Electronic File Location. CCMS ref: Version History
|
|
- Kristina Parsons
- 5 years ago
- Views:
Transcription
1
2 Electronic File Location CCMS ref: Version History Issue Date Comments /06/13 Initial draft for internal review and comment /09/13 Updated for further internal review /11/13 Updated by Harv Bhatia & Arvind Bali /06/14 Updated from Reference Design for internal review /06/15 Updated by Arvind Bali from Consolidation Workshop and Reference Design /08/15 Extract from DOORS database for Technical Author review /08/15 Updated by Arvind Bali after Technical Author review /01/16 Updated after ORRG, SRSG, NRT and internal review /03/16 Updated post Requirements Consolidation Workshop for telecoms. For Technical Author review /03/16 First Issue /04/16 Update following Reference Design requirement harmonisation /08/16 Update for SRSG /08/16 Update from SRSG /09/16 Update for SRSG /09/16 Release for ESB / OSG review /01/17 Update from Industry review /03/17 Formal issue Disclaimer Network Rail has used its best endeavours to ensure that the content, layout and text of this document are accurate, complete and suitable for its stated purpose. It makes no warranties, expressed or implied, that compliance with the contents of this document shall be sufficient to ensure safe systems of work or operation. Network Rail will not be liable to pay compensation in respect of the content or subsequent use of this document for any purpose other than its stated purpose or for any purpose other than that for which it was prepared except where it can be shown to have acted in bad faith or there has been wilful default. NETWORK RAIL Page 2 of 18
3 Contents 1 INTRODUCTION Purpose of this Document Scope Context Abbreviations Requirements: Form, Applicability and Identification Requirements Assurance Requirements Change Areas for Development REQUIREMENTS... 7 APPENDIX A: ABBREVIATIONS APPENDIX B: LIST OF REFERENCES APPENDIX C: OPTIONS LOOKUP TABLE APPENDIX D: AREAS FOR DEVELOPMENT NETWORK RAIL Page 3 of 18
4 1 INTRODUCTION 1.1 Purpose of this Document This document provides a specification that is intended to promote effective implementation of the ETCS. It is applicable to ETCS installations, and provides requirements that are optimised for operation on the GB rail network. As stated in the industry-agreed and issued National ETCS Requirements Management Strategy [RD1] and Plan [RD2], the document provides the requirements which have been developed as part of a suite of ETCS requirements covering all elements required to optimise performance and operation of an ETCS railway. The document can be utilised as a standalone specification for the Telecoms aspect of the ETCS; further details of the parent requirements that drive the development of this specification are included within the System Requirements Specification [RD3] and the other Sub-system Requirements (Trackside, Onboard, and Operations [RD4], [RD5] & [RD6]). This Specification for the ETCS Telecoms sub-system has been written to complement the European Union Agency for Railways specification for Baseline 3 ETCS 1 [RD7] & [RD8]. Every effort has been made to avoid conflict with the Baseline 3 specification but, in case of conflict, the Baseline 3 specification takes precedence. The document is set out in the form of standard requirements with the ETCS Telecoms Requirement (ETCSS) identifier, followed by rationale and guidance notes where appropriate. 1.2 Scope This document consists of requirements which describe the functionality and application of the ETCS Telecoms sub-system optimised for application on the GB rail network at all required levels of operation. These requirements do not prevent the ETCS operating in conjunction with an Automatic Train Operation (ATO) system. Requirements will be added at a later date once the European specification for adding ATO to an ETCS sub-system has been finalised. Projects are encouraged to seek advice from the ERTMS Systems Body if there is a wish to facilitate early introduction of ATO. These requirements do not prevent the ETCS operating in conjunction with a Traffic Management (TM) system. No specific TM requirements have been identified for inclusion to date. Specific requirements and domain knowledge for a particular application are not included within this document, and will need to be defined by the Contracting Entity or their appointed Agent. Nothing in this document obviates any legal requirement with which any of the parties must comply. Furthermore, it does not preclude operation of a TSI-compliant vehicle on the GB rail network, nor a vehicle compliant to this specification operating on TSI-compliant infrastructure outside the GB rail network. 1.3 Context This document has been developed from a number of sources. 1 Note: This suite of requirements has been written to meet Baseline 3 Release 2, although the ETCS DOORS requirements database has the capability of producing a suite of requirements to meet Baseline 3 Maintenance Release 1. Should a suite of Baseline 3 Maintenance Release 1 requirements be needed, or if any background information be required for any specific requirement, then an with specifics should be sent to: nationalertmsrequirements@networkrail.co.uk NETWORK RAIL Page 4 of 18
5 Input from the ETCS programme, ETCS suppliers, and the wider rail industry has been used to develop the requirements. A series of workshops and industry consultations have identified new requirements. Guidance has been added to justify changes. Requirements amended and deleted through this development process have been captured within the requirements database, along with justification for their amendment or removal. 1.4 Abbreviations Abbreviations are explained in full where used in Requirements. A fuller explanation of Terms and Abbreviations can be found in Appendix A: and the ERTMS Glossary [RD9]. 1.5 Requirements: Form, Applicability and Identification Requirement Functionality Requirements may be functional or non-functional: Functional Requirements - Technical details that define what a system needs to accomplish, i.e. how suppliers equipment will be applied, what it needs to do, and what processes, procedures and rules need to be in place to achieve that. Non-Functional Requirements - Constraints on the design or implementation, such as performance, security, competence, training, and reliability requirements. Functional requirements have been derived through the Reference Design generation process [RD10], whereas non-functional requirements have been derived from the Cambrian Requirements suite and supplemented by workshop input [RD11] Basic Requirement Form All requirements are in the following form: Safety Requirement text. Unique ETCSS-Identifier Status: Normative/Application-Specific/Preferred. (See Section below). Rationale: Shows applicability of the requirement. Guidance: Supplementary information to support Requirement interpretation and satisfaction. Options: Reference Design Topics (If applicable). (See Section below) Safety Requirement Where a requirement has been associated with a Safety Measure, this is identified Normative / Application-Specific / Preferred status Each requirement within this document is identified as one of: normative, preferred, or application-specific. These are defined as follows: Normative o Necessary to achieve compatibility or optimisation of the system in relation to the GB rail network, or o A system feature that is deemed to be cost-effective and universally beneficial. NETWORK RAIL Page 5 of 18
