1 Feedback WG BG Meetings 4/9 Verwarrend: Users Group 21/9/2017 David Zenner

2 Implementation Network Codes: status update 2

3 Network Code Status Best guess(!) for entry into force Market codes: Status NC adoption Summary = changes since last plenary Users Group meeting Capacity Allocation and Congestion Management (CACM) Entered into force 14/08/2015 Forward Capacity Allocation (FCA) Entered into force 16/10/2016 Electricity balancing (EB) Approved in Comitology (16/03/2017) Q Connection codes: Requirements for generators (RfG) Entered into force 17/05/2016 Demand Connection Code (DCC) Entered into force 07/09/2016 HVDC (HVDC) Entered into force 28/09/2016 Operational codes: Operational Security (OS) Merged in one guideline Operational Planning & Scheduling (OPS) Published in the Official Journal of the EU (25/08/2017) 14/09/2017 Load Frequency Control & Reserve (LFCR) Emergency & Restoration (E&R) Approved in Comitology (24/10/2016) November

4 Indicative planning and agenda workshops with focus on Federal Grid Code and general requirements Task Force Implementation Network Codes has ended. 4 dedicated workshops for discussing: Federal Grid Code impact and amendment proposals Progress on general requirements All interested parties are welcome. All workshop material distributed prior to the workshop allowing preparation by all parties + everything will be published on elia.be Workshop 1 22/9/2017 Workshop 2 23/11/2017 Workshop 4 7/2/2018 Public consultation limits ABCD 19/5/ /6/2017 Workshop 3 18/12/2017 Public consultation FTR and Gen Req. 3/2018 4/2018 mei jul sep nov 2018 mrt mei /6/2017 WG BG 04/9/2017 WG BG 07/11/2017 WG BG Normal WG BG meetings Normal WG Bal meetings Normal WG EMD/SO meetings 17/5/2018 Submission: FTR proposal general req. ABCD proposal The normal UG Working Groups can work in support of the FTR workshops, e.g. for discussing topics for which it is too early to discuss concrete amendment proposals (e.g. non-nc wish-list ). 4

5 Network Code content on Elia website Publications Public consultation Public consultation webpage relating to the proposal for maximum capacity thresholds for types B, C and D powergenerating modules containing: Consultation document (consultation ran from 19 May till 20 June) Consultation report Original stakeholder feedback received EU NC publications Publication of all terms and conditions or proposals, established (partly) by Elia as part of the EU network codes An overview of the documents that will be published in the future (including estimated publication date), will be added soon The publication of these documents is a NC requirement WG Belgian Grid Task Force Implementation NC Presentations, minutes and documentation of the Task Force that started in 2015 and continued till the end of Q Structured per topic (e.g. Significant Grid Users) Overview of all Task Force sessions that have taken place Workshops 'Federal Grid Code and General Requirements' Presentations, minutes and documentation of the stakeholder workshops that will soon take place (cfr. previous slide) Implementation EU Network Code General information on the EU Network Codes Status on the adoption and description of the content of each Network Code Information on the Task Force Implementation NC and on the stakeholder workshops In addition, ENTSO-E launched a new Network Codes webpage with all information about codes, timelines, implementation projects, upcoming consultations, latest news, etc. ENTSO-E link 5

6 Elia Publications Public Consultation Archive Proposal for maximum capacity thresholds 6

7 Elia Publications Public Consultation Archive Proposal for maximum capacity thresholds 7

8 Elia Publications EU Network Codes 8

9 Elia Publications EU Network Codes 9

10 Users Group WG Belgian Grid Task Force Implementation NC No more Agenda 10

11 Users Group WG Belgian Grid Task Force Implementation NC No more agenda but, per topic, list of the meetings occured 11

12 Users Group WG Belgian Grid Task Force Implementation NC Topics : the place to find the whole set of documentation on a topic 12

