirements on minimum reading time or distance and positioning of the sign. b) The reason why the new sign is required. c) Evidence that the design of the sign complies with the requirements set out in GI/RT7033 sections 2.2 to 2.4. If it does not comply with the requirements, the reason why should be included in the proposal. d) Evidence that a trial has been completed successfully. e) A list of the affected parties consulted and any documented feedback. Page 10 of 25

11 d) The proposal for change shall include artwork clearly denoting the dimension, shape and layout, as set out in Appendix A. G Rationale: The artwork and parameters specified in Appendix A show consistency in the design of the sign. G The artwork submitted with the proposal for change is the design of the sign which is proved to be adequate for its intended purpose. It could be the same as the design submitted for the deviations application. G Further guidance is given in Appendix A. G G G G G G G G Process for introducing a new use of an existing lineside operational sign GI/RT7033 issue three Process for introducing a new use of an existing lineside operational sign When a lineside operational sign defined in GI/GN7634 is used for a new application, the following process shall be followed: a) A deviation application against this document, for a trial of the new application of the sign and, if the application of the sign is within the scope of an existing standard, a separate deviation against the relevant standard, shall be submitted in accordance with the Railway Group Standards Code. b) On completion of the trial, if it is decided to proceed with the new application of the sign nationally, a proposal for the use of the sign shall be submitted in accordance with the Railway Group Standards Code. Rationale: It is necessary to provide management with a process of introducing a new application of an existing lineside operational sign. Rationale: A trial of a new application of a lineside operational sign is to establish the adequacy of the new application of the sign. The result from a trial provides supporting evidence for the proposal for the new use of the sign. Rationale: The separate deviation application against a relevant standard for the operational needs of a sign is needed to confirm the purpose and use of the sign in the contexts of the relevant standard. The deviations applications should cross-reference each other, and the same reference number with sub numbers / letters could be considered for the two applications to indicate their association. The introduction of new use of an existing lineside operational sign should be limited to specific situations where a new use of an existing sign is effective and does not cause confusion to drivers and other users. The process for a deviation application is set out in the Railway Group Standards Code section 7. Further guidance is provided on the website The process of introducing a new use to an existing sign is indicated in Figure G 1 using dashed lines and shapes. The deviation application for a trial of a new application of an existing lineside operational sign should include: a) Details of the proposed requirements on readability and positioning of the sign. b) The reason why the new application of the existing sign is considered. c) The duration of the deviation, which should accommodate the duration of the trial and the duration of a potential proposal for change period, so that the sign does not have to be covered up or removed immediately after the trial. d) An outline plan of how the proposed trial is to be conducted, including locations. Page 11 of 25

12 e) Predictions of any safety and performance impact. f) The success criteria for the trial. g) A list of the affected parties consulted and any documented feedback. G G On completion of the trial, if it is decided to proceed with the introduction of the new use of the sign for either national or geographically limited applications, evidence that supports the introduction of the new use of the sign should be submitted to the relevant standards committee(s). For a new use of a sign intended for national application, the supporting evidence should be submitted together with the proposal for change application. If the proposal for change is approved, a new deviation certificate would be issued, with limitation on the duration extended to, until the requirement mandating the use of the sign is updated in a relevant standard. G For a new use of a sign not intended to be applied nationally, the supporting evidence should be submitted to the relevant standards committee(s) for its decision on a new deviation certificate being issued with the limitation on the duration removed. G The process for a proposal for change to a Railway Group Standard is set out in the Railway Group Standards Code section 6. Further guidance can be found on the website G The proposal for change should include: a) Details of the proposed changes, including proposed requirements on minimum reading time or distance and positioning of the sign. b) The reason why the new application of the sign is required. c) Evidence that a trial has been completed successfully. d) A list of the affected parties consulted and any documented feedback. e) Demonstration of why the proposed changes are reasonable, in particular those that impact on safety and performance. Page 12 of 25

13 * The process for introducing a new use of an existing operational sign is indicated by the flowchart using dashed lines and shapes Process for introducing new designs of signs Page 13 of 25.

14 Part 3 Application of this Document The requirements of this document apply to all new installation of lineside operational signs, whether new or altered in design, provided by an infrastructure manager (network) or an infrastructure manager (stations) to convey information, instructions and warnings for the management of the operation of trains This document does not address the requirements for signs on trains or other signs that provide information to personnel authorised to access the track and to members of the public This Railway Group Standard comes into force and is to be complied with from 05 March After the compliance date or the date by which compliance is achieved, if earlier, infrastructure managers are to maintain compliance with the requirements set out in this Railway Group Standard. Where it is considered not reasonably practicable to comply with the requirements, permission to comply with a specified alternative should be sought in accordance with the Railway Group Standards Code There are no requirements applicable to railway undertakings. G Users of documents published by are reminded of the need to consider their own responsibilities to ensure health and safety at work and their own duties under health and safety legislation. does not warrant that compliance with all or any documents published by is sufficient in itself to ensure safe systems of work or operation or to satisfy such responsibilities or duties. No guidance is associated with Part 3 of GI/RT7033. Page 14 of 25

15 Appendix A Document Template for Lineside Operational Signs The content of this appendix is mandatory. G A.1 Template for lineside operational signs Typeface [Artwork for design of the sign. An example is shown above] [Typeface for text and digits] Colour [Colour for text, symbol, background and border, as set out in 2.3.2] Luminance Readability performance Associated sign(s) Supplementary information Readable distance Visible distance [Retroreflectivity and / or illumination. If illumination is required, a separate table of specification is also required, as set out below] [The distance at which the sign is readable] [The distance at which the sign is visible] [Lists the identification of associated signs, for example, signs AF03, AF04m, AF05, AF06, AF07 and AF08 are referenced for sign AF02m] [Supplementary information, if required, for appearance, size, shape and text layout] Illumination (where required) Colour Flashing Performance Flashing rate Flashing pattern Supplementary information [Colour used] [Value in Hz] [Mark-space ratio: value and tolerance range] [Whether two or more lights flash synchronously] [Readable horizontal and vertical angle range relative to the centre axis of the emitted light, for example Sign AF01 needs to be visible at an observation angle of no greater than 15 o and 10 o relative to the centre horizontal and vertical axis of the emitted light] [Supplementary information, if required, for size and shape] Figure A.1 Template for lineside operational signs Page 15 of 25

16 G A.1.1 G A.1.2 G A.1.3 G A.1.4 Both the physical parameters (size, shape, typeface and layout of text) and optical characteristics (colour and luminance) set out in the template are determined by the readability performance required for the application of a sign. For existing lineside operational signs, the readability performance required for a specific application is determined through a Signal Sighting Committee (SSC), as set out in GE/RT8101. Guidance on how to decide when it is feasible to use visible distance as a means of achieving interpretability is given in GE/GN8601. For new designs of lineside operational signs, guidance on readability performance is set out in Appendix E of GK/GN0657. Further guidance about reading times and readable distances is given in GE/GN8601. The readability performance should form part of the success criteria for a trial. Further guidance on undertaking trials is given in Appendix E of this document. Page 16 of 25

