1 Engineering Standard - Design Signalling & Operational Control Systems COMMUNICATION LINKS FOR SIGNALLING Version: 2 Issued: April 2016 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION
2 Approval Amendment Record Approval Date Version Description 20/12/ Initial issue detailing the communication links requirements for signal interlocking and train control system. 08/04/ Updated PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 2 of 8
3 Table of Contents 1. Purpose Scope Abbreviation Definitions References & Legislations Related Documents Responsibilities Background Performance Requirements Availability Performance Bit Error Rate Performance Latency Delay IP Addressing Requirements Installation Requirements Fault and status monitoring Design Review by Head of Engineering Procurement of Services Testing of Signalling Communication Links and Routes Records... 8 PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 3 of 8
4 1. Purpose This document is to specify the minimum requirements acceptable for the Signalling communications network within MTM Metropolitan Rail Network. This standard is to identify the design, installation and performance requirements. 2. Scope The Metropolitan Rail Network signalling system requires communication links between interlocking systems, train control and monitoring system (TCMS), operator workstations, object controllers and CIS interface. The content of this document is to be incorporated into all signalling design works involving the provision or re-configuration of any of the above mentioned equipment or systems associated with signalling. 3. Abbreviation ARO Accredited Rail Operator CBI IP Computer based Interlocking Internet Protocol MTM Metro Trains Melbourne HoE Head of Engineering, Metro Trains OCS Operational Control System CIS Customer Information System RAMS Reliability, Availability and Maintainability SDH Synchronous Digital Hierarchy TCMS Train Control and Monitoring System TSA Telecommunications Services Agreement between MTM and VicTrack VRIOG Victorian Rail Industry Operators Group 4. Definitions Shall Should Is used as the descriptive word to express a requirement that is mandatory to achieve conformance to the standard. Is used as the descriptive word to express a requirement that is recommended in order to achieve compliance to the standard. Should can also be used if a requirement is a design goal but not a mandatory requirement. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 4 of 8
5 Test VicTrack Test is the verification method used to verify requirements by exercising or operating the system or a part of the system using instrumentation (hardware and/or software) or special test equipment that is not an integral part of the system being verified. The test method by its nature generates data, which is recorded by the instrumentation, test equipment, or procedures. Analysis or review is performed on the data derived from the testing. OCS Telecommunications Service Provider 5. References & Legislations The following documents are referenced by this standard: VRIOGS Computer Based Interlocking L1-CHE-PRO-001 Standard Waiver Procedure 6. Related Documents The following documents are related to this standard: L1-CHE-INS-012 Design Practice Note CBI to CIS Telemetry Interface L1-CHE-POL-017 Router, Switch and Firewall Security Policy L1-CHE-POL-016 Remote Access Policy 7. Responsibilities Designers shall be responsible for ensuring all relevant system designs adhere to this standard. Project Managers, Contractors, and Service Providers shall be responsible for conformance to this standard. 8. Background VRIOGS defines signalling communications as any data transfer between the interlocking equipment, the train control and monitoring systems (TCMS), the operator workstations and the object controllers concerning the detection of signalling object states, operation of signalling objects and signalling system inputs and outputs, where this information is used for the running of trains. It also includes the transmission of train and signalling related information for the purpose of overall Metro operation. When any of the signalling interlocking systems, TCMS systems and / or object controllers are located remote from one another, the communication links and routes are required to be procured from VicTrack (under the conditions of the TSA), while local communication routes within the site are usually constructed specifically for the project as part of the signalling system provision. Ownership and ongoing maintenance of the local communication optical fibre shall transfer to VicTrack at the completion of the project. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 5 of 8