6 Satisfaction of normative requirements in compliance with this document is expected to be a requirement of individual delivery contracts. Application-Specific o A requirement which may not be relevant or applicable to every implementation of the ETCS. It is expected that, where a requirement is applicable, it will be applied. Satisfaction of application-specific requirements in compliance with this document is expected to be a requirement of individual delivery contracts, as appropriate to the implementation being considered. Preferred o A requirement of lower importance which, whilst not essential, the industry would prefer were satisfied. It is expected that, where a requirement is applicable, it will be applied Options Satisfaction of preferred requirements in compliance with this document is not expected to be a requirement of individual delivery contracts unless explicitly specified within the relevant contract. Where applicable, the Reference Design Topic has been identified, as detailed in the Topics Lookup Table in Appendix C:. 1.6 Requirements Assurance Requirements assurance has been explained in the ETCS Requirements Assurance Statement [RD12]. 1.7 Requirements Change The ETCS Requirements Change Management Process [RD13] will be used to raise Change Requests (CRs) to amend existing requirements or add new requirements. 1.8 Areas for Development Noting that this document represents the best understanding of the needs of GB s rail network at the time of publishing, it is recognised that there are a number of areas where the document may be deficient. New deficiencies may be identified as understanding of the ETCS develops, as well as areas being closed out through further work being undertaken. The current known areas of deficiency are listed in Appendix D: NETWORK RAIL Page 6 of 18
7 2 REQUIREMENTS The GSM-R infrastructure shall, as a minimum, meet the Telecommunications Reliability, Availability & Maintainability (RAM) requirements specified in the ERTMS Reliability Specification (NR/AM/SA/SPE/00147) [RD14]. ETCSS-1 Rationale: NR/AM/SA/SPE/00147 defines ETCS reliability and availability targets, which are then apportioned to the respective Onboard, Trackside and Telecommunications elements. Guidance: RAM Requirements for the network sub-systems are specified in the ERTMS Reliability Specification NR/AM/SA/SPE/00147 Issue: A07 [RD14]. The specification only considers single GSM-R components; however, it is acknowledged that the overall network architecture needs to be considered holistically, and the Guidance Note 'GSM-R Availability Assessment for ETCS Traffic' (NEPT/ERTMS/HBK/0402 ver1.1) [RD15] addresses how to meet the availability requirement of the route. Options: A1-1, A1-2, A2-1, A2-2, O2-1, O2-2, HH Whole life Service Level Agreements (SLAs) and procedures related to planned telecoms infrastructure system maintenance outages shall be reviewed and updated before each ETCS route deployment. ETCSS-2 Rationale: System outages will be required in order to carry out system maintenance and upgrades to the Fixed Telecommunications Network (FTN) and Global System for Mobile Communications Railway (GSM-R) networks and their supporting systems, e.g. power supplies. The procedures for handling such outages need to be discussed with Industry and agreed at the National level as part of the ETCS life cycle plan. Guidance: SLAs will be agreed at the National level and will have to be in place before each route commissioning. Unambiguous procedures shall be provided for degraded and abnormal telecoms conditions. ETCSS-65 Rationale: Telecoms personnel must advise operations personnel so that operators can safely and efficiently manage the situation in degraded working. Guidance: In the event of any service affecting failure of the telecoms network, operational procedures will be implemented immediately by the Telecommunications network provider to advise the signallers of the nature of the failure and ensure that they are aware of the operational implications and projected recovery times. Operation of the ETCS on the Telecommunications network shall not have a detrimental impact on existing services using the Telecommunications network. Rationale: The introduction of ETCS must not adversely impact other existing users. ETCSS-70 NETWORK RAIL Page 7 of 18
8 Guidance: Existing services using the Telecommunications network include GSM-R voice, Supervisory Control & Data Acquisition (SCADA), level crossings, etc. In the event of failure of voice communications following application of the ETCS, there shall be an alternative means of voice communication with the signaller. Rationale: To provide a suitable method of communication with the signaller to meet operational or safety obligations. Guidance: Drivers, track workers and members of the public may need to maintain communications with the signaller regardless of the availability of the GSM-R. Locations can include platforms, level crossings, tunnels and key junctions. Options: A4, HH ETCSS-61 The characteristics and performance of the data bearer services provided by the GSM-R network shall satisfy Subset 093. Rationale: Subset 093 is currently a non-mandatory specification within the Control, Command and Signalling Technical Specification for Interoperability (CCS TSI) [RD8] and needs to be applied in the absence of any other Quality of Service (QoS) specification. Guidance: Subset-093 provides end-to-end service requirements for GSM-R networks. Subset-093 provides end-to-end minimum QoS, including establishment of a connection, the connection loss rate, and re-establishment of connection. Options: A1-1, A1-2, A2-1, A2-2, O2-1, O2-2, R1 ETCSS-3 Subset-037 and A 11 T 6001 configuration parameters for communications shall be optimised. ETCSS-12 Rationale: Subset-037 and A 11 T 6001 specify the parameters that need to be optimised. Guidance: Subset-037 version (Euroradio FIS) and A 11 T 6001 version (Radio Transmission FFFIS for EuroRadio) contain parameters that need to be optimised to take into account GSM-R network behaviour. Options: R1 Processes and procedures shall be in place to maintain the levels of GSM-R network service throughout the lifetime of the GSM-R system. ETCSS-9 Rationale: Loss of the GSM-R has an immediate impact on an ETCS railway. Guidance: The levels of service are as specified in Subset-093 and network coverage requirements are contained in the European Integrated Railway Radio Enhanced Network (EIRENE) System Requirements Specification (SRS) [RD8]. Options: A1-1, A1-2, A2-1, A2-2, A4, O2-1, O2-2, EE2 NETWORK RAIL Page 8 of 18
9 Safety A quality of service monitoring system shall be implemented across the telecoms infrastructure. ETCSS-10 Rationale: This is required for gathering service statistics to predict potential performance degradation. Safety requirement for hazard N-H028. Guidance: Service statistics required for ETCS operations include, but are not limited to, the number of successful ETCS calls, the number of failed ETCS calls, and the cell handover success rate for ETCS calls encountered. The following should also be included, but not be limited to: ETCS Connection Establishment Delay, ETCS Connection Errors, ETCS Connection Loss Rate, delayed Subset-026 messages, High-Level Data Link Control (HDLC) Frame Error, Cyclic Redundancy Check (CRC) error, retransmitted frames, and lost frames. Options: N2-1, O2-1, O2-2 The Telecommunications system shall be supported by a life cycle management plan. Rationale: To ensure that budgets and system design deliver whole-life cost-efficiency. Guidance: The telecoms lifecycle management plan will need links into a life cycle management strategy for the ETCS as a system on the rail network to enable effective management of configuration and reliability through industry Data Recording Analysis and Corrective Action System (DRACAS) processes. ETCSS-16 The GSM-R network capacity shall support ETCS data and voice traffic for normal, degraded and emergency operations on the route. ETCSS-4 Rationale: To provide Telecommunications traffic capacity that will be required to support the ETCS and voice communications. This will include the capacity required to support online key management. Guidance: The Guidance Note 'GSM-R Capacity Assessment for ETCS Traffic' [RD17] provides instruction on what needs to be considered when identifying the data capacity requirements, taking into consideration future increase in rail operations, Radio Block Centre (RBC) handovers, Start of Mission, degraded operations, etc. The Operational Concept for ERTMS [RD18] defines normal operations as situations expected to be encountered entering, exiting, and making train movements in the ETCS, and any setting up or closing down arrangements as part of start of service or end of service. Degraded operation is defined as planned or unplanned reduction in the ability of the ETCS to operate in its normal manner. This could include a partial degradation where it remains acceptable to continue to operate the ETCS. Options: A1-1, A1-2, A2-1, A2-2, A4, C, J3, J4, N1-1, N2-1, N2-2, O2-1, O2-2, S5-1, U1, U2, U4, U5, U6, V1, V2, EE2, JJ1, JJ2, JJ3, JJ4, JJ5, JJ6, JJ7, JJ8 The Telecommunications network shall satisfy the route's apportioned availability requirement for the telecoms network. ETCSS-64 NETWORK RAIL Page 9 of 18