17 Appendix B Readability and Interpretability of Lineside Operational Signs The content of this appendix is not mandatory and is provided for guidance only. G B.1 G B.1.1 G B.1.2 G B.1.3 G B.2 G B.2.1 G B G B.2.2 G B Technical compatibility: readability and interpretability Technical compatibility of lineside operational signs is only achieved when lineside signs are readable and interpretable in the operational context. Compatibility between 'be readable' (a control, command and signalling (CCS) system capability) and 'read the display of the sign (a human capability) is described using the term 'readability'. Similarly, compatibility between be interpretable (a CCS system capability) and interpret (a human capability) is described using the term interpretability. Factors that influence readability and interpretability Consistency Conveying information in a consistent manner supports both the readability and the interpretability of signs. The design of lineside signs should provide a one-to-one relationship between the display appearance and the information being conveyed. Environmental conditions Signs should be readable under the following environmental conditions: a) Temperature range T1 (external ambient only) as defined in BS EN :2003. b) Humidity range T1 (external ambient only) as defined in BS EN :2003. c) Atmospheric pollutants adversely affecting the readability of signs, including sand and salt, as defined in BS EN :2003. d) High wind loading value, as defined in BS EN :2007. G B The environmental conditions encountered within Europe are set out in BS EN :2003. It covers the design, as well as the use of equipment and any portable equipment used for railway signalling and telecommunications systems. G B G B.2.3 G B G B G B.2.4 G B Recommended wind load values suitable for UK practice are set out in BS EN :2007 Table NA.2. The wind load values set out in the table are conservative. Designers can derive a wind load value for a specific location or defined area, by referring to BS EN :2005+A1:2010. Human factors The minimum eyesight performance requirements for train drivers are set out in GO/RT3451. Drivers workload should be considered when designing and positioning signs, so that drivers are not overloaded with information that could result in misinterpretation or undue distraction from other activities. Operational contexts The factors in the operational contexts that could affect the readability of signs include, but are not limited to, the position, contrast to the background, ambient light, external light sources and rolling stock cab design. Page 17 of 25

18 Appendix C Lineside Safety Signs The content of this appendix is not mandatory and is provided for guidance only. G C.1 Introduction B.1.1 The online catalogue of lineside signs includes mandatory lineside operational signs and non-mandatory lineside safety signs. The non-mandatory lineside safety signs have been included so that the application and presentation of these signs are consistent throughout the network. This appendix sets out preferred design principles and a process for the introduction of new designs of non-mandatory lineside safety signs. G C.1.1 G C.2 Guidance for non-mandatory lineside safety signs is given in this appendix. Existing lineside safety signs B.2.1 Only approved lineside safety signs in the catalogue are to be used. G C.2.1 G C.3 G C.3.1 The use of approved signs prevents a proliferation of different designs of signs that convey the same information. Introducing new designs of lineside safety signs Design principles B B The following documents describe signs that have relevance to the railway: a) Traffic Signs Regulations and General Directions b) The Health and Safety (Safety Signs and Signals) Regulations c) Private Crossings (Signs and Barriers) Regulations d) BS ISO :2011 Graphical symbols. Safety colours and safety signs. Design principles for safety signs and safety markings. Sections 2.2 and 2.3 of this document should be applied for lineside safety signs used for the display of information. G C G C.3.2 The general high-level design principles for lineside safety signs are set by regulations and standards. Process for introducing new designs of signs B When a new design of a lineside safety sign is required, the following process is to be followed: a) A trial is to be carried out where there is a need to provide supporting evidence that the sign meets the operational need and is fit for purpose. And b) A proposal for change is to be submitted, to consider inclusion of the sign into the online catalogue. The template shown in Figure B.1 is to be used to support the proposal. Page 18 of 25

19 G C G C G C.4 A trial of the new design of a sign should be conducted to demonstrate that the design of the sign supports its intended purpose and does not introduce any risk to the operation of the railway. A proposal for change should be submitted for the new design of the sign to be included in the catalogue. The relevant standards committee(s) should make a decision on whether to include the sign in the catalogue, but not on the actual context of its use. Template for lineside safety signs Application Typeface [Artwork for design of the sign. An example is shown above] [Contexts of the use and position of this sign] [Typeface for text and digits] Colour [Colour for text, symbol, background and border, as set out in ] Luminance Associated sign(s) Supplementary information [Retroreflectivity and / or illumination. If illumination is required, a separate table of specification is required, as set out below] [Lists the identification of associated signs] [Supplementary information, if required, for appearance, size, shape and text layout] Illumination (where required) Colour Flashing Performance Flashing rate Flashing pattern Supplementary information [Colour used] [Value in Hz] [Mark-space ratio: value and tolerance range] [Whether two or more lights flash synchronously] [Readable horizontal and vertical angle range relative to the centre axis of the emitted light] [Supplementary information, if required, for size and shape] Template for lineside safety signs G C.4.1 G C.4.2 This template for lineside safety signs includes an additional parameter application, which provides the contexts of the use and position of a sign. As the use of safety signs would not be specified elsewhere in a Railway Group Standard, the inclusion of this parameter is useful in achieving consistency in the use and position of signs. It is also helpful for potential users of a safety sign, to judge if the sign is suitable for its intended application. Page 19 of 25

20 Appendix D Installation and Maintenance of Signs The content of this appendix is not mandatory and is provided for guidance only. G D.1 G D.1.1 Installation When planning the installation of signs, the following should be considered: a) Positioning for application. b) Resistance to vandalism. c) Method of fixing and removal. d) Resistance to rotation. e) Control of vegetation to prevent signs from becoming obscured. f) Access for maintenance. G D.2 G D.2.1 Maintenance Signs should be: a) Maintained to be fit for their intended purpose. b) Subject to a planned inspection and condition-monitoring regime. c) The subject of a maintenance programme that includes cleaning, graffiti removal and replacement, as soon as these become necessary. G D.3 G D.3.1 G D.3.2 G D.4 G D.4.1 Clearance Requirements for normal clearances for new, altered and temporary infrastructure are set out in GC/RT5212. Requirements for electrical clearances to the live parts of overhead line equipment and pantographs, and to the live parts of third rail electrification systems, are set out in GE/RT8025. Temporary signs Temporary signs should be designed for: a) Portability, ease of use and resistance to unauthorised removal. b) Stability, when subjected to the effects of high winds and passing trains; ground conditions, including ballast and other uneven surfaces. c) Installation on AC and DC electrified lines. G D.4.2 Where temporary signs are illuminated, the power supply should: a) Not allow unauthorised operation. b) Have a means of checking the condition of the power supply for the illumination. c) Not emit a light from any indications in a direction which allows observation by a driver of a train. Page 20 of 25

