1 Connection & Compliance processes Experts Group Implementation NCs (session 1) Brussel, 25/01/2016 Ann Larsen
2 Agenda 1 Network Codes requirements 2 Current versus Future 3 Procedure for type A Generators 4 Procedure for type B/C Generators 5 EON-ION-FON Procedure 6 Limited Operational Notification 2
3 Network Codes requirements NC Categories of Grid Users Procedure NC Articles RfG Generators type A/B/C/D Scope of application Art. 3 RfG Generators type A/B/C/D Regulatory aspects Art. 7 Rfg Generators type A/B/C/D Generalities Art. 29 RfG Generators type A Installation Document Art.30 RfG Generators type B/C Power generating module document Art. 32 RfG Generators type D EON / ION / FON / LON Art DCC Transmission connected demand facility / distribution facility / distribution system Scope of application Art. 3/4 DCC Transmission connected demand facility / distribution facility / distribution system Regulatory aspects Art. 6 Transmission connected demand facility / DCC distribution facility / distribution system EON / ION / FON / LON Art DCC Demand response services > 1000V Installation Document Art. 32 DCC Demand response services < 1000V Demand response unit Document Art. 33 Transmission connected demand facility / Responsibility of DSO and demand DCC distribution facility / distribution system facility owner Art. 34 Transmission connected demand facility / DCC distribution facility / distribution system Tasks of SO concerning compliance Art. 35 3
4 Network Codes requirements Rfg Art. 3 & DCC Art. 3/4 Application of the NCs to new users and for substantial modifications The definition of a substantial modification will be discussed later in the topic "Modernization of interconnection point". Rfg Art. 7 The topic "Compliance verification can influence the connection and compliance process DCC Art. 6 The topic Common regulatory provisions can influence the connection and compliance process, but actually no impact or compliancy detected. DCC Art This this process (DSR) will be examined in a second step 4
5 Current versus Future connection process Current Process Connection Study Main modifications of the NCs Publication of the operational notification procedure by the relevant system operator Connection Contract Realization of the connection EON = Energization Operational Notification ION = Interim Operational Notification FON = Final Operation Notification Operation of the connection LON = Limited operational Notification Elia philosophy: Integrate the NCs requirements for the connection of grid users (generation and demand facilities) in the existing process. No intention to completely modify the process if not required, but potential re-evaluation of specific points are possible. 5
6 Capacity reservation 6
7 Process generators type A New power generating module Type A Relevant system operator Complete the installation document Submit installation document Installation document with at least (content specify by the NCs, Art. 30.2): the location at which the connection is made the date of the connection the maximum capacity of the installation in kw the type of primary energy source the classification of the PGM as an emerging technology according to Title VI reference to equipment certificates / information to provided the contact details & signatures (owner and installer) If Elia must connect generators type A: minor modifications of annex 1 of the connection contract are needed to include all the required information 7
8 Process generators type B/C New power generating module (PGM) Type B/C Complete the power generating module document (with a statement of compliance) per power generating module Relevant system operator Receive the PGMD Issue a FON (Final Operational Notification) Based on the RfG NC, Power generating module document may contain: evidence of an agreement on the protection and control settings itemized statement of compliance detailed technical data of the power generating module equipment certificates issued by an authorized certifier for Type C power generating modules, simulation models compliance test reports demonstrating steady-state and dynamic performance, including use of actual measured values during testing studies demonstrating steady-state and dynamic performance The information to provide will be determined and discussed in the related topics. Elia proposal: modification of the annex 1 of the connection contract and/or TR most probably 8