10 Rationale: To support the route in selecting a system configuration that is suitable for that route. Expenditure on telecoms availability needs to be considered against the impact of loss of service on the route. Guidance: The route will have a business plan for delay reduction when the ETCS is operational. Applying apportionment modelling will derive a budget of allowable delay for the route and the system. The Guidance note 'GSM-R Availability Assessment for ETCS Traffic' [RD15] provides guidance on the process to support the route in selecting a suitable system configuration. Options: A1-1, A1-2, A2-1, A2-2, O2-1, O2-2 The Telecommunications network shall allow trains to register and de-register from the ETCS at any location which is ETCS data-enabled. ETCSS-72 Rationale: GSM-R coverage is required in all locations where ETCS-fitted trains plan to operate under ETCS control. Guidance: The Guidance Note 'GSM-R Coverage Assessment and Cell Planning' [RD16] provides guidance on operational areas that need to be considered. Locations include terminus / turnback stations, ETCS level transition points, and relevant depots / sidings. De-registration in areas not fitted with the ETCS will be achieved through timeout. Options: B, C, G1-1, G1-2, G2, G4-3, I, O1, O2-1, O2-2, O3 Where there is a requirement to provide General Packet Radio Service (GPRS) for capacity reasons, the whole of the RBC operational area shall be provided with GPRS capability, including the RBC to RBC handover zones. ETCSS-71 Rationale: This aligns with Subset 037 version Guidance: Once in an RBC area, it is not possible for the Onboard to switch automatically from packet-switched data to circuit-switched data. Options: R1 GSM-R network coverage shall be provided in all areas where ETCS-fitted trains will enter, operate in, and exit Level 2. ETCSS-13 Rationale: GSM-R data coverage is required in all areas where ETCS-fitted trains enter, operate in, and exit Level 2. Guidance: This includes associated depots, maintenance facilities and sidings, as well as possessions, and during emergency degraded and abnormal conditions. Coverage is also required to support online key management. The Guidance Note 'GSM-R Coverage Assessment and Cell Planning' [RD16] provides guidance on signal strengths in the operational areas that need to be considered. The Guidance Note asks for higher levels than those defined in the EIRENE System Requirements Specification and provides target coverage levels by location, including major stations, junctions, tunnels, and urban and rural lines. It also provides coverage guidance for RBC handovers, Start of Mission, transition into Level 2, etc. Options: A1-1, A1-2, A2-1, A2-2, A4, G1-1, G1-2, G2, G4-1, G4-2, J2, J3, J4, J5, L1, N1-1, N2-1, O2-1, O2-2, S5-1, V1, V2, HH NETWORK RAIL Page 10 of 18
11 The Telecommunications network shall provide sufficient GSM-R signal strength and overlapping coverage at locations where marginal coverage or loss of coverage would cause significant disruption to railway operations. Rationale: Loss of coverage or marginal coverage in key areas would cause significant disruption to railway operations. Guidance: The Guidance Note 'GSM-R Coverage Assessment and Cell Planning' [RD16] provides guidance on operational areas that need to be considered. Although minimum levels are defined by the EIRENE SRS, this requirement is to make sure that critical areas have the best coverage. Options: A1-1, A1-2, A2-1, A2-2, I ETCSS-73 The Telecommunications network shall provide sufficient GSM-R signal strength to mitigate against interference from Mobile Network Operator (MNO) interferer sites. ETCSS-74 Rationale: To minimise the likelihood of interference from MNO sites disrupting railway operations. Guidance: The GSM-R network design should take into consideration that the base-stations are authorised to operate only within the power limits defined in the Wireless Telegraphy Act licence. Coordination and cooperation with MNOs could provide additional measures to minimise interference. Options: A1-1, A1-2, A2-1, A2-2, I The Telecommunications network shall provide coverage overlap between adjacent GSM-R cells to allow successful circuit-switched handovers or General Packet Radio Service (GPRS) re-selections to take place at line speed at the required signal level. ETCSS-75 Rationale: GSM-R coverage is required in all locations where ETCS-fitted trains will operate. Guidance: The Guidance Note 'GSM-R Coverage Assessment and Cell Planning' [RD16] provides guidance on operational areas that need to be considered. Options: EE1, EE2 The Telecommunications system shall support the testing associated with the introduction of, and future changes to, ETCS installations. ETCSS-62 Rationale: There are locations that will need ETCS coverage purely to test GSM-R functionality on its introduction, or as a result of maintenance. Guidance: This will be needed at test tracks, in depots, and on the mainline and would cover General Packet Radio Service (GPRS), Enhanced Data rates for GSM Evolution (EDGE), and the complex rail environment. The telecoms application design shall facilitate ease of maintenance, repair and replacement, and configuration control of components. ETCSS-66 NETWORK RAIL Page 11 of 18
12 Rationale: Ease of maintenance and installation contributes to whole-life cost reduction. Guidance: The design should enable ease of installation and maintenance activities for rapid fault resolution. The Telecommunications system shall be protected from threats with sufficient physical, procedural and technical controls to minimise damage and security risks. ETCSS-67 Rationale: Telecommunications systems can be compromised at several levels. This requirement addresses intended and unintended consequences of the system being compromised. Guidance: Access to systems must be controlled to avoid unauthorised access, either unintentional or deliberate. Consideration should be given to the location and environment of the equipment to be protected. Network Rail s Security Assurance Framework (SAF) [RD19] should be used to assess GB operational rail systems (including communications networks) for risk. The Telecommunications sub-system equipment, processes and people shall not give rise to unacceptable and unmanageable safety risks. ETCSS-68 Rationale: To ensure that the complete system of systems is safe. Guidance: The Telecommunications sub-system equipment and processes will interact with other systems. The interaction encompasses intentional interaction via a defined interface and unintentional interaction where there is no defined interface. The Telecommunications network provider shall provide profiled Subscriber Identity Module (SIM) cards to support deployment of the ETCS. ETCSS-5 Rationale: The Telecoms network provider intends to procure a large number of SIM cards in advance and profile them in time for deployment on the route. Guidance: The SIM cards will be profiled for the desired service, e.g. data, testing, voice, etc. The total number of SIM cards for end-user equipment will need to be specified for each application. All the necessary SIM cards for the lifetime of the project will be made available before the deployment of the route. All Subscriber Identity Module (SIM) cards shall be profiled for both Circuit Switched and Packet Switched communications modes. Rationale: The TSI specifies the GSM-R SIM card as an Interoperability constituent. Guidance: The SIM needs to be profiled for both circuit switched and packet switched modes to allow the ETCS Data Only Radio (EDOR) to use packet switching where required. ETCSS-92 NETWORK RAIL Page 12 of 18