21 Appendix E Trials for New Designs of Signs The content of this appendix is not mandatory and is provided for guidance only. G E.1 G E.1.1 G E.1.2 G E.1.3 G E.2 G E.2.1 G E.2.2 G E.2.3 General considerations The main purpose of the trial is to obtain driver feedback with respect to the adequacy of a sign. A risk assessment should be carried out to identify any risk control measures to be applied during the trial. A human factors assessment should consider the impact of the trial on drivers workload. Preparation for the trial The affected stakeholders should be consulted prior to the trial, in order to identify any controls that might be necessary to manage any risks associated with the trial. The details of the trial should be briefed to the drivers, signallers and maintainers on the route of the trial, in order to minimise any confusion or distraction being caused by the trial. A plan for the trial should be prepared and include the following: a) Objectives of the trial. b) Descriptions of the need and purpose of the sign. c) Details of how the trial is to be conducted, including the duration, location and number of installations. d) Details of how the feedback and other observations are to be collected. e) Details of how the results are to be analysed, including any evaluation criteria used to assess whether the sign is fit for purpose. f) Risk assessment. g) Human factors assessment. h) Success criteria for the trial. G E.2.4 G E.2.5 G E.3 G E.3.1 G E.3.2 Feedback on the effectiveness of the sign could be sought from the affected parties by the use of a questionnaire. The questionnaire should address the design range of environmental and operational conditions, and provide for general comments to be recorded. A point of contact should be published in the Weekly Operating Notice (WON) and Periodical Operating Notice (PON), so that the potential users can provide feedback directly or ask for assistance on any questions they may have about the trial. Results The feedback should be reviewed to identify any operational or technical issues that are associated with the sign. The results of the trial should confirm that: a) The sign is fit for purpose. Or b) The sign can be used after any issues identified during the trial have been resolved. Or c) The design of the sign is not satisfactory for its intended application. Page 21 of 25

22 Definitions Authorised user A competent person, meeting the minimum eyesight standard, who is responsible for an operational role that includes reading and interpreting the information displayed by the lineside signalling system. Catalogue of lineside signs A collection of design specifications for lineside signs. Each individual specification within the catalogue of lineside signs is assigned a unique identifier, and records issue number and date separately. Detect (see also visible and visibility ) The initial part of the reading process when an authorised user observes a visible signalling system feature without necessarily being able to identify that it is applicable or distinguish what is being displayed. Distinguish The final stage of the reading process when an authorised user recognises what is being displayed on the basis of its appearance. Distinguishable (sign) The extent to which a sign is capable of being distinguished, ranging from not distinguishable to easily distinguishable. Identifiable (sign) The extent to which a sign is capable of being identified, ranging from not identifiable to easily identifiable. Identify / identifying (lineside signs) The stage of the reading process when an authorised user is able to confirm that a lineside sign is relevant to the task being performed. Interpret / interpreting (lineside signs) The action of understanding the meaning of the lineside sign after it has been read. Interpretable The extent to which the meaning of a lineside sign can be reliably interpreted, ranging from not interpretable to easily interpretable. Interpretability The ease and reliability with which signs can be interpreted by an authorised user throughout the range of operational and ambient conditions applicable to that feature, within the operational context and while performing typical required duties. This ranges from never interpretable to always interpretable. Infrastructure manager (network) The infrastructure manager (network) is the person who: a) In relation to infrastructure, other than a station, is responsible for developing and maintaining that infrastructure. And b) Manages and uses that infrastructure, or permits it to be used, for the operation of a vehicle. Page 22 of 25

23 Infrastructure manager (stations) The infrastructure manager (stations) is the person who: a) In relation to a station is responsible for managing and operating that station. And b) Manages and uses that station, or permits it to be used, for the operation of a vehicle. Lineside operational sign A sign, positioned at the lineside, which conveys information needed to support the management of the operation of trains. Lineside safety sign A sign that conveys information about health and safety to railway personnel or the public, and is located on, or in close proximity to, the railway. New design of lineside operational sign A sign required for a purpose within the scope of this document, but which is not currently included within the catalogue of lineside signs. Read / reading (signs) The process of detecting, identifying and distinguishing the relevant signs. Reading is a precondition to an authorised user interpreting the information conveyed by the lineside signs. Readability (signs) The ease and reliability with which signs can be read by an authorised user throughout the range of operational and ambient conditions applicable to that hardware, within the operational context and while performing typical required duties. This ranges from never readable to always readable. Readable (signs) Lineside operational signs are readable when an authorised user who meets the minimum eyesight and competence requirement for their role is able to reliably read the information displayed by the signs throughout the range of operational and ambient conditions applicable to that sign, within the operational context and while performing their required duties. Sign A device that displays a fixed image and/or text in order to convey specific information to the reader. Typeface - BS 3693B:1964 A typeface approved for use, as specified in this document. BS 3693B:1964 has been withdrawn. The current version BS 3693:1992 does not contain the required information. Typeface - Rail Alphabet A typeface approved for use, as specified in this document, designed by Kinnear & Calvert for the British Railways Board in the 1960s. Visibility (signs) The ease with which a lineside sign can be detected. Visibility is a precursor to readability. Visible (signs) The ease and reliability with which signs can be detected by an authorised user throughout the range of operational and ambient conditions applicable to that hardware, within the operational context and while performing typical required duties. This ranges from never visible to always visible. Page 23 of 25

24 References The Catalogue of Railway Group Standards gives the current issue number and status of documents published by. This information is also available from RGSC 01 RGSC 02 Railway Group Standards Code Standards Manual Documents referenced in the text Railway Group Standards GC/RT5212 GE/RT8025 GE/RT8101 GI/RT7033 GO/RT3451 documents GE/GN8601 GI/GN7634 GK/GN0657 Other references BS 3693B:1964 (withdrawn) BS 3693:1993 BS 8408:2005 BS EN 873-6:1983 Requirements for Defining and Maintaining Clearances Electrical Protective Provisions for Electrified Lines Lineside Signalling Asset Compatibility Assessment Requirements [in preparation, will replace GE/RT8037] Lineside Signs Train Drivers Suitability and Medical Fitness Requirements Guidance on Lineside Signalling Asset Compatibility Assessment Requirements [in preparation, will replace GE/GN8537] Index for Lineside Signs Guidance on Lineside Signal and Indicator Product Design and Assessment Requirements Recommendations for the design of scales, indexes and geometric construction of the recommended form of digits for use on dials and scales Recommendations for design of scales and indexes on analogue indicating instruments Road traffic signs. Testing and performance of microprismatic retroreflective sheeting materials. Specifications Road traffic signs and internally illuminated bollards. Specification for retroreflective and non-retroreflective signs BS EN :2005+A1:2010 Eurocode 1: Actions on structures. Parts 1-4: General actions - Wind actions BS EN :2007 BS EN 16494:2015 BS EN :2003 BS ISO :2011 HSE 1996 No. 341 Fixed, vertical road traffic signs. Part 1: Fixed signs Railway applications Requirements for ERTMS Trackside Boards Railway applications. Environmental conditions for equipment. Part 3: Equipment for signalling and telecommunications Graphical symbols. Safety colours and safety signs. Design principles for safety signs and safety markings The Health and Safety (Safety Signs and Signals) Regulations 1996 PCR 1996 Private Crossings (Signs and Barriers) Regulations 1996 TSRG 2002 Traffic Signs Regulations and General Directions /88/EU The technical specification for interoperability relating to the control-command and signalling subsystems of the trans-european rail system (CCS TSI) Page 24 of 25

