1 Building a Topology Estimator for Large Inter-regional Networks ETREP02.pdf Robin Podmore *, Margaret Goodrich**, David Becker***, Peter Hirsch***, Stephen Lee ***, Marck Robinson**** robin@incsys.com, margaret@psycor.com, dbecker@epri.com, phirsch@epri.com, slee@epri.com, marck@powerdata.com *Incremental Systems Corporation, 194th Ave. S.E., Issaquah, WA, **Psycor International, P.O. Box 2106, Malakoff, Texas ***Electric Power Research Institute, 3412 Hillview Ave., Palo Alto, CA, ****PowerData Corporation, S.E. 54 th Place, Bellevue, WA Abstract The Common Information Model (CIM) [1] defines a utility industry standard object-model for the development and integration of applications used for electric power systems engineering, planning, management, operation and commerce. This paper describes the scope and technical basis for a project to develop a real-time Common Information Model (CIM) for the entire Eastern Interconnection. The project, which also features an automatic real-time network topology estimator, could have farreaching implications for on-line security assessment in North America. The project will be implemented using the ICCP, CIM and Common Data Access (CDA) Application Program Interface (API) standards sponsored by the Electric Power Research Institute. Wide Area Models Needed In the area of power grid operation, the energy industry in North America faces a variety of challenges. Foremost among these is the difficulty of continuing to ensure secure grid operation in an open access environment. Electric load continues to grow at a steady rate, yet North American transmission system additions have slowed to a crawl. These facts, combined with mandated open access to transmission systems, are forcing the industry to operate the power grid closer to its operating limits. Pushing the system to its limits for maximum economic benefit while maintaining adequate security margins requires on-line security assessment. This, in turn, requires real-time models for the entire interconnected system network. Currently, at the interconnection level, this responsibility is assigned to regional Security Coordinators as shown in Figure 1. Each Security Coordinator is responsible for monitoring the overall security of the system for their region. The Security Coordinator Computer Systems are based on Energy Management Systems from a variety of suppliers. These systems include Topology Processor, State Estimator, Contingency Analysis and Dispatcher Powerflow applications. The Security Coordinator Systems are connected using the Interregional Security Network (ISN) Nodes with the ICCP protocol. The nodes all connect to the NERC ISN Frame Relay Network. Control Area Computer Systems are those systems that perform data acquisition, supervisory control, automatic generation control and possibly network analysis functions. The Control Area Computer Systems have the /00 $10.00 (c) 2000 IEEE 1

2 connections to the field devices via their RTUs. The Control Area Computers are the primary source of the measurements for the ISN. The Control Area Computer Systems link to the Security Coordinators primarily using the ICCP protocol. The operation of the ISN requires that the participants exchange a vast amount of realtime, modeling and scheduling information. This exchange must take place between systems and applications that are supplied by a diverse range of vendors. In order for the systems to be implemented in a timely manner and maintained with a reasonable amount of manpower it is essential that open industry standards such as ICCP and CIM be used wherever possible. Some progress has been made in the area of wide area modeling. Real-time operational models have been built for control areas, and are now being built for Security Coordinators (SCs) and independent system operators (ISOs). An effort currently underway is converting such models to a Common Information Model (CIM) format so that they can be shared between different control areas, SCs, and ISOs. The SC models are being built by merging the models of the individual control areas. Yet, development of a real-time model for the entire Eastern or Western Interconnection has not yet been attempted. The real-time CIM will support FERC s recent NOPR guidelines on regional transmission organizations (RTOs). In short, a real-time CIM can act as the modeling foundation for an RTO. By implementing real-time CIMs at SCs, a new RTO that consolidates some of these SCs is able to more quickly implement real-time power applications. In fact, this approach is likely to save 1-2 years in construction of models that meet RTO needs. The alternative of not using the CIM means that RTO modeling cannot begin until a proprietary EMS vendor format is selected. Better Topology Estimation Required On-line security assessment also requires accurate state estimator (SE) results. An SE assumes that the network topology is known before it estimates the voltages and angles for the entire system. If the actual network topology is not as assumed, the results of the SE are incorrect, adversely impacting on-line security assessment. SE engineers typically make needed corrections to the topology assumptions manually at the control area level. However, when an extra large model is developed (such as an Interconnection-wide model), an automated method of identifying topology errors is essential. This paper describes the scope of a project to build a real-time CIM for the Eastern Interconnection, as well as a Topology Estimator that will automatically determine the accurate network topology in real time to support on-line security applications for the Eastern Interconnection. The objectives of this project include the following: To build a real-time operational model of the Eastern U.S. and Canada interconnected systems. To enable the NERC Interchange Distribution Calculator (IDC) models to be updated using real-time topology information. To provide tools to facilitate integration of the NERC Inter-Regional Security Network (ISN) data with operational models. To demonstrate the feasibility of using the Common Data Access (CDA) Application Program Interface (API) for integrating applications distributed at different SCs. Project Overview The project team would consist of several vendors and their respective software applications would be integrated using the CIM and the CDA API. Real-time CIM software would be installed at designated SCs. The Multiregional Modeling Working Group (MMWG) would be provided with the operational models of the SCs, enabling the group to reconcile differences between the SC energy management system (EMS) models and MMWG planning model. Then, the project would implement a topology estimator interface for the IDC. The project will convert proprietary EMS models into the industry standard CIM, enabling /00 $10.00 (c) 2000 IEEE 2 2