9 Operational notification procedure EON-ION-FON Procedure applicable to: Generators of type D Demand facilities CDS Distribution systems Compliance to demonstrate to: The relevant system operator Energisation Operational Notification (EON) Energisation of the internal network by using the network connection Interim Operational Notification (ION) Operate by using the network connection for a limited period of time Final Operational Notification (FON) Operate by using the network connection Elia proposal: modifications of the connection contract and it will impact the TR and SOK 9
10 Operational notification procedure - Requirements Energisation Operational Notification (EON) Interim Operational Notification (ION) Final Operational Notification (FON) - fulfilment TSO requirements - agreement on protection & control - Data and study review process - TSO may request: interim statement of compliance detailed technical data equipment certificates simulation models studies demonstrating expected steady-state and dynamic performance details of intended practical method of completing compliance tests - Removal of all incompatibilities - Data and study review process - TSO may request statement of compliance update of the applicable technical data, simulation models and studies including the use of actual measured values during testing The requested information will contain at least what is asked currently. 10
11 Operational notification procedure TSO Implementation To be analyzed if it could be done simultaneously Letter TSO issues the ION Letter TSO issues the FON Letter TSO issues the EON Information update Grid users provides specified information EON ION FON Energization Operation Validity period max 24 months LON - Significant modification - Loss of capability - Equipment failure leading to non-compliance or relevant requirements 11
12 Limited operational notification (LON) Transmission connected demand facility Distribution system connection TSO Granted a FON Incident: temporary modification or loss of capability equipment failures leading to non compliance Inform TSO in the 24 hours (or a longer period if agreed) After 1 month Will persist more than 3 months No Keep the FON Issue a LON with unresolved issues responsibilities and timescales for the solution initial period of validity Yes Apply for a LON Removal of the problems Yes No FON Invalid Refuse the operation Re Issue a FON Elia proposal: modifications of the connection contract and it will impact the TR and SOK 12
13 Many thanks for your attention! Ann Larsen ELIA SYSTEM OPERATOR Boulevard de l'empereur Brussels info@ elia.be An Elia Group company
Data Exchange & Switching
Data Exchange & Switching Belgian Grid 26/9/2016 Ann Larsen Data considered - Sources Data exchanges: Injection and offtake measurements (qh) Allocations CDS Loop losses Nominations Sources : Grid Code:
More informationNetwork Code on Operational Security. User s Group System Operations 06/11/2013
Network Code on Operational Security User s Group System Operations 06/11/2013 Agenda Objectives of Network Codes Operations codes vs. Connection codes System Operation NC and NC OS State of play of NC
More informationAn Introduction to the Operational Notification and Compliance Process Including Timescales for New Generation Connections
An Introduction to the Operational Notification and Compliance Process Including Timescales for New Generation Connections An Introduction to the Operational Notification and Compliance Process Including
More informationWG Belgian Grid. WG Belgian Grid 19/06/2017
WG Belgian Grid WG Belgian Grid 19/06/2017 2.1 Werkplan 2017 Data & agenda van de Workshops RTF Network Code Status Best guess(!) for entry into force Market codes: Status NC adoption Summary No changes
More informationENTSO-e Operational Security Network Code. OS Code Objectives. Update for JESG meeting 20 th Feb 2013
ENTSO-e Operational Security Network Code Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. OS
More informationAn Introduction to Network Codes & The Links Between Codes
An Introduction to Network Codes & The Links Between Codes April 2014 About ENTSO-E 41 TSOs from 34 countries 532 million citizens served 828 GW generation 305 Thousand Km of transmission lines Ten-Year
More informationFeedback WG BG Meetings 4/9
Feedback WG BG Meetings 4/9 Verwarrend: Users Group 21/9/2017 David Zenner Implementation Network Codes: status update 2 Network Code Status Best guess(!) for entry into force Market codes: Status NC adoption
More informationAreas of impact for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949
Areas of for client consideration taken from the Rules for achieving and maintaining IATF recognition 4 th Edition for ISO/TS 16949 1 st February 2014 1 Foreword Introduction The IATF recognizes certification