13 Options: None The Telecommunications network provider shall manage the provision of Subscriber Identity Module (SIM) cards and configuration databases throughout the lifetime of the ETCS. ETCSS-76 Rationale: To support Railway Undertakings (RUs) in replacing defective ETCS Data only Radios (EDORs). Guidance: Replacement SIM cards will need to be profiled for the desired service (e.g. data, test, etc.) and the GSM-R configuration database will need to be maintained to enable the EDOR to work on the GSM-R network. Packet switched data communications shall be available at all locations where online key updates are required to take place. Rationale: To enable keys to be updated when required. Guidance: To provide packet switched data communications at locations where key transfers are required to take place. These include ETCS running lines, maintenance depots and stabling points attached to ETCS running lines, maintenance depots where ETCS equipped trains will be maintained, private sidings and facilities, and other locations, as required. Options: EE1, EE2 ETCSS-77 Safety The Telecommunications system shall record system event data suitable for use to monitor system performance and investigate incidents effectively. ETCSS-78 Rationale: Speedy investigation and resolution of incidents is critical to keep the service running. Safety requirement for hazard N-H028. Guidance: It must be possible to understand how the whole system has behaved (including those who operate it) in order to determine the underlying causes of any incident or performance failure. Therefore, data from the Onboard, Trackside and Telecommunications sub-systems must be collected and synchronised. Information relating to the human element would be managed through review of written records and interviews as well as actions at the human machine interfaces recorded by sub-systems. GSM-R network coverage shall be provided when the train's reporting of position or requesting of Movement Authority updates might be used to influence the operation of the level crossing. ETCSS-79 Rationale: Good coverage is required where ETCS is used to influence the operation of the level crossing. Guidance: The coverage would be from a point which allows the ETCS and the level crossing system to react, taking into consideration the braking distance of the NETWORK RAIL Page 13 of 18
14 Options: train. This can be approximated to 4 minutes running time at linespeed from the crossing. A1-1, A1-2, A2-1, A2-2, JJ1, JJ2, JJ3, JJ4, JJ7 There shall be no designed radio holes from a point 200m on the approach to an End Of Authority (EOA) protecting a level crossing and the level crossing itself. ETCSS-80 Rationale: Trains crossing a failed level crossing need to be able to receive the movement authority and mode profile in this area. Options: JJ8 NETWORK RAIL Page 14 of 18
15 APPENDIX A: ABBREVIATIONS The following abbreviations are used within this document, and can also be found in the ETCS Glossary [RD9]. ATO CCS CRC DRACAS EDGE EDOR EIRENE ERTMS ESB ETCS FTN GPRS GSM-R HDLC MNO QoS RAM RBC RU SCADA SIM SLA TM TSI VBS Automatic Train Operation Control, Command & Signalling Cyclic Redundancy Check Data Recording Analysis and Corrective Action System Enhanced Data rates for GSM Evolution ETCS Data Only Radio European Integrated Radio Enhanced Network European Rail Traffic Management System ERTMS Systems Body European Train Control System Fixed Telecommunications Network General Packet Radio Service Global System for Mobile Communications - Railway High-Level Data Link Control Mobile Network Operator Quality of Service Reliability, Availability & Maintainability Radio Block Centre Railway Undertaking Supervisory Control And Data Acquisition Subscriber Identity Module Service Level Agreement Traffic Management Technical Specification for Interoperability Voice Broadcast Service NETWORK RAIL Page 15 of 18
16 APPENDIX B: LIST OF REFERENCES Note: Unless otherwise stated, reference should be made to the most recent authorised version of the document. [RD1] National ETCS Requirements Management Strategy, NEPT/ERTMS/REQ/0003 [RD2] ETCS Requirements Management Plan, NEPT/ERTMS/REQ/0001 [RD3] ETCS Baseline 3 - System Requirements Specification, NEPT/ERTMS/REQ/0005 [RD4] ETCS Baseline 3 GB Trackside Subsystem Requirements, NEPT/ERTMS/REQ/0006 [RD5] ETCS Baseline 3 GB Onboard Subsystem Requirements, NEPT/ERTMS/REQ/0007 [RD6] ETCS Baseline 3 GB Operational Subsystem Requirements, NEPT/ERTMS/REQ/0009 [RD7] COMMISSION REGULATION (EU) 2016/919 of 27 May 2016 on the technical specification for interoperability relating to the control-command and signalling subsystems of the rail system in the European Union [RD8] Baseline 3 Release 2 (TSI CCS Annex A set of specifications #3, which includes GSM-R Baseline 1 (EIRENE FRS V8.0.0 & SRS V16.0.0)) [RD9] ERTMS Programme Glossary of Terms, ERTMS/PGM/D0115 [RD10] ERTMS Reference Design, NEPT/ERTMS/SYS/0032 [RD11] National ETCS Requirements Consolidation Process, CCMS: [RD12] ETCS Requirements Assurance Statement, CCMS No: [RD13] ETCS Requirements Change Management Process, NEPT/ERTMS/REQ/0013 [RD14] ERTMS Reliability Specification NR/AM/SA/SPE/00147 Issue: A07. [RD15] Guidance Note 'GSM-R Availability Assessment for ETCS Traffic', NEPT/ERTMS/HBK/0402 version 1.1 [RD16] Guidance Note 'GSM-R Coverage Assessment and Cell Planning', NEPT/ERTMS/HBK/0403 version 2.1 [RD17] Guidance Note 'GSM-R Capacity Assessment for ETCS Traffic', NEPT/ERTMS/HBK/0401 version 1.1 [RD18] Operational Concept for ERTMS, RSSB-ERTMS-OC, Issue 2 [RD19] NR Security Assurance Framework, NRT/SY/2015/036 The TSI and Class 1 Specifications are obtainable from the European Union Agency for Railways. NETWORK RAIL Page 16 of 18
17 APPENDIX C: OPTIONS LOOKUP TABLE Note: (W) indicates a Working Version and not a Release Version. Topic ID Topic Title Version A Continuing Movement 3.0 B Operation in Possession 6.0 C End of Mission 2.0 D Train Dispatch 2.0 E Stopping at an End of Authority (EOA) 3.0 F Applying Speed Restrictions 3.0 G Starting 3.1 H Permissive Moves 3.0 I Attaching and Detaching 3.0 J Stopping Trains 3.0 K Changing Driver ID and TRN mid-journey 3.0 L ETCS Route Release 3.0 M Neutral Sections, Traction Changeover and Pantograph Management 5.0 N Entering ETCS 3.0 O Exiting ETCS (Leaving Level 2 and 3) 3.0 R Boundaries 4.0 S5 Degraded or Abnormal Working, Route Not proved 5.0 T Inhibition of Transition 5.0 U System Controls for Issue of Movement Authorities 4.0 V Provision of Routing Information 5.0 Y Miscellaneous 4.0 Z Non trackside 2.0 AA Consistent Provision of Lineside Signage 4.0 CC Utilisation of Packet 44 in ETCS Areas 3.0 EE Key Management 2.7 HH Train Maintenance and Testing 4.0 II Balise Configuration Rules 4.0 JJ Level Crossing Operation and Protection 5.0 KK Transmission of National Values 3.0 LL Use of Track Condition Functions 5.0 NETWORK RAIL Page 17 of 18
18 APPENDIX D: AREAS FOR DEVELOPMENT No. Issue Description Identified in version Closed in version 1 Reference Design The Specification Requirements need to be updated to incorporate the latest requirements from the Release Versions of the Reference Design Topics Z and EE, which are identified as (Provisional). 2 Automatic Train Operation When Automatic Train Operation has been developed and European standards published further requirements may need to be included. 3 ETCS Level 3 When ETCS Level 3 has been developed and European standards and GB application rules published further requirements may need to be included. 4 Remaining comments from Industry Review 5 Operational Test Scenario input Remaining comments from the Industry review need to be closed out. There will be consequential amendments required arising from the output from the OTS work NETWORK RAIL Page 18 of 18
COMMISSION DECISION. of
EUROPEAN COMMISSION Brussels, 6.11.2012 C(2012) 7325 final COMMISSION DECISION of 6.11.2012 amending Commission Decision 2012/88/EU on the technical specifications for interoperability relating to the
More informationMemorandum of Understanding
Memorandum of Understanding between the European Commission, the European Union Agency for Railways and the European rail sector associations (CER, EIM, EPTTOLA, ERFA, the ERTMS Users Group, GSM-R Industry
More informationCyber Security of ETCS
1 Addressing the challenges Cyber Security of ETCS Simon Tonks 2 Background The UK rail network is currently being upgraded to use new signalling technology (ERTMS) The ROSCOs are delivering the First
More informationAUTHORITY FOR ELECTRICITY REGULATION
SULTANATE OF OMAN AUTHORITY FOR ELECTRICITY REGULATION SCADA AND DCS CYBER SECURITY STANDARD FIRST EDITION AUGUST 2015 i Contents 1. Introduction... 1 2. Definitions... 1 3. Baseline Mandatory Requirements...