3 their accessibility using the CDA API. The project will also allow operators to view oneline displays of all major stations in the Eastern U.S. via a Web browser. When operational problems occur across SC boundaries, these displays will provide operators a common basis for analyzing problems and developing solutions. This project supports NERC s IDC. The CIM and CDA infrastructure will be established to support applications such as IDC that need realtime information and operational models from multiple SCs. The Anatomy of a Real-Time CIM Examining each key element of the real-time CIM shown in Figure 2 from left to right aids understanding of the system. EMS model import filters will enable import of the models for the existing SCs into the CIM and underlying database and messaging infrastructure. This process, like several others in this system, will make use of API adapters which accomplish two objectives: Ensuring that applications can be run with different database engines and messaging middle-ware using the exact same API. Insulating application developers from the complexity of the CIM. An Inter-Control Center Communication Protocol (ICCP) data link will support real-time information exchange between the CIM database and external systems (e.g., EMS) using the ICCP protocol. This data link allows bi-directional exchange of analog, status and accumulator data. These data are stored in the measurement table of the CIM so that they are accessible via the CDA API. If available, results of the SC topology processor and State Estimator will also be transferred over the ICCP interface. One of the key elements in this real-time CIM for an SC is the topology estimator. This software automates the process of identifying network topology errors. For example, it will verify that MW flows on open lines are zero, verifies that the summation of flows into a bus are zero, and verifies that the summation of angle differences around a closed loop are zero. In real-time, the topology estimator determines the accurate network topology to support on-line security applications. The system will also feature a CDA interface to other SCs and the IDC. The Common Data Access services are defined to meet the requirements that are encountered in building mission-critical, high-availability, real-time Energy Management Systems and Distribution Management Systems. The services that are important for an application developer in this environment include the following: Get object attributes Update object attributes Get attribute extent Update attribute extent Create object Delete object Create attribute Delete attribute Query to determine attributes Structure Changed Event (An object has been created or deleted) Value(s) Changed Event Data Source Lock and Unlock Query to determine services supported The Get/Update attribute extent, Structure Changed Event and Value(s) Changed Event have been specifically included to meet the real-time requirements of EMS systems. These services are not commonly supported by commercial database management systems. The CDA API supports the request-reply processing communication style that is typical for client server databases. A client requests information from the component. The client waits until the component replies with a response. This is a synchronous or pull model of communication. The CDA API also supports event driven or asynchronous or push models of communications. The client registers for a call back when a component event occurs. Upon receiving the call back, the client can query the component for additional information. This event driven feature is critical for real-time systems. If this feature is not available the clients have to constantly poll the component, asking if there have been any changes. This provides an excessive load on the component server and the network if the response times are to be kept small. Component developers will be able to implement to a subset of the CDA services and still provide a /00 $10.00 (c) 2000 IEEE 3 3

4 valuable facility. An application or user can query the Component to determine what services are supported. At the bottom of Figure 2, three graphical user interface applications will enable users to access one-line diagrams and tabular displays from real-time CIMs using a Web browser. These diagrams and displays will be dynamically updated whenever real-time values change. The one-line viewer offers graphical schematics, updated in real-time. The one-line editor enables operators to arrange these schematics, and the one-line auto builder enables automatic construction of schematics from the CIM database. The applications at an individual SC will be tightly coupled. Each application will need to be coordinated to work with a single consistent database. For example, if a new database modification is being installed, the Topology Estimator should not be updating this with a new solution. Applications will need to read from and write to the CIM. Figure 3 shows how various real-time CIMs at the SCs will be able to communicate via the NERC ISN. The real time CIMs at the different SCs will be loosely integrated. Database configuration changes can be made at each of the SCs independently. Each SC will publish an event when its database is updated and the other SCs will be able to receive the required modifications and then adjust their external models. The IDC, control area, and MMWG users will also be plugged into the network. The IDC estimates the flow impact of each interchange transaction on the flow gates of the Eastern Interconnection by computing power transfer distribution factors (PTDF) and outage transfer distribution factors (OTDF). The latter models the effect of a limited number of critical contingencies for certain flow gates. Upon the request from a SC to relieve congestion on a flow gate, the IDC computes a list of transactions that can be curtailed in a priority order. The IDC depends upon accurate information on the status of the lines and the bus splits in the entire interconnection. Currently, this information is input to the IDC manually. The real-time CIMs and the Topology Estimator will allow this information to be updated automatically in real-time. The IDC will subscribe to the results published by each of the Topology Estimators at the SCs. The IDC will selectively register to receive information concerning the high voltage network. Summary This paper has described a practical approach for implementing a Topology Estimator for large interconnected networks such as the Eastern U.S. and Canada. The approach is based upon a distributed network in which calculations are performed at each of the SCs. Each SC has responsibility for check out and maintenance of the topological model for its own area. With the distributed approach it is not necessary to build a single interconnection wide database that has details of all the switches and breakers in the entire interconnection. An application such as the IDC that requires information on the entire interconnection subscribes to receive the line energization status and bus split information from each SC. This information supports building an accurate realtime bus branch model for the entire interconnection. By using industry standards, such as ICCP and CIM and off the shelf software components, multiple vendors can participate in delivery of the various subsystems. The system will establish an architecture and the industry standard interfaces so that other applications that require data to be shared between SCs can be integrated. The approach takes advantage of the existing MMWG model. In future with data warehousing in place at the SCs it will be possible to automatically generate an MMWG model for the entire interconnection based on actual recorded data /00 $10.00 (c) 2000 IEEE 4 4

