PROPOSED PROCEDURE CHANGE (PPC) SUMMARY SECTION (For Proponent or AEMO to complete. Template focuses on solution identification)

Size: px
Start display at page:

Download "PROPOSED PROCEDURE CHANGE (PPC) SUMMARY SECTION (For Proponent or AEMO to complete. Template focuses on solution identification)"

Transcription

1 Issue PROPOSED PROCEDURE CHANGE (PPC) SUMMARY SECTION (For Proponent or AEMO to complete. Template focuses on solution identification) IN006/09 Impacted Jurisdiction(s) Vicia Queensland South Australia Proponent Nandu Datar Company AEMO Proponent Proponent phone Affected Gas Market(s) Wholesale Bulletin Board STTM Short Title Oth key contact information Gas Date proposal sent to AEMO Technology changes - Proposed changes to the Svice Ord Response transaction for VIC, QD and SA. (te - formally known as Codes) grcf@aemo.com.au PPC IN SO Response Changes Page 1

2 PROPOSED PROCEDURE CHANGE (PPC) DETAIED REPORT SECTION 1. Description of change(s) and reasons for change(s). ence documentation ence GIP/Specification Pack ence Oth ence 3. The high level details of the change to the existing s This includes: A comparison of the existing opation of the s to the proposed change to the opation of the s. A marked up vsion of the change (see Attachment A). This Proposed Change (PPC) has been developed by AEMO and proposes documentation changes to seval technical artefacts contained in the Gas Intface Protocol (GIP) and the Specification Pack (SP). In summary, the proposed changes are: the introduction of SA-type Code (JCC) combinations and validation for the VIC and QD retail gas market; and The inclusion of a comments field in the Svice Ord response transaction and mandate its use in defined situations. These changes will optimise the current Svice Ord process that is opational in Vicia, South Australia and Queensland to allow clear and concise information to be provided to s by s on the outcome of jobs that have not been completed or we cancelled. The target effective date for these changes is Q It is to be noted he that due to oth priorities AGN will only be in a position amend their systems by Q 016 and the retails have agreed to implement workarounds till then. The same changes set out in this PPC have been included in the NSW/ACT Harmonisation program of work (IN006/14 Harmonisation of NSW ACT business to business processes). See Attachments A, B, C, D and E for marked-up changes to the GIP and SP documents. Gas Intface Protocol (VIC/QD): Participant Build Pack 1: Process Flow Table of Transactions Participant Build Pack 3: System Intface itions Specification Pack (SA/WA): BB Svice Ord Specifications (Part ) FRC BB System Intface itions Below is a summary of the proposed changes to the technical artefacts contained in the GIP. Amend VIC & QD Participant Build Pack 3 to add the new comment field to: o o Svice Ord Response transaction in Transaction Data Elements A.1 asexm Data Elements in Appendix A Data Dictionary Amend VIC & QD Participant Build Pack 1 to add the new comment field to: o o The Sheet Elements The Sheet Process Flow Tables, column Data Elements Received and against each applicable Below is a summary of the proposed changes to the technical artefacts contained in the SP. PPC IN SO Response Changes Page

3 4. Consequences for making or not making the change(s) 5. Explanation regarding the ord of magnitude of the change(s) (eg: matial, non-matial or nonsubstantial) 6. ikely benefits for industry as a whole 7. The likely implementation effect of the proposal on Industry in genal and/or any identified parties (e.g. end-uss) 8. Testing requirements 9. Supporting Documentation Amend SA FRC BB System Intface itions to add the new comment field to: o Svice Ord Response transaction in Transaction Data Elements o asexm Data Elements in Appendix A Data Dictionary The proposed changes will result in IT changes to the Svice Ord Transaction, Participant process and potentially system changes, howev the cost to implement such changes should be offset by the benefits as foreshowed in the VAT Results. The proposed changes will result in IT changes to the Svice Ord Transaction and Participant process and potentially system changes, howev the cost to implement such changes should be offset by the benefits as foreshowed in the industry and AEMO considation of tangible and intangible benefits. The proposed changes require changes to and systems. changes are to AEMO systems. The proposed changes will enable s to provide clear and concise information to s on the outcome of uncompleted or cancelled jobs. This will enable the s communicate and resolve access issues with the custom. The proposed changes will require changes to systems to genate svice ord with valid JCC and new comment field and systems to receive and intpret the JCC and new comment field. Intnal system testing by the s will be to ensure that the svice ord genated contains JCC and new comment field. Intnal system testing by the s will be to ensure that the svice ord received contains JCC and new comment field. Extnal testing may be to ensure svice ords genated by a is successfully received and validated by a. to Attachments A to E (attach if necessary) PPC IN SO Response Changes Page 3

4 10. If applicable, a proposed effective date for the proposed changed s to take effect and justification for that timeline. The consultation timeline related to this Gas Market Issue aims at an AEMO decision targeted for. The consultation dates are: PPC released: 8 vemb 014 PPC consultation closing date: 19 Decemb 014 IIR released: 16 January 015 IIR submissions due: 9 February 015 AEMO decision: 3 February 015 June 015 Target date for AEMO publishing notice of effective date Target effective date: Q3 015 and Q 016 for AGN PPC IN SO Response Changes Page 4

5 ATTACHMENT A PROPOSED CHANGES PARTICIPANT BUID PACK 3: SYSTEM INTERFACE DEFINITIONS Blue represents additions Red and strikeout represents deletions Marked up changes Amend page 8 as follows Transaction Data Elements TRANSACTION: SERVICEORDERRESPONSE Received From: Sent To: Data Element Manday / Optional / t Required Usage responsetype M Initial for initial response Closure when Svice Ord is closed Implemented as an attribute of the SviceOrdResponse asexm element. NMI O Required when supplied by the in the Svice Ord Request. Required on completion of a Fix (Job Enquiry Code = MFX ) regardless of wheth provided in the Svice Ord Request or not. Required when the Svice Ord work affected a specific NMI regardless of wheth provided in the Svice Ord Request or wheth the Svice Ord was initiated by the. Optional for Svice Connection (Job Enquiry Code = SCR ) Othwise not. checksum O Required if NMI is populated. Implemented as an attribute of the NMI asexm element Address O Required if NMI not populated. Implemented in the asexm "Address" structured format JobEnquiryCode M Used by to detmine work requirement and priority SviceOrd O s RB ence Required when Svice Ord was initiated by a PPC IN SO Response Changes Page 5

6 TRANSACTION: SERVICEORDERRESPONSE Received From: Sent To: Data Element Manday / Optional / t Required Usage SviceProvidence M s AppointmentDetail/ Prefred/ Date AppointmentDetail/ Prefred/ O O Required for Initial response for Svice Connection Request (Job Enquiry Code = SCR) and Access response to all Svice Ord Requests. Required for Access response if supplied in request transaction DateSviceOrdd O Required if Svice Ord completed SviceOrdd O Optional if Svice Ord completed Removed/ Sial O Required whenev a met is removed as part of the Svice Ord completion Removed/ Read/ Current/ IndexValue O Required whenev a met is removed as part of the Svice Ord completion. If supplied will result in the provision of engy data for this MIRN via a Datatification transaction. New/ Sial O Required whenev a new met is fitted as part of the Svice Ord completion New/ PressureCorrectionFac O Required whenev a new met is fitted as part of the Svice Ord completion New/ TypeSizeCode O Required whenev a new met is fitted as part of the Svice Ord completion New/ Read/ Current/ IndexValue New/ Basic/ NextScheduledReadDate New/ Basic/ ScheduledReadingDay Current/ Read/ Current/ IndexValue O O O O Required whenev a new met is fitted as part of the Svice Ord completion. If supplied will result in the provision of engy data for this MIRN via a Datatification transaction. Required for Fix (Job Enquiry Code = MFX ) Required for Fix (Job Enquiry Code = MFX ) Required whenev a validated met read is taken as part of the Svice Ord completion. If supplied will result in the provision of engy data for this MIRN via a Datatification transaction. PPC IN SO Response Changes Page 6