More informationENTSO-E connection network codes Implementation guidance documents. Joint DSO response paper
ENTSO-E connection network codes Implementation guidance documents Joint DSO response paper August 2016 Dépôt légal: D/2016/12.105/45 Questionnaire Rate-of-change- of- frequency withstand capability (RoCoF)
More informationWork to establish standard ENTSOE STAKEHOLDER COMMITTEE 1
Work to establish standard EN50549-1 EN50549-2 EN50549-10 2017-03-14 ENTSOE STAKEHOLDER COMMITTEE 1 SOMMAIRE Summary Key points TC8X / WG31 01 Schedule1 TC8X / approach1 02 03 Next steps 04 Others considerations1
More informationCertification Description of Malaysia Sustainable Palm Oil (MSPO) Standard
The certification of a management system based on standard Malaysia Sustainable Palm Oil Standard (MSPO) respectively, consists of the offer and contract phase, the audit preparation, performance of the
More informationTask Force icaros. Integrated Coordination of Assets for Redispatching and Operational Security. Meeting 5 November 21, Elia
Task Force icaros Integrated Coordination of Assets for Redispatching and Operational Security Meeting 5 November 21, 2017 Elia Web page: http://www.elia.be/en/users-group/working-group_balancing/task-force-cipu-redesign
More informationCertification. Causes of Reduction of Scope of Certification
Certification Granting Maintaining Suspension Reduction of Scope Withdrawal Changes & Modification of Certification Causes of Reduction of Scope of Certification Issue of changed certificate Assessment
More informationGLOBAL MANAGEMENT CERTIFICATION SERVICES PRIVATE LIMITED PROCEDURE
GLOBAL MANAGEMENT CERTIFICATION SERVICES PRIVATE LIMITED Document No. P-04 PROCEDURE Version. 2.00 Granting, Maintaining, Extending, Reducing, Date of Issue 04.04.2016 Reviewed & Approved By Name Designation
More informationSparta Systems TrackWise Digital Solution
Systems TrackWise Digital Solution 21 CFR Part 11 and Annex 11 Assessment February 2018 Systems TrackWise Digital Solution Introduction The purpose of this document is to outline the roles and responsibilities
More informationGC0106: Mod Title: Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL)
Stage 01: Modification Proposal Grid Code GC0106: Mod Title: Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL) Purpose of Modification: This modification seeks to make changes
More informationCIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XII EFFECTIVE : FORTHWITH
GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDURJUNG AIRPORT, New Delhi CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XII, 2017 EFFECTIVE
More informationAPPROVAL PROCESS TO BE FOLLOWED FOR PROVISIONAL ACCREDITATION OF CBs UNDER FM CERTIFICATION SCHEME
APPROVAL PROCESS TO BE FOLLOWED FOR PROVISIONAL ACCREDITATION OF CBs UNDER FM CERTIFICATION SCHEME Contents Scope... 3 A. Application for the Notification of the Certification Body... 3 B. Approval from
More informationGC0104:EU Connection Codes GB Implementation Demand Connection Code
GC0104:EU Connection Codes GB Implementation Demand Connection Code Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size
More informationDescription of the Certification procedure FSSC 22000
Description of the Certification procedure FSSC 22000 Certific ation Table of contents 1 CERTIFICATION PROCEDURE... 2 1.1 Audit Preparation... 2 1.2 Audit Stage 1... 2 1.3 Audit Stage 2 Certification Audit...
More informationAreas of impact for client consideration taken from the Rules for achieving IATF recognition Third edition for ISO/TS
Areas of impact for client consideration taken from the Rules for achieving IATF recognition Third edition for ISO/TS 16949 June 2009 1 Matrix of areas of impact on the client: Clause Area of impact content
More informationNetwork Code on Emergency and Restoration - Implementation Guide for the Communication Systems Requirements. Final VERSION
Network Code on Emergency and Restoration - Implementation Guide for the Communication Systems Requirements Final VERSION September 2018 1 TABLE OF CONTENTS 1 INTRODUCTION... 3 1.1 COMMUNICATION SYSTEM
More informationTimber Products Inspection, Inc.
Timber Products Inspection, Inc. Product Certification Public Document Timber Products Inspection, Inc. P.O. Box 919 Conyers, GA 30012 Phone: (770) 922-8000 Fax: (770) 922-1290 TP Product Certification
More informationTURKISH STANDARDS INSTITUTION
TURKISH STANDARDS INSTITUTION NEW GLOBAL OLD APPROACH REGULATIONS CONFORMITY ASSESSMENT PROCEDURES AND PRINCIPLES Board Decision : 29.04.2014 Date 50.-236 Validity date : 05.05.2014 CHAPTER ONE Objective,
More informationSTCP19-3 Issue 006 Operational Notification & Compliance Testing