More informationHuawei Railway Communication Service Solution Guide
Huawei Railway Communication Service Solution Guide Huawei Technologies Co., Ltd. Keywords Railway transport, service solution, subsystem, design,, solution implementation Abstract Huawei Railway Communication
More informationRailway Telecoms. Short & Long Term Actions
Railway Telecoms Short & Long Term Actions Dan Mandoc, UIC ERTMS Platform Steering Committee 02.12.2009 1 Short Term ERTMS Platform Steering Committee 02.12.2009 2 Mobile Communications - GSM-R EIRENE
More informationEUROPEAN ICT PROFESSIONAL ROLE PROFILES VERSION 2 CWA 16458:2018 LOGFILE
EUROPEAN ICT PROFESSIONAL ROLE PROFILES VERSION 2 CWA 16458:2018 LOGFILE Overview all ICT Profile changes in title, summary, mission and from version 1 to version 2 Versions Version 1 Version 2 Role Profile
More informationSector Vision for the Future of Reference Standards
The Group of Representative Bodies (GRB) The Sector Forum Rail (SFR) Sector Vision for the Future of s Brussels, 13 th July 2018 Sector Vision for Future of s 13 th July 2018 Page 1 of 6 Scope of position
More informationTARGET2-SECURITIES INFORMATION SECURITY REQUIREMENTS
Target2-Securities Project Team TARGET2-SECURITIES INFORMATION SECURITY REQUIREMENTS Reference: T2S-07-0270 Date: 09 October 2007 Version: 0.1 Status: Draft Target2-Securities - User s TABLE OF CONTENTS
More informationDeutsche Bahn AG Digital Rail (IDX)
Deutsche Bahn s Digital Rail Vision and its Implications on the Future Radio for Rail Transport Dr. Patrick Marsch ETSI Workshop on Developing the Future Radio for Rail Transport, July 5th, 2018 The Envisioned
More informationSevern Trent Water. Telecommunications Policy and Access Procedure
Severn Trent Water Telecommunications Policy and Access Procedure Contents STW Telecommunications Policy: 5-12 Health and Safety: 13-18 Access Procedures:19-30 2 STW LSH Sites Access Policy [Controlled
More informationSTCP Amendment Proposal Form
STCP Amendment Proposal Form PA036 1. Title of Amendment Proposal STCP 09-2 Incorporation material currently within SPT SCS and making standard for both TOs. 2. Description of the Proposed Amendment (mandatory
More informationITU Asia-Pacific Centres of Excellence Training on Conformity and Interoperability. Session 2: Conformity Assessment Principles
ITU Asia-Pacific Centres of Excellence Training on Conformity and Interoperability Session 2: Conformity Assessment Principles 12-16 October 2015 Beijing, China Keith Mainwaring ITU Expert Agenda 1. Context
More informationResistance is Useless.
Resistance is Useless. Version 2.0 23-01-2018 Peter Symons IRSE President My Text for today Strategic Drivers of change in the Signalling Industry Written and edited by Alan Rumsey on behalf of the International
More information0522: Governance of the use of as a valid UNC communication
Stage 01: Modification 0522: Governance of the use of email as a valid UNC communication At what stage is this document in the process? This modification proposes business rules to ensure that appropriate
More information0522: Governance of the use of as a valid UNC communication
Stage 01: Modification 0522: Governance of the use of email as a valid UNC communication At what stage is this document in the process? This Modification proposes business rules to ensure that appropriate
More informationNew Zealand Telecommunications Forum. Code for Vulnerable End Users of Telecommunication Services. ( Vulnerable End User Code )
New Zealand Telecommunications Forum Code for Vulnerable End Users of Telecommunication Services ( Vulnerable End User Code ) Code Status: Code Classification: Date: Review Status: For Public Consultation
More informationGovernance of the use of as a valid UNC communication
Stage 01: : u Governance of the use of email as a valid UNC communication At what stage is this document in the process? This modification proposes business rules to ensure that appropriate assurance is
More informationGuidelines for Interface Publication Issue 3
Editorial Note : These Guidelines are based on the OFTEL Guidelines Issue 2, which provided guidance on interface publication under the R&TTE Directive. They have now been amended to reflect the terminology
More informationService Description: CNS Federal High Touch Technical Support
Page 1 of 1 Service Description: CNS Federal High Touch Technical Support This service description ( Service Description ) describes Cisco s Federal High Touch Technical support (CNS-HTTS), a tier 2 in
More informationISO27001:2013 The New Standard Revised Edition
ECSC UNRESTRICTED ISO27001:2013 The New Standard Revised Edition +44 (0) 1274 736223 consulting@ecsc.co.uk www.ecsc.co.uk A Blue Paper from Page 1 of 14 Version 1_00 Date: 27 January 2014 For more information
More informationQ&A for Citco Fund Services clients The General Data Protection Regulation ( GDPR )
Q&A for Citco Fund Services clients The General Data Protection Regulation ( GDPR ) May 2018 Document Classification Public Q&A for Citco Fund Services clients in relation to The General Data Protection
More informationCustomer Managed Connectivity - Milan
Customer Managed Connectivity - Milan Service and Technical Description June 2017 Version 2 Table of Contents 1.0 Document Scope 3 1.1 1.2 1.3 1.4 Structure of this document 3 Version History 4 Use of
More informationECC Recommendation (17)04. Numbering for ecall
ECC Recommendation (17)04 Numbering for ecall Approved 22 November 2017 ECC/REC/(17)04 Page 2 INTRODUCTION ecall is a service designed for automotive vehicles to provide quick emergency response in case
More informationSERVICE SCHEDULE & ADDITIONAL TERMS AND CONDITIONS FOR DIRECT WHOLESALE INTERCONNECT VOICE SERVICE
SERVICE SCHEDULE & ADDITIONAL TERMS AND CONDITIONS FOR DIRECT WHOLESALE INTERCONNECT VOICE SERVICE The following terms and conditions are additional to those in the prevailing Viatel General Terms and
More informationThe Apple Store, Coombe Lodge, Blagdon BS40 7RG,
1 The General Data Protection Regulation ( GDPR ) is the new legal framework that will come into effect on the 25th of May 2018 in the European Union ( EU ) and will be directly applicable in all EU Member
More informationWhat is cloud computing? The enterprise is liable as data controller. Various forms of cloud computing. Data controller
A guide to CLOUD COMPUTING 2014 Cloud computing Businesses that make use of cloud computing are legally liable, and must ensure that personal data is processed in accordance with the relevant legislation
More informationRemit Issue April 2016
1 Introduction Remit Issue 02 18 April 2016 1.1 This document defines the scope, purpose and working arrangements for the High Integrity Systems Group. High integrity systems are playing an increasingly
More informationMISTRAL WORKSHOP #1 Trends on future train-to-wayside communications Barcelona, 07/07/2017
MISTRAL WORKSHOP #1 Trends on future train-to-wayside communications Barcelona, 07/07/2017 INDEX Introduction: MISTRAL Project Future technological trends for train-to-wayside communications Future economic
More informationAlternatives for mission-critical services in public mobile networks in Norway. May 2018
Alternatives for mission-critical services in public mobile networks in Norway May 2018 TABLE OF CONTENTS 1 Background 3 2 NGN expectations 3 3 Solution concepts proposed by operators 3 4 Level of governmental