7 TRANSACTION: SERVICEORDERRESPONSE Received From: Sent To: Data Element Manday / Optional / t Required Usage DateOfAttemptedAccess O Required for Access response JobCompletionCode1 O Required if Svice Ord completed or attempted but not successfully completed. (e.g. Access) JobCompletionCode O Required if Svice Ord completed or attempted but not successfully completed. (e.g. Access) JobCompletionCode3 O Required whenev a met is removed as part of the Svice Ord completion Optional for oth Svice Ord completions tificationdata/specialtes/co mmentine O Required if Svice Ord not completed including when cancelled (by the DB). For the avoidance of doubt, not for retail initiated BB cancellation transaction unless: Cancel SO was rejected by the DB but lat cancelled in the field SO cancellation was vbally communicated by the. Up to 3 comment lines can be provided (80 characts each) te: Participants will ref to this field as SORDtComment/Commenti ne Event O May be repeated any numb of times. The Event element will identify any rors occurring in the processing of the request record. PPC IN SO Response Changes Page 7

8 XM Sample <?xml vsion="1.0" encoding="utf-8"?> <ase:asexm xmlns:ase="urn:asexm:r33" xmlns:xsi=" xsi:schemaocation="urn:asexm:r33 <Head> <From>INTEGP</From> <To>AGE</To> <MessageID>0F9E5ABE-31-40A5-AE05-C47FFFC77777</MessageID> <MessageDate> T09:30:47+10:00</MessageDate> <TransactionGroup>SORD</TransactionGroup> <Priority>Medium</Priority> <Market>VICGAS</Market> </Head> <Transactions> <Transaction transactionid="abcdsod f " transactiondate=" T09:30:47+10:00" initiatingtransactionid="sord ab"> <SviceOrdResponse vsion="r17" responsetype="closure"> <SviceOrd> <NMI checksum="3"> </nmi> <SviceOrd> </SviceOrd> </SviceOrd> <ContactDetail> <PsonName> <NameTitle>Mr</NameTitle> <GivenName>John</GivenName> <FamilyName>Smith</FamilyName> </PsonName> <Phone svicetype="fixed Voice"> <Prefix>03</Prefix> <> </> </Phone> </ContactDetail> <tificationdata xsi:type="ase:gassviceordtificationdata"> <Specialtes> <Commentine>Some gas related comments to be typed in he</commentine> <Commentine> comments if it exceeds eighty characts in the first line.</commentine> <Commentine>This is the last line of comment.</commentine> </Specialtes> <Access> <SpecialReadAccess> <ReasonForAccess>Access Ovgrown</ReasonForAccess> <NextAvailableReadDate> </NextAvailableReadDate> </SpecialReadAccess> </Access> <JobCompletionCodes> <JobCompletionCode1>10</JobCompletionCode1> <JobCompletionCode>1</JobCompletionCode> </JobCompletionCodes> </tificationdata> </SviceOrdResponse> PPC IN SO Response Changes Page 8

9 </Transaction> </Transactions> </ase:asexm> PPC IN SO Response Changes Page 9

10 Appendix A. Data Dictionary A.1 asexm Data Elements1 ASEXM EEMENT NAME EEMENT NAME DESCRIPTION ATTRIBUTES/FORMAT ENGTH/ DECIMA PACES AOWED VAUES tificationdata/s pecialtes/com mentine Comments for t Required if Svice Ord not completed including when cancelled (by the DB). String 80 For the avoidance of doubt, not for retail initiated BB cancellation transaction unless:.. Cancel SO was rejected by the DB but lat cancelled in the field SO cancellation was vbally communicated by the. Up to 3 comment lines can be provided (80 characts each) te: Participants will ref to this field as SORDtComment/Com mentine 1 Codes and enumations in PBP3: In most cases asexm uses enumations of fully expanded descriptions. Exception to this rule is the use of codes that have been already in use in the electricity FRC. CSV data elements utilise acronyms and abbreviations instead. PPC IN SO Response Changes Page 10

11 ATTACHMENT B PROPOSED CHANGES SA FRC BB SYSTEM INTERFACE DEFINITIONS Blue represents additions Red and strikeout represents deletions Marked up changes Amend page 78 as follows Transaction Data Elements Data Element Transaction: Received From: Sent To: SA/WA Manday / Optional / t Required SviceOrdResponse Network Opa Us Vicia Manday / Optional/ t Required Usage responsetype M M Initial for initial response Closure when Svice Ord is closed Implemented as an attribute of the SviceOrdResponse asexm element. NMI O O Required when supplied by the Us in the Svice Ord Request. Required on completion of a Fix (Job Enquiry Code = MFX ) regardless of wheth provided in the Svice Ord Request or not. Required when the Svice Ord work affected a specific NMI regardless of wheth provided in the Svice Ord Request or wheth the Svice Ord was initiated by the Network Opa. Optional for Svice Connection (Job Enquiry Code = SCR ) Othwise not. checksum O O Required if MIRN is populated. Implemented as an attribute of the MIRN asexm element Address O O Required if MIRN not populated. Implemented in the asexm "Address" structured format JobEnquiryCode M M Used by Network Opa to detmine work requirement and priority SviceOrd O O A refence numb genated by a Us. This numb is always Required when a Us initiated the Svice Ord and provided the Svice Ord. For an implied svice ord, the Svice Ord will always equal the transf request ID allocated by the Market Opa. SviceProvidence M M Network Opa s PPC IN SO Response Changes Page 11

12 Data Element AppointmentDetail/ Prefred/ Date Transaction: Received From: Sent To: SA/WA Manday / Optional / t Required SviceOrdResponse Network Opa Us Vicia Manday / Optional/ t Required Usage O O Required for Initial response for Svice Connection Request (Job Enquiry Code = SCR) and Access response to all Svice Ord Requests. t used in WA. AppointmentDetail/ Prefred/ O O Required for Access response if supplied in request transaction DateSviceOrdd O O Required if Svice Ord completed SviceOrdd O O Optional if Svice Ord completed Removed/ Sial Removed/ Read/ Current/ IndexValue O O Required whenev a met is removed as part of the Svice Ord completion O O Required whenev a met is removed as part of the Svice Ord completion. If supplied will result in the provision of engy data for this MIRN via a Datatification transaction. New/ Sial O O Required whenev a new met is fitted as part of the Svice Ord completion New/ PressureCorrectionFac O O Required whenev a new met is fitted as part of the Svice Ord completion New/ TypeSizeCode O O Required whenev a new met is fitted as part of the Svice Ord completion New/ Read/ Current/ IndexValue New/ Basic/ NextScheduledReadDate New/ Basic/ ScheduledReadingDayNumb Current/ Read/ Current/ IndexValue O O Required whenev a new met is fitted as part of the Svice Ord completion. If supplied will result in the provision of engy data for this MIRN via a Datatification transaction. O O Required for Fix (Job Enquiry Code = MFX ) O O Required for Fix (Job Enquiry Code = MFX ) O O Required whenev a validated met read is taken as part of the Svice Ord completion. If supplied will result in the provision of engy data for this MIRN via a Datatification transaction. DateOfAttemptedAccess O O Required for Access response JobCompletionCode1 O O Required if Svice Ord completed or attempted but not successfully completed (e.g. Access) PPC IN SO Response Changes Page 1

13 Data Element Transaction: Received From: Sent To: SA/WA Manday / Optional / t Required SviceOrdResponse Network Opa Us Vicia Manday / Optional/ t Required Usage JobCompletionCode O O Required if Svice Ord completed or attempted but not successfully completed (e.g. Access) JobCompletionCode3 O O Required whenev a met is removed as part of the Svice Ord completion Optional for oth Svice Ord completions. t used in WA. tificationdata/specialte s/commentine HeatingValue Zone O t included TransmissionZone O t included tion Tariff O t included AccessDetails O t included Position O t included DogCode O t included O O Required if Svice Ord not completed including when cancelled (by the DB). For the avoidance of doubt, not for retail initiated BB cancellation transaction unless:.. Cancel SO was rejected by the DB but lat cancelled in the field SO cancellation was vbally communicated by the. Up to 3 comment lines can be provided (80 characts each) te: Participants will ref to this field as SORDtComment/Co mmentine Required in WA, t included in SA Required in WA, t included in SA Required in WA, t included in SA t included in SA. Included in WA for SO responses for SCR,CT and ECO. Optional for oth job enquiry codes. t included in SA. Included in WA for SO responses for SCR,CT,ECO and MCH. Optional for oth job enquiry codes. t included in SA. Included in WA for SO responses for SCR,CT,ECO and MCH. Optional for oth job enquiry codes. PPC IN SO Response Changes Page 13