25 Other relevant documents Railway Group Standards GE/RT8037 RS521 Other references Signal Positioning and Visibility Signals, hand signals, indicators and signs handbook 2011/291/EU Locomotives and passenger rolling stock TSI (OJ L 139, , p.65) Page 25 of 25

Impact assessment for change to a Railway Group Standard, new Rail Industry Standard and withdrawal of associated RACOPs and Guidance Note

Impact assessment for change to a Railway Group Standard, new Rail Industry Standard and withdrawal of associated RACOPs and Guidance Note Impact assessment for change to a Railway Group Standard, new Rail Industry Standard and withdrawal of associated RACOPs and Guidance Note Version: Publication Date: 05 September 2017 Relevant Railway

More information

Memorandum of Understanding

Memorandum of Understanding Memorandum of Understanding between the European Commission, the European Union Agency for Railways and the European rail sector associations (CER, EIM, EPTTOLA, ERFA, the ERTMS Users Group, GSM-R Industry

More information

RST Standards Committee Chairman s presentation. Presented by Hugh O Neill 17 November 2016

RST Standards Committee Chairman s presentation. Presented by Hugh O Neill 17 November 2016 RST Standards Committee Chairman s presentation Presented by Hugh O Neill 17 November 2016 1. Key issues from the last six months 1. Sanders Standard GMRT2461 issue 2 was published Jun 2016: 3 months early

More information

Network Certification Body

Network Certification Body Network Certification Body Scheme rules for assessment of railway projects to requirements of the Railways Interoperability Regulations as a Notified and Designated Body 1 NCB_MS_56_Notified and Introduction

More information

Quality Assurance Procedure Use of Accreditation Body & FP Certification FZE Marks, Logos and Symbols

Quality Assurance Procedure Use of Accreditation Body & FP Certification FZE Marks, Logos and Symbols Index 1.0 Purpose 2.0 Scope 3.0 References 4.0 Definitions 5.0 Responsibilities 6.0 Procedure 7.0 Records FP Certification Template Rev 002 1.0 Purpose 1.1 This procedure describes the applicable, rules

More information

Certificate of Acceptance

Certificate of Acceptance Specific Conditions The following Conditions are specific to the approved product/s contained within this Certificate. These conditions must be adhered to in addition to the Network Rail General Conditions

More information

Network Certification Body

Network Certification Body Network Certification Body Scheme rules for assessment of Entities in Charge of Maintenance in accordance with requirements of ECM Regulation EU 445/2011 ECM certification scheme 1 NCB_MS_106_ECM Introduction

More information

Guide for the application of the CR NOI TSI

Guide for the application of the CR NOI TSI European Railway Agency According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 1.01 Date: 03 December 2013 Document prepared by Document type:

More information

ENISA s Position on the NIS Directive

ENISA s Position on the NIS Directive ENISA s Position on the NIS Directive 1 Introduction This note briefly summarises ENISA s position on the NIS Directive. It provides the background to the Directive, explains its significance, provides

More information

Reference No: 04/14. Issue Date: 16/10/14

Reference No: 04/14. Issue Date: 16/10/14 Reference No: 04/14 Issue 1 Issue Date: 16/10/14 Focal: FCL SAFETY REGULATION DIVISION PERSONNEL LICENSING ADVISORY MEMORANDUM (PLAM) TITLE GUIDANCE TO CANDIDATES FOR THE INITIAL ISSUE OF AN EU PART-FCL

More information

EA-7/05 - EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits

EA-7/05 - EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits Publication Reference EA-7/05 EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits PURPOSE This document has been prepared by a task force under the direction of the European Cooperation

More information

REFERENCE TO AND USE OF ENAO ACCREDITATION SYMBOLS

REFERENCE TO AND USE OF ENAO ACCREDITATION SYMBOLS Page 1 of 15 Revised by: Meseret Tessema Approved by: Araya Fesseha Position: D.Quality Manager Position: Director General Signature: Signature: Contents 1 Purpose and Scope... 2 2 References... 2 3 Responsibility...

More information

Accreditation Body Evaluation Procedure for AASHTO R18 Accreditation

Accreditation Body Evaluation Procedure for AASHTO R18 Accreditation Accreditation Body Evaluation Procedure for AASHTO R18 Accreditation Final August 9, 2016 Page 1 of 12 Section Number Table of Contents Title of Section 0 Purpose 1 Scope 2 References 3 Objectives 4 Criteria

More information

Information Bulletin

Information Bulletin Application of Primary and Secondary Reference Documents Version 1.1 Approved for release July 2014 Table of Contents 1.0 Purpose statement... 3 2.0 Audience... 3 3.0 BCA requirements and referenced documents...

More information

The Accreditation and Verification Regulation - Verification report

The Accreditation and Verification Regulation - Verification report EUROPEAN COMMISSION DIRECTORATE-GENERAL CLIMATE ACTION Directorate A - International and Climate Strategy CLIMA.A.3 - Monitoring, Reporting, Verification Guidance Document The Accreditation and Verification

More information

European Train Control System: The Management of Packet 44

European Train Control System: The Management of Packet 44 European Train Control System: The Management of Packet 44 Synopsis This document mandates the manner in which the packet 44 of the European Train Control System data protocol shall be managed to ensure

More information

IAF Mandatory Document for the Transfer of Accredited Certification of Management Systems

IAF Mandatory Document for the Transfer of Accredited Certification of Management Systems IAF MD 2:2007. International Accreditation Forum, Inc. IAF Mandatory Document IAF Mandatory Document for the Transfer of Accredited Certification of Management Systems (IAF MD 2:2007) IAF MD2:2007 International

More information

ISO/IEC INTERNATIONAL STANDARD

ISO/IEC INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO/IEC 27006 First edition 2007-03-01 Information technology Security techniques Requirements for bodies providing audit and certification of information security management systems

More information

"Energy and Ecological Transition for the Climate" Label Control and Monitoring Plan Guidelines

Energy and Ecological Transition for the Climate Label Control and Monitoring Plan Guidelines MINISTRY OF ENVIRONMENT, ENERGY AND THE SEA "Energy and Ecological Transition for the Climate" Label Control and Monitoring Plan Guidelines Contents FOREWORD... 3 INTRODUCTION... 4 I. INITIAL CERTIFICATION

More information

UKAS Guidance for Bodies Offering Certification of Anti-Bribery Management Systems

UKAS Guidance for Bodies Offering Certification of Anti-Bribery Management Systems CIS 14 Edition 1 September 2018 UKAS Guidance for Bodies Offering Certification of Anti-Bribery Management Systems CIS 14 Edition 1 Page 1 of 10 Contents 1. Introduction 3 2. UKAS Assessment Approach 3

More information

CRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS

CRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS CRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS Approved By: Executive: Accreditation: Mpho Phaloane Revised By: RBI STC Working Group Members Date

More information

Standards Designation and Organization Manual

Standards Designation and Organization Manual Standards Designation and Organization Manual InfoComm International Standards Program Ver. 2014-1 April 28, 2014 Issued by: Joseph Bocchiaro III, Ph.D., CStd., CTS-D, CTS-I, ISF-C Director of Standards

More information

Are You GHS Compliant or at RISK for FINES?