13 Users Group WG Belgian Grid Workshops Federal Grod Code and General Requirements New page 13

14 Users Group Implementation EU Network Codes 14

15 European Network Codes Implementation of Topic Modernization Presented on WG BG 04/09/2017 Requirements for Generators: Modernisation based on power and functional blocks Demand: Modernisation based on power put at disposal and functional blocks For the global presentation : Substantial modernisation : Presentation Next steps: RfG: present case by case examples DCC: Prepare new proposal no use of notion PPAD FTR: * Insert concept of modernization in the current existing process for connection => to be presented in Workshop n 3 * Incorporate general philosophy and way to handle cases (potentially including thresholds) * Define notion of full/partial compliance 15

16 European Network Codes Implementation of Topic Compliance simulation and testing Presented on BG 04/09/2017 Requirements for Generators: Simulations: Process currently already implemented, finetuning necessary Testing: To develop Demand: Simulations: Testing: currently not applicable, incorporate in existing process. To develop For the global presentation : Compliance - Testing : Presentation Next steps: RfG + DCC: elaborate on the proposed process summarize demanded tests and simulations FTR:insert required element for compliance and testing in the current existing process for connection => to be presented in Workshop n 3 16

17 To set a framework for the federal CDS Approval of the Position Paper «Aanbevelingen betreffende de vast te stellen regels voor de gesloten distributienetten in het Technisch Federaal Reglement» 17

18 Objective of the Position Paper To have a common understanding within Users Group of the necessary rules constituting a federal framework for CDS To guide drafting work for modifications in federal grid code regarding CDS: Not yet detailed rules (see next steps) Guidelines for developing a coherent set of rules at federal level, taken into account fact that CDS grids are mostly mix (they are situated at F & R levels) New title for CDS in the Federal Grid Code, based on existing rules (PVNTR, Appendix 14 of Elia access contract, current practices of existing CDS) Not covering the (connection) NCs elements related to the CDS Position Paper CDS Users Group 21/9//

19 The Proposal of Position Paper in a nutshet Description of current situation and gap analysis of the reglementation => general proposal of the UG How to develop a coherent set of rules at federal level, taken into account fact that CDS grids are at F & R levels Proposal for differentiated application of the rules (3 steps): CDS is considered as a grid user if no TPA /flexibility activation New set of rules to be added in federal grid code: list of topics to be covered Heart of the Position Paper Proposal to integrate all rules spread in TRPVN in one unique chapter Specific rules for the Tractienet spoor Position Paper CDS Users Group 21/9//

20 Next steps for implementing the federal CDS rules 21/9: validation of final version Position Paper CDS at plenary meeting Users Group 7/11: presentation of a global proposal for new Title CDS in WG BG 9/11: send track-changes regarding the proposal to Users Group (2 weeks before the 2 nd Workshop on Federal Grid Code) 23/11: 2 nd Workshop on Federal Grid Code : discussion & feedback on proposal for Title CDS 7/2/2018: 4rd Workshop on Federal Grid Code : finalisation of the proposal for Title CDS Position Paper CDS Users Group 21/9//

WG Belgian Grid. WG Belgian Grid 19/06/2017

WG Belgian Grid. WG Belgian Grid 19/06/2017 WG Belgian Grid WG Belgian Grid 19/06/2017 2.1 Werkplan 2017 Data & agenda van de Workshops RTF Network Code Status Best guess(!) for entry into force Market codes: Status NC adoption Summary No changes

More information

An Introduction to Network Codes & The Links Between Codes

An Introduction to Network Codes & The Links Between Codes An Introduction to Network Codes & The Links Between Codes April 2014 About ENTSO-E 41 TSOs from 34 countries 532 million citizens served 828 GW generation 305 Thousand Km of transmission lines Ten-Year

More information

ENTSO-e Operational Security Network Code. OS Code Objectives. Update for JESG meeting 20 th Feb 2013

ENTSO-e Operational Security Network Code. OS Code Objectives. Update for JESG meeting 20 th Feb 2013 ENTSO-e Operational Security Network Code Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. OS