5 References [1] EPRI. Guidelines for Control Center Application Program Interfaces. Final Report for Project , EPRI Report Number TR , June /00 $10.00 (c) 2000 IEEE 5 5

6 MARITIMES HQ BPA MAPP OH NYISO ISONE MECS WAPA MAIN AEP ECAR APS VP PJM CAISO ENTERGY SPP TVA DUKE SCS ERCOT SECURITY COORDINATORS ISN NODES FP&L Figure 1: NERC Security Coordinators and Inter-regional Security Network (ISN) Nodes /00 $10.00 (c) 2000 IEEE 6 6

7 EMS Data Base EMS Import Filter ICCP Data Link Topology Estimator Remote CDA Interface to other SCs and IDC CDA API EPRI Common Information Model Database and Messaging Infrastructure CDA API One-line Viewer One-line Editor One-line Auto Builder Figure 2: Real-time Common Information Model for Security Coordinators SC#! SC#2 SC#3 SC#4 SC#5 NERC ISN IDC Control Areas SC, CA and MMWG users Figure 3: Integration of Real Time CIMs with the NERC ISN /00 $10.00 (c) 2000 IEEE 7 7

AC-DC ERCOT. Bill Bojorquez Dejan J. Sobajic ERCOT Grid Engineering LLC. June 6, 2005 Les Diablerets, Switzerland

AC-DC ERCOT. Bill Bojorquez Dejan J. Sobajic ERCOT Grid Engineering LLC. June 6, 2005 Les Diablerets, Switzerland The 8 th Electric Power Control Centers Workshop June 5-8, 2005, Les Diablerets, Switzerland Panel Session "Monitoring and Control of Large Interconnections under Normal and Emergency Operating Conditions"

More information

Common Information Model A Developer s Perspective

Common Information Model A Developer s Perspective Proceedings of the 32nd Hawaii International Conference on System Sciences 999 Proceedings of the 32nd Hawaii International Conference on System Sciences - 999 Common Information Model A Developer s Perspective

More information

Wide Area Measurements & Control Systems

Wide Area Measurements & Control Systems The 8 th Electric Power Control Centers Workshop June 5-8, 2005, Les Diablerets, Switzerland Wide Area Measurements & Control Systems NERC Security Coordinators and Interregional Security Network Nodes

More information

Simulation Environment for Development and Testing of Plug Compatible Power System Applications

Simulation Environment for Development and Testing of Plug Compatible Power System Applications Simulation Environment for Development and Testing of Plug Compatible Power System Applications CSIMG02 Robin Podmore*, Marck Robinson**, Anjan Bose***, robin@incsys.com, marck@powerdata.com, bose@wsu.edu,

More information

Proposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time Study Models November 12, 2013

Proposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time Study Models November 12, 2013 Proposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time November 12, 2013 Rationale Background Interconnection wide powerflow and dynamics cases are currently

More information

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005 Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency Presented to TAC on April 5, 2005 and PAC on April 22, 2005 Background Power Grid has evolved from a vertically integrated

More information

Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security

Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security CERTS Briefing for Kevin Kolevar, Director Office of Electricity and Energy Assurance Department of Energy Washington,

More information

Operating Reliability Subcommittee Presentations. February 10-11, 2015

Operating Reliability Subcommittee Presentations. February 10-11, 2015 Operating Reliability Subcommittee Presentations February 10-11, 2015 Presentation 1 ORS February 10, 2015 EInet Transition Efforts All current RC nodes on NERCNet have placed orders for new network EIDSN

More information

Wide-Area Reliability Monitoring and Visualization Tools

Wide-Area Reliability Monitoring and Visualization Tools OE Visualization and Controls Peer Review Wide-Area Reliability Monitoring and Visualization Tools Carlos Martinez CERTS - Electric Power Group 21 October 2008 Washington, D.C. Presentation Outline Research

More information

INTEGRATING A GIS AND DMS SYSTEM USING OBJECT-ORIENTED TECHNOLOGY WITH AN EXTENDED EPRI MODEL FOR DISTRIBUTION

INTEGRATING A GIS AND DMS SYSTEM USING OBJECT-ORIENTED TECHNOLOGY WITH AN EXTENDED EPRI MODEL FOR DISTRIBUTION INTEGRATING A AND SYSTEM USING OBJECT-ORIENTED TECHNOLOGY WITH AN EXTENDED EPRI MODEL FOR DISTRIBUTION Erich Würgler Telegyr Systems Corp. Gartenstadtstr. 2a, CH-6301 Zug (Switzerland) Tel: +41 41 724

More information

Grid Protection Alliance NYISO 2010 Smart Grid Vendor Forum. December 9, 2010

Grid Protection Alliance NYISO 2010 Smart Grid Vendor Forum. December 9, 2010 Grid Protection Alliance NYISO 2010 Smart Grid Vendor Forum December 9, 2010 1 Who is GPA? A not-for-profit corporation to support the utility industry The Grid Solutions Division of GPA is an open-source

More information

N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL

N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL Michehl R. Gent President and CEO N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL Princeton Forrestal Village, 116-390 Village Boulevard, Princeton, New Jersey 08540-5731 The Honorable Patrick H. Wood III,

More information

Chapter 2 State Estimation and Visualization

Chapter 2 State Estimation and Visualization Chapter 2 State Estimation and Visualization One obvious application of GPS-synchronized measurements is the dynamic monitoring of the operating conditions of the system or the dynamic state estimation

More information

Comments by the Northeast Power Coordinating Council FERC Reactive Power Technical Conference

Comments by the Northeast Power Coordinating Council FERC Reactive Power Technical Conference Introduction The Northeast Power Coordinating Council 1 (NPCC) is an international electric regional reliability council formed shortly after the 1965 Northeast Blackout to promote the reliability and

More information

SOUTH TEXAS ELECTRIC COOPERATIVE, INC.