STCP19-3 Issue 006 Operational Notification & Compliance Testing STC Procedure Document Authorisation Company National Grid Electricity Transmission plc Name of Party Representative Signature Date SP Transmission
More informationAgreements & Queue Management
Agreements & Queue Management Resource Interconnection Fair February 24, 2016 Page 1 Interconnection Process Map You are here Page 2 Topics 1. Generator Interconnection Agreement (GIA) 2. Affected Systems
More informationEOQ methods and criteria for approval of training courses and training providers
1. Scope This document is describing EOQ rules and criteria to be used for the approval of training providers and training courses using as reference the EOQ Competence Specifications (CoS) and by Accreditation
More informationPCN CRITERIA FOR THE APPOINTMENT OF LEVEL 3 TECHNICIANS FOR GUIDED WAVE TESTING AS A TRANSITIONAL ARRANGEMENT
Certification Services Division Newton Building, St George s Avenue Northampton, NN2 6JB United Kingdom Tel: +44(0)1604-893-811. Fax: +44(0)1604-893-868. E-mail: pcn@bindt.org CP12A INITIAL ISSUE DATED
More informationDescription of the TÜV NORD CERT certification procedure GMP+ FC (Feed Certification scheme) of GMP+ International B.V. (NL)
Certific ation Table of contents 1 CERTIFICATION PROCEDURE... 3 1.1 Audit Preparation... 3 1.2 Establishment of readiness for certification... 3 1.3 Temporary approval... 3 1.4 Audit Stage 2 Certification
More informationAPPROVAL SHEET PROCEDURE INFORMATION SECURITY MANAGEMENT SYSTEM CERTIFICATION. PT. TÜV NORD Indonesia PS - TNI 001 Rev.05
APPROVAL SHEET PROCEDURE INFORMATION SECURITY MANAGEMENT SYSTEM CERTIFICATION PT. TÜV NORD Indonesia PS - TNI 001 Rev.05 Created : 20-06-2016 Checked: 20-06-2016 Approved : 20-06-2016 Indah Lestari Karlina
More informationContent of mandatory certificates
Chapter: 2.5.1 Conformity assessment procedures; General rules Text:... Key words: certificate, certificate of competence, 1. Purpose The purpose of this recommendation is to provide guidance on the minimum
More informationFY2016 FCC Form 470 and Competitive Bidding
and Competitive Bidding Slide 1 Table of Contents Topic Page The E-Rate Process 3 Making a Plan 5 The Basics 11 Filing a Form 470 21 Form Actions 25 Form 470 Section One: Basic Information 29 Form 470
More informationCustomer Hub. User Manual
User Manual Summary This document describes how external users can use the. The is a web portal developed by Elia to exchange information with its customers. Version 1.0 Date 11-10-2016 Info If you have
More informationJune 2012 First Data PCI RAPID COMPLY SM Solution
June 2012 First Data PCI RAPID COMPLY SM Solution You don t have to be a security expert to be compliant. Developer: 06 Rev: 05/03/2012 V: 1.0 Agenda Research Background Product Overview Steps to becoming
More informationBEST PRACTICE GUIDE for Type IB Variations. CMD(v)/BPG/005. Edition 00. Edition date: Implementation date:
Co-ordination Group for Mutual Recognition and Decentralised Procedures - Veterinary EMEA/CMD(v)/115405/2005 BEST PRACTICE GUIDE for Type IB Variations Edition 00 Edition date: 10-12-2005 Implementation
More informationAgreements and Queue Management
Agreements and Queue Management Infrastructure Contracts and Management Emilee Plouff, Contract Negotiation and Regulatory Contracts Joanne Bradley, Queue Management March 6, 2018 Interconnection Process
More informationver. 1.0 page 1 from 10 Meter Data Collection and Aggregation
ver. 1.0 page 1 from 10 Meter Data Collection and Aggregation ver. 1.0 page 2 from 10 TABLE OF CONTENTS 1. PURPOSE...3 2. SCOPE 3 3. RESPONSIBLE PARTIES AND USERS...4 3.1. Market Operator...4 3.2. System
More informationUser Access Administrator (UAA) Form and Access to Resource Interconnection Management System (RIMS 5)
User Access Administrator (UAA) Form and Access to Resource Interconnection Management System (RIMS 5) Massih Ahmadi 11/28/2017
More informationJapan Patent Office (JPO)
Japan Patent Office (JPO) Q1 Filing Date Q2 Representation Q3 Forms and Means of Communications Q4 Relief in Respect of Time Limits Q5 Reinstatement of Rights Q6 Restoration of Priority Rights Where the
More informationRSPO Certification Step by step
RSPO Certification Step by step Index Terms and definitions... 3 Objectives and applicable certification schemes... 5 Evaluation procedures... 7 Certification request... 7 Critical analysis of certification
More informationReliability Standard Audit Worksheet 1
Reliability Standard Audit Worksheet 1 FAC-003-4 Transmission Vegetation Management. Registered Entity Name: Applicable Function(s): Applicable only for TO and GO Compliance Monitoring Method: RSAW Version:
More informationReference Framework for the FERMA Certification Programme
Brussels, 23/07/2015 Dear Sir/Madam, Subject: Invitation to Tender Reference Framework for the FERMA Certification Programme Background The Federation of European Risk Management Associations (FERMA) brings
More informationGUIDELINE. of the European Committee for Welding of Railway Vehicles (ECWRV) ( ) PART 1
GUIDELINE of the European Committee for Welding of Railway Vehicles (ECWRV) (2016-05-10) PART 1 Procedure for the application of EN 15085 and certification of welding manufacturers for welding railway
More informationOIML-CS PD-05 Edition 2
PROCEDURAL DOCUMENT OIML-CS PD-05 Edition 2 Processing an application for an OIML Type Evaluation Report and OIML Certificate OIML-CS PD-05 Edition 2 ORGANISATION INTERNATIONALE DE MÉTROLOGIE LÉGALE INTERNATIONAL
More informationPECB Certified ISO/IEC Lead Auditor
When Recognition Matters Lead Auditor 25-29 March 2018 Master the Audit of Rainbow Towers Hotel, Harare Systems (ISMS) based on $1250.00 Who should attend? - Auditors seeking to perform and lead System
More informationAudit and Certification Process of GUTcert for
Audit and Certification Process of GUTcert for PRODUCT CERTIFICATION ACC. TO ISO 17065 Sustainable Biomass acc. ISCC and REDcert GUT Certifizierungsgesellschaft für Managementsysteme mbh Umweltgutachter
More informationGDPR Processor Security Controls. GDPR Toolkit Version 1 Datagator Ltd
GDPR Processor Security Controls GDPR Toolkit Version 1 Datagator Ltd Implementation Guidance (The header page and this section must be removed from final version of the document) Purpose of this document
More informationSparta Systems TrackWise Solution
Systems Solution 21 CFR Part 11 and Annex 11 Assessment October 2017 Systems Solution Introduction The purpose of this document is to outline the roles and responsibilities for compliance with the FDA
More informationImplementation Network Codes. WG Belgian Grid 26 October 2016
Implementation Network Codes WG Belgian Grid 26 October 2016 P. Buijs Overview 1. Non-NC driven changes to the Federal Grid Code a) Proposed priority topics b) Proposed approach per priority topic c) Capacity
More informationLONG-RANGE IDENTIFICATION AND TRACKING SYSTEM TECHNICAL DOCUMENTATION (PART II)
E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 ax: +44 (0)20 7587 3210 LONG-RANGE IDENTIICATION AND TRACKING SYSTEM TECHNICAL DOCUMENTATION (PART II) MSC.1/Circ.1294/Rev.5 17 January
More informationSparta Systems Stratas Solution
Systems Solution 21 CFR Part 11 and Annex 11 Assessment October 2017 Systems Solution Introduction The purpose of this document is to outline the roles and responsibilities for compliance with the FDA
More informationInhalt. Description of Certification Procedure ISO 22000, HACCP and DIN 15593
Inhalt 1. CERTIFICATION PROCEDURE... 2 1.1 Audit Preparation... 2 1.2 Audit Stage 1... 2 1.3 Audit Stage 2 Certification Audit... 3 1.4. Issue of Certificate... 3 2. SURVEILLANCE AUDIT... 3 3. RECERTIFICATION
More informationRules for LNE Certification of Management Systems
Rules for LNE Certification of Management Systems Application date: March 10 th, 2017 Rev. 040716 RULES FOR LNE CERTIFICATION OF MANAGEMENT SYSTEMS CONTENTS 1. PURPOSE... 3 2. SCOPE... 3 3. DEFINITION
More informationOrion Registrar, Inc. Certification Regulations Revision J Effective Date January 23, 2018
Introduction This document outlines the process of obtaining and maintaining certification with Orion Registrar Incorporated. Included are the requirements and rights of a Company undergoing certification
More informationGuidance: Operational Conditions Precedent (OCPs) September 2016 Version 1
Guidance: Operational Conditions Precedent (OCPs) September 2016 Version 1 Contents 1 Introduction 4 2 Operational Conditions Precedent requirements 4 3 Low Carbon Contracts Company Process 8 4 Supporting
More informationSecurity Standards for Electric Market Participants
Security Standards for Electric Market Participants PURPOSE Wholesale electric grid operations are highly interdependent, and a failure of one part of the generation, transmission or grid management system
More informationRole of the DSO in providing flexibility. Febeliec Workshop Demand Response 15/6/2015
Role of the DSO in providing flexibility Febeliec Workshop Demand Response 15/6/2015 Introduction: Synergrid, the flexibility ballpark Synergrid C8WG5 Technical specifications NFS/CCC master data Reflex
More informationIssue 1. August Page 1 of 6. National Security Inspectorate Sentinel House, 5 Reform Road Maidenhead SL6 8BY Website: nsi.org.