6 The signalling system is designed to incorporate redundancy and diversity so far as reasonably practicable, a requirement that shall also apply to the signal communications network. 9. Performance Requirements The following set of MTM requirements shall become the basis for design and provisioning of entire signalling communication links and routes including the associated communication equipment. 9.1 Availability Performance The design of these communication links and routes shall meet the VRIOGS requirement of a category 1 system as they serve as the primary communication backbone for signalling and in no case lower than an availability of 99.97%. 9.2 Bit Error Rate Performance Communication links shall have a bit error rate better than 1 X 10-7 VRIOGS as required in 9.3 Latency Delay Latency delays between redundant communication links and routes shall be within the tolerable limits of the signalling equipment to be provided and stipulated by the manufacturer, and in no case shall exceed 70ms. 10. IP Addressing Requirements 10.1 MTM OCS Engineering is responsible for defining and maintaining the IP addressing scheme for all signalling networks. The designer shall liaise with MTM OCS Engineering to obtain an approved IP address range for the project. 11. Installation Requirements 11.1 Redundancy and diversity shall be provided for all communication links to avoid any single point of failure Redundant communication links shall not be carried over the same conduit, cable route or hardware including lead in cables where practical 11.3 The physical cable routes shall maintain a minimum of 3 metres separation between these diverse routes throughout Note: Limitations due to physical constraints that impact on the diversity in routing are to be documented and approved by MTM in accordance with MTM Standard Waiver Procedure prior to any installation works commencing. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 6 of 8
7 11.5 Diverse routed dual redundant dedicated dark fibre optic communication links shall be provisioned between the interlocking system and the train control system located remotely at the train control centre or train control room, 11.6 Diverse routed dual redundant dedicated dark fibre optic communication links shall be provisioned between the interlocking & wayside signalling equipment In circumstances where dark fibre is not feasible between the interlocking system and the train control system, diverse routed dual redundant and protected communication links provided by VicTrack as a managed service may be considered provided there is good justification. A standards waiver shall be necessary for this Where a communication link provided by VicTrack as a managed service is utilised for the diverse route they shall be secured in a manner approved by MTM via the standards waiver. Implementation of a VPN tunnel over the managed service is MTM s preferred solution for this requirement Where new dedicated dark fibre optic communications links are provisioned by others these shall be constructed to VicTrack standards. Prior to commissioning into operational service the ownership and maintenance of the dark fibre shall be transferred to VicTrack, acceptance criteria provided by VicTrack Existing routes based on copper cables, shall be upgraded to meet the diversely routed links requirement. 12. Fault and status monitoring 12.1 For dedicated dark fibre, all associated communication equipment shall be continuously monitored and reported to an MTM designated location including notification of the failure of a redundant path 12.2 For communication links provided via VicTrack managed services, links and related transmission equipment shall be continuously monitored by the VicTrack management system and fault logs stored for retrieval at any time. Active network equipment maintained by MTM shall be continuously monitored and reported to an MTM designated location Fault logs shall be maintained for a minimum period of six months at the time of retrieval for any type of system implementation. 13. Design Review by Head of Engineering 13.1 The overall communications network design shall be subject to acceptance and sign off by the HoE OCS Acceptance of VicTrack proposals shall require sign off by the HoE OCS PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 7 of 8
8 14. Procurement of Services 14.1 Procurement of all services shall be via VicTrack as per Clause 3.6, part (b) of the TSA The project may elect to install dark fibre cabling for signal use as an alternative to the provision of dark fibres by VicTrack. In this case 11.9 shall apply. 15. Testing of Signalling Communication Links and Routes 15.1 Signalling communication links and routes, both main and standby, shall be tested and verified for all the above requirements. Fail over and recovery between main and redundant communications paths shall be tested and demonstrated at an overall system level Latency delays between the redundant communication links shall be verified for each type of link. 16. Records 16.1 VicTrack Service Acceptance Records consisting of service performance test results shall be signed off by the testers, witnesses and the Head of Engineering OCS, and shall be submitted to MTM for future reference as part of the as in service drawings and records. As built drawings shall specifically identify the VicTrack service number and service description Device IP addresses shall be clearly identified on as in service records and drawings. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 8 of 8
MTM DESIGN PRACTICE NOTE 110V AC SURGE PROTECTION IN SIGNAL EQUIPMENT ROOMS AND TRACKSIDE ZONE BOXES
SURGE PROTECTION IN SIGNAL Approval Amendment Record Approval Date Version Description 11/05/2016 1 Initial Issue under MTM PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION
More informationMTM Standards Induction for the Signal Design Roles
MTM Standards Induction for the Signal Design Roles Version 1, 2018 Applicant Name: RSW number It is a requirement of the MTM Signals, CS&C, and Project Competency Management system for all RSW to be familiar
More informationQUIZ-MTM Standards Induction for the Signal Design Roles