More informationSolution Pack. Managed Services Virtual Private Cloud Security Features Selections and Prerequisites
Solution Pack Managed Services Virtual Private Cloud Security Features Selections and Prerequisites Subject Governing Agreement DXC Services Requirements Agreement between DXC and Customer including DXC
More informationdevelopment, return of experience, state of the art
CCRCC 2012 Thomas Wesenberg Speaker of the GSM-R Industry Group Lille November 6th, 2012 development, return of experience, state of the art www.gsm-rail.com # Agenda 1. GSM-R IG general update 2. Developing
More informationData Protection. Code of Conduct for Cloud Infrastructure Service Providers
Data Protection Code of Conduct for Cloud Infrastructure Service Providers 27 JANUARY 2017 Introduction... 3 1 Structure of the Code... 5 2 Purpose... 6 3 Scope... 7 4 Data Protection Requirements... 9
More informationNATIONAL GUIDELINES ON CLOUD COMPUTING FOR GOVERNMENT, MINISTRIES, DEPARTMENTS AND AGENCIES
NATIONAL GUIDELINES ON CLOUD COMPUTING FOR GOVERNMENT, MINISTRIES, DEPARTMENTS AND AGENCIES DOCUMENT DETAIL Security Classification Unclassified Authority National Information Technology Authority - Uganda
More informationAuthorisation of placing in service in the context of new technologies
Roma, 22 January 2016 GNSS technology advantages in a multiconstellation framework Authorisation of placing in service in the context of new technologies Assumption For its size and complexity, the rail
More informationEuropean Train Control System: The Management of Packet 44
European Train Control System: The Management of Packet 44 Synopsis This document mandates the manner in which the packet 44 of the European Train Control System data protocol shall be managed to ensure
More informationTrack Side On Board Mobile Communications. Dennis Schut UIC Research Manager
Track Side On Board Mobile Communications Dennis Schut UIC Research Manager Track Side On Board Operational Communication In Europe, the radio system supporting track side-on - board communications is
More informationCRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS
CRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS Approved By: Executive: Accreditation: Mpho Phaloane Revised By: RBI STC Working Group Members Date
More informationDATA PROTECTION POLICY THE HOLST GROUP
DATA PROTECTION POLICY THE HOLST GROUP INTRODUCTION The purpose of this document is to provide a concise policy regarding the data protection obligations of The Holst Group. The Holst Group is a data controller
More informationOFFICIAL COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE
Title of document ONR GUIDE COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE Document Type: Unique Document ID and Revision No: Nuclear Security Technical Assessment Guide CNS-TAST-GD-4.4 Revision
More information"PPS" is Private Practice Software as developed and produced by Rushcliff Ltd.
Rushcliff Ltd Data Processing Agreement This Data Processing Agreement ( DPA ) forms part of the main terms of use of PPS, PPS Express, PPS Online booking, any other Rushcliff products or services and
More informationOPEN Networks - Future Worlds Consultation
ENA Open Networks Future Worlds Consultation OPEN Networks - Future Worlds Consultation Developing change options to facilitate energy decarbonisation, digitisation and decentralisation Executive Summary
More informationV/TC SIC Vehicle / Train Control Communications System Interface Committee
V/TC&C SIC PROGRAMME OF WORK Issue number: 2 2/4/2011 Traffic Management to improve energy efficiency, reduce cost, reduce carbon, and improve train performance. Advisory Information for Energy Management
More informationNDIS Quality and Safeguards Commission. Incident Management System Guidance
NDIS Quality and Safeguards Commission Incident Management System Guidance Version 1 - May 2018 Acknowledgment This guidance is published by the Australian Government, using resources developed by the
More informationENISA s Position on the NIS Directive
ENISA s Position on the NIS Directive 1 Introduction This note briefly summarises ENISA s position on the NIS Directive. It provides the background to the Directive, explains its significance, provides
More informationEthernet Modbus X80 Gateway Device Type Manager
Ethernet Modbus X80 Gateway Device Type Manager EIO0000001315 10/2012 Ethernet Modbus X80 Gateway Device Type Manager User Manual 10/2012 EIO0000001315.00 www.schneider-electric.com The information provided
More informationSecurity Annex for Firewalls Additional Terms for Firewall Service
CONTENTS 1 Glossary of Terms & Definitions... 2 2 Service Description... 2 2.1 Firewall Service... 2 2.2 Provisioning... 2 3 Firewall throughput... 3 4 Vendor Change... 3 5 Charges... 3 5.1 Charges payable
More informationSchedule document N4MDM. PUBLIC Node4 limited 31/11/2018. Node4 Limited Millennium Way Pride Park Derby DE24 8HZ
Schedule document N4MDM PUBLIC Node4 limited 31/11/2018 Schedule document N4MDM This Schedule contains additional terms, Service Description & Service Level Agreement applicable to the N4 End Point Management
More informationSCHEDULE DOCUMENT N4MDM PUBLIC NODE4 LIMITED 13/07/2017. Node4 Limited Millennium Way Pride Park Derby DE24 8HZ
SCHEDULE DOCUMENT N4MDM PUBLIC NODE4 LIMITED 13/07/2017 SCHEDULE This Schedule contains additional terms, Service Description & Service Level Agreement applicable to the N4 End Point Management Service
More informationChartered Membership: Professional Standards Framework
Chartered Membership: Professional Standards Framework Foreword The Chartered Institute of Architectural Technologists (CIAT) is the lead professional body for Architectural Technology and the UK Competent
More informationBT One Mobile Secure Devices (MobileIron) Schedule to the General Terms
BT One Mobile Secure Devices (MobileIron) Schedule to the General Terms Contents A note on you... 2 Words defined in the General Terms and Schedule... 2 Part A The BT One Mobile Secure Devices (MobileIron)
More informationONE OFFICE LITE - PRODUCT SPECIFICATION
1. INTRODUCTION ONE OFFICE LITE - PRODUCT SPECIFICATION This document contains product information for the One Office Lite service. If you require more detailed technical information, please contact your
More informationCalling Line Identification (CLI) Code of Practice
Calling Line Identification (CLI) Code of Practice Information Notice 05/02 Gibraltar Regulatory Authority Suite 603, Europort, Gibraltar Telephone: +350 20074636 Fax: +350 20072166 Website: www.gra.gi
More informationAir Transport & Travel Industry. Principles, Functional and Business Requirements PNRGOV
Air Transport & Travel Industry Principles, Functional and Business Requirements Version 15.1 Endorsed by WCO Council in July 2016 Table of Contents 1 INTRODUCTION... 3 1.1 PURPOSE... 3 1.2 SCOPE... 3
More informationInformation Security Controls Policy
Information Security Controls Policy Classification: Policy Version Number: 1-00 Status: Published Approved by (Board): University Leadership Team Approval Date: 30 January 2018 Effective from: 30 January
More informationThese terms are product specific terms which apply to our DSL Services.