14 Data Element Transaction: Received From: Sent To: SA/WA Manday / Optional / t Required SviceOrdResponse Network Opa Us Vicia Manday / Optional/ t Required Usage Event O O May be repeated any numb of times. The Event element will identify any rors occurring in the processing of the request record. PPC IN SO Response Changes Page 14

15 Appendix A. Data Dictionary asexm Data Elements asexm Element Name Element Name Description Attributes/ Format tificationdata/specialtes/ Commentine Comments for t Required if Svice Ord not completed including when cancelled (by the DB). For the avoidance of doubt, not for retail initiated BB cancellation transaction unless:.. Cancel SO was rejected by the DB but lat cancelled in the field SO cancellation was vbally communicated by the. Up to 3 comment lines can be provided (80 characts each) te: Participants will ref to this field as SORDtComment/Commentin e ength/ Decimal Places String 80 Allowed Values In most cases asexm uses enumations of fully expanded descriptions. Exception to this rule is the use of codes that have been already in use in the electricity FRC. CSV data elements utilise acronyms and abbreviations instead. PPC IN SO Response Changes Page 15

16 ATTACHMENT C PROPOSED CHANGES PARTICIPANT BUID PACK 1: PROCESS FOW TABE OF TRANSACTIONS Blue represents additions Red and strikeout represents deletions Marked up changes Sheet: Job Enquiry Codes VIC, QD AND SA DEFINITION AND USAGE - RESPONSE ACTIVITIES See attached that contains valid JCC for each JEC Participant Build Pack 1 - Process Flow Sheet: Elements Comments for t Required if Svice Ord not completed including when cancelled (by the DB). For the avoidance of doubt, not for retail initiated BB cancellation transaction unless:.. Cancel SO was rejected by the DB but lat cancelled in the field SO cancellation was vbally Access 80 N PPC IN SO Response Changes Page 16

17 communicated by the. Up to 3 comment lines can be provided (80 characts each) Sheet: Process Flow Tables RE F NO X RE F BASIC, INTERV A OR BOTH GIP NO N- GIP CATEG ORY PROCED URE REF COMMEN T IN REF TO PROCED URE PROCE SS MAP ID PBP &3 INTE R DEFI N REF TRANS TYPE TRIGG ER FROM TO PURPO SE TYP E METH OD DATA EEMENTS - RECEIVED (MIRN/NMI INTERCHANGE ABE) Both GIP 104 Basic Fix.9.1(e) (ii) Basic Installatio n By 5pm on the 5th business day aft met installed 104 PBP3 Int 4... Fix completed DB receive s informat ion from Contrac t Fitt DB sends Fix data to BB asexm - Real or Batch MIRN MIRN Checksum RB ence Scheduled Reading Day Date Svice Request d Gas Type Size Code Pressure Correction Fac PPC IN SO Response Changes Page 17

18 New Index Value Next Scheduled Read Date Code1 Code Code3 (Optional) Both GIP 104 Basic Fix 104 PBP3 Int e 4... Access to complete Fix Contrac t fitt was unable to complet e installati on due to no access DB sends Fix data to BB asexm - Real or Batch MIRN MIRN Checksum RB ence Appointment Date Appointment (Optional) Date of Attempted Access Code1 Code Code3 (Optional) PPC IN SO Response Changes Page 18

19 Both GIP 100 Basic Change 100 PBP3 Int 4... Access to complete Change Contrac t fitt was unable to complet e change due to no access DB notifies BB asexm - Real or Batch MIRN MIRN Checksum RB ence Appointment Date Appointment (Optional) Date of Attempted Access Code1 Code Code3 (Optional) Both GIP 100 Basic Change.9. (a) (ii) (c) Removal of basic met 100 PBP3 Int 4... Change d DB receive s details from Contrac t Fitt DB sends Change data to BB asexm - Real or Batch MIRN MIRN Checksum Appointment Date Date Svice Request d Old Gas Old Gas Index Value New Gas Type Size Code PPC IN SO Response Changes Page 19

20 Pressure Correction Fac New Index Value Code1 Code Code Both GIP 105 Basic Upgrade to Intval.9.3 (b) (i)- Basic Upgrade 105 PBP3 Int 4... Upgrade d RB Advice Contrac t Fitt complet ed and Installati on Databa se updated DB sends Upgrad e data to BB Electro nic - asexm Work Reque st - Real or Batch MIRN MIRN Checksum Appointment Date Date Svice Request d Old Gas Old Gas Index Value New Gas Type Size Code Pressure Correction Fac New Index Value Code1 Code Code3 (Optional) PPC IN SO Response Changes Page 0

21 Both GIP 5.5 Basic Removal 100 PBP3 Int 4... Access to complete Removal Contrac t fitt was unable to complet e change due to no access DB sends Remov e data to BB asexm Work Reque st - Real or Batch MIRN MIRN Checksum RB ence Appointment Date Appointment (Optional) Date of Attempted Access Code1 Code Code3 (Optional) Both GIP 5.5 Basic Removal.9. (a) (ii) (c) Removal of basic met 100 PBP3 Int 4... Removal d DB receive s details from Contrac t Fitt DB sends Remov e data to BB asexm Work Reque st - Real or Batch MIRN MIRN Checksum RB ence Date Svice Request d Old Gas Removed Index Value PPC IN SO Response Changes Page 1

22 Code1 Code Code3 311 Both GIP 99. n Procedur es Transacti ons 100 PBP3 Int 4... Svice Connectio n BB asexm Real or Batch Date Svice Request d RB ence MIRN (Optional) MIRN Checksum (Optional) Address Code1 Code Code3 (Optional) PPC IN SO Response Changes Page

23 313 Both GIP 99. n Procedur es Transacti ons.9.6 link 100 PBP3 Int 4... Svice Disconnec tion BB asexm Real or Batch MIRN MIRN Checksum RB ence Date Svice Request d Svice Request d Code1 Code Code3 (Optional) Both GIP 99. n Procedur es Transacti ons 100 PBP3 Int 4... Svice Ords d for Priority A - K BB asexm Real or Batch MIRN MIRN Checksum New Index Value (Optional) RB ence (Optional) Gas (Optional) Date Svice Request d Svice Request d PPC IN SO Response Changes Page 3

24 (Optional) Address Code1 Code Code3 (Optional) 317 Both GIP 99. n Procedur es Transacti ons 100 PBP3 Int 4... Relocate Svice BB asexm MIRN MIRN Checksum RB ence Date Svice Request d Address Code1 Code Code3 (Optional) PPC IN SO Response Changes Page 4

25 319 Both GIP 99. n Procedur es Transacti ons 103 PBP3 Int 4... Upgrade Svice Size BB asexm MIRN MIRN Checksum RB ence Date Svice Request d Address Code1 Code Code3 (Optional) Both GIP 99. n Procedur es Transacti ons 103 PBP3 Int 4... Upgrade Size BB asexm MIRN MIRN Checksum Appointment Date Date Svice Request d Old Gas Old Gas Index Value New Gas New Type Size Code New Pressure Correction Fac New Index Value PPC IN SO Response Changes Page 5

26 Code1 Code Code3 (Optional) RB ence (Optional) 101 A Both GIP 5. Basic Change 100 PBP3 Int 4... Change Request response Custom Reques t Change Sends Change Reques t to DB BB Electro nic - asexm - Real 151 A Both GIP 5.5 Basic Removal 100 PBP3 Int 4... Removal Request response Custom Reques t Remov al Sends Remov e Reques t to DB BB asexm Work Reque st - Real or Batch 310 A Both GIP 99. n Procedur es Transacti ons 100 PBP3 Int 4... Svice Connectio n requests response BB asexm MIRN (Optional) MIRN Checksum (Optional) mination Completion Date PPC IN SO Response Changes Page 6

27 31 A Both GIP 99. n Procedur es Transacti ons 100 PBP3 Int 4... Svice Disconnec tion Request response BB asexm Real or Batch 314 A Both GIP 99. n Procedur es Transacti ons 100 PBP3 Int 4... Svice Ords for Priority C -K response BB asexm Real or Batch 316 A Both GIP 99. n Procedur es Transacti ons 100 PBP3 Int 4... Relocate Svice Connectio n request response BB asexm 318 A Both GIP 99. n Procedur es Transacti ons 100 PBP3 Int 4... Upgrade Svice Size request response BB asexm 30 A Both GIP 99. n Procedur es Transacti ons 100 PBP3 Int 4... Upgrade Size request response BB asexm PPC IN SO Response Changes Page 7