Regulations for NSI Approved Companies Annex 4: Additional regulations relating to companies holding NSI 'NACOSS Gold' and 'Systems Silver' approval (including Scaffold Alarms) Issue 1 August 2016 National
More informationENTSO-E working to fulfill the 3 rd Package
ENTSO-E working to fulfill the 3 rd Package Regulators Role in Developing Infrastructure, Florence February 7 2012 Geoffrey Feasey, ENTSO-E Corporate Affairs Manager ENTSOE s role in implementing European
More informationCERTIFICATION GUIDELINES FOR MANAGEMENT SYSTEM
CERTIFICATION GUIDELINES FOR MANAGEMENT SYSTEM Table of Content 1.0 INTRODUCTION... 2 2.0 CERTIFICATION PROCESS... 2 3.0 SCHEDULE OF FEES... 3 4.1 CERTIFICATION REQUIREMENTS... 3 4.2 Eligibility criteria
More informationFY2017 FCC Form 470 and Competitive Bidding
and Competitive Bidding Slide 1 Table of Contents Topic Page The E-Rate Process 3 Making a Plan 5 The Basics 11 Filing a Form 470 21 Form Actions 25 Form 470 Section One: Basic Information 30 Form 470
More informationiii) Activity Definitions
iii) Activity Definitions A0, Preserve Electronic Records Under the control of Archival and Institutional Requirements, and limited by the possibilities available within the State of the Art of Information
More informationADIENT VENDOR SECURITY STANDARD
Contents 1. Scope and General Considerations... 1 2. Definitions... 1 3. Governance... 2 3.1 Personnel... 2 3.2 Sub-Contractors... 2 3.3. Development of Applications... 2 4. Technical and Organizational
More informationPART IV GLOSSARY OF TERMS
PART IV GLOSSARY OF TERMS Terms and Definitions For the purposes of this document, the following terms and definitions shall apply: PROCESS MANUAL FOR THE GFSI BENCHMARKING PROCESS V7.2 Introduction Purpose
More informationCyber Security Supply Chain Risk Management
Cyber Security Supply Chain Risk Management JoAnn Murphy, SDT Vice Chair, PJM Interconnection May 31, 2017 FERC Order No. 829 [the Commission directs] that NERC, pursuant to section 215(d)(5) of the FPA,
More informationSPECIFIC PROVISIONS FOR THE ACCREDITATION OF CERTIFICATION BODIES IN THE FIELD OF FOOD SAFETY MANAGEMENT SYSTEMS
BELAC 2-405-FSMS Rev 1-2017 SPECIFIC PROVISIONS FOR THE ACCREDITATION OF CERTIFICATION BODIES IN THE FIELD OF FOOD SAFETY MANAGEMENT SYSTEMS The only valid versions of the documents of the BELAC management
More informationSİGMACERT ULUSLARARASI BELGELENDİRME EĞİTİM TEST HİZMETLERİ LTD. ŞTİ.
SİGMACERT ULUSLARARASI BELGELENDİRME EĞİTİM TEST HİZMETLERİ LTD. ŞTİ. YS.PR.01 Certification Procedure (Revision 01 03.05.2017) Written by Reviewed & Authorized by Date: Date: CONTENT PAGE NO. A. Objective
More informationAgreements and Queue Management
Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019 Interconnection
More informationStakeholder Comments Template
Stakeholder Comments Template Submitted By Company Date Submitted Shannon Eddy (shannon@consciousventuresgroup.com) Rachel Gold (Rachel@consciousventuresgroup.com) Large-scale Solar Association (LSA) December
More informationBusiness Requirements Specification for the. Nomination and Matching Procedures. In Gas Transmission Systems (NOM BRS)
27 May 2015 Rev14 1 2 3 4 for the In Gas Transmission Systems (NOM BRS) 5 6 Version 0 Revision 14 2015-05-27 7 8 ENTSOG AISBL; Av. de Cortenbergh 100, 1000-Brussels; Tel: +32 2 894 5100; Fax: +32 2 894
More informationYouth can begin apprenticeship in high school through Secondary School Apprenticeship (SSA) programs.