CONDITIONS OF SERVICE - DSL SERVICES 1. ABOUT These terms are product specific terms which apply to our DSL Services. 2. APPLICATION We will supply the DSL Services to you pursuant to the terms and conditions
More informationGrid Security Policy
CERN-EDMS-428008 Version 5.7a Page 1 of 9 Joint Security Policy Group Grid Security Policy Date: 10 October 2007 Version: 5.7a Identifier: https://edms.cern.ch/document/428008 Status: Released Author:
More informationDESIGN PRACTICE NOTE AXLE COUNTER RESET
Approval Amendment Record Approval Date Version Description 09/09/2015 1 Initial issue 01/02/2016 2 Updated with issue of Works Instruction & Signal Engineering comments 31/08/2017 3 Updates with Standard
More informationBT Compute Protect Schedule to the General Terms
BT Compute Protect Schedule to the General Terms Contents A note on you... 2 Words defined in the General Terms... 2 Part A The BT Compute Protect Service... 2 1 Service Summary... 2 2 Standard Service
More informationGoogle Cloud & the General Data Protection Regulation (GDPR)
Google Cloud & the General Data Protection Regulation (GDPR) INTRODUCTION General Data Protection Regulation (GDPR) On 25 May 2018, the most significant piece of European data protection legislation to
More informationAlTrac ETCS solutions Customer focused innovation for business performance
www.thalesgroup.com AlTrac ETCS solutions Customer focused innovation for business performance Growing your business with ETCS Smart signalling is at the heart of rail transformation Every rail business
More informationProcedure for Network and Network-related devices
Lloyd s Register Type Approval System Type Approval Requirements for components within Cyber Enabled Systems on board Ships Procedure for Network and Network-related devices September 2017 1 Reference:
More informationASSURANCE CONTINUITY: CCRA REQUIREMENTS
ASSURANCE CONTINUITY: CCRA REQUIREMENTS VERSION 2.1 JUNE 2012 1 INTRODUCTION...3 1.1 SCOPE...3 1.2 APPROACH...3 1.3 CONTENTS...3 2 TECHNICAL CONCEPTS...4 2.1 ASSURANCE CONTINUITY PURPOSE...4 2.2 TERMINOLOGY...4
More informationConsolidation of the Specifications
ERTMS Users Group - UNISIG joint co-operation operation for Consolidation of the Specifications F. Camurri UNISIG P. Guido ERTMS Users Group A Collaborative Framework European Commission DB PRORAIL NETWORK
More informationIP WAN SERVICE SCHEDULE
IP WAN SERVICE SCHEDULE 1. DEFINITIONS Additional Charge means charges to be determined by Vocus on a time and materials basis in respect of installation of additional infrastructure or charges payable
More informationThales rue Grange Dame Rose Vélizy-Villacoublay - +33(0)
Thales 20-22 rue Grange Dame Rose - 78141 Vélizy-Villacoublay - +33(0)1 73 32 00 00 Email: transportation@thalesgroup.com 04/2012 - Thales 2012 THCS008-brochure_ETCS_A4_8p.indd 8 13/04/12 15:20 www.thalesgroup.com
More informationThe NIS Directive and Cybersecurity in
The NIS Directive and Cybersecurity in ehealth Dr. Athanasios Drougkas Officer in NIS Belgian Hospitals Meeting on Security Brussels 13 th October European Union Agency For Network And Information Security
More informationEUROPEAN STANDARD Global System for Mobile communication (GSM); Requirements for GSM operation on railways
Draft EN 301 515 V3.0.0 (2018-03) EUROPEAN STANDARD Global System for Mobile communication (GSM); Requirements for GSM operation on railways 2 Draft EN 301 515 V3.0.0 (2018-03) Reference REN/RT-0041 Keywords
More informationDepartment of Public Health O F S A N F R A N C I S C O
PAGE 1 of 7 Category: Information Technology Security and HIPAA DPH Unit of Origin: Department of Public Health Policy Owner: Phillip McDown, CISSP Phone: 255-3577 CISSPCISSP/C Distribution: DPH-wide Other:
More informationInformation Bulletin
Application of Primary and Secondary Reference Documents Version 1.1 Approved for release July 2014 Table of Contents 1.0 Purpose statement... 3 2.0 Audience... 3 3.0 BCA requirements and referenced documents...
More informationEco Web Hosting Security and Data Processing Agreement
1 of 7 24-May-18, 11:50 AM Eco Web Hosting Security and Data Processing Agreement Updated 19th May 2018 1. Introduction 1.1 The customer agreeing to these terms ( The Customer ), and Eco Web Hosting, have
More informationData Processing Clauses
Data Processing Clauses The examples of processing clauses below are proposed pending the adoption of standard contractual clauses within the meaning of Article 28.8 of general data protection regulation.