Are You GHS Compliant or at RISK for FINES? Are You GHS Compliant or at RISK for FINES? Newsletter Date 06/24/15, Issue 74 The Globally Harmonized System (GHS) of classifying and labeling chemicals is an internationally agreed-upon system, designed

More information

Analysis of part B GMO deliberate release field trials management in Member States and prevention of accidental entry into the marketplace

Analysis of part B GMO deliberate release field trials management in Member States and prevention of accidental entry into the marketplace Analysis of part B GMO deliberate release field trials management in Member States and prevention of accidental entry into the marketplace A study for EC DG Environment under research tender ENV.B.3/ETU/2007/0008

More information

PEFC N 04 Requirements for certification bodies and accreditation bodies

PEFC N 04 Requirements for certification bodies and accreditation bodies PEFC N 04 Requirements for certification and accreditation Organisation Articles of Association for PEFC Norway Forest certification PEFC N 01 Norwegian PEFC certification system for sustainable forestry

More information

RECOMMENDATION FOR USE

RECOMMENDATION FOR USE Page 1 of 6 TITLE CONTENT OF THE TECHNICAL FILE ORIGINATOR NB-RAIL STRATEGY SG SUBJECT RELATED TO Directives 2008/57/EC, 2009/131/EC, 2011/18/EU, Recommendation 2011/217/EU, Decision 2010/713/EU and all

More information

Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679)

Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679) Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679) Adopted on 4 December 2018 Adopted 1 Contents 1 Introduction... 3 2

More information

ARTICLE 29 DATA PROTECTION WORKING PARTY

ARTICLE 29 DATA PROTECTION WORKING PARTY ARTICLE 29 DATA PROTECTION WORKING PARTY 18/EN WP261 Article 29 Working Party Draft Guidelines on the accreditation of certification bodies under Regulation (EU) 2016/679 Adopted on 6 february 2018 1 THE

More information

PTSPAS Product Assessment HAPAS Equivalent in accordance with MCHW SHW Volume 1 Clause and

PTSPAS Product Assessment HAPAS Equivalent in accordance with MCHW SHW Volume 1 Clause and 1. Policy It is the policy of Pavement Testing Services Ltd (hereafter PTS) to operate its certification/ assessment services in a non-discriminatory manner. PTS shall not use procedures / processes to

More information

EUROPEAN MEDICINES AGENCY (EMA) CONSULTATION

EUROPEAN MEDICINES AGENCY (EMA) CONSULTATION EUROPEAN MEDICINES AGENCY (EMA) CONSULTATION Guideline on GCP compliance in relation to trial master file (paper and/or electronic) for content, management, archiving, audit and inspection of clinical

More information

Introduction to the TII Publications System

Introduction to the TII Publications System Introduction to the TII Publications System June 2016 About TII Transport Infrastructure Ireland (TII) is responsible for managing and improving the country s national road and light rail networks. About

More information

ITU Asia-Pacific Centres of Excellence Training on Conformity and Interoperability. Session 2: Conformity Assessment Principles

ITU Asia-Pacific Centres of Excellence Training on Conformity and Interoperability. Session 2: Conformity Assessment Principles ITU Asia-Pacific Centres of Excellence Training on Conformity and Interoperability Session 2: Conformity Assessment Principles 12-16 October 2015 Beijing, China Keith Mainwaring ITU Expert Agenda 1. Context

More information

ADMIN 3.4. V e r s i o n 4. Paul Daly CEO RISSB

ADMIN 3.4. V e r s i o n 4. Paul Daly CEO RISSB ADMIN 3.4 V e r s i o n 4 Paul Daly CEO RISSB 01 November 2017 DOCUMENT CONTROL Identification Document Title Number Version Date Document ADMIN 3.4 1 23/11/2007 Document ADMIN 3.4 2 04/02/2010 Document

More information

AFAQ USER CHARTER CERTI F /2012

AFAQ USER CHARTER CERTI F /2012 CERTI F 0974.3 04/2012 AFAQ USER CHARTER 11 rue Francis de Pressensé - 93571 La Plaine Saint-Denis Cedex - France - T. +33 (0)1 41 62 80 00 - F. +33 (0)1 49 17 90 00 SAS au capital de 18 187 000-479 076

More information

APPROVAL SHEET PROCEDURE INFORMATION SECURITY MANAGEMENT SYSTEM CERTIFICATION. PT. TÜV NORD Indonesia PS - TNI 001 Rev.05

APPROVAL SHEET PROCEDURE INFORMATION SECURITY MANAGEMENT SYSTEM CERTIFICATION. PT. TÜV NORD Indonesia PS - TNI 001 Rev.05 APPROVAL SHEET PROCEDURE INFORMATION SECURITY MANAGEMENT SYSTEM CERTIFICATION PT. TÜV NORD Indonesia PS - TNI 001 Rev.05 Created : 20-06-2016 Checked: 20-06-2016 Approved : 20-06-2016 Indah Lestari Karlina

More information

Specification for Threading, Gauging and Thread Inspection of Casing, Tubing, and Line Pipe Threads

Specification for Threading, Gauging and Thread Inspection of Casing, Tubing, and Line Pipe Threads Specification for Threading, Gauging and Thread Inspection of Casing, Tubing, and Line Pipe Threads API SPECIFICATION 5B FIFTEENTH EDITION, APRIL 2008 EFFECTIVE DATE: OCTOBER 1, 2008 Specification for

More information

Operating instructions. Switching amplifier DN0210 DN / / 2015

Operating instructions. Switching amplifier DN0210 DN / / 2015 Operating instructions Switching amplifier DN0210 DN0220 UK 80011079 / 00 01 / 2015 Contents 1 Preliminary note...4 1.1 Symbols used...4 1.2 Warning signs used...4 2 Safety instructions...5 2.1 General...5

More information

OIML-CS PD-05 Edition 2

OIML-CS PD-05 Edition 2 PROCEDURAL DOCUMENT OIML-CS PD-05 Edition 2 Processing an application for an OIML Type Evaluation Report and OIML Certificate OIML-CS PD-05 Edition 2 ORGANISATION INTERNATIONALE DE MÉTROLOGIE LÉGALE INTERNATIONAL

More information

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History RP unique number: GI-UKEPR-CI-01-RP 0 30/06/2011 1 of 19 Approved for EDF by: A. PETIT Approved for AREVA by: C. WOOLDRIDGE Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011 Resolution Plan History

More information

NSW ACCREDITED VISITOR INFORMATION CENTRE GRAPHIC STANDARDS GUIDELINES

NSW ACCREDITED VISITOR INFORMATION CENTRE GRAPHIC STANDARDS GUIDELINES NSW ACCREDITED VISITOR INFORMATION CENTRE GRAPHIC STANDARDS GUIDELINES ACCREDITED VISITOR INFORMATION CENTRE IDENTITY The italic yellow i sign on the blue background is a registered trademark. It denotes

More information

SPAD Mobile Device Sub Group

SPAD Mobile Device Sub Group SPAD Mobile Device Sub Group Guidelines for managing mobile device use in the active driving cabs of rail vehicles Version 3 - July 2015 Page 1 of 5 IN-CAB CHECKLIST (DRAFT) Introduction As part of the

More information

Global Specification Protocol for Organisations Certifying to an ISO Standard related to Market, Opinion and Social Research.