28 87 A Both GIP 5.1 Basic Fix.9.1(a) Basic Installatio n 104 PBP3 Int 4... Fix request "Simple" or "Complex" type response Validate d CoC and Plumbe rs icence s numb or Start Work tice Sends Fix Reques t to DB BB asexm - Real PPC IN SO Response Changes Page 8

29 ATTACHMENT D PROPOSED CHANGES BB SERVICE ORDER SPECIFICATIONS PART Blue represents additions Red and strikeout represents deletions Marked up changes Sheet: Job Enquiry Codes VIC, QD AND SA DEFINITION AND USAGE - RESPONSE ACTIVITIES PPC IN SO Response Changes Page 9

30 ATTACHMENT E VAT RESUTS JOB COMPETION CODES Blue represents additions Red and strikeout represents deletions Marked up changes VAT_Results_-_Job_ Completion_Codes_-_ PPC IN SO Response Changes Page 30

Notice to Participants on AEMO decision to approve amendments to the artefacts of Gas Interface Protocol (VIC and QLD) and Specification Pack (SA)

Notice to Participants on AEMO decision to approve amendments to the artefacts of Gas Interface Protocol (VIC and QLD) and Specification Pack (SA) Notice to all Participants, 6 March 2015 Notice to Participants on AEMO decision to approve amendments to the artefacts of Gas Interface Protocol (VIC and QLD) and Specification Pack (SA) This notice advises

More information

PROPOSED PROCEDURE CHANGE (PPC) SUMMARY SECTION (For Proponent or AEMO to complete. Template focuses on solution identification)

PROPOSED PROCEDURE CHANGE (PPC) SUMMARY SECTION (For Proponent or AEMO to complete. Template focuses on solution identification) Issue Number PROPOSED PROCEDURE CHANGE (PPC) SUMMARY SECTION (For Proponent or AEMO to complete. Template focuses on solution identification) IN039/16 Impacted All Jurisdiction(s) Proponent Nandu Datar

More information

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) (Ordinary or Expedited)

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) (Ordinary or Expedited) Issue Number IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) IN039/16 Impacted All Jurisdiction (s) Proponent Nandu Datar Company AEMO Affected Gas Markets(s) Retail

More information

PROPOSED PROCEDURE CHANGE (PPC) SUMMARY SECTION (For Proponent or AEMO to complete. Template focuses on solution identification)

PROPOSED PROCEDURE CHANGE (PPC) SUMMARY SECTION (For Proponent or AEMO to complete. Template focuses on solution identification) Issue Number PROPOSED PROCEDURE CHANGE (PPC) SUMMARY SECTION (For Proponent or AEMO to complete. Template focuses on solution identification) IN034/16 Impacted All Jurisdiction(s) Proponent Nandu Datar

More information

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer)

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) Issue Number Impacted Jurisdiction (s) IN015/13 South Australia Proponent Danny McGowan Company AEMO Affected Gas Markets(s)

More information

Final PBP Responses to IIR for IN (NARGP As Built consultation), including Wagga Wagga Tamworth (WWT) responses

Final PBP Responses to IIR for IN (NARGP As Built consultation), including Wagga Wagga Tamworth (WWT) responses Final PBP Responses to IIR for IN018-15 (NARGP As Built consultation), including Wagga Wagga Tamworth (WWT) responses 2 Specific comments regarding PBPs # Participant Document Clause/ 1. EA Gas FRC Connectivity

More information

Gas B2B Service Order Outage Plan

Gas B2B Service Order Outage Plan Gas B2B Service Order Outage Plan Version: 3.4 (FINAL) Date: September 2017 Prepared in collaboration by: Gas Retail Consultative Forum (GRCF) Gas Contingency Plan V3.4 1 of 8 1. Background A single industry

More information

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer)

IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) IMPACT & IMPLEMENTATION REPORT SUMMARY SECTION (For AEMO to complete and administer) Issue Number Impacted Jurisdiction (s) IN003/13 South Australia Proponent Brooke Edwards Company AEMO Affected Gas Markets(s)

More information

PARTICIPANT BUILD PACK 5 PROCESS FLOW DIAGRAMS VER 1.0 PREPARED BY: REGULATORY CHANGE VERSION: 1.0 DATE: 2 MAY 2016 FINAL

PARTICIPANT BUILD PACK 5 PROCESS FLOW DIAGRAMS VER 1.0 PREPARED BY: REGULATORY CHANGE VERSION: 1.0 DATE: 2 MAY 2016 FINAL PARTICIPANT BUILD PACK 5 PROCESS FLOW DIAGRAMS VER 1.0 PREPARED BY: REGULATORY CHANGE VERSION: 1.0 DATE: 2 MAY 2016 FINAL Document Approval and Acceptance AEMO Approval This document has been prepared

More information

Specification Pack Usage Guidelines. For the SA and WA Gas Retail Markets

Specification Pack Usage Guidelines. For the SA and WA Gas Retail Markets For the SA and WA Gas Retail Markets Version: 6.6 Last Update: 4 December 2017 1 Version History Version Date Author(s) Changes and Comments 0.1 18/11/03 B. Eaves First version 1.0 14/11/03 D Bone Updated

More information

FRC B2B System Interface Definitions. For the SA and WA Gas Retail Markets

FRC B2B System Interface Definitions. For the SA and WA Gas Retail Markets FRC B2B System Interface Definitions For the SA and WA Gas Retail arkets Version: 3.9 Last Update: 14/9/2015 FRC B2B System Interface Definitions Version History Version Date Author(s) Changes and Comments

More information

B2B PROCEDURE ONE WAY NOTIFICATION PROCESS

B2B PROCEDURE ONE WAY NOTIFICATION PROCESS B2B PROCEDURE ONE WAY NOTIFICATION PROCESS ENERGY TYPE: PREPARED BY: DOCUMENT NO: VERSION NO: 2.2 Electricity Retail Markets and Metering Not Applicable EFFECTIVE DATE: 13 May 2015 FINAL DETERMINATION

More information

PARTICIPANT BUILD PACK 2 USAGE GUIDE

PARTICIPANT BUILD PACK 2 USAGE GUIDE PARTICIPANT BUILD PACK 2 USAGE GUIDE PREPARED BY: MARKET DEVELOPMENT DOCUMENT REF: 305137 VERSION: 3.1 DATE: 1 JULY 2014 FINAL : N E'.,.V SOU'IH 'NA!.ES QU : ENSlA N l) 50 J f H AUS'IRA..IA \'ICl'ORA AL

More information

DRAFT DETERMINATION CONSULTATION

DRAFT DETERMINATION CONSULTATION DRAFT DETERMINATION CONSULTATION MSATS PROCEDURES: Consumer Administration and Transfer Solution (CATS) Procedure Principles and Obligations Version 4.6 Procedure for the Management of Wholesale, Interconnector,

More information

MSATS PROCEDURES: CATS PROCEDURE PRINCIPLES AND OBLIGATIONS

MSATS PROCEDURES: CATS PROCEDURE PRINCIPLES AND OBLIGATIONS MSATS PROCEDURES: CATS PROCEDURE PRINCIPLES AND OBLIGATIONS PPEPARED FOR: Electricity PREPARED BY: Retail Markets and Metering DOCUMENT NO: MT_RT1700v004.03.8 VERSION NO: 4.03.8 EFFECTIVE DATE: 15 May

More information

B2B PROCEDURE METER DATA PROCESS

B2B PROCEDURE METER DATA PROCESS B2B PROCEDURE METER DATA PROCESS ENERGY TYPE: PREPARED BY: DOCUMENT NO: VERSION NO: 2.2 Electricity Retail Markets and Metering Not Applicable EFFECTIVE DATE: 13 May 2015 FINAL DETERMINATION Australian

More information

B2B GUIDE. PREPARED BY: VERSION: 1.0 EFFECTIVE DATE: 01 December Approved for distribution and use by: APPROVED BY: [NAME] DATE: / / 20

B2B GUIDE. PREPARED BY: VERSION: 1.0 EFFECTIVE DATE: 01 December Approved for distribution and use by: APPROVED BY: [NAME] DATE: / / 20 INFORMATION EXCHANGE COMMITTEE C/ - IEC SECRETARIAT AEMO LTD Level 22 530 Collins Street Melbourne VIC 3000 Tel: (03) 9609 8000 FAX: (03) 9609 8080 B2B GUIDE PREPARED BY: VERSION: 1.0 EFFECTIVE DATE: 01

More information

HOW WEBMETHODS IS USED TO SUPPORT THE ELECTRICITY AND GAS MARKETS IN AUSTRALIA.