QUIZ-MTM Standards Induction for the Signal Design Roles Version 1.1, 2018 Applicant Name: RSW number It is a requirement of the MTM Signals, CS&C, and Project Competency Management system for all RSW
More informationDESIGN PRACTICE NOTE NEGATIVE BUSBAR SHUNTS
Approval Amendment Record Approval Date Version Description 27/05/2013 1 Initial issue under MTM. PRINTOUT MAY NOT BE UP-TO-DATE; REFER TO METRO INTRANET FOR THE LATEST VERSION Page 1 of 6 Table of Contents
More informationMESP MODULAR SUBSTATION USER REQUIREMENTS
Engineering Specification Electrical Networks MODULAR SUBSTATION USER Version: 2 Issued: November 2015 Owner: Head of Engineering/Electrical Approved By: Head of Engineering/Electrical PRINTOUT MAY NOT
More informationMTM Standards Induction for the Signal Project Roles
MTM Standards Induction for the Signal Project Roles Version 1, 2018 Applicant Name: RSW number It is a requirement of the MTM Signals, CS&C, and Project Competency Management system for all RSW to be
More informationSpecification Voltage Limiting Device
Engineering Specification Electrical Networks L1-CHE-SPE-152 Specification Voltage Limiting Device Version: 1 Issued: 20 th April 2018 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering,
More informationQUIZ-MTM Standards Induction for the Signal Project Roles
QUIZ-MTM Standards Induction for the Signal Project Roles Version 1.1, 2018 Applicant Name: RSW number It is a requirement of the MTM Signals, CS&C, and Project Competency Management system for all RSW
More informationMESP TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V DC TRACTION SYSTEM
Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V Version: 1 Issued: March 2014 Owner: Electrical Networks Asset
More informationQUIZ-MTM Standards Induction for the Signal Maintain Roles Version 1.1, 2018
QUIZ-MTM Standards Induction for the Signal Maintain Roles Version 1.1, 2018 Applicant Name: RSW number It is a requirement of the MTM Signals, CS&C, and Project Competency Management system for all RSW
More informationMTM Standards Induction for the Signal Maintain Roles
MTM Standards Induction for the Signal Maintain Roles Version 1, 2018 Applicant Name: RSW number It is a requirement of the MTM Signals, CS&C, and Project Competency Management system for all RSW to be
More informationMESP TECHNICAL SPECIFICATION FOR SCADA CABLING IN SUBSTATIONS
Engineering Specification Electrical Networks MESP 081000-01 TECHNICAL SPECIFICATION FOR SCADA CABLING IN Version: 1 Issued: March 2014 Owner: Electrical Networks Asset Manager Approved By: George Marulli
More informationRemotely Operable 1500V DC Disconnector & Short-Circuit Switch Assembly
Specification Electrical Networks L1-CHE-SPE-128 Remotely Operable 1500V DC Disconnector & Short-Circuit Switch Assembly Version: 1 Issued: February 2016 Owner: Head of Engineering - Electrical Approved
More informationSPECIFIC TERMS METRO ETHERNET SERVICE
SPECIFIC TERMS METRO ETHERNET SERVICE This Specific Terms form the Agreement between you and SP Telecommunications Pte Ltd (Reg No. 199700517K) and may be amended by the Application Form. It is agreed
More informationL1-CHE-SPE-303 ELECTRICAL AND ELECTRONIC COMPONENTS (RATINGS AND CONSTRUCTION REQUIREMENTS)
Engineering Specification Signalling L1-CHE-SPE-303 ELECTRICAL AND ELECTRONIC COMPONENTS (RATINGS AND CONSTRUCTION REQUIREMENTS) Version: 1 ENGINEERING SPECIFICATION ELECTRICAL AND ELECTRONIC COMPONENTS
More informationCyber Security Requirements for Electronic Safety and Security
This document is to provide suggested language to address cyber security elements as they may apply to physical and electronic security projects. Security consultants and specifiers should consider this
More informationMESP TECHNICAL SPECIFICATION FOR 22 kv METAL ENCLOSED SWITCHGEAR
Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR 22 kv Version: 2 Issued: 19 th December 2016 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering - Electrical
More informationMETRO LAN EXTENSION - PRODUCT SPECIFICATION
METRO LAN EXTENSION - PRODUCT SPECIFICATION 1. INTRODUCTION This document contains information on the Metro LAN Extension service. If you require more detailed technical information, please contact your
More informationNetwork Service Assurance
Service Assurance Embedded 'Always-On' Ethernet Devices for Circuit 'Turn-Up' Testing & In-Service Assurance for Layer- 2 and Layer-3 infrastructures Ethernet (L-2) - Typical Scenario HQ & Operations Centre
More informationNETWORK SERVICES STANDARD TERMS FOR TELECOM'S UNBUNDLED COPPER LOCAL LOOP NETWORK BACKHAUL (TELEPHONE EXCHANGE TO INTERCONNECT POINT) SERVICE
NETWORK SERVICES STANDARD TERMS FOR TELECOM'S UNBUNDLED COPPER LOCAL LOOP NETWORK BACKHAUL (TELEPHONE EXCHANGE TO INTERCONNECT POINT) SERVICE SCHEDULE 1 UCLL BACKHAUL SERVICE DESCRIPTION PUBLIC VERSION
More informationRECOMMENDATION FOR USE
Page 1 of 6 TITLE CONTENT OF THE TECHNICAL FILE ORIGINATOR NB-RAIL STRATEGY SG SUBJECT RELATED TO Directives 2008/57/EC, 2009/131/EC, 2011/18/EU, Recommendation 2011/217/EU, Decision 2010/713/EU and all
More informationAPPLICATION FOR DARK FIBRE OPTIC SERVICE
Suite 101, 310 Ward Street, Nelson, BC V1L 5S4 Phone: (250) 352-5511 Fax: (250) 352-2131 Website: http://www.nelson.ca/ APPLICATION FOR DARK FIBRE OPTIC SERVICE FOR OFFICE USE: APPLICATION # DATE OF APPLICATION:
More informationIP WAN SERVICE SCHEDULE. Business Hours means between the hours of 9am and 5pm, on a Business Day.