SOUTH TEXAS ELECTRIC COOPERATIVE, INC. SOUTH TEXAS ELECTRIC COOPERATIVE, INC. P.O. Box 119 Nursery, Texas 77976 (361) 575-6491 Fax (361) 576-1433 Transmission Interconnection Requirements Table of Contents I. Introduction II. Interconnection

More information

LAKE ERIE EMERGENCY RE-DISPATCH OPERATIONS MANUAL. September 2001

LAKE ERIE EMERGENCY RE-DISPATCH OPERATIONS MANUAL. September 2001 LAKE ERIE EMERGENCY RE-DISPATCH OPERATIONS MANUAL September 2001 TABLE OF CONTENTS INTRODUCTION...3 SECTION A: GENERATION SHIFT FACTORS...4 SECTION B: COMMUNICATIONS PROTOCOLS...ERROR! BOOKMARK NOT DEFINED.

More information

2017 RTEP Assumptions for Western Sub-Region

2017 RTEP Assumptions for Western Sub-Region CLICK TO EDIT MASTER TITLE STYLE Click to edit Master text styles 2017 RTEP Assumptions for Western Sub-Region CLICK 2017 RTEP TO EDIT Assumptions MASTER TITLE STYLE Click Duquesne to edit uses Master

More information

Rationale for the Use of Local and Remote (Zone 3) Protective Relaying Backup Systems A Report On The Implications And Uses Of Zone 3 Relays

Rationale for the Use of Local and Remote (Zone 3) Protective Relaying Backup Systems A Report On The Implications And Uses Of Zone 3 Relays Rationale for the Use of Local and Remote (Zone 3) Protective Relaying Backup Systems A Report On The Implications And Uses Of Zone 3 Relays Prepared by the System Protection and Control Task Force of

More information

Feasibility Study on Load Flow and Short Circuit Project

Feasibility Study on Load Flow and Short Circuit Project Feasibility Study on Load Flow and Short Circuit Project 101813-01 Prepared by: Transmission Planning Department Cleco Corporation, Inc. 2180 St. Landry Hwy P.O. Box 70 St. Landry, LA 71367 Final November

More information

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities Concept White Paper Concepts for Proposed Content of Eventual Standard(s) for Project 2009-02: Real-Time Monitoring and Analysis Capabilities Real-time Monitoring and Analysis Capabilities Standard Drafting

More information

Introduction to the NYISO

Introduction to the NYISO Introduction to the NYISO Power Control Center Guilderland, NY July 21, 2011 1 Today s Topics NYISO History NYISO Roles & Governance NYISO Markets Building Reliability Emerging Trends 2 Evolution of the

More information

Electric Transmission and Distribution Future R&D Needs

Electric Transmission and Distribution Future R&D Needs Electric Transmission and Distribution Future R&D Needs Planning, Operation, Control, and Visualization The Center for Advanced Power Systems Florida State University, Tallahassee, Florida February 1,

More information

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012 CAISO Metering & Telemetry Requirements Jeremy Laundergan - Director, EnerNex November 8, 2012 Background and Overview Both federal and state regulatory authorities are advocating the participation of

More information

Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September

Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September 23, 2009 TABLE OF CONTENTS INTRODUCTION A. RESPONSIBILITIES

More information

Network Model Management PSS ODMS

Network Model Management PSS ODMS Network Model Management PSS ODMS usa.siemens.com/digitalgrid Network Model Management Goals Consolidate power system modeling functions across domains Manage shared modeling data in single source master

More information

Report on the Common Information Model (CIM) Extensible Markup Language (XML) Interoperability Test #4

Report on the Common Information Model (CIM) Extensible Markup Language (XML) Interoperability Test #4 Report on the Common Information Model (CIM) Extensible Markup Language (XML) Interoperability Test #4 The Power of the CIM to Exchange Power System Models Technical Report Report on the Common Information

More information

Phasor Technology Research Roadmap for the Grid of the Future

Phasor Technology Research Roadmap for the Grid of the Future Phasor Technology Research Roadmap for the Grid of the Future Briefing for Secretary of Energy Samuel W. Bodman and OEDER Director Kevin Kolevar May 15, 2006 Briefing Summary EIPP started in 2002 to address

More information

Quarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan

Quarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan Quarter 3, (Q3) Generation Deliverability Assessment Study Plan Background and Purpose of Study Phases I & II Generation and Import Deliverability Studies were completed that established the deliverability

More information

Essential Reliability Services NERC Staff Report

Essential Reliability Services NERC Staff Report Essential Reliability Services NERC Staff Report Mark Lauby, Senior Vice President and Chief Reliability Officer Annual Meeting of the National Conference of State Legislators August 20, 2014 About NERC

More information

Order No Assessment of Protection System Single Points of Failure Based on the Section 1600 Data Request. September, 2015

Order No Assessment of Protection System Single Points of Failure Based on the Section 1600 Data Request. September, 2015 Order No. 754 Assessment of Protection System Single Points of Failure Based on the Section 1600 Data Request System Protection and Control Subcommittee (SPCS) and System Modeling and Analysis Subcommittee

More information

Ali Abur Northeastern University Department of Electrical and Computer Engineering Boston, MA 02115