HOW WEBMETHODS IS USED TO SUPPORT THE ELECTRICITY AND GAS MARKETS IN AUSTRALIA. HOW WEBMETHODS IS USED TO SUPPORT THE ELECTRICITY AND GAS MARKETS IN AUSTRALIA. September 2017 WARREN VELLA PRINCIPAL INTEGRATION SPECIALIST SLIDE 1 TOPICS 1. Who is AEMO? 2. AEMO s Integration Objectives

More information

MSATS PROCEDURES CATS PROCEDURE PRINCIPLES AND OBLIGATIONS. PREPARED BY: Retail Markets and Metering VERSION: 4.5 EFFECTIVE DATE: 1 December 2017

MSATS PROCEDURES CATS PROCEDURE PRINCIPLES AND OBLIGATIONS. PREPARED BY: Retail Markets and Metering VERSION: 4.5 EFFECTIVE DATE: 1 December 2017 CATS PROCEDURE PRINCIPLES AND OBLIGATIONS PREPARED BY: Retail Markets and Metering VERSION: 4.5 EFFECTIVE DATE: 1 December 2017 STATUS: FINAL Approved for distribution and use by: APPROVED BY: PETER GEERS

More information

MSATS PROCEDURES: PROCEDURE FOR THE MANAGEMENT OF WHOLESALE, INTERCONNECTOR, GENERATOR AND SAMPLE (WIGS) NMIS

MSATS PROCEDURES: PROCEDURE FOR THE MANAGEMENT OF WHOLESALE, INTERCONNECTOR, GENERATOR AND SAMPLE (WIGS) NMIS MSATS PROCEDURES: PROCEDURE FOR THE MANAGEMENT OF WHOLESALE, INTERCONNECTOR, GENERATOR AND SAMPLE (WIGS) NMIS PPEPARED FOR: PREPARED BY: DOCUMENT NO: VERSION NO: 3.76 Electricity Metering & SettlementsRetail

More information

CAPACITY TRANSFER AND AUCTION INTERFACE PROTOCOL

CAPACITY TRANSFER AND AUCTION INTERFACE PROTOCOL CAPACITY TRANSFER AND AUCTION INTERFACE PROTOCOL Version: 1.0 Published: 23 November 2018 IMPORTANT NOTICE Purpose This Capacity Transfer and Auction Interface Protocol is produced by AEMO in accordance

More information

B2B PROCEDURE: METER DATA PROCESS. PREPARED BY: AEMO Markets VERSION: 3.2 EFFECTIVE DATE: 1 February 2019

B2B PROCEDURE: METER DATA PROCESS. PREPARED BY: AEMO Markets VERSION: 3.2 EFFECTIVE DATE: 1 February 2019 PREPARED BY: AEMO Markets VERSION: 3.2 EFFECTIVE DATE: 1 February 2019 STATUS: DRAFT Approved for distribution and use by: APPROVED BY: Information Exchange Committee DATE: 20/07/2018 VERSION RELEASE HISTORY

More information

ALLOCATION OF EMBEDDED NETWORK CODES

ALLOCATION OF EMBEDDED NETWORK CODES ALLOCATION OF EMBEDDED NETWORK CODES PREPARED BY: Retail Markets and Metering DOCUMENT NO: MT_GN1710v007 VERSION NO: 7 PREPARED FOR: National Electricity Market EFFECTIVE DATE: September 2014 Australian

More information

Schema Change Request

Schema Change Request Schema Change Request Document ID 1 Change Type Bug Fix or Enhancement or New Requirement Title MSATS functional enhancements Date 14 February, 2003 Prepared By Nada Reinprecht Priority Notes Last saved

More information

MSATS PROCEDURES: Consumer Administration and Transfer Solution (CATS) Procedure Principles and Obligations Version 4.6

MSATS PROCEDURES: Consumer Administration and Transfer Solution (CATS) Procedure Principles and Obligations Version 4.6 INITIAL CONSULTATION MSATS PROCEDURES: Consumer Administration and Transfer Solution (CATS) Procedure Principles and Obligations Version 4.6 Procedure for the Management of Wholesale, Interconnector, Generator

More information

FRC HUB OPERATIONAL TERMS AND CONDITIONS

FRC HUB OPERATIONAL TERMS AND CONDITIONS FRC HUB OPERATIONAL TERMS AND CONDITIONS PREPARED BY: DOCUMENT REF: 308009 VERSION: 56.0 DATE: FINALDRAFT : MARKET PERFORMANCE TBA 1. RECITALS Definitions Recitals Subscriber means any business that sends

More information

AEMO S RESPONSE TO MARKET AUDITOR S REPORTS FOR AUDIT PERIOD 1 AUGUST 2015 TO 30 JUNE 2016

AEMO S RESPONSE TO MARKET AUDITOR S REPORTS FOR AUDIT PERIOD 1 AUGUST 2015 TO 30 JUNE 2016 AEMO S RESPONSE TO MARKET AUDITOR S REPORTS FOR AUDIT PERIOD 1 AUGUST 2015 TO 30 JUNE 2016 Published: January 2017 IMPORTANT NOTICE Purpose AEMO has prepared this document in response to the Market Auditor

More information

CSV Data Format Specification. For the SA and WA Gas Retail Markets

CSV Data Format Specification. For the SA and WA Gas Retail Markets CSV Data Format Specification For the SA and WA Gas Retail Markets Version: 3.3 Last Update: 31 October 2016 Version History Version Date Author(s) Changes and Comments 1.1 26/08/02 MK Original from Michael

More information

Market Participant Test Kit Version 5.3

Market Participant Test Kit Version 5.3 Market Participant Test Kit Version 5.3 07 February, 2018 Issued by SP Services Ltd Contacts/Further Information To request any further information or clarifications please email retailerhelp@spgroup.com.sg

More information

B2B GUIDE. PREPARED BY: VERSION: 1.23 EFFECTIVE DATE: 01 December February Approved for distribution and use by: APPROVED BY: IEC

B2B GUIDE. PREPARED BY: VERSION: 1.23 EFFECTIVE DATE: 01 December February Approved for distribution and use by: APPROVED BY: IEC INFORMATION EXCHANGE COMMITTEE C/ - IEC SECRETARIAT AEMO LTD Level 22 530 Collins Street Melbourne VIC 3000 Tel: (03) 9609 8000 FAX: (03) 9609 8080 B2B GUIDE PREPARED BY: VERSION: 1.23 EFFECTIVE DATE:

More information

NOTICES BOILERPLATE CLAUSE

NOTICES BOILERPLATE CLAUSE NOTICES BOILERPLATE CLAUSE Need to know Notices clauses are included in contracts: to establish an agreed and valid mechanism for the giving and serving of notices; or to determine if and when notices

More information

Testing Framework Work Stream

Testing Framework Work Stream Meeting Summary Workshop No: #6 Venue: PwC Offices, 2 Southbank Boulevard, Melbourne Date: 20 April 2010 Time: 10:00 AM 4:00 PM 1. Welcome & Introductions - Harry Koller welcomed TFWG members to the 6

More information

Pre-production: Wednesday 12 December 2018 Production: Wednesday 30 January 2019

Pre-production: Wednesday 12 December 2018 Production: Wednesday 30 January 2019 1.00 Draft December 2018 Pre-production: Wednesday 12 December 2018 Production: Wednesday 30 January 2019 Release series: MSATS012019 AEMO 2018 MSATS 46.91 - Release Schedule - January 2019 1 PURPOSE &

More information

CAPACITY TRANSFER AND AUCTION INTERFACE PROTOCOL

CAPACITY TRANSFER AND AUCTION INTERFACE PROTOCOL CAPACITY TRANSFER AND AUCTION INTERFACE PROTOCOL Version: 0.1 Published: 28 August 2018 IMPORTANT NOTICE Purpose This Capacity Transfer and Auction Interface Protocol is produced by AEMO in accordance