IP WAN SERVICE SCHEDULE 1. DEFINITIONS 24x7x4 means 24x7x365 with a four (4) hour response target. 24x7x365 means 24 hours per day, 7 days per week. means between the hours of 9am and 5pm, on a Day. Customer
More informationCOMMERCIAL FURNACES CERTIFICATION PROGRAM
COMMERCIAL FURNACES CERTIFICATION PROGRAM AHRI OM CFRN JANUARY 2018 2111 Wilson Blvd, Suite 500 Arlington, Virginia 22201 (703) 524-8800 Sponsored and administered by: PREFACE The following manual outlines
More informationThis document is a preview generated by EVS
ISO/IEC 11801-2 INTERNATIONAL STANDARD Edition 1.0 2017-11 Information technology Generic cabling for customer premises Part 2: Office premises ISO/IEC 11801-2:2017-11(en) THIS PUBLICATION IS COPYRIGHT
More informationB.3 DEDICATED ACCESS ARRANGEMENTS
B.3 DEDICATED ACCESS ARRANGEMENTS Qwest s offer for Dedicated Access Arrangements is fully compliant with Section C.2.1.5. In no case will the price for dedicated access in this Section be higher than
More informationVodacom MPLS Service Specific Terms & Conditions
1. Abstract This document provides a guideline on the minimum requirements and business rules surrounding the layout of the various topologies featuring access medium link/s to the customer site on the
More informationINTERNATIONAL TELECOMMUNICATION UNION
INTERNATIONAL TELECOMMUNICATION UNION ITU-T M.2110 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (07/2002) SERIES M: TMN AND NETWORK MAINTENANCE: INTERNATIONAL TRANSMISSION SYSTEMS, TELEPHONE CIRCUITS,
More informationATTACHMENT A Statement of Work
ATTACHMENT A Statement of Work Albuquerque Public Schools is soliciting proposals for a fiber optic wide area network solution for all locations identified in the Scope of Services below. SCOPE OF SERVICES
More informationSchedule 2a for Capital Leases
1. SERVICE DESCRIPTION The Interoute Managed Bandwidth service comprises protected Circuits and unprotected Circuits carrying communications traffic between fixed points. 2. DEFINITIONS In this Agreement,
More informationDESIGN PRACTICE NOTE AXLE COUNTER RESET
Approval Amendment Record Approval Date Version Description 09/09/2015 1 Initial issue 01/02/2016 2 Updated with issue of Works Instruction & Signal Engineering comments 31/08/2017 3 Updates with Standard
More informationCANADIAN PAYMENTS ASSOCIATION LVTS RULE 11 CHANGE MANAGEMENT, TESTING AND CERTIFICATION
CANADIAN PAYMENTS ASSOCIATION LVTS RULE 11 LVTS Rule 11, December 1998: as amended November 25, 2002, November 24, 2003, May 31, 2004, August 14, 2006, January 28, 2008, August 16, 2010, January 1, 2013,
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO/IEC 9314-20 First edition 2001-03 Information technology Fibre distributed data interface (FDDI) Part 20: Abstract test suite for FDDI physical medium ISO/IEC 2001 All rights
More informationNetwork Services Internet VPN
Contents 1. 2. Network Services Customer Responsibilities 3. Network Services General 4. Service Management Boundary 5. Defined Terms Network Services Where the Customer selects as detailed in the Order
More informationTRANSMISSION ENGINEERING STANDARDS SUBSTATIONS
This standard was reviewed and approved by key managers on. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a generating plant with the Oncor
More informationSpecification For SCADA and PLC Architecture. Pr9833
Specification For SCADA and PLC Architecture Pr9833 Documents Details This document is only valid on the day it was printed. Version Review Revision Reviewed by Approved by Date approved Revision type
More informationAmerican Association for Laboratory Accreditation
R311 - Specific Requirements: Federal Risk and Authorization Management Program Page 1 of 10 R311 - Specific Requirements: Federal Risk and Authorization Management Program 2017 by A2LA. All rights reserved.