More information

Grid Code Planner EU Code Modifications GC0100/101/102/104

Grid Code Planner EU Code Modifications GC0100/101/102/104 Grid Code Planner EU Code Modifications GC0100/101/102/104 Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a

More information

Network Code on Operational Security. User s Group System Operations 06/11/2013

Network Code on Operational Security. User s Group System Operations 06/11/2013 Network Code on Operational Security User s Group System Operations 06/11/2013 Agenda Objectives of Network Codes Operations codes vs. Connection codes System Operation NC and NC OS State of play of NC

More information

Implementation Network Codes. WG Belgian Grid 26 October 2016

Implementation Network Codes. WG Belgian Grid 26 October 2016 Implementation Network Codes WG Belgian Grid 26 October 2016 P. Buijs Overview 1. Non-NC driven changes to the Federal Grid Code a) Proposed priority topics b) Proposed approach per priority topic c) Capacity

More information

European Network Codes: RfG GB Grid Code Application Options

European Network Codes: RfG GB Grid Code Application Options European Network Codes: RfG GB Grid Code Application Options Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in

More information

Annual Industry Consultation

Annual Industry Consultation nd Annual Industry Consultation Proposed revisions to the Balancing Services Adjustment Data Methodology Statement Procurement Guidelines System Management Action Flagging Methodology Statement Balancing

More information

Connection & Compliance processes

Connection & Compliance processes Connection & Compliance processes Experts Group Implementation NCs (session 1) Brussel, 25/01/2016 Ann Larsen Agenda 1 Network Codes requirements 2 Current versus Future 3 Procedure for type A Generators

More information

WORKSHOP WITH STAKEHOLDERS ON THE CONNECTION NETWORK CODES NATIONAL IMPLEMENTATION GUIDANCE DOCUMENTS

WORKSHOP WITH STAKEHOLDERS ON THE CONNECTION NETWORK CODES NATIONAL IMPLEMENTATION GUIDANCE DOCUMENTS WORKSHOP WITH STAKEHOLDERS ON THE CONNECTION NETWORK CODES NATIONAL IMPLEMENTATION GUIDANCE DOCUMENTS ENTSO-E Secretariat Ground floor Av. de Cortenbergh 100-1000 Brussels 29 Februuary 2016 ENTSO-E Stakeholder

More information

GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3

GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3 Stage 01: Modification Proposal Grid Code GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3 Purpose of Modification: This modification (3/4) will set out within the Grid Code the following

More information

GC0106: Mod Title: Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL)

GC0106: Mod Title: Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL) Stage 01: Modification Proposal Grid Code GC0106: Mod Title: Data exchange requirements in accordance with Regulation (EU) 2017/1485 (SOGL) Purpose of Modification: This modification seeks to make changes

More information

Task Force icaros. Integrated Coordination of Assets for Redispatching and Operational Security. Meeting 5 November 21, Elia

Task Force icaros. Integrated Coordination of Assets for Redispatching and Operational Security. Meeting 5 November 21, Elia Task Force icaros Integrated Coordination of Assets for Redispatching and Operational Security Meeting 5 November 21, 2017 Elia Web page: http://www.elia.be/en/users-group/working-group_balancing/task-force-cipu-redesign

More information

European Developments

European Developments European Developments Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Transmission Workgroup

More information

European Network of Transmission System Operators for Electricity (ENTSO-E) GCRP - November 2009

European Network of Transmission System Operators for Electricity (ENTSO-E) GCRP - November 2009 European Network of Transmission System Operators for Electricity (ENTSO-E) GCRP - November 2009 Contents Who are ENTSO-E? Background and legal standing Activities and Remit European Network Code Development

More information

Work to establish standard ENTSOE STAKEHOLDER COMMITTEE 1

Work to establish standard ENTSOE STAKEHOLDER COMMITTEE 1 Work to establish standard EN50549-1 EN50549-2 EN50549-10 2017-03-14 ENTSOE STAKEHOLDER COMMITTEE 1 SOMMAIRE Summary Key points TC8X / WG31 01 Schedule1 TC8X / approach1 02 03 Next steps 04 Others considerations1