More information

Major Customer Connections: Application to Connect Form: Embedded Generation > 5 MW

Major Customer Connections: Application to Connect Form: Embedded Generation > 5 MW Major Customer Connections: Application to Connect Form: Embedded Generation > 5 MW For the connection of embedded generating units having an aggregate nameplate capacity > 5 MW FEBRUARY 2018 Privacy Notice

More information

THE NATIONAL GAS MARKET BULLETIN BOARD - PARTICIPANT REGISTRATION KIT

THE NATIONAL GAS MARKET BULLETIN BOARD - PARTICIPANT REGISTRATION KIT THE NATIONAL GAS MARKET BULLETIN BOARD - PARTICIPANT REGISTRATION KIT VERSION: 1.00 DOCUMENT REF: PREPARED BY: (EITS) ELECMARKDEV-9-617 Information Management and Technology (IMT) Electricity IT Solutions

More information

Basic Arithmetic and the ALU. Basic Arithmetic and the ALU. Background. Background. Integer multiplication, division

Basic Arithmetic and the ALU. Basic Arithmetic and the ALU. Background. Background. Integer multiplication, division Basic Arithmetic and the ALU Forecast Representing numbs, 2 s Complement, unsigned ition and subtraction /Sub ALU full add, ripple carry, subtraction, togeth Carry-Lookahead addition, etc. Logical opations

More information

MSATS PROCEDURE: MDM PROCEDURES

MSATS PROCEDURE: MDM PROCEDURES MSATS PROCEDURE: MDM PROCEDURES PREPARED BY: AEMO MARKETS VERSION: 3.3 EFFECTIVE DATE: 1 DECEMBER 2017 STATUS: FINAL Approved for distribution and use by: APPROVED BY: PETER GEERS TITLE: EXECUTIVE GENERAL

More information

MMS DATA SUBSCRIPTION SERVICES USER INTERFACE GUIDE

MMS DATA SUBSCRIPTION SERVICES USER INTERFACE GUIDE MMS DATA SUBSCRIPTION SERVICES USER INTERFACE GUIDE VERSION: 2.01 DOCUMENT REF: PREPARED BY: MMSTDPD69 EMD DATE: 16 February 2010 Final Copyright Copyright 2012 Australian Energy Market Operator Limited

More information

REMIT Reporting Service

REMIT Reporting Service REMIT Reporting Service User Guide Version:1.1 31 March 2015 Deleted: 19 Contents 1. Introduction... 4 2. REMIT Reporting Services Agreement... 5 2.1 Subscription to Services-Registry of Subscribed Users

More information

Description of the Application Process for Small Embedded Generators

Description of the Application Process for Small Embedded Generators Description of the Application Process for Small Embedded Generators This document describes the Application Process for Small Embedded Generators (as required under section 5.3.3A of the National Electricity

More information

METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7

METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7 METROLOGY PROCEDURE: PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PROCEDURE FOR METERING TYPES 1 7 PREPARED BY: DOCUMENT NO: VERSION NO: 5.10 Retail Markets and Metering MT_MA80 EFFECTIVE

More information

GRMS FTP Procedure Guide. For the SA and WA Gas Retail Markets

GRMS FTP Procedure Guide. For the SA and WA Gas Retail Markets For the SA and WA Gas Retail Markets Version: 2.3 Release Date: 31 October 2016 Relevant documents: Description AEMO Self-change password guide included in the Information Pack AEMO Self-change password

More information

Online ordering and tracking

Online ordering and tracking Online ordering and tracking Managing orders You can use the notification queue to: Filter your search for a particular notification to find the exact information you need, enhancing your ability to manage

More information

BB DAILY STORAGE REPORT TRANSACTION REPORT INFORMATION

BB DAILY STORAGE REPORT TRANSACTION REPORT INFORMATION TRANSACTION REPORT INFORMATION Version: 1.0 Published: 26 April 2018 IMPORTANT NOTICE Purpose These BB Daily Storage Report are made by AEMO under section 227 of the National Gas Law to specify the manner

More information

POWER SYSTEM DATA COMMUNICATION STANDARD

POWER SYSTEM DATA COMMUNICATION STANDARD POWER SYSTEM DATA COMMUNICATION STANDARD PREPARED BY: AEMO Systems Capability VERSION: 2 EFFECTIVE DATE: 1 December 2017 STATUS: FINAL Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au

More information

Electricity Information Exchange Protocols (EIEP)

Electricity Information Exchange Protocols (EIEP) The Authority is currently updating the numbering and formatting in this document and an updated document will be released soon. Electricity Information Exchange Protocols (EIEP) Functional Specification

More information

The Impact of Refactoring Legacy Systems on Code Quality Metrics. By Alan Jonsson

The Impact of Refactoring Legacy Systems on Code Quality Metrics. By Alan Jonsson The Impact of Refactoring Legacy Systems on Code Quality Metrics By Alan Jonsson Abstract Maintaining legacy code can be difficult, it can also be hard to know wheth what you are doing to maintain the

More information

GUIDE TO B2B VALIDATION MODULE SOFTWARE COVERS THE SET-UP AND USE OF THE B2B VALIDATION MODULE SOFTWARE

GUIDE TO B2B VALIDATION MODULE SOFTWARE COVERS THE SET-UP AND USE OF THE B2B VALIDATION MODULE SOFTWARE GUIDE TO B2B VALIDATION MODULE SOFTWARE COVERS THE SET-UP AND USE OF THE B2B VALIDATION MODULE SOFTWARE Version: 3.02 Published: Wednesday, 14 February 2018 IMPORTANT NOTICE Purpose This Guide to B2B Validation

More information

MEDICINES CONTROL COUNCIL

MEDICINES CONTROL COUNCIL MEDICINES CONTROL COUNCIL Questions & Answers Implementation of ectd in South Africa This document is intended to provide clarity on guidelines and specifications for applications for the registration

More information

VAR DISPATCH WEB INTERFACE USER GUIDE VERSION 0.3

VAR DISPATCH WEB INTERFACE USER GUIDE VERSION 0.3 VAR DISPATCH WEB INTERFACE USER GUIDE VERSION 0.3 Published: November 2015 IMPORTANT NOTICE Purpose AEMO has prepared this document to provide information about the VAR Dispatch web interface, as at the

More information

Rules on Standards for Requesting and Exchanging Site-Specific Historic Usage Information for Retail Electricity and Natural Gas Markets

Rules on Standards for Requesting and Exchanging Site-Specific Historic Usage Information for Retail Electricity and Natural Gas Markets Rule 010 Rules on Standards for Requesting and Exchanging Site-Specific Historic Usage Information for Retail Electricity and Natural Gas Markets This rule was approved by the Alberta Utilities Commission

More information

METROLOGY PROCEDURE PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION

METROLOGY PROCEDURE PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION METROLOGY PROCEDURE PART B: METERING DATA VALIDATION, SUBSTITUTION AND ESTIMATION PREPARED BY: AEMO MARKETS DOCUMENT REF: MT_MA80 VERSION: 6.0 EFFECTIVE DATE: 1 DECEMBER STATUS: DRAFT Approved for distribution

More information

BB DAILY STORAGE DATA SUBMISSION TRANSACTION AND VALIDATION INFORMATION

BB DAILY STORAGE DATA SUBMISSION TRANSACTION AND VALIDATION INFORMATION BB DAILY STORAGE DATA SUBMISSION TRANSACTION AND VALIDATION INFORMATION Version: 1.01 Published: 10 May 2018 IMPORTANT NOTICE Purpose These BB Daily Storage Data Submission are made by AEMO under section

More information

Business Process and Procedures Workstream

Business Process and Procedures Workstream National Smart Metering Program Business Process and Procedures Workstream Load Mgt CLC/R process Version Number: Version 0.3 Status: Draft Author: P Egger Date Published: 23 July 2010 File Name: 04_bppwg

More information

B2B PROCEDURE ONE WAY NOTIFICATION PROCESS

B2B PROCEDURE ONE WAY NOTIFICATION PROCESS ONE WAY NOTIFICATION PROCESS PREPARED BY: AEMO Markets VERSION: 3.2 EFFECTIVE DATE: 1 February 2019 STATUS: FINAL Approved for distribution and use by: APPROVED BY: Information Exchange Committee SIGNED:

More information

FRC GAS HUB PARTICIPANT USER GUIDE

FRC GAS HUB PARTICIPANT USER GUIDE FRC GAS HUB PARTICIPANT USER GUIDE PREPARED BY: FOR: DOCUMENT NO: VERSION NO: 10.0 AEMO IMT EFFECTIVE DATE: 2 May 2016 STATUS: Gas Market Participants Active.A.u$1rolkin Er ~rg}' Marke; O~ rotc ljd ASN

More information

GBB (WA) 1.11 (BUILD 345) RELEASE NOTES

GBB (WA) 1.11 (BUILD 345) RELEASE NOTES GBB (WA) 1.11 (BUILD 345) RELEASE NOTES Published: September 2018 IMPORTANT NOTICE Purpose The Australian Energy Market Operator (AEMO) has prepared this document to provide information about the GBB (WA)

More information

Guide to Contract Reference Selections 1.00 Final March 2019

Guide to Contract Reference Selections 1.00 Final March 2019 Guide to Contract Reference Selections 1.00 Final March 2019 Gas Supply Hub Important Notice PURPOSE This Guide to Contract Reference Selections (Guide), prepared by the Australian Energy Market Operator

More information

B2B MAPPING TO ASEXML

B2B MAPPING TO ASEXML FORMELY THE ELECTRICITY B2B BUILD PACK OCTOBER 2013 Version: 2.00 Reference: ELECMARKDEV-9-432 2013 Australian Energy Market Operator Ltd (AEMO). All rights reserved. B2B Mapping to asexml Important Notice

More information

SLED Certification of 3 rd Party NCIC/SCIC Applications Overview February 2, 2004

SLED Certification of 3 rd Party NCIC/SCIC Applications Overview February 2, 2004 SLED Certification of 3 rd Party NCIC/SCIC Applications Overview February 2, 2004 This document provides an overview of the program put into place by the South Carolina Law Enforcement Division (SLED)

More information

The Proposer recommends that this modification should be assessed by a Workgroup

The Proposer recommends that this modification should be assessed by a Workgroup Stage 01: At what stage is this document in the process? : Supply Point Registration Facilitation of Faster Switching! This modification seeks to reduce the Supply Point confirmation period following the

More information

B2B PROCEDURE: CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS

B2B PROCEDURE: CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS PREPARED BY: AEMO Markets VERSION: 3.1 EFFECTIVE DATE: 01 December 2017 STATUS: FINAL Approved for distribution and use by: APPROVED BY: Information Exchange

More information

NSMP Gap Review Analysis of Procedure Limitations

NSMP Gap Review Analysis of Procedure Limitations GRAPL No: NSMP23 Status: Draft/Final Version: 0.7 Date: 05 Jul 2010 Short Title Function #7.23 Operating Conditions Deleted: 6 Deleted: 7 Jun NEM Procedures Impacted Metrology Procedure Metrology Procedure

More information

MSATS USER INTERFACE GUIDE

MSATS USER INTERFACE GUIDE MSATS USER INTERFACE GUIDE MONDAY, 26 NOVEMBER 2012 Version: 10.00 Reference: ELECMARKDEV-3-20 2012 Australian Energy Market Operator Ltd (AEMO). All rights reserved. MSATS User Interface Guide Disclaimer

More information

Service Description NBN Co Platform Interfacing Service

Service Description NBN Co Platform Interfacing Service Service Description This document forms part of NBN Co s Wholesale Broadband Agreement, which is a Standard Form of Access Agreement for the purposes of Part XIC of the Competition and Consumer Act 2010.

More information

Employment Ontario Information System (EOIS) Case Management System Service Provider User Guide

Employment Ontario Information System (EOIS) Case Management System Service Provider User Guide Employment Ontario Information System (EOIS) Case Management System Service Provider User Guide Chapter 8C: Service Plan Management for the Canada- Ontario Job Grant Version 2.1July 2018 Table of Contents

More information

SHORT TERM OPERATING RESERVE E-TENDER GUIDANCE DOCUMENT

SHORT TERM OPERATING RESERVE E-TENDER GUIDANCE DOCUMENT SHORT TERM OPERATING RESERVE E-TENDER GUIDANCE DOCUMENT For use with the STOR Tender Submission Spreadsheet Issued on 14 th July 2017 National Grid Electricity Transmission plc National Grid House Warwick

More information

Provision of Network Information to System Management (RC_2014_10)

Provision of Network Information to System Management (RC_2014_10) Rule Change Notice Provision of Network Information to System Management (RC_2014_10) This notice is given under clause 2.5.7 of the Wholesale Electricity Market Rules (Market Rules). Submitter: Kate Ryan,

More information

MDM FILE FORMAT AND LOAD PROCESS

MDM FILE FORMAT AND LOAD PROCESS MDM FILE FORMAT AND LOAD PROCESS PREPARED BY: AEMO MARKETS VERSION: 1.1 EFFECTIVE DATE: STATUS: DRAFT Approved for distribution and use by: APPROVED BY: PETER GEERS TITLE: EXECUTIVE GENERAL MANAGER, MARKETS

More information

TERTIARY INSTITUTIONS SERVICE CENTRE (Incorporated in Western Australia)

TERTIARY INSTITUTIONS SERVICE CENTRE (Incorporated in Western Australia) TERTIARY INSTITUTIONS SERVICE CENTRE (Incorporated in Western Australia) Royal Street East Perth, Western Australia 6004 Telephone (08) 9318 8000 Facsimile (08) 9225 7050 http://www.tisc.edu.au/ THE AUSTRALIAN

More information

REX: An External Guide for Electrical Contractors

REX: An External Guide for Electrical Contractors REX: An External Guide for Electrical Contractors Effective from 24 July 2018 Version 1.2 SA Power Networks Page 1 of 16 Contents General Overview... 3 Getting Started... 3 New Users - Information you

More information

UPDATES ON IMPLEMENTATION OF SDPC AT SYSTEM INJECTION POINTS WITH MULTIPLE SUPPLY SOURCES

UPDATES ON IMPLEMENTATION OF SDPC AT SYSTEM INJECTION POINTS WITH MULTIPLE SUPPLY SOURCES UPDATES ON IMPLEMENTATION OF SDPC AT SYSTEM INJECTION POINTS WITH MULTIPLE SUPPLY SOURCES PREPARED BY: Market Performance DOCUMENT NO: GWCF 11-080-02 GWCF MEETING: 163 DATE: 15 Mar 2011.',,utlra!ion Er

More information

Provider Monitoring Process

Provider Monitoring Process Provider Monitoring Process This statewide provider monitoring process is applicable for all providers including direct vendors, Agency with Choice (AWC) Financial Management Services (FMS) providers and

More information

WEMS 3.24 AND WEMS: RCM 1.5 RELEASE NOTES

WEMS 3.24 AND WEMS: RCM 1.5 RELEASE NOTES WEMS 3.24 AND WEMS: RCM 1.5 RELEASE NOTES Published: February 2018 IMPORTANT NOTICE Purpose The Australian Energy Market Operator has prepared this document to provide information about the Wholesale Electricity

More information

REX: An External Guide for Electrical Contractors

REX: An External Guide for Electrical Contractors REX: An External Guide for Electrical Contractors Effective from 1 December 2017 Version 1.1 SA Power Networks Page 1 of 13 Contents General Overview... 3 Getting Started... 3 New Users - Information you

More information

Iowa Workers Compensation Commission (IWD DWC) Claims Release 3.1 Test Plan. Table of Contents

Iowa Workers Compensation Commission (IWD DWC) Claims Release 3.1 Test Plan. Table of Contents Table of Contents IWD DWC Summary...2 Who is required to Test?... 2 Summary of Test Stages... 3 Miscellaneous Information for Test Stages... 3 Stage 1: EDI Trading Partner Profile Electronic Registration...4

More information

Final draft ETSI EN V1.2.0 ( )

Final draft ETSI EN V1.2.0 ( ) European Standard (Telecommunications series) Terrestrial Trunked Radio (TETRA); Voice plus Data (V+D); Part 10: Supplementary services stage 1; Sub-part 17: Include Call (IC) 2 Reference REN/TETRA-03080

More information

GUIDE TO DATA SUBSCRIPTION PROVIDES INSTRUCTIONS FOR USING THE DATA SUBSCRIPTION WEB INTERFACE IN THE EMMS MARKETS PORTAL. Version: 3.