Ali Abur Northeastern University Department of Electrical and Computer Engineering Boston, MA 02115 Enhanced State t Estimation Ali Abur Northeastern University Department of Electrical and Computer Engineering Boston, MA 02115 GCEP Workshop: Advanced Electricity Infrastructure Frances Arriallaga Alumni

More information

Final Report, January EPRI Project Manager D. Becker

Final Report, January EPRI Project Manager D. Becker Interoperability Test #9 of the Generic Interface Definition (GID) and the Common Information Model (CIM) The Power of the Common Information Model (CIM) and Generic Interface Definition (GID) to Exchange

More information

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure 1 2 3 Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure MISO Functions Served by the Network Model by the

More information

Software Technologies

Software Technologies The Power of Trust. The Future of Energy. MAINTAINING GRID SECURITY Analysis tools for off-line and on-line Dynamic Security Assessment 02 Maintaining grid security is a fundamental requirement for power

More information

Interconnection and Transmission

Interconnection and Transmission Interconnection and Transmission Gary L. Brown, P.E. Director of Energy Development Gary@ZGlobal.biz 916-985-9461 Kevin Coffee Energy Management Committee Meeting Irvine, California August 26, 2015 Interconnection

More information

REAL-TIME MONITORING DATA SPECIFICATION

REAL-TIME MONITORING DATA SPECIFICATION REAL-TIME MONITORING DATA SPECIFICATION Version 1 December 9, 2016 Revision History Version Date Reviewer Revisions 1 11/1/16 Mansion Hudson Initial document 1 Contents 1. DOCUMENT REVIEW... 3 2. DEFINITIONS...

More information

RELIABILITY OF THE BULK POWER SYSTEM

RELIABILITY OF THE BULK POWER SYSTEM RELIABILITY OF THE BULK POWER SYSTEM Jim Burley, VP of Compliance, Mitigation and Standards October 26, 2011 Promoting RELIABILITY and Mitigating RISKS to the Bulk Power System Context In the Beginning-2003

More information

Peak Reliability Coordination Services in the West March 30, 2018

Peak Reliability Coordination Services in the West March 30, 2018 Peak Reliability Coordination Services in the West March 30, 2018 Peak Reliability, 2018. 1 Peak Reliability Coordination Services in the West Peak s fundamental mission is to enhance and promote the reliability

More information

Achieving Smarter Grid Operation With On-Line DSA Technology

Achieving Smarter Grid Operation With On-Line DSA Technology Achieving Smarter Grid Operation With On-Line DSA Technology Powercon 2014 October 20-22, 2014, Chengdu, China Lei Wang Powertech Labs Inc. 12388 88 th Avenue Surrey, BC, Canada A very simple version of

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure No. Table of Contents Purpose... 1 1. Responsibilities... 2 2. Scope/ Applicability... 2 2.1. Background... 2 2.2. Scope... 2 2.3. Applicability... 3 3. Detail... 3 3.1. Format and Security Protocols...

More information

Overview of DSASP; Telemetry/Communication Alternatives

Overview of DSASP; Telemetry/Communication Alternatives Overview of DSASP; Telemetry/Communication Alternatives The New York Independent System Operator Price Responsive Load Working Group May 12, 2010 Agenda Overview of DSASP Market Rules Current Communications/Telemetry

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.

More information

Date adopted/approved 02/08/2013 Custodian (entity responsible for maintenance and upkeep) Data Exchange Work Group. Web URL: Previous name/number

Date adopted/approved 02/08/2013 Custodian (entity responsible for maintenance and upkeep) Data Exchange Work Group. Web URL: Previous name/number Document name Category Guideline for WECC Operations Network Node: Responsibilities and Procedures ( ) Regional Reliability Standard ( ) Regional Criteria ( ) Policy (X) Guideline ( ) Report or other (

More information

Smart Grid Application of Optimal Transmission Switching

Smart Grid Application of Optimal Transmission Switching Smart Grid Application of Optimal Transmission Switching By, Kory W. Hedman, et al.* University of California, Berkeley INFORMS Annual Meeting Washington, DC October 15, 2008 *Dr. Richard P. O Neill (Chief

More information

Categorizing Cyber Systems

Categorizing Cyber Systems Categorizing Cyber Systems An Approach Based on BES Reliability Functions NERC Cyber Security Standards Drafting Team for Order 706 06/15/2009 Team CATEGORIZING CYBER SYSTEMS: AN APPROACH BASED ON IMPACT

More information

GridEx IV Initial Lessons Learned and Resilience Initiatives

GridEx IV Initial Lessons Learned and Resilience Initiatives GridEx IV Initial Lessons Learned and Resilience Initiatives LeRoy T. Bunyon, MBA, CBCP Sr. Lead Analyst, Business Continuity 2017 GridEx IV GridEx is a NERC-sponsored, North American grid resilience exercise

More information

Strategy Consulting Digital Technology Operations. Transmission Distribution SCADA Separation 2017 EMMOS Conference

Strategy Consulting Digital Technology Operations. Transmission Distribution SCADA Separation 2017 EMMOS Conference Strategy Consulting Digital Technology Operations Transmission Distribution SCADA Separation 2017 EMMOS Conference SCADA for Electric Utility Operations The SCADA platform is at the heart of Electric Utility

More information

Addressing Challenges Through Interconnection Wide

Addressing Challenges Through Interconnection Wide Addressing Challenges Through Interconnection Wide Transmission Analysis High Plains Regional Transmission Summit November 3, 2009 David A. Whiteley, Whiteley BPS Planning Ventures LLC 2 Challenge and

More information

Model Parts and Assembly. Jay Britton Britton Consulting LLC

Model Parts and Assembly. Jay Britton Britton Consulting LLC Model Parts and Assembly Jay Britton Britton Consulting LLC jay.britton@comcast.net WG13 Ref Model for a Network Analysis Case Physical Network Model Parts Repository Full Model Parts Incremental Model

More information

Power System Controls

Power System Controls Power System Controls Control Schemes Ref: A. P. Meliopoulos, Power System Modeling, 1990-2006 Voltage Control The objective of this control loop is to regulate the voltage at the terminals of the generator.