More information

Much more than Rules need to be in place by 2014

Much more than Rules need to be in place by 2014 Much more than Rules need to be in place by 2014 Alberto Pototschnig Director CEER 2012 Annual Conference Energy TITRE Infrastructure and Energy Efficiency Brussels, 25 January 2012 A strong momentum The

More information

ANNUAL WORK PROGRAMME 2018 VERSION FOR PUBLIC CONSULTATION

ANNUAL WORK PROGRAMME 2018 VERSION FOR PUBLIC CONSULTATION ANNUAL WORK PROGRAMME 2018 VERSION FOR PUBLIC CONSULTATION TABLE OF CONTENTS Table of contents ABOUT ENTSO-E 01 1. EXECUTIVE SUMMARY 02 2. IMPLEMENTING THE NETWORK CODES 04 How are network codes implemented?

More information

ENTSO-E working to fulfill the 3 rd Package

ENTSO-E working to fulfill the 3 rd Package ENTSO-E working to fulfill the 3 rd Package Regulators Role in Developing Infrastructure, Florence February 7 2012 Geoffrey Feasey, ENTSO-E Corporate Affairs Manager ENTSOE s role in implementing European

More information

National Grid s European Transparency Project (ETP) ENTSOG Transparency Workshop Brussels 14 th September 2010

National Grid s European Transparency Project (ETP) ENTSOG Transparency Workshop Brussels 14 th September 2010 National Grid s European Transparency Project (ETP) ENTSOG Transparency Workshop Brussels 14 th September 2010 NG European Transparency Project (ETP): Background IT project launched to facilitate implementation

More information

SESAR Deployment and upcoming CEF Transport Calls ANS Consultative Board. Helsinki, 12 October 2015

SESAR Deployment and upcoming CEF Transport Calls ANS Consultative Board. Helsinki, 12 October 2015 SESAR Deployment and upcoming CEF Transport Calls Presentation @NEFAB ANS Consultative Board Helsinki, 12 October 2015 SESAR JU SESAR DM 2 entities, 1 project European ATM Master Plan R&D INDUSTRIALISATION

More information

All-island European Stakeholder Forum. 22 September 2016 Dublin

All-island European Stakeholder Forum. 22 September 2016 Dublin All-island European Stakeholder Forum 22 September 2016 Dublin 1 Welcome & Introductions Agenda 2 RA update on regulatory developments 3 TSO update on European Network Code developments Market Guidelines

More information

ENTSO-E connection network codes Implementation guidance documents. Joint DSO response paper

ENTSO-E connection network codes Implementation guidance documents. Joint DSO response paper ENTSO-E connection network codes Implementation guidance documents Joint DSO response paper August 2016 Dépôt légal: D/2016/12.105/45 Questionnaire Rate-of-change- of- frequency withstand capability (RoCoF)

More information

Data Exchange & Switching

Data Exchange & Switching Data Exchange & Switching Belgian Grid 26/9/2016 Ann Larsen Data considered - Sources Data exchanges: Injection and offtake measurements (qh) Allocations CDS Loop losses Nominations Sources : Grid Code:

More information

On the Road to a Common Market: The European Electricity Market and the Role of Regional Cooperation. Mark Copley 27/05/14

On the Road to a Common Market: The European Electricity Market and the Role of Regional Cooperation. Mark Copley 27/05/14 On the Road to a Common Market: The European Electricity Market and the Role of Regional Cooperation Mark Copley 27/05/14 1) Why integrate markets? 2) The legal framework 3) The European Target Model 4)

More information

MISO PJM Joint and Common Market Cross Border Transmission Planning

MISO PJM Joint and Common Market Cross Border Transmission Planning MISO PJM Joint and Common Market Cross Border Transmission Planning May 30, 2018 1 Coordinated System Plan Study 2 Using information from the March 30 Annual Issues Review, the JRPC has decided to perform