GUIDE TO DATA SUBSCRIPTION PROVIDES INSTRUCTIONS FOR USING THE DATA SUBSCRIPTION WEB INTERFACE IN THE EMMS MARKETS PORTAL. Version: 3. GUIDE TO DATA SUBSCRIPTION PROVIDES INSTRUCTIONS FOR USING THE DATA SUBSCRIPTION WEB INTERFACE IN THE EMMS MARKETS PORTAL. Version: 3.00 Published: Monday, 18 December 2017 IMPORTANT NOTICE No reliance

More information

Customer Functions Service Provider Role Paper

Customer Functions Service Provider Role Paper Background Customer Functions Service Provider Role Paper One of the General Policy Principles in all jurisdictions for small customers was to ensure that all parties who provide access to enable provision

More information

January 30, Docket Nos. ER and ER Interconnection Queue Quarterly Progress Report, Q4 2014

January 30, Docket Nos. ER and ER Interconnection Queue Quarterly Progress Report, Q4 2014 California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 January 30, 2015 Re: California

More information

INTRODUCTION TO MSATS PROVIDES AN INTRODUCTION TO THE MARKET SETTLEMENT AND TRANSFER SOLUTION (MSATS)

INTRODUCTION TO MSATS PROVIDES AN INTRODUCTION TO THE MARKET SETTLEMENT AND TRANSFER SOLUTION (MSATS) INTRODUCTION TO MSATS PROVIDES AN INTRODUCTION TO THE MARKET SETTLEMENT AND TRANSFER SOLUTION (MSATS) Version: 11.00 Published: Wednesday, 22 November 2017 IMPORTANT NOTICE No reliance or warranty This

More information

Our Customer Relationship Agreement NODELINE SERVICE DESCRIPTION

Our Customer Relationship Agreement NODELINE SERVICE DESCRIPTION Our Customer Relationship Agreement NODELINE SERVICE DESCRIPTION Internode Pty Ltd ABN 82 052 008 581 Phone: 13 66 33 1/502 Hay Street, Subiaco WA 6008 20 February 2018 Rules of interpretation and capitalised

More information

Woolworths Price Form

Woolworths Price Form Woolworths Price Form Reference Guide Doc ID #1397 Last updated 19 February 2018 Copyright Woolworths Group Page 1 of 16 Contents Purpose Key Things to Know Forms Tool Validation Messages Woolworths Price

More information

Schema Change Request

Schema Change Request Schema Change Request Document ID 23 Change Type s and Bug fixes Title B2B Electricity transactions Date Prepared By Nada Reinprecht Priority Notes Last saved at 24-Mar-2005 01:12:00 PM Page 1 of 55 Document

More information

METERING SERVICE PROVIDER APPLICATION FORM (PART 2)

METERING SERVICE PROVIDER APPLICATION FORM (PART 2) METERING SERVICE PROVIDER APPLICATION FORM (PART 2) PREPARED BY: Retail Markets and Metering DOCUMENT NO: MT_MP821 VERSION NO: v009 PREPARED FOR: National Electricity Market EFFECTIVE DATE: 11 November

More information

Santa Ana Unified School District (SAUSD)

Santa Ana Unified School District (SAUSD) Santa Ana Unified School District (SAUSD) Internet Expenses Implementation User s Guide Mileage Claim 0 Introducing Oracle Internet Expenses With Oracle Internet Expenses, employees can enter and submit

More information

2018 Summary Report into the cyber security preparedness of the National and WA Wholesale Electricity Markets. AEMO report to market participants

2018 Summary Report into the cyber security preparedness of the National and WA Wholesale Electricity Markets. AEMO report to market participants 2018 Summary Report into the cyber security preparedness of the National and WA Wholesale Electricity Markets AEMO report to market participants December 2018 Important notice PURPOSE AEMO has published

More information

NEM 12&13 FILE FORMAT CLARIFICATIONS

NEM 12&13 FILE FORMAT CLARIFICATIONS NEM 12&13 FILE FORMAT CLARIFICATIONS PREPARED BY: DOCUMENT NO: VERSION NO: PREPARED FOR: Metering & Settlements N/A v006 National Electricity Market EFFECTIVE DATE: September 2009 FINAL Important Disclaimer

More information

DPP Compliance Programme AMWA AS-11 DPP Product Test Report (See note 5, on next page) DPP Lab, BBC R&D, Centre House, 56 Wood Lane, W12 7SB, UK

DPP Compliance Programme AMWA AS-11 DPP Product Test Report (See note 5, on next page) DPP Lab, BBC R&D, Centre House, 56 Wood Lane, W12 7SB, UK TEST REPORT No R1008 DPP Compliance Programme AMWA AS-11 DPP Product Test Report (See note 5, on next page) DPP Lab, BBC R&D, Centre House, 56 Wood Lane, W12 7SB, UK OEM Product (Note 6) Product Version

More information

Commonwealth of Pennsylvania Office of Developmental Programs Year 8 Cost Report for the Consolidated Waiver Program

Commonwealth of Pennsylvania Office of Developmental Programs Year 8 Cost Report for the Consolidated Waiver Program September 21, 2015 Commonwealth of Pennsylvania Office of Developmental Programs Year 8 Cost Report for the Consolidated Waiver Program Training Session on Cost Report Changes for Year 8 Dial-in: (855)

More information

B2B PROCEDURE: CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS

B2B PROCEDURE: CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS PREPARED BY: AEMO Markets VERSION: 3.2 EFFECTIVE DATE: 01 February 2019 STATUS: Draft Approved for distribution and use by: APPROVED BY: Information Exchange

More information

PANORAMA Data Security & Access Protocol

PANORAMA Data Security & Access Protocol PANORAMA Data Security & Access Protocol ALL DATA Security Any data provided to the PANORAMA Data Management Facility by external data guardians will be stored securely on the Flinders Medical Centre Y

More information

FRC B2M-B2B Hub System Architecture. For the SA and WA Gas Retail Markets

FRC B2M-B2B Hub System Architecture. For the SA and WA Gas Retail Markets FRC B2M-B2B Hub System Architecture For the SA and WA Gas Retail Markets Version: 3.6 Last Update: 4 December 2017 Version History Version Date Author(s) Changes and Comments 0.1 30/9/03 D. Bone Minor

More information

e-lms Electronic Lodgement of Mailing Statements User Guide Version 4.5

e-lms Electronic Lodgement of Mailing Statements User Guide Version 4.5 e-lms Electronic Lodgement of Mailing Statements User Guide Version 4.5 Copyright Statement Copyright the Australian Postal Corporation 2016. All rights reserved. No part of this document may be reproduced,

More information

B2B PROCEDURE: CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS

B2B PROCEDURE: CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS CUSTOMER AND SITE DETAILS NOTIFICATION PROCESS PREPARED BY: AEMO Markets VERSION: 3.2 EFFECTIVE DATE: 01 February 2019 STATUS: Draft Approved for distribution and use by: APPROVED BY: Information Exchange

More information

The SSD2 system and its use for data reporting. Valentina Rizzi Biological Monitoring Unit

The SSD2 system and its use for data reporting. Valentina Rizzi Biological Monitoring Unit The SSD2 system and its use for data reporting Valentina Rizzi Biological Monitoring Unit EURL-AR Training Course 2013 Copenhagen (Denmark), 27 November 2013 SSD version 2 What is SSD? New mandate for

More information

Employment Ontario Information System (EOIS) Case Management System

Employment Ontario Information System (EOIS) Case Management System Employment Ontario Information System (EOIS) Case Management System Service Provider User Guide Chapter 8B: Service Plan Management for Literacy and Basic Skills Version 2.7 December 2017 Table of Contents

More information

0522: Governance of the use of as a valid UNC communication

0522: Governance of the use of  as a valid UNC communication Stage 01: Modification 0522: Governance of the use of email as a valid UNC communication At what stage is this document in the process? This modification proposes business rules to ensure that appropriate

More information

SERVICE LEVEL PROCEDURE:

SERVICE LEVEL PROCEDURE: SERVICE LEVEL PROCEDURE: METERING DATA PROVIDER SERVICES PREPARED BY: AEMO MARKETS VERSION: 1.7 EFFECTIVE DATE: 01 DECEMBER 2017 STATUS: FINAL Approved for distribution and use by: APPROVED BY: PETER GEERS

More information