More information

November 29, ECE 421 Session 28. Utility SCADA and Automation. Presented by: Chris Dyer

November 29, ECE 421 Session 28. Utility SCADA and Automation. Presented by: Chris Dyer ECE 421 Session 28 November 29, 2018 Utility SCADA and Automation Presented by: Chris Dyer Utility SCADA & Automation Chris Dyer, P.E. BSEE University of Idaho, 1997 SCADA & Automation Engineer POWER Engineers,

More information

Implementation Issues for Hierarchical State Estimators

Implementation Issues for Hierarchical State Estimators PSERC Implementation Issues for Hierarchical State Estimators Final Project Report Power Systems Engineering Research Center Empowering Minds to Engineer the Future Electric Energy System Since 1996 Implementation

More information

Evolution of Control for the Power Grid

Evolution of Control for the Power Grid Evolution of Control for the Power Grid Anjan Bose Washington State University Pullman, WA, USA PaiFest In Honor of Prof. M. A. Pai Urbana-Champaign, IL October 15, 2015 The Past (before 1960s) Hard

More information

Master Resource-ID Concept Specification

Master Resource-ID Concept Specification Master Resource-ID Concept Specification Prepared By NERC DEWG Station Naming Focus Team Version 3.0 November 10, 2002 Document Revision Log Revision # Revision Date Revision Description November 6, 2000

More information

Modifications to TOP and IRO Standards

Modifications to TOP and IRO Standards Modifications to TOP and IRO Standards Jason Smith, Southwest Power Pool Industry Webinar July 22, 2016 NERC Antitrust Guidelines It is NERC's policy and practice to obey the antitrust laws to avoid all

More information

New York ISO - Dynamic Data Response. Copyr i ght 2014 O SIs oft, LLC.

New York ISO - Dynamic Data Response. Copyr i ght 2014 O SIs oft, LLC. 1 New York ISO - Dynamic Data Response Presented by Matthew Musto NYISO Dynamic Data Response As the amount of information system operators, engineers and business units face continues to grow, we are

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Appendix M... 2 Dynamic Scheduling Protocol (DSP)... 2 1. DYNAMIC SCHEDULES OF IMPORTS TO THE CAISO BALANCING AUTHORITY AREA... 2 1.2 Contractual Relationships... 2 1.3 Communications,

More information

A DNP3 Protocol Primer

A DNP3 Protocol Primer A Protocol Primer This is a primer for people who want a quick understanding of without having to comb through the tedious details of a complex specification. So let us start with what it is. Protocols

More information

Software as a Service Model for Operator Training

Software as a Service Model for Operator Training Software as a Service Model for Operator Training EPCC Dublin, Ireland June 14-17, 2009 by Robin Podmore Incremental Systems, Issaquah, WA 2008 Copyright Incremental Systems Corporation Definition Software

More information

Blackstart Hardware-in-the-loop Relay Testing Platform

Blackstart Hardware-in-the-loop Relay Testing Platform 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Blackstart Hardware-in-the-loop Relay Testing Platform R. LIU R. SUN M. TANIA Washington

More information

Evolution of Control for the Power Grid

Evolution of Control for the Power Grid Evolution of Control for the Power Grid Anjan Bose Washington State University Pullman, Washington, USA University of Seville Seville, Spain June 17, 2016 THE INTERCONNECTED GRID Economics Transfer electric

More information

Project Consideration of Commission Directives in Order No. 693

Project Consideration of Commission Directives in Order No. 693 Project 2009-02 Consideration of Commission Directives in Order Order P 905-906 Further, consistent with the NOPR, the Commission directs the ERO to modify IRO-002-1 to require a minimum set of tools that

More information

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS

More information

Consideration of Issues and Directives Project Modeling Data (MOD B) October 7, 2013

Consideration of Issues and Directives Project Modeling Data (MOD B) October 7, 2013 Project 2010-03 Modeling Data (MOD B) October 7, 2013 Para 290. Project 2010-03 - Modeling Data The Commission directs public utilities, working through NERC, to modify the reliability standards MOD- 010

More information

Midwest ISO and PJM Joint Operating Agreement (JOA) Update. Joint Stakeholder Meeting November 14, 2008

Midwest ISO and PJM Joint Operating Agreement (JOA) Update. Joint Stakeholder Meeting November 14, 2008 Midwest ISO and PJM Joint Operating Agreement (JOA) Update Joint Stakeholder Meeting November 14, 2008 JOA Update Introduction Joint Operating Agreement Main Document Initially filed in December 2003 Congestion

More information

Optimal Proxy-Limited Lines for Representing Voltage Constraints in a DC Optimal Powerflow