More informationSERIES G: TRANSMISSION SYSTEMS AND MEDIA, DIGITAL SYSTEMS AND NETWORKS Digital networks Quality and availability targets
International Telecommunication Union ITU-T G.825 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU Amendment 1 (05/2008) SERIES G: TRANSMISSION SYSTEMS AND MEDIA, DIGITAL SYSTEMS AND NETWORKS Digital networks
More informationNZQA unit standard version 3 Page 1 of 6. Demonstrate knowledge of telecommunications bearer and switching systems
Page 1 of 6 Title Demonstrate knowledge of telecommunications bearer and switching systems Level 4 Credits 20 Purpose This unit standard covers underpinning knowledge for people engaged in installation
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO/IEC 9314-6 First edition 1998-08 Information technology Fibre distributed data interface (FDDI) Part 6: Station Management (SMT) ISO/IEC 1998 All rights reserved. Unless otherwise
More informationGuidance: Operational Conditions Precedent (OCPs) September 2016 Version 1
Guidance: Operational Conditions Precedent (OCPs) September 2016 Version 1 Contents 1 Introduction 4 2 Operational Conditions Precedent requirements 4 3 Low Carbon Contracts Company Process 8 4 Supporting
More informationIP WAN SERVICE SCHEDULE
IP WAN SERVICE SCHEDULE 1. DEFINITIONS Additional Charge means charges to be determined by Vocus on a time and materials basis in respect of installation of additional infrastructure or charges payable
More informationFinal draft ETSI EN V1.4.1 ( )
Final draft EN 300 147 V1.4.1 (2001-05) European Standard (Telecommunications series) Transmission and Multiplexing (TM); Synchronous Digital Hierarchy (SDH); Multiplexing structure 2 Final draft EN 300
More informationOur Customer Terms Page 1 of 18 Ethernet MAN section
Our Customer Terms Page 1 of 18 Contents Click on the section you re interested in. 1 About this section 3 Our Customer Terms 3 Inconsistencies 3 When this section applies 3 No assignment or resupply 3
More informationCommon Operating Environment (COE) Platform Certification Program. Certification Policy
Common Operating Environment (COE) Platform Certification Program Certification Policy February 2004 Version 2.0 Copyright February 2004, The Open Group All rights reserved. No part of this publication
More informationADDITIONAL TERMS FOR HOSTED IP TELEPHONY SERVICES SCHEDULE 2K(B)
ADDITIONAL TERMS FOR HOSTED IP TELEPHONY SERVICES SCHEDULE 2K(B) CONTENTS 1. Service Description... 3 2. Definitions... 3 3. Service Terms... 3 4. IP Phones... 4 5. Customer Obligations... 4 6. Access
More informationSpecial Provision No. 683S27 June 2017
GATEWAY ROUTERS - Item No. Special Provision No. 683S27 June 2017 1. SCOPE This Special Provision covers the requirements for the installation of Gateway Routers with integrated digital subscriber line
More informationSystem Requirements VERSION 2.5. Prepared for: Metropolitan Transportation Commission. Prepared by: April 17,
TO 8-06: Regional Real-Time Transit Architecture Design, Procurement and Technical Assistance Real-Time Transit Information System System Requirements VERSION 2.5 Prepared for: Metropolitan Transportation
More informationINTERNATIONAL STANDARD
ISO/IEC 11801-3 INTERNATIONAL STANDARD Edition 1.0 2017-11 Information technology Generic cabling for customer premises Part 3: Industrial premises INTERNATIONAL ELECTROTECHNICAL COMMISSION ICS 35.200
More informationSuperannuation Transaction Network
Superannuation Transaction Network Process and Requirements for New Gateway Operators Version 2.1 November 2016 For further information or questions, contact the GNGB secretariat via email at contactus@gngb.com.au
More informationITU-T G /Y
International Telecommunication Union ITU-T TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU G.8261.1/Y.1361.1 (02/2012) SERIES G: TRANSMISSION SYSTEMS AND MEDIA, DIGITAL SYSTEMS AND NETWORKS Packet over
More informationStandard CIP Cyber Security Critical Cyber Asset Identification
Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed
More informationCOMCAST ENTERPRISE SERVICES PRODUCT-SPECIFIC ATTACHMENT SOFTWARE-DEFINED WIDE AREA NETWORKING (SD-WAN)
ATTACHMENT IDENTIFIER: SD-WAN, Ver. 1.0 COMCAST ENTERPRISE SERVICES PRODUCT-SPECIFIC ATTACHMENT SOFTWARE-DEFINED WIDE AREA NETWORKING (SD-WAN) The following additional terms and conditions are applicable
More informationChapter 8: IT Service Management. Topics covered: 1.1 Roles of helpdesk support staff. 1.2 Different types of helpdesk support level