More information

Protocol Governance Committee Meeting #19 28/06/ h00 Summary Minutes

Protocol Governance Committee Meeting #19 28/06/ h00 Summary Minutes In attendance Protocol Governance Committee Meeting #19 28/06/2018 13h00 Summary Minutes Meeting chaired by Roger Gill (Vice-Chair) Hydropower Suppliers and Consultants Hydropower Operators or Developers

More information

Deliverable No. 6.3 E-newsletter 2

Deliverable No. 6.3 E-newsletter 2 Ref. Ares(2016)5757895-04/10/2016 Deliverable No. 6.3 E-newsletter 2 Project acronym FERTINNOWA Project number 689687 Project title Start date of project 1 January 2016 Duration 36 months sustainable WAter

More information

Joint European Stakeholder Group

Joint European Stakeholder Group Joint European Stakeholder Group Wednesday 26 August 2015: Meeting 5 JESG August: Shepherd and Wedderburn, Edinburgh 1. Introductions and Apologies Barbara Vest JESG Independent Chair JESG August: Shepherd

More information

ENTSO-E WORK PROGRAMME

ENTSO-E WORK PROGRAMME ENTSO-E WORK PROGRAMME 2016 THROUGH DECEMBER 2017 European Netork of Transmission System Operators for Electricity 2 ENTSO-E Work Programme 2016 through December 2017 ENTSO-E WORK PROGRAMME 2016 THROUGH

More information

GC0104:EU Connection Codes GB Implementation Demand Connection Code

GC0104:EU Connection Codes GB Implementation Demand Connection Code GC0104:EU Connection Codes GB Implementation Demand Connection Code Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size

More information

SME License Order Working Group Update - Webinar #3 Call in number:

SME License Order Working Group Update - Webinar #3 Call in number: SME License Order Working Group Update - Webinar #3 Call in number: Canada Local: +1-416-915-8942 Canada Toll Free: +1-855-244-8680 Event Number: 662 298 966 Attendee ID: check your WebEx session under

More information

BCI Principles & Criteria: Revision

BCI Principles & Criteria: Revision BCI Principles & Criteria: 2015-2017 Revision In January 2015 the BCI Council approved the proposal to launch a formal review of BCI s Principles & Criteria (P&C). This revision process provided an exciting

More information

The EU OPEN meter project

The EU OPEN meter project Open Public Extended Network ing 7 TH FRAMEWORK PROGRAMME The EU project ERGEG workshop on Smart Metering Authors: Date: Nicolas Arcauz 14th December 2009, Brussels ENERGY 2008.7.1.1 Official Journal of

More information

Plan Management Stakeholder Committee April 6, 2017

Plan Management Stakeholder Committee April 6, 2017 Plan Management Stakeholder Committee April 6, 2017 Welcome and Introductions Standing Agenda Meeting Minutes Approval Feedback From the Field Essential Community Providers Write-in Process MHBE will allow

More information

Network Codes, Governance and Regulatory issues for the Transition towards up to 100% RES

Network Codes, Governance and Regulatory issues for the Transition towards up to 100% RES 6/27/2018 Slide No. 2 Network Codes, Governance and Regulatory issues for the Transition towards up to 100% RES 28th June 2018 Bucharest, Romania Dr. Mihai PAUN Vice-President Romanian Energy Center RESERVE:

More information

ENISA S WORK ON ICS AND SMART GRID SECURITY

ENISA S WORK ON ICS AND SMART GRID SECURITY AMSTERDAM, OCTOBER 15, 2012 ENISA S WORK ON ICS AND SMART GRID SECURITY Dr. Evangelos OUZOUNIS Head of CIIP & Resilience Unit ENISA 1 Why is it important? Industrial networks is the CI for the SCADA and