Optimal Proxy-Limited Lines for Representing Voltage Constraints in a DC Optimal Powerflow Optimal Proxy-Limited Lines for Representing Voltage Constraints in a DC Optimal Powerflow by Michael Schlindwein A thesis submitted in fulfillment of the requirements for the degree of Master of Science

More information

In this Lecture you will Learn: System Design. System Architecture. System Architecture

In this Lecture you will Learn: System Design. System Architecture. System Architecture In this Lecture you will Learn: System Design Chapter 13 The major concerns of system design The main aspects of system architecture, in particular what is meant by subdividing a system into layers and

More information

Standards Are Not Enough! Challenges of Interoperability. A. ESHPETER SUBNET Solutions Inc. Canada

Standards Are Not Enough! Challenges of Interoperability. A. ESHPETER SUBNET Solutions Inc. Canada 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2015 Grid of the Future Symposium Standards Are Not Enough! Challenges of 61850 Interoperability A. ESHPETER SUBNET Solutions

More information

ENTERPRISE-WIDE USES OF DIAGNOSTICS DATA

ENTERPRISE-WIDE USES OF DIAGNOSTICS DATA ENTERPRISE-WIDE USES OF DIAGNOSTICS DATA M. Kezunovic, B. Matic-Cuka A. Edris Texas A&M University Electric Power Research Institute Abstract The paper discusses how the data integration and information

More information

SDG&E s Accomplishments and Future Plans

SDG&E s Accomplishments and Future Plans SDG&E s Accomplishments and Future Plans Tariq Raman and Subbu Sankaran San Diego Gas & Electric Work Group Meeting October 23-24, 2018 San Diego Gas & Electric San Francisco SDG&E Los Angeles San Diego

More information

Final Report, March EPRI Project Manager D. Becker

Final Report, March EPRI Project Manager D. Becker Report on Interoperability Test #5 of the Generic Interface Definition (GID) Standards and the Common Information Model (CIM) Extensible Markup Language (XML) Technical Report Testing of Generic Interface

More information

Generation Interconnection Feasibility Study Report

Generation Interconnection Feasibility Study Report Project #169 Generation Interconnection Feasibility Study Report 7/2/2014 Regional Electric Transmission Planning TABLE OF CONTENTS Executive Summary... 3 Generator and Interconnection Data... 5 Study

More information

Digital Protection Past, Present, and Future

Digital Protection Past, Present, and Future Digital Protection Past, Present, and Future Eric A. Udren Quanta Technology, LLC Pittsburgh, PA Presentation for CIGRÉ Grid of the Future Symposium Boston, MA October 22, 2013 eudren@quanta-technology.com

More information

Proposed Improvements for NERC MOD Standards July 10, 2012

Proposed Improvements for NERC MOD Standards July 10, 2012 Agenda Item 3.6 Planning Committee Meeting September 18-19, 2012 Proposed Improvements for NERC MOD Standards July 10, 2012 Background This paper outlines proposed improvements for NERC Reliability Standards

More information

Coordinate Interchange

Coordinate Interchange Coordinate Interchange Purpose: The purpose of this standard is to define procedures for market participants to request the implementation of Interchange Transactions. Applicability: This Standard applies

More information

Coordinate Interchange

Coordinate Interchange Coordinate Interchange Purpose: The purpose of this standard is to define procedures for market participants to request the implementation of Interchange Transactions. Applicability: This Standard applies

More information

Modeling of RAS and Relays in Power Flow Contingency Analysis. Jamie Weber

Modeling of RAS and Relays in Power Flow Contingency Analysis. Jamie Weber Modeling of RAS and Relays in Power Flow Contingency Analysis Jamie Weber weber@powerworld.com 217 384 6330 ext. 13 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com

More information

2 nd Annual NERC Monitoring and Situational Awareness Conference: FPL s Operational Technology Center

2 nd Annual NERC Monitoring and Situational Awareness Conference: FPL s Operational Technology Center 2 nd Annual NERC Monitoring and Situational Awareness Conference: FPL s Operational Technology Center Ed Batalla Director of Grid Control Systems Florida Power & Light Company Sept. 24, 2014 Florida Power

More information

DRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1

DRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1 DRAFT Cyber Security Communications between Control Centers Technical Rationale and Justification for Reliability Standard CIP-012-1 March May 2018 NERC Report Title Report Date I Table of Contents Preface...

More information

CIM Base PMU Registry

CIM Base PMU Registry The Standards Based Integration Company Systems Integration Specialists Company, Inc. CIM Base PMU Registry John Gillerman SISCO, Inc. Tel: +1-732-937-9745 Mobile: +1-732-979-9595 Email: johng@sisconet.com

More information

Standard Authorization Request Form

Standard Authorization Request Form Title of Proposed Standard Cyber Security Request Date May 2, 2003 SAR Requestor Information Name Charles Noble (on behalf of CIPAG) Company Telephone SAR Type (Check box for one of these selections.)