1 Chapter 8: IT Service Management Topics covered: 1.1 Roles of helpdesk support staff 1.2 Different types of helpdesk support level 1.3 Role of Internet Service Provider (ISP) 1.4 Change request process
More informationSIN 513 Issue 1.1 January 2016
SIN 513 Issue 1.1 January 2016 Suppliers' Information Note For The BT Network BT Dense Wave Division Multiplex 40G Wavelength Services Service & Interface Description Each SIN is the copyright of British
More informationCloud Service SLA Declaration
Cloud Service SLA Declaration Basic level of support for Cloud services (SLA 1) Table of Content: 1. Definitions 2. General terms 3. Level of service warranty service functioning 4. Provider`s liability
More informationStandard CIP Cyber Security Critical Cyber Asset Identification
Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed
More informationIEC Quality Assessment System for Electronic Components (IECQ System)
IECQ 03-4 Edition 2.0 2012-09 IECQ PUBLICATION IEC Quality Assessment System for Electronic Components (IECQ System) Rules of Procedure Part 4: IECQ ECMP Scheme Avionics Assessment Program Requirements
More informationLVTS RULE 11 CHANGE MANAGEMENT, TESTING AND CERTIFICATION 2018 CANADIAN PAYMENTS ASSOCIATION
LVTS RULE 11 CHANGE MANAGEMENT, TESTING AND CERTIFICATION 2018 CANADIAN PAYMENTS ASSOCIATION This Rule is copyrighted by the Canadian Payments Association. All rights reserved, including the right of reproduction
More informationT PG Ten Gigabit Adelaide Service PRODUCT GUIDE
T PG Ten Gigabit Adelaide Service PRODUCT GUIDE We have partnered with the City of Adelaide to deliver the Ten Gigabit Adelaide initiative; Australia s first 10Gbps fibre optic network. Businesses throughout
More information19 March Assessment Policy for Qualifications and Part Qualifications on the Occupational Qualifications Sub-Framework (OQSF)
19 March 2014 Assessment Policy for Qualifications and Part Qualifications on the Occupational Qualifications Sub-Framework (OQSF) Table of Contents List of Acronyms... 3 Glossary of terms... 4 1. Preamble...
More informationThis document is a preview generated by EVS
TECHNICAL SPECIFICATION ISO/IEC TS 22237-5 First edition 2018-05 Information technology Data centre facilities and infrastructures Part 5: Telecommunications cabling infrastructure Technologie de l information
More informationReference Access and Interconnection Offer
1. Commercial Proposal for Reference Access and Interconnection Offer Sub Annex E Technical Specification Table of Contents 1 General... 3 2 Physical and Electrical Interface... 4 3 Transmission... 7 4
More information5.2.6 STORAGE SERVICES (SS) (L , M.2.1.4)
5.2.6 STORAGE SERVICES (SS) (L.34.1.5.4, M.2.1.4) Qwest s Networx Storage Services provides a secure and highly available environment for Agency applications, which allows Agencies to free up valuable
More informationSmart Meters Programme Schedule 6.3. (Development Process) (CSP North version)
Smart Meters Programme Schedule 6.3 (Development Process) (CSP North version) Schedule 6.3 (Development Process) (CSP North version) Amendment History Version Date Status v.1 Signature Date Execution copy
More informationNetwork Security Policy
Network Security Policy Date: January 2016 Policy Title Network Security Policy Policy Number: POL 030 Version 3.0 Policy Sponsor Policy Owner Committee Director of Business Support Head of ICU / ICT Business
More informationInformation Security Management Criteria for Our Business Partners
Information Security Management Criteria for Our Business Partners Ver. 2.1 April 1, 2016 Global Procurement Company Information Security Enhancement Department Panasonic Corporation 1 Table of Contents
More informationCarrier Line Services
Version 2-2 Date of issue 008.2013 Replaces version 2-1 Valid from 008.2013 Contract Contract for Data Services Contract for Mietleitungen FMG Valid from 003.2018 1/10 Contents Introduction...3 1 Referenced
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO/IEC 9314-21 First edition 2000-10 Information technology Fibre Distributed Data Interface (FDDI) Part 21: Abstract test suite for FDDI physical layer protocol conformance testing
More informationTransition Plan. Data Center Operations Outsourcing. Implementation: Final. Ref: TR0007
Data Center Operations Outsourcing Transition Plan Implementation: Final Page 1 of 15 DOCUMENT CONTROL SHEET Schedule/Exhibit Amendment Control Sheet Title of Amended Document: Section 4 Transition Plan
More informationFault Current Margin Queuing Position Process for Parallel Synchronous Distributed Generation. Consolidated Edison Company of New York, Inc.