LOCKSMITH Occupation Description means a person who repairs, services and/or installs all types of keys, locks, access/egress control systems (mechanical or electrical), and builders of hardware in accordance
More informationProcedure for Issue and Withdrawal of Certificates
IC/PR/11- Rev.01 Pages: 1/6 Procedure for Issue and Withdrawal of Certificates Inter Cert Pvt. Ltd. C-46, Ground Floor, Sector 10, Noida 201301, U.P., India Tel: +91-120-4542204, 4542205, Fax: 91-120-4542205
More informationITSM20F_Umang. Number: ITSM20F Passing Score: 800 Time Limit: 120 min File Version: 4.0. Exin ITSM20F
ITSM20F_Umang Number: ITSM20F Passing Score: 800 Time Limit: 120 min File Version: 4.0 http://www.gratisexam.com/ Exin ITSM20F IT Service Management Foundation based on ISO/IEC 20000 (ITSM20F.EN) Version:
More informationApproved Trainers Certification
Approved Trainers Certification The APM Group Limited QMS Related Documents Eligibility Requirements Training Certification Overview Application forms Training Organisation Certification Certification
More informationA80F300e Description of the SA8000:2014 certification procedure
The certification of a management system based on standard SA8000:2014 consists of the offer and contract phase, the audit preparation, performance of the Stage 1 audit with evaluation of the management
More informationINTERNATIONAL TELECOMMUNICATION UNION
INTERNATIONAL TELECOMMUNICATION UNION ITU-T E.212 TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU (05/2004) SERIES E: OVERALL NETWORK OPERATION, TELEPHONE SERVICE, SERVICE OPERATION AND HUMAN FACTORS International
More informationTechnical guidelines implementing eidas
Technical guidelines implementing eidas Sławek Górniak CA/Day Berlin 19 th September 2016 European Union Agency for Network and Information Security About ENISA 2 Positioning ENISA activities 3 ENISA and
More informationMARKET PROCESS DESIGN. MPD 10 - Market Process for Re-Energisation
MARKET PROCESS DESIGN MPD 10 - Market Process for Re-Energisation TABLE OF CONTENTS 1 INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2 PROCESS MAP... 5 2.1 PROCESS DESCRIPTION... 8 3 SUPPLEMENTARY
More informationAgreement on High Security Locks
Agreement on High Security Locks Participants: Certification Body Signatory CNPP VdS Schadenverhütung Svensk Brand- och Säkerhetscertifiering AB (SBSC) Associated Testing Laboratories Signatory CNPP VdS
More informationWORKSHOP WITH STAKEHOLDERS ON THE CONNECTION NETWORK CODES NATIONAL IMPLEMENTATION GUIDANCE DOCUMENTS
WORKSHOP WITH STAKEHOLDERS ON THE CONNECTION NETWORK CODES NATIONAL IMPLEMENTATION GUIDANCE DOCUMENTS ENTSO-E Secretariat Ground floor Av. de Cortenbergh 100-1000 Brussels 29 Februuary 2016 ENTSO-E Stakeholder
More informationIndonesia - SNI Certification Service Terms
Indonesia - SNI Certification Service Terms These Service Terms shall govern the Indonesian National Standard ( SNI ) Certification Services performed by the UL Contracting Party (as identified in the
More informationRenewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group
Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Table of Contents 1. Introduction... 1 2. Purpose... 1 3. Customer Eligibility...