More informationEXIN BCS SIAM Foundation. Sample Exam. Edition
EXIN BCS SIAM Foundation Sample Exam Edition 201704 Copyright EXIN Holding B.V. and BCS, 2017. All rights reserved. EXIN is a registered trademark. SIAM is a registered trademark. ITIL is a registered
More informationEligibility for Associate Membership
Official Document AA.24 Title Version 3.3.3 Date June 2010 Eligibility for Associate Membership GSM Association Classifications Permanent Reference Document - Binding Document Owner: GSMA Board Security
More informationGC0102 Mod Title: EU Connection Codes GB Implementation Mod 3
Stage 01: Modification Proposal Grid Code GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3 Purpose of Modification: This modification (3/4) will set out within the Grid Code the following
More informationGuide for the application of the CR NOI TSI
European Railway Agency According to Framework Mandate C(2007)3371 final of 13/07/2007 Reference in ERA: ERA/GUI/07-2011/INT Version in ERA: 1.01 Date: 03 December 2013 Document prepared by Document type:
More informationService Level Agreement
Service Level Agreement General This document is a Service Level Agreement (SLA) setting out the levels of services to be provided to you by Luminet. This document must be read in conjunction with our
More informationRev 2 May Health and Safety Authority. Function and Scope of REACH and CLP Helpdesk
Rev 2 May 2011 Health and Safety Authority Function and Scope of REACH and CLP Helpdesk Introduction The EU Regulation for Registration, Evaluation, Authorisation and Restriction of Chemicals (REACH) entered
More informationARTICLE 29 DATA PROTECTION WORKING PARTY
ARTICLE 29 DATA PROTECTION WORKING PARTY 18/EN WP261 Article 29 Working Party Draft Guidelines on the accreditation of certification bodies under Regulation (EU) 2016/679 Adopted on 6 february 2018 1 THE
More informationPRIVACY IMPACT ASSESSMENT CONDUCTING A PRIVACY IMPACT ASSESSMENT ON SURVEILLANCE CAMERA SYSTEMS (CCTV)
PRIVACY IMPACT ASSESSMENT CONDUCTING A PRIVACY IMPACT ASSESSMENT ON SURVEILLANCE CAMERA SYSTEMS (CCTV) 1 Principle 2 of the surveillance camera code of practice states that the use of a surveillance camera
More informationDATA PROCESSING TERMS
DATA PROCESSING TERMS Safetica Technologies s.r.o. These Data Processing Terms (hereinafter the Terms ) govern the rights and obligations between the Software User (hereinafter the User ) and Safetica
More informationPublic Safety Canada. Audit of the Business Continuity Planning Program
Public Safety Canada Audit of the Business Continuity Planning Program October 2016 Her Majesty the Queen in Right of Canada, 2016 Cat: PS4-208/2016E-PDF ISBN: 978-0-660-06766-7 This material may be freely
More informationPolicy. Business Resilience MB2010.P.119
MB.P.119 Business Resilience Policy This policy been prepared by the Bi-Cameral Business Risk and Resilience Group and endorsed by the Management Boards of both Houses. It is effective from December to
More informationCyber Security Guidelines for Defining NIAP Scope Statements
Cyber Security Guidelines for Defining NIAP Scope Statements Version 1.1 Author: Cyber Security Policy and Standards Document Published Date: June 2018 Document History: Version Description Date 1.0 Published
More informationCommon Understanding 10/2014 Implementation of Article 6(5) of the Commission Regulation (EU) 73/2010
Common Understanding 10/2014 Implementation of Article 6(5) of the Commission Regulation (EU) 73/2010 Edition: 1.2 Date: 20 October 2016 Reference: ARWG CU 10/2014 1/6 1. INTRODUCTION This document describes
More informationETSI TS V8.0.0 ( )
TS 101 180 V8.0.0 (2000-05) Technical Specification Digital cellular telecommunications system (Phase 2+); Security mechanisms for the SIM Application Toolkit; Stage 1 (GSM 02.48 version 8.0.0 Release
More informationNetwork Code on Emergency and Restoration - Implementation Guide for the Communication Systems Requirements. Final VERSION
Network Code on Emergency and Restoration - Implementation Guide for the Communication Systems Requirements Final VERSION September 2018 1 TABLE OF CONTENTS 1 INTRODUCTION... 3 1.1 COMMUNICATION SYSTEM
More informationNICC ND 1636 V1.2.2 ( )
NICC ND 1636 V1.2.2 (2012-03) NICC Document NGN Interconnect IP Address Allocation Michael Faraday House, Six Hills Way, Stevenage SG1 2AY Tel.: +44(0) 20 7036 3636 Registered in England and Wales under
More informationBT One Cloud Cisco UK Schedule to the General Terms
BT One Cloud Cisco UK Schedule to the General Terms Contents A note on you... 2 1 Service Summary... 2 2 Standard Service Components... 2 3 Service Options... 2 4 Service Management Boundary... 3 5 Associated
More informationGuidelines. on the security measures for operational and security risks of payment services under Directive (EU) 2015/2366 (PSD2) EBA/GL/2017/17
GUIDELINES ON SECURITY MEASURES FOR OPERATIONAL AND SECURITY RISKS UNDER EBA/GL/2017/17 12/01/2018 Guidelines on the security measures for operational and security risks of payment services under Directive
More informationAMCP/4-WP/70. b) requirements and recommendations together with their rationale; and
Appendix A to the Report on Agenda Item 3 3A-1 APPENDIX A VHF DIGITAL LINK (VDL) DESIGN GUIDELINES 1. INTRODUCTION 1.1 In the absence of a comprehensive and detailed set of operational requirements, the
More informationPrivacy Impact Assessment
Automatic Number Plate Recognition (ANPR) Deployments Review Of ANPR infrastructure February 2018 Contents 1. Overview.. 3 2. Identifying the need for a (PIA).. 3 3. Screening Questions.. 4 4. Provisions
More informationNext Generation IP technology. The Railway PRO Investment Summit October 7, 2015 Bucharest Andrei Vuţă
Next Generation IP technology The Railway PRO Investment Summit October 7, 2015 Bucharest Andrei Vuţă Main considerations Railways are happy with GSM-R and wish to keep it as long as possible (UIC). But,
More informationUK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History
RP unique number: GI-UKEPR-CI-01-RP 0 30/06/2011 1 of 19 Approved for EDF by: A. PETIT Approved for AREVA by: C. WOOLDRIDGE Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011 Resolution Plan History
More informationSTCP 18-3 Issue 006 TEC Changes
STCP 18-3 Issue 006 TEC Changes STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc. Scottish Hydro-Electric
More informationNetwork Security Policy
Network Security Policy Date: January 2016 Policy Title Network Security Policy Policy Number: POL 030 Version 3.0 Policy Sponsor Policy Owner Committee Director of Business Support Head of ICU / ICT Business
More informationSYSTEMKARAN ADVISER & INFORMATION CENTER. Information technology- security techniques information security management systems-requirement
SYSTEM KARAN ADVISER & INFORMATION CENTER Information technology- security techniques information security management systems-requirement ISO/IEC27001:2013 WWW.SYSTEMKARAN.ORG 1 www.systemkaran.org Foreword...
More informationIT Governance ISO/IEC 27001:2013 ISMS Implementation. Service description. Protect Comply Thrive
IT Governance ISO/IEC 27001:2013 ISMS Implementation Service description Protect Comply Thrive 100% guaranteed ISO 27001 certification with the global experts With the IT Governance ISO 27001 Implementation
More informationGuidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679)
Guidelines 4/2018 on the accreditation of certification bodies under Article 43 of the General Data Protection Regulation (2016/679) Adopted on 4 December 2018 Adopted 1 Contents 1 Introduction... 3 2
More informationQUICKLINE PREMIUM CLASS SERVICE LEVEL AGREEMENT Includes the non-financially backed Premium Class and Premium Plus SLA
QUICKLINE PREMIUM CLASS SERVICE LEVEL AGREEMENT Includes the non-financially backed Premium Class and Premium Plus SLA Rev SLAQPC06052016SJ Please Note: This may not be the newest version of this document;
More information