Global Specification Protocol for Organisations Certifying to an ISO Standard related to Market, Opinion and Social Research. CONTENTS i. INTRODUCTION 3 ii. OVERVIEW SPECIFICATION PROTOCOL DOCUMENT DEVELOPMENT PROCESS 4 1. SCOPE 5 2. DEFINITIONS 5 3. REFERENCES 6 4. MANAGEMENT STANDARDS FOR APPROVED CERTIFICATION BODIES 6 4.1

More information

ISO/IEC INTERNATIONAL STANDARD

ISO/IEC INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO/IEC 14143-2 First edition 2002-11-15 Information technology Software measurement Functional size measurement Part 2: Conformity evaluation of software size measurement methods

More information

RetroSign GRX-7 1. MEASUREMENT PARAMETERS:

RetroSign GRX-7 1. MEASUREMENT PARAMETERS: Specification for handheld Retroreflectometer for determining the coefficient of retroreflected luminance (R A ) of road traffic signs, high visibility clothing, license plates and reflective tapes 1.

More information

ISO27001:2013 The New Standard Revised Edition

ISO27001:2013 The New Standard Revised Edition ECSC UNRESTRICTED ISO27001:2013 The New Standard Revised Edition +44 (0) 1274 736223 consulting@ecsc.co.uk www.ecsc.co.uk A Blue Paper from Page 1 of 14 Version 1_00 Date: 27 January 2014 For more information

More information

GDPR AMC SAAS AND HOSTED MODULES. UK version. AMC Consult A/S June 26, 2018 Version 1.10

GDPR AMC SAAS AND HOSTED MODULES. UK version. AMC Consult A/S June 26, 2018 Version 1.10 GDPR AMC SAAS AND HOSTED MODULES UK version AMC Consult A/S June 26, 2018 Version 1.10 INDEX 1 Signatures...3 2 General...4 3 Definitions...5 4 Scoping...6 4.1 In scope...6 5 Responsibilities of the data

More information

Rules for Operators. Version 6 / Version 6, 13 May 2011 Page 1/12

Rules for Operators. Version 6 / Version 6, 13 May 2011 Page 1/12 Rules for Operators Version 6 / 2011-05-13 Version 6, 13 May 2011 Page 1/12 TABLE OF CONTENTS 1. Introduction... 3 2. Application for certification and FAMI-QS associate membership... 3 3. Assessment of

More information

IP Office Contact Center 10.X Wallboard Voluntary Product Accessibility Template (VPAT)

IP Office Contact Center 10.X Wallboard Voluntary Product Accessibility Template (VPAT) IP Office Contact Center 10.X Wallboard Voluntary Product Accessibility Template (VPAT) IP Office Contact Center 10.X is a multimedia contact center suite that runs on the Windows Operating System. The

More information

REGULATORY FRAMEWORK FOR THE ACTIVITY OF MOBILE VIRTUAL NETWORK OPERATORS (MVNO)

REGULATORY FRAMEWORK FOR THE ACTIVITY OF MOBILE VIRTUAL NETWORK OPERATORS (MVNO) http://www.anacom.pt/template31.jsp?categoryid=235163 Determination of 9.2.2007 REGULATORY FRAMEWORK FOR THE ACTIVITY OF MOBILE VIRTUAL NETWORK OPERATORS (MVNO) A. Framework 1. Within the scope of relevant

More information

European Railway Agency. Electromagnetic Compatibility Requirements. Denmark

European Railway Agency. Electromagnetic Compatibility Requirements. Denmark European Railway Agency Electromagnetic Compatibility Requirements Denmark Extract of the study on EMC Requirements Lloyd s Register - November 2010 1. Processes Compatibility demonstration in Denmark

More information

Development of Optimum Assessment Technique for Railway Infrastructure Clearances

Development of Optimum Assessment Technique for Railway Infrastructure Clearances Development of Optimum Assessment Technique for Railway Infrastructure Clearances F. Moghadasnejad 1 and M. Fathali 2 1- Assistant Professor, moghadas@aut.ac.ir 2- PhD. Student, m_fathali@aut.ac.ir Amirkabir

More information

ISO/IEC INTERNATIONAL STANDARD

ISO/IEC INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO/IEC 27006 Second edition 2011-12-01 Information technology Security techniques Requirements for bodies providing audit and certification of information security management systems

More information

Severn Trent Water. Telecommunications Policy and Access Procedure

Severn Trent Water. Telecommunications Policy and Access Procedure Severn Trent Water Telecommunications Policy and Access Procedure Contents STW Telecommunications Policy: 5-12 Health and Safety: 13-18 Access Procedures:19-30 2 STW LSH Sites Access Policy [Controlled

More information

ABB Limited. Table of Content. Executive Summary

ABB Limited. Table of Content. Executive Summary 21 CFR Part 11 Electronic Records; Electronic Signatures Guidance for Industry Scope of Application Position Paper: A Summary and Interpretation of the Guidance Note: This document has been prepared based

More information

Scheme Document SD 003

Scheme Document SD 003 Scheme Document SD 003 Management Systems (ISO 9001, ISO 14001, BS OHSAS 18001 & PN111 Factory Production Control) SD 003 Rev 03.6 10 Oct 2013 Page 1 of 13 (blank) SD 003 Rev 03.6 10 Oct 2013 Page 2 of

More information

Sector Vision for the Future of Reference Standards

Sector Vision for the Future of Reference Standards The Group of Representative Bodies (GRB) The Sector Forum Rail (SFR) Sector Vision for the Future of s Brussels, 13 th July 2018 Sector Vision for Future of s 13 th July 2018 Page 1 of 6 Scope of position

More information

KENYA ACCREDITATION SERVICE

KENYA ACCREDITATION SERVICE KENAS-GUD-010 01 22/06/2013 22/07/2013 GUD 1 of 9 Approval and Authorisation Completion of the following signature blocks signifies the review and approval of this Document. Name Job Title / Role Signature

More information

ETSI EN V1.2.1 ( )

ETSI EN V1.2.1 ( ) EN 302 999 V1.2.1 (2013-03) European Standard Safety; Remote Power Feeding Installations; Safety requirements for the erection and operation of information technology installations with remote power feeding

More information

ACCREDITATION COMMISSION FOR CONFORMITY ASSESSMENT BODIES

ACCREDITATION COMMISSION FOR CONFORMITY ASSESSMENT BODIES ACCREDITATION COMMISSION FOR CONFORMITY ASSESSMENT BODIES ACCREDITATION SCHEME MANUAL Document Title: Document Number: Various Accreditation Schemes ACCAB-ASM-7.0 CONTROLLED COPY Revision Number Revision