More informationBattery Program Management Document
Battery Program Management Document Revision 5.1 February 2011 CTIA Certification Program 1400 16 th Street, NW, Suite 600 Washington, DC 20036 e-mail: certification@ctia.org Telephone: 1.202.785.0081
More informationGDPR AMC SAAS AND HOSTED MODULES. UK version. AMC Consult A/S June 26, 2018 Version 1.10
GDPR AMC SAAS AND HOSTED MODULES UK version AMC Consult A/S June 26, 2018 Version 1.10 INDEX 1 Signatures...3 2 General...4 3 Definitions...5 4 Scoping...6 4.1 In scope...6 5 Responsibilities of the data
More informationCertification Program
Certification Program Ryan Stewart, Manager of Registration, NERC FRCC Reliability Performance Workshop September 20, 2017 Purpose of the Certification Program Rules of Procedure (ROP) Section 500: The
More informationPersonnel Certification Program
Personnel Certification Program ISO 9001 (QMS) / ISO 14001 (EMS) Form PC1000 Last Updated 9/11/2017 Page 1 of 14 INDEX Auditor Certification Quality or Environmental Program Pg 3-4 Certification Status
More information0522: Governance of the use of as a valid UNC communication
Stage 01: Modification 0522: Governance of the use of email as a valid UNC communication At what stage is this document in the process? This Modification proposes business rules to ensure that appropriate
More informationScreening Procedures for Access to ISO Register of Transmission Facilities and Entitlements
Screening Procedures for Access to ISO Register of Transmission Facilities and Entitlements In accordance with the Federal Energy Regulatory Commission (FERC) order issued on January 24, 2003 (as modified
More informationSolar*Rewards Community MN Application Manual
Solar*Rewards Community MN Application Manual Version 2.0 February 2018 Contents 1. Introduction... 4 2. Application Form: Submission and Validation - Submitting Application Form... 5 2.1. Overview...
More informationVersion 1/2018. GDPR Processor Security Controls
Version 1/2018 GDPR Processor Security Controls Guidance Purpose of this document This document describes the information security controls that are in place by an organisation acting as a processor in
More informationData Subject Access Request Form (GDPR)
Data Subject Access Request Form (GDPR) Data Subject Access Request Form Article 15 of the EU General Data Protection Regulation (Regulation (EU) 2016/679) (GDPR) grants you the right to access your personal
More informationEUIPO Ex-ante product quality audits (trademarks and designs) Prior Checking Opinion Case
EUIPO Ex-ante product quality audits (trademarks and designs) Prior Checking Opinion Case 2016-0477 *** Organisations such as EUIPO ensure the quality of their output in different ways. One such way is
More informationCEN & ETSI standards & eidas Compliance
CEN & ETSI standards & eidas Compliance Nick Pope - Thales Vice Chair, ETSI TC Electronic Signature & Infrastructures Jan Ulrik Kjærsgaard Cryptomathic Editor CEN EN 419 241-2 (Remote Signing) eidas and
More informationCIP Cyber Security Personnel & Training
A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-5.1 3. Purpose: To minimize the risk against compromise that could lead to misoperation or instability in the BES from individuals
More informationJIS Mark Building Trust and Reliability
Procedures for Making Changes, etc. after Acquiring Certification JIS Mark Building Trust and Reliability JIS Mark is to be displayed appropriately pursuant to the Agreement. JIS CERTIFICATION DEPARTMENT
More informationSTCP Amendment Proposal Form
STCP Amendment Proposal Form PA036 1. Title of Amendment Proposal STCP 09-2 Incorporation material currently within SPT SCS and making standard for both TOs. 2. Description of the Proposed Amendment (mandatory
More informationDEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA MERCHANT SHIPPING SECRETARIAT MINISTRY OF PORTS AND SHIPPING
DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA MERCHANT SHIPPING SECRETARIAT MINISTRY OF PORTS AND SHIPPING 1 st Floor, Bristol Building, 43-89, York Street, Colombo 01, Sri Lanka. Telephone: +94(0)112435127,
More informationSOUTHERN COMPANY DISTRIBUTION INTERCONNECTION POLICY
SOUTHERN COMPANY DISTRIBUTION INTERCONNECTION POLICY Inverter Based Generators 25 kw and This document contains the interconnection requirements for inverter based generators, 25 kw and smaller, that operate
More informationVoluntary certification at an intermediate stage of manufacture
Chapter: 2.15 Other Text: Key words: MDD results of any assessment and verification operation, which where appropriate have been carried out in accordance with this Directive at an intermediate stage of
More informationSCI QUAL INTERNATIONAL PTY LTD ENQUIRY & APPLICATION/RENEWAL FORM FOR CERTIFICATION
SCI QUAL INTERNATIONAL PTY LTD ENQUIRY & APPLICATION/RENEWAL FORM FOR CERTIFICATION Enquiry Application Renewal COMPANY DETAILS COMPANY NAME TRADING NAME ABN WEBSITE POSTAL ADDRESS LOCATION ADDRESS ORGANISATION
More information