More information

Privacy Code of Conduct on mhealth apps the role of soft-law in enhancing trust ehealth Week 2016

Privacy Code of Conduct on mhealth apps the role of soft-law in enhancing trust ehealth Week 2016 Privacy Code of Conduct on mhealth apps the role of soft-law in enhancing trust ehealth Week 2016 Pēteris Zilgalvis, J.D., Head of Unit for Health and Well-Being, DG CONNECT Table of Contents 1. Context

More information

Joint European Standing Group (JESG)

Joint European Standing Group (JESG) V1 Headline Report Meeting name Meeting number 15 Date of meeting 20 February 2013 Location Joint European Standing Group (JESG) Elexon, London This note sets out the headlines of the most recent meeting

More information

Standards of Practice Committee (SoPC) Guidelines

Standards of Practice Committee (SoPC) Guidelines Standards of Practice Committee (SoPC) Guidelines 1. Purpose of the SOPC 2. Role of SOPC and Working Groups i) Role of SOPC Chairperson ii) Role of the Working Group 3. Document Structure i) CIRSE Guidelines

More information

The latest update of power market in Latvia

The latest update of power market in Latvia The latest update of power market in Latvia Ainārs Meņģelsons Public Utilities Commission of Latvia Director of Energy Department 21st Baltic Electricity Market Forum, Vilnius, May 3, 2016 Content Some

More information

The Road to Paris. Towards the 2015 Climate Agreement

The Road to Paris. Towards the 2015 Climate Agreement The Road to Paris Towards the 2015 Agreement Delphine Brissonneau Delegation of the European Union to Thailand 9 September 2014 1 Out line Negotiation Outcomes - COP 15 Copenhagen Accord 2009 - COP 16

More information

ENTSO-E Requirements for Generators Network Code: GB Stakeholder s Key Issues. Feedback to JESG Garth Graham (SSE) 16 August

ENTSO-E Requirements for Generators Network Code: GB Stakeholder s Key Issues. Feedback to JESG Garth Graham (SSE) 16 August ENTSO-E Requirements for Generators Network Code: GB Stakeholder s Key Issues Feedback to JESG Garth Graham (SSE) 16 August Overview Key issues for GB Industry Stakeholders with the RFG Network Code Captured

More information

The European Single Electronic Format (ESEF)

The European Single Electronic Format (ESEF) ESMA REGULAR USE 4 July 2018 The European Single Electronic Format (ESEF) TEG / CFSS meeting Objectives set out in the Transparency Directive Directive 2004/109/EC as revised by Directive 2013/50/EU (relevant

More information

Stakeholder consultation process and online consultation platform

Stakeholder consultation process and online consultation platform Stakeholder consultation process and online consultation platform Grant agreement no.: 633107 Deliverable No. D6.2 Stakeholder consultation process and online consultation platform Status: Final Dissemination

More information

INSPIRE status report

INSPIRE status report INSPIRE Team INSPIRE Status report 29/10/2010 Page 1 of 7 INSPIRE status report Table of contents 1 INTRODUCTION... 1 2 INSPIRE STATUS... 2 2.1 BACKGROUND AND RATIONAL... 2 2.2 STAKEHOLDER PARTICIPATION...

More information

D3.1 Validation workshops Workplan v.0

D3.1 Validation workshops Workplan v.0 D3.1 Validation workshops Workplan v.0 D3.1 Validation workshops Tasks and Steps The objectives within this deliverable are: To involve relevant stakeholders in the drafting of a certification process

More information

ACER ON THE ADOPTION OF COMMON NETWORK OPERATION TOOLS BY ENTSOG. OPINION Of THE AGENCY FOR THE COOPERATION Of ENERGY REGULATORS No 04/2017