More information

ASSURANCE CONTINUITY: CCRA REQUIREMENTS

ASSURANCE CONTINUITY: CCRA REQUIREMENTS ASSURANCE CONTINUITY: CCRA REQUIREMENTS VERSION 2.1 JUNE 2012 1 INTRODUCTION...3 1.1 SCOPE...3 1.2 APPROACH...3 1.3 CONTENTS...3 2 TECHNICAL CONCEPTS...4 2.1 ASSURANCE CONTINUITY PURPOSE...4 2.2 TERMINOLOGY...4

More information

ACCREDITATION COMMISSION FOR CONFORMITY ASSESSMENT BODIES

ACCREDITATION COMMISSION FOR CONFORMITY ASSESSMENT BODIES ACCREDITATION COMMISSION FOR CONFORMITY ASSESSMENT BODIES ACCREDITATION SCHEME MANUAL Document Title: Document Number: Various Accreditation Schemes ACCAB-ASM-7.0 CONTROLLED COPY Revision Number Revision

More information

25th of October EuroMedRail project National Safety Authority Belgium

25th of October EuroMedRail project National Safety Authority Belgium 25th of October 2017 - EuroMedRail project National Safety Authority Belgium 2 Content 1. Legal basis and history 2. The Belgian rail system 3. Railway safety in Belgium 2016 4. The Belgian NSA : DRSI

More information

Scheme Document. For more information or help with your application contact BRE Global on +44 (0) or

Scheme Document. For more information or help with your application contact BRE Global on +44 (0) or Page: Page 1 of 15 1. Introduction This certification scheme has been designed to promote sustainable production of construction products and materials. Responsible sourcing includes organisational management,

More information

Checklist According to ISO IEC 17065:2012 for bodies certifying products, process and services

Checklist According to ISO IEC 17065:2012 for bodies certifying products, process and services Name of Certifying Body Address of Certifying Body Case number Date of assessment With several locations Yes No Assessed locations: (Name)/Address: (Name)/Address: (Name)/Address: Assessed area (technical

More information

Guidance Solvency II data quality management by insurers

Guidance Solvency II data quality management by insurers Guidance Solvency II data quality management by insurers De Nederlandsche Bank N.V. Guidance Solvency II data quality management by insurers Guidance document of De Nederlandsche Bank N.V., dated 1 September

More information

Rules for the use of the RINA certification logo

Rules for the use of the RINA certification logo Rules for the use of the RINA certification logo Valid from 7/3/2013 RINA Via Corsica, 12 16128 Genova Italy Tel. +39 01053851 Fax: +39 0105351000 Website: www.rina.org Technical rules CONTENTS 1. AIM

More information

CEN and CENELEC Position Paper on the draft regulation ''Cybersecurity Act''

CEN and CENELEC Position Paper on the draft regulation ''Cybersecurity Act'' CEN Identification number in the EC register: 63623305522-13 CENELEC Identification number in the EC register: 58258552517-56 CEN and CENELEC Position Paper on the draft regulation ''Cybersecurity Act''

More information

2009 MUTCD CONTENT Introduction Part 1 General Part 2 Signs Part 3 Markings Part 4 - Highway Traffic Signals Part 5 Traffic Control Devices for Low

2009 MUTCD CONTENT Introduction Part 1 General Part 2 Signs Part 3 Markings Part 4 - Highway Traffic Signals Part 5 Traffic Control Devices for Low 2009 MUTCD CONTENT Introduction Part 1 General Part 2 Signs Part 3 Markings Part 4 - Highway Traffic Signals Part 5 Traffic Control Devices for Low Volume Roads 1 MUTCD CONTENT (Cont.) Part 6 Temporary

More information

Operating instructions. Standstill monitor A / / 2011

Operating instructions. Standstill monitor A / / 2011 Operating instructions Standstill monitor A300 UK 1 2 3 4 5 6 7 8 7390337 / 01 02 / 2011 1 2 3 4 5 6 7 8 switchpoint min max pulse/min power Made in Germany ifm electronic gmbh D 45127 Essen func. I II

More information

Minimum Requirements For The Operation of Management System Certification Bodies

Minimum Requirements For The Operation of Management System Certification Bodies ETHIOPIAN NATIONAL ACCREDITATION OFFICE Minimum Requirements For The Operation of Management System Certification Bodies April 2011 Page 1 of 11 No. Content Page 1. Introduction 2 2. Scope 2 3. Definitions

More information

Pierre Sebellin. Systems Technical Officer International Electrotechnical Commission

Pierre Sebellin. Systems Technical Officer International Electrotechnical Commission Pierre Sebellin Systems Technical Officer International Electrotechnical Commission Introduction IEC is a global organization that publishes consensus-based international Standards and manages Conformity

More information

Better Training for Safer Food initiative. Visual identity. guidelines for Contractors. Executive Agency for Health and Consumers

Better Training for Safer Food initiative. Visual identity. guidelines for Contractors. Executive Agency for Health and Consumers Better Training for Safer Food initiative Visual identity guidelines for Contractors Executive Agency for Health and Consumers Visual Identity Guidelines for Contractors Of the European Commission s Initiative

More information

BRE Global Limited Scheme Document SD 186: Issue No December 2017

BRE Global Limited Scheme Document SD 186: Issue No December 2017 BRE Global Limited Scheme Document SD 186: Issue No. 11.1 Commercial-in-Confidence Page 1 of 9 Introduction This certification scheme has been designed to promote the use of sustainable materials and

More information

Submission of information in the public consultation on potential candidates for substitution under the Biocidal Products Regulation

Submission of information in the public consultation on potential candidates for substitution under the Biocidal Products Regulation Submission of information in the public consultation on potential candidates for substitution under the Biocidal Products Regulation Version 3.0 May 2017 2 Submission of information in the public consultation

More information

DESIGN PRACTICE NOTE AXLE COUNTER RESET

DESIGN PRACTICE NOTE AXLE COUNTER RESET Approval Amendment Record Approval Date Version Description 09/09/2015 1 Initial issue 01/02/2016 2 Updated with issue of Works Instruction & Signal Engineering comments 31/08/2017 3 Updates with Standard

More information

Rights of Individuals under the General Data Protection Regulation

Rights of Individuals under the General Data Protection Regulation Rights of Individuals under the General Data Protection Regulation 2018 Contents Introduction... 2 Glossary... 3 Personal data... 3 Processing... 3 Data Protection Commission... 3 Data Controller... 3

More information

Smart Meters Programme Schedule 6.3. (Development Process) (CSP North version)

Smart Meters Programme Schedule 6.3. (Development Process) (CSP North version) Smart Meters Programme Schedule 6.3 (Development Process) (CSP North version) Schedule 6.3 (Development Process) (CSP North version) Amendment History Version Date Status v.1 Signature Date Execution copy

More information

Annexure: B INFORMATION. Responsible Executive Manager: Division/Unit Responsible for Formulation: Writer/s: Date + Number of Revision: Review Date:

Annexure: B INFORMATION. Responsible Executive Manager: Division/Unit Responsible for Formulation: Writer/s: Date + Number of Revision: Review Date: PROTOCOL FOR THE INSTALLATION OF TELECOMMUNICATION INFRASTRUCTURE IN THE KRUGER NATIONAL PARK Reference Ref: Number: 17/Pr/KNP/pro/telecom mast/vs2 (02-11) INFORMATION Responsible Executive Manager: Mr