Fault Current Margin Queuing Position Process for Parallel Synchronous Distributed Generation Purpose: To establish an equitable process for allocating fault current margin, where available, to applicants
More informationMicrogeneration Certification Scheme: MCS 005
Microgeneration Certification Scheme: MCS 005 Product Certification Scheme Requirements: Solar Photovoltaic Modules Issue 2.5 This Microgeneration Installation Standard is the property of Department of
More informationSECTION FARE COLLECTION SYSTEM
SECTION 17830 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for the Ticket Vending Machines (TVMs) and for the Clipper Network Card Interface Devices (CIDs) as a subsystem of the station
More informationThis document is a preview generated by EVS
INTERNATIONAL STANDARD IEC 62056-46 First edition 2002-02 Electricity metering Data exchange for meter reading, tariff and load control Part 46: Data link layer using HDLC protocol Reference number IEC
More informationCIP Cyber Security Personnel & Training
A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-6 3. Purpose: To minimize the risk against compromise that could lead to misoperation or instability in the Bulk Electric
More informationThis Policy has been prepared with due regard to the General Data Protection Regulation (EU Regulation 2016/679) ( GDPR ).
PRIVACY POLICY Data Protection Policy 1. Introduction This Data Protection Policy (this Policy ) sets out how Brital Foods Limited ( we, us, our ) handle the Personal Data we Process in the course of our
More informationLackland ATC Dorm #3 SECTION UTILITY MONITORING AND CONTROL SYSTEM TESTING
SECTION 25 08 10 UTILITY MONITORING AND CONTROL SYSTEM TESTING PART 1 GENERAL The purpose of this Specification is to define generic Factory, Performance Verification, and Endurance Test procedures for
More informationSIN 396 Issue 3.1 January 2016
SIN 396 Issue 3.1 January 2016 Suppliers' Information Note For The BT Network BT Dense Wave Division Multiplex Wavelength Services Service Description Each SIN is the copyright of British Telecommunications
More informationThis document is a preview generated by EVS
INTERNATIONAL STANDARD ISO/IEC 17821 First edition 2015-04-15 Information technology Specification of low power wireless mesh network over channel-hopped TDMA links Technologies de l information Spécification
More informationAES standard for digital audio engineering - High-resolution multi-channel audio interconnection (HRMAI) Preview only
(revision of AES50-2005) AES standard for digital audio engineering - High-resolution multi-channel audio interconnection (HRMAI) Published by Audio Engineering Society, Inc. Copyright 2011 by the Audio
More informationOUR CUSTOMER TERMS IP SOLUTIONS SECTION PART D SERVICE LEVELS CONTENTS
CONTENTS 1 ABOUT THIS PART... 3 2 PROVISIONING AND CHANGES... 3 Terms... 3 IP MAN... 3 IP WAN... 4 IP Wireless... 5 Trans Tasman IP... 5 3 PERFORMANCE... 6 Terms... 6 General Description... 6 Network availability...
More informationThis is a preview - click here to buy the full publication
ISO/IEC/TR 14165-314 TECHNICAL REPORT Edition 1.0 2013-02 Information technology Fibre channel Part 314: Avionics environment Remote direct memory access (FC-AE-RDMA) INTERNATIONAL ELECTROTECHNICAL COMMISSION
More informationINTERNATIONAL STANDARD
INTERNATIONAL STANDARD IEC 62056-61 First edition 2002-02 Electricity metering Data exchange for meter reading, tariff and load control Part 61: Object identification system (OBIS) Reference number IEC
More information9 March Assessment Policy for Qualifications and Part Qualifications on the Occupational Qualifications Sub-Framework (OQSF)
9 March 2016 Assessment Policy for Qualifications and Part Qualifications on the Occupational Qualifications Sub-Framework (OQSF) Document name: Assessment Policy for Qualifications and Part qualifications
More informationFor all Metering installations connected to the Horizon Power Networks
HORIZON POWER MANDATORY LINK CRITERIA For all Metering installations connected to the Horizon Power Networks Produced by: Horizon Power ABN: 579 550 11697 10 April 2017 This document must not be made available
More informationCIP Cyber Security Personnel & Training
A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-5.1 3. Purpose: To minimize the risk against compromise that could lead to misoperation or instability in the BES from individuals
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).