ACER ON THE ADOPTION OF COMMON NETWORK OPERATION TOOLS BY ENTSOG. OPINION Of THE AGENCY FOR THE COOPERATION Of ENERGY REGULATORS No 04/2017 Energy Regulators OPINION Of THE AGENCY FOR THE COOPERATION Of ENERGY REGULATORS No 04/2017 9 february 2017 ON THE ADOPTION OF COMMON NETWORK OPERATION TOOLS BY ENTSOG THE AGENCY FOR THE COOPERATION OF

More information

New Concept for Article 36 Networking and Management of the List

New Concept for Article 36 Networking and Management of the List New Concept for Article 36 Networking and Management of the List Kerstin Gross-Helmert, AFSCO 28 th Meeting of the Focal Point Network EFSA, MTG SEAT 00/M08-09 THE PRESENTATION Why a new concept? What

More information

Joint European Standing Group (JESG)

Joint European Standing Group (JESG) V1 Headline Report Meeting name Meeting number 17 Date of meeting 17 April 2013 Location Joint European Standing Group (JESG) Elexon, London This note sets out the headlines of the most recent meeting

More information

PSUR Repository Implementation Plan

PSUR Repository Implementation Plan 23 January 2015 EMA/34364/2015 Introduction of concepts of go-live, pilot and switch on 1. Purpose EMA has worked together with the NCAs and industry representatives in a specifically constituted PSUR

More information

Overview of OGC Document Types

Overview of OGC Document Types Overview of Document Types Carl Reed February 2015 Overview The following set of slides documents the current set of key documents, their key policy and procedure actions, and key document work flows.

More information

Agenda and General Information

Agenda and General Information Agenda and General Information IEEE P802.3bt 4-Pair Power over Ethernet (4PPoE) Chad Jones Cisco Systems Catania, Italy Oct 13, 2015 Page 1 Agenda Welcome and Introductions (Secretary George Zimmerman)

More information

Important information about the transition phase between the 3 BG model and the 1 BG model and use of the customer portal for balance groups:

Important information about the transition phase between the 3 BG model and the 1 BG model and use of the customer portal for balance groups: Page 1 of 12 Guideline for the customer portal for balance groups Content 1. Applying for access to the customer portal for balance groups 2 2. Logging in to the customer portal for balance groups 2 3.

More information

SEE CCR TSOs Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 Iuly 2015 establishing a guideline

SEE CCR TSOs Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 Iuly 2015 establishing a guideline SEE CCR TSOs Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 Iuly 2015 establishing a guideline on Capacity Allocation and Congestion Management February

More information

TSO-DSO RELATIONS IN THE FUTURE EUROPEAN POWER SYSTEM

TSO-DSO RELATIONS IN THE FUTURE EUROPEAN POWER SYSTEM TSO-DSO RELATIONS IN THE FUTURE EUROPEAN POWER SYSTEM Carlo SABELLI GO 15 San Francisco April 13 2016 42 TSOs in ENTSO-E the European Network for Transmission System Operators for Electricity 42 TSOs from

More information

ENISA s Position on the NIS Directive

ENISA s Position on the NIS Directive ENISA s Position on the NIS Directive 1 Introduction This note briefly summarises ENISA s position on the NIS Directive. It provides the background to the Directive, explains its significance, provides

More information

ESMA REGULAR USE. 30 May The European Single Electronic Format (ESEF) XBRL Europe Day. Anna Sciortino

ESMA REGULAR USE. 30 May The European Single Electronic Format (ESEF) XBRL Europe Day. Anna Sciortino ESMA REGULAR USE 30 May 2018 The European Single Electronic Format (ESEF) XBRL Europe Day Anna Sciortino An overview of the development process 2 Consultation Paper Research Analysis of responses Feedback

More information

Executive Committee Meeting

Executive Committee Meeting Executive Committee Meeting To hear the meeting, you must call in Toll-free phone number: 1-866-740-1260 Access Code: 2201876 For international call in numbers, please visit: https://www.readytalk.com/account-administration/international-numbers