More information

RULES GOVERNING THE USE OF SAC ACCREDITATION MARK CONDITION OF USE. General Conditions on Use of Accreditation Marks and GIC logo

RULES GOVERNING THE USE OF SAC ACCREDITATION MARK CONDITION OF USE. General Conditions on Use of Accreditation Marks and GIC logo General Conditions on Use of Accreditation Marks and GIC logo 1. The Accreditation Mark is illustrated below and the appropriate artwork shall be reproduced accurately without any alteration subject to

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 978 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE MP 1.1 Objective

More information

RECOMMENDATION FOR USE

RECOMMENDATION FOR USE Page 1 of 23 TITLE CONTENT OF EC CERTIFICATE/ QMS-APPROVAL/ ISV ORIGINATOR NB-RAIL SUB-GROUP STRATEGY SUBJECT RELATED TO DIRECTIVE 2008/57/EC (AS AMENDED BY 2009/131/EC, 2011/18/EU, 2010/713/EU, 2013/9/EU,

More information

DATA PROCESSING TERMS

DATA PROCESSING TERMS DATA PROCESSING TERMS Safetica Technologies s.r.o. These Data Processing Terms (hereinafter the Terms ) govern the rights and obligations between the Software User (hereinafter the User ) and Safetica

More information

Data Processor Agreement

Data Processor Agreement Data Processor Agreement Data Controller: Customer located within the EU (the Data Controller ) and Data Processor: European Representative Company: ONE.COM (B-one FZ-LLC) One.com A/S Reg.no. Reg.no. 19.958

More information

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL

CALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 728 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE

More information

NEWCASTLE CLINICAL TRIALS UNIT STANDARD OPERATING PROCEDURES

NEWCASTLE CLINICAL TRIALS UNIT STANDARD OPERATING PROCEDURES SOP details SOP title: Protocol development SOP number: TM 010 SOP category: Trial Management Version number: 03 Version date: 16 December 2016 Effective date: 16 January 2017 Revision due date: 16 January

More information

Guide to the implementation and auditing of ISMS controls based on ISO/IEC 27001

Guide to the implementation and auditing of ISMS controls based on ISO/IEC 27001 Guide to the implementation and auditing of ISMS controls based on ISO/IEC 27001 Information Security Management Systems Guidance series The Information Security Management Systems (ISMS) series of books

More information

General Data Protection Regulation BT s amendments to the proposed Regulation on the protection of individuals with regard to the processing of

General Data Protection Regulation BT s amendments to the proposed Regulation on the protection of individuals with regard to the processing of General Data Protection Regulation BT s amendments to the proposed Regulation on the protection of individuals with regard to the processing of personal data and on the free movement of such data (General

More information

OpenFlow Trademark Policy

OpenFlow Trademark Policy Introduction OpenFlow Trademark Policy This document outlines the Open Networking Foundation s ( ONF ) policy for the trademarks and graphic logos that we use to identify the OpenFlow specification and

More information

Guidelines for Interface Publication Issue 3

Guidelines for Interface Publication Issue 3 Editorial Note : These Guidelines are based on the OFTEL Guidelines Issue 2, which provided guidance on interface publication under the R&TTE Directive. They have now been amended to reflect the terminology

More information

EBB PILOT FOR THE LIVE CONNECTION OF UNMETERED EQUIPMENT TO OVERHEAD LINES

EBB PILOT FOR THE LIVE CONNECTION OF UNMETERED EQUIPMENT TO OVERHEAD LINES Network(s): Summary: ENGINEERING BULLETIN EBB 08-0061 PILOT FOR THE LIVE CONNECTION OF UNMETERED EQUIPMENT TO OVERHEAD LINES EPN, SPN This bulletin provides a framework for the pilot scheme for unmetered

More information

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL New Approach Industries, Tourism and CSR Construction, Pressure Equipment, Metrology Brussels, 21 st December 2009 M/457 EN Standardisation

More information

QUESTION / CLARIFICATION

QUESTION / CLARIFICATION QUESTION / CLARIFICATION CO-ORDINATION BETWEEN NOTIFIED BODIES DIRECTIVE 2008/57/EC AND SUBSEQUENT AMENDMENTS ON THE INTEROPERABILITY OF THE RAIL SYSTEM WITHIN THE UNION QC-INF-015 Issue 01 Date: 25/02/2015

More information

Specific Accreditation Criteria

Specific Accreditation Criteria Specific Accreditation Criteria ISO/IEC 17025 Application Document Infrastructure and Asset Integrity - Annex July 2018 Copyright National Association of Testing Authorities, Australia 2013 This publication

More information

CERTIFICATION BODY (CB) APPROVAL REQUIREMENTS FOR THE IFFO RESPONSIBLE SUPPLY (IFFO RS) AUDITS AND CERTIFICATION

CERTIFICATION BODY (CB) APPROVAL REQUIREMENTS FOR THE IFFO RESPONSIBLE SUPPLY (IFFO RS) AUDITS AND CERTIFICATION CERTIFICATION BODY (CB) APPROVAL REQUIREMENTS FOR THE IFFO RESPONSIBLE SUPPLY (IFFO RS) AUDITS AND CERTIFICATION Introduction The IFFO RS Certification Programme is a third party, independent and accredited

More information

GUIDELINE. of the European Committee for Welding of Railway Vehicles (ECWRV) ( ) PART 1

GUIDELINE. of the European Committee for Welding of Railway Vehicles (ECWRV) ( ) PART 1 GUIDELINE of the European Committee for Welding of Railway Vehicles (ECWRV) (2016-05-10) PART 1 Procedure for the application of EN 15085 and certification of welding manufacturers for welding railway

More information

COMMISSION DECISION. of

COMMISSION DECISION. of EUROPEAN COMMISSION Brussels, 6.11.2012 C(2012) 7325 final COMMISSION DECISION of 6.11.2012 amending Commission Decision 2012/88/EU on the technical specifications for interoperability relating to the

More information

Rules for LNE Certification of Management Systems

Rules for LNE Certification of Management Systems Rules for LNE Certification of Management Systems Application date: March 10 th, 2017 Rev. 040716 RULES FOR LNE CERTIFICATION OF MANAGEMENT SYSTEMS CONTENTS 1. PURPOSE... 3 2. SCOPE... 3 3. DEFINITION

More information

Revised November EFESC Handbook

Revised November EFESC Handbook Revised November 2015 EFESC Handbook 1 Table of Contents EFESC Handbook... 1 Table of Contents... 2 Handbook EFESC... 4 1 Background and objectives... 4 1.1 Sectoral developments... 4 1.1 Objectives...

More information

OFFICIAL COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE

OFFICIAL COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE Title of document ONR GUIDE COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE Document Type: Unique Document ID and Revision No: Nuclear Security Technical Assessment Guide CNS-TAST-GD-4.4 Revision

More information

INAB Mandatory and Guidance Documents Policy and Index

INAB Mandatory and Guidance Documents Policy and Index INAB Mandatory and Guidance s Policy and Index This publication is aimed at assisting in determining what documents are relevant to various organisations and at providing contact points for accessing such

More information