More information

Regulatory Impacts on Research Topics. Jennifer T. Sterling Director, Exelon NERC Compliance Program

Regulatory Impacts on Research Topics. Jennifer T. Sterling Director, Exelon NERC Compliance Program Regulatory Impacts on Research Topics Jennifer T. Sterling Director, Exelon NERC Compliance Program The 2003 Blackout On August 14, 2003, an electric power blackout affected large portions of the Northeast

More information

2012 Grid of the Future Symposium. The Need for Next Generation Grid Energy Management System P. T. MYRDA S. GRIJALVA

2012 Grid of the Future Symposium. The Need for Next Generation Grid Energy Management System P. T. MYRDA S. GRIJALVA 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2012 Grid of the Future Symposium The Need for Next Generation Grid Energy Management System P. T. MYRDA S. GRIJALVA Electric

More information

1. Description of purpose/cause of hold/curtailment: Flowgate 6023 flow gate consists of the following elements.

1. Description of purpose/cause of hold/curtailment: Flowgate 6023 flow gate consists of the following elements. MISO Investigation Report on the NERC TLR Level 5 Event North Platte Stockville 115kV for the loss of the Gentleman Red Willow 345kV Flowgate 6023 August 22 nd / 23 rd, 2002 Report issued: September 3

More information

Electric Grid Situational Awareness

Electric Grid Situational Awareness Electric Grid Situational Awareness VERDE Visualizing Energy Resources Dynamically on Earth NASPI Meeting Tom King John Stovall Where is Oak Ridge, TN? U. S. DEPARTMENTOF ENERGY ORNL is DOE s largest multipurpose

More information

ENERGY MANAGEMENT SYSTEM. ABB Ability Network Manager EMS Operational confidence.

ENERGY MANAGEMENT SYSTEM. ABB Ability Network Manager EMS Operational confidence. ENERGY MANAGEMENT SYSTEM ABB Ability Network Manager EMS Operational confidence. 2 ABB ABILITY NETWORK MANAGER EMS ABB Ability Network Manager Energy Management System The ever-increasing demand for power

More information

2014 Reliability Leadership Summit

2014 Reliability Leadership Summit 2014 Reliability Leadership Summit September 11, 2014 9:00 a.m. to 4:30 p.m. Washington Marriott at Metro Center 775 12th St NW, Washington, DC RELIABILITY ACCOUNTABILITY 3353 Peachtree Road NE Suite 600,

More information

USE CASE 14 CONTROLLED ISLANDING

USE CASE 14 CONTROLLED ISLANDING I USE CASE 14 CONTROLLED ISLANDING Use Case Title Centralized application separates grid into islands to prevent blackout Use Case Summary Controlled islanding is a method that can significantly improve

More information

Report on the Common Information Model (CIM) Extensible Markup Language (XML) Interoperability Test #3

Report on the Common Information Model (CIM) Extensible Markup Language (XML) Interoperability Test #3 Report on the Common Information Model (CIM) Extensible Markup Language (XML) Interoperability Test #3 The Power of the CIM to Exchange Power System Models Technical Report Report on the Common Information

More information

Effect of Topology Control on System Reliability: TVA Test Case

Effect of Topology Control on System Reliability: TVA Test Case Effect of Topology Control on System Reliability: TVA Test Case Professor Kory W. Hedman School of Electrical, Computer, and Energy Engineering Arizona State University Tempe, AZ 85287-5706 CIGRE, October

More information

ESINets and Map Based Location Technology Use

ESINets and Map Based Location Technology Use WHITE PAPER DEFENDING WORLD SECURITY Emergency Services IP NetworkS ESINets and Map Based Location Technology Use Page 1 The reproduction, distribution and use of this document as well as the communication

More information

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM A. Valenti* I Bel ** S. Lee *EDF **EPRI E2I ConEdison France USA USA arnaud.valenti@edf.fr

More information

Standards Authorization Request Justification

Standards Authorization Request Justification Standards Authorization Request Justification Project 2009-02 Real-time Monitoring and Analysis Capabilities NERC Report Title Report Date 1 of 30 3353 Peachtree Road NE Suite 600, North Tower Atlanta,

More information

Model Driven Integration Using CCAPI Technologies

Model Driven Integration Using CCAPI Technologies Model Driven Integration Using CCAPI Technologies 2002 EMS Users Conference Ralph Mackiewicz, SISCO Inc. Agenda What is Model Driven Integration? Common Information Model Model Driven Messaging Model Aware

More information

Project Modifications to BAL Frequency Response and Frequency Bias Setting. Industry Webinar December 18, 2018

Project Modifications to BAL Frequency Response and Frequency Bias Setting. Industry Webinar December 18, 2018 Project 2017-01 Modifications to BAL-003-1.1 Frequency Response and Frequency Bias Setting Industry Webinar December 18, 2018 Administrative Items North American Electric Reliability Corporation (NERC)

More information

Misoperations Information Data Analysis System (MIDAS)

Misoperations Information Data Analysis System (MIDAS) Misoperations Information Data Analysis System (MIDAS) End User Guide June 2016 NERC Report Title Report Date I Table of Contents Preface... iii Chapter 1 Reporting Obligations...1 Entities Obligated to

More information

Report on the Common Information Model (CIM) Extensible Markup Language (XML) Interoperability Test #1

Report on the Common Information Model (CIM) Extensible Markup Language (XML) Interoperability Test #1 Report on the Common Information Model (CIM) Extensible Markup Language (XML) Interoperability Test #1 The Power of the CIM to Exchange Power System Models Technical Report Report on the Common Information

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: FINAL Approved for distribution

More information

2009 SPP TransCanada Pipeline Study Report

2009 SPP TransCanada Pipeline Study Report 2009 SPP TransCanada Pipeline Study Report SPP Engineering Department, Planning Section PUBLISHED: 7/9/2009 LATEST REVISION: 7/9/2009 Copyright 2009 by Southwest Power Pool, Inc. All rights reserved. Table

More information

Grid Operations - Program 39

Grid Operations - Program 39 Grid Operations - Program 39 Program Description Program Overview In many ways, today's power system must be operated to meet objectives for which it was not explicitly designed. Today's transmission system

More information