More informationThis document is a preview generated by EVS
INTERNATIONAL STANDARD IEC 62439-1 Edition 1.0 2010-02 colour inside Industrial communication networks High availability automation networks Part 1: General concepts and calculation methods IEC 62439-1:2010(E)
More informationASX NET. In Detail: Connectivity Guide
ASX NET In Detail: Connectivity Guide CONTENTS INTRODUCTION 2 ASX NET SITE REQUIREMENTS 3 ASX NET SERVICES OVERVIEW 4 ASX NET SERVICES IN DETAIL 5 ASX NET NETWORK SERVICES 6 ASX NET GLOBAL OVERVIEW 11
More informationCritical Cyber Asset Identification Security Management Controls
Implementation Plan Purpose On January 18, 2008, FERC (or Commission ) issued Order. 706 that approved Version 1 of the Critical Infrastructure Protection Reliability Standards, CIP-002-1 through CIP-009-1.
More informationService Definition Internet Service
Service Definition Internet Service Standard S003 Ver 2 Contents 1 Overview... 1 1.1 Introduction... 1 1.2 Product Overview... 1 2 Service Specification... 1 2.1 Service Options... 2 2.2 Access Service...
More informationIP Connect UK. Schedule to the General Terms
IP Connect UK Schedule to the General Terms Contents A note on we and you... 2 1. Service Summary... 2 2. Standard Service Components... 2 3. Service Options... 3 4. Service Management Boundary... 4 5.
More informationL1-CHE-SPE-274 VITAL RELAY - MINIATURE PLUG-IN
Engineering Specification Signalling L1-CHE-SPE-274 VITAL RELAY - MINIATURE PLUG-IN Version: 1 ENGINEERING SPECIFICATION VITAL RELAY - MINIATURE PLUG-IN L1-CHE-SPE-274 Version: 1 Effective from: 1 st July
More informationAPPLICATION FOR DARK FIBRE OPTIC SERVICE
Suite 101, 310 Ward Street, Nelson, BC V1L 5S4 Phone: (250) 352-5511 Fax: (250) 352-2131 Website: http://www.nelson.ca/ APPLICATION FOR DARK FIBRE OPTIC SERVICE FOR OFFICE USE: APPLICATION # DATE OF APPLICATION:
More informationREVISION HISTORY DATE AMENDMENT DESCRIPTION OF AMENDMENT
REVISION HISTORY DATE AMENDMENT DESCRIPTION OF AMENDMENT SERVICE DESCRIPTION Page 1 of 17 SERVICE DESCRIPTION 2-11: WHOLESALE DSL SERVICE 1. THE SERVICE The Wholesale DSL service is a service which enables
More informationFSC INTERNATIONAL STANDARD
Forest Stewardship Council FSC INTERNATIONAL STANDARD Chain of Custody certification of multiple sites FSC-STD-40-003 V2-0 D2-0 EN CHAIN OF CUSTODY Title: Document reference code: Scope: Approval date:
More informationData channel ports and LAN channel ports will be referred to as channel ports when distinction between the two is not required.
DROP / INSERT NODES - Item No. CHANNEL PORTS - Item No. Special Provision No. 683S19 September 2007 1. SCOPE This Special Provision covers the requirements for the installation and testing of Field Drop
More information1. Price of SDNet/2 Circuit (Effective from 1 st March 2016)
1. Price of SDNet/2 Circuit (Effective from 1 st March 2016) SDNet/2 services are provided by the Accredited Vendors directly to Information Vendors (IVs). IVs shall apply for the services and engage into
More informationTelecommunications Equipment Certification Scheme FEBRUARY 2017
Telecommunications Equipment Certification Scheme FEBRUARY 2017 Canberra Red Building Benjamin Offices Chan Street Belconnen ACT PO Box 78 Belconnen ACT 2616 T +61 2 6219 5555 F +61 2 6219 5353 Melbourne
More informationGTS Ethernet line is designed so as to be compliant with the specifications of the MEF 6.1 and MEF 10.2 standards.
1 Content of the service is designed for high-speed interconnection local computer networks. It offers an environment providing for transfer of all types of data on a single infrastructure. The service
More information