More information

BEREC Public debriefing

BEREC Public debriefing BEREC Public debriefing from the 31th BEREC plenary meetings Sébastien Soriano, BEREC Chair 2017 Elisabeth Dornetshumer, Co-Chair of the Roaming Expert Group Michiel van Dijk, Co-Chair of the Net Neutrality

More information

Welcome Membership Update Sub-group / Initiatives update Investigator TMF Clarifications Sub-artifacts Observational Studies Exchange Mechanism

Welcome Membership Update Sub-group / Initiatives update Investigator TMF Clarifications Sub-artifacts Observational Studies Exchange Mechanism 11 February 2019 While we are waiting for attendees to join and the host to start the meeting, all lines will be muted. Please stay on the call. You can unmute yourself when you want to talk! Welcome Membership

More information

European Transport Policy: ITS in action ITS Action Plan Directive 2010/40/EU

European Transport Policy: ITS in action ITS Action Plan Directive 2010/40/EU European Transport Policy: ITS in action ITS Action Plan Directive 2010/40/EU Hermann Meyer, CEO ERTICO IMPACTS, Barcelona, 31 March 2011 This presentation is mainly based on charts which were already

More information

CORE Voluntary Certification: Certification from the Testing Vendor s Perspective. February 18, :00 3:00pm ET

CORE Voluntary Certification: Certification from the Testing Vendor s Perspective. February 18, :00 3:00pm ET CORE Voluntary Certification: Certification from the Testing Vendor s Perspective February 18, 2015 2:00 3:00pm ET Participating in Today s Session Download a copy of today s presentation on the CAQH.org

More information

ARISE + IPR. Ignacio de Medrano Caballero HIPOC meeting Tokyo, 19-20/02/2018

ARISE + IPR. Ignacio de Medrano Caballero HIPOC meeting Tokyo, 19-20/02/2018 ARISE + IPR Ignacio de Medrano Caballero HIPOC meeting Tokyo, 19-20/02/2018 Background ARISE+ IPR In May 2014 the Action Fiche of the programme was already endorsed by AMS at the 1 st Heads of EU-ASEAN

More information

Smart Metering Forum: The DCC Roadmap. Chris Rowell 30 November 2011

Smart Metering Forum: The DCC Roadmap. Chris Rowell 30 November 2011 Smart Metering Forum: The DCC Roadmap Chris Rowell 30 November 0 The Data & Communications Company What we know about the DCC What we would like to know about the DCC What the DCC will need to do DCC The

More information

Business Requirements Specification for the. Nomination and Matching Procedures. In Gas Transmission Systems (NOM BRS)

Business Requirements Specification for the. Nomination and Matching Procedures. In Gas Transmission Systems (NOM BRS) 27 May 2015 Rev14 1 2 3 4 for the In Gas Transmission Systems (NOM BRS) 5 6 Version 0 Revision 14 2015-05-27 7 8 ENTSOG AISBL; Av. de Cortenbergh 100, 1000-Brussels; Tel: +32 2 894 5100; Fax: +32 2 894

More information

SLHC-PP DELIVERABLE REPORT EU DELIVERABLE: Document identifier: SLHC-PP-D v1.1. End of Month 03 (June 2008) 30/06/2008

SLHC-PP DELIVERABLE REPORT EU DELIVERABLE: Document identifier: SLHC-PP-D v1.1. End of Month 03 (June 2008) 30/06/2008 SLHC-PP DELIVERABLE REPORT EU DELIVERABLE: 1.2.1 Document identifier: Contractual Date of Delivery to the EC Actual Date of Delivery to the EC End of Month 03 (June 2008) 30/06/2008 Document date: 27/06/2008

More information

FP7 Information & Communication Technologies. Rules of the Programme

FP7 Information & Communication Technologies. Rules of the Programme FP7 Information & Communication Technologies Rules of the Programme FP7/ICT Calls in Information Society 2009-2010 ICT Call 4, Closed Opened 19 November 2008: Close 1 April 2009 Joint Call with ENERGY,

More information

Client Services Procedure Manual

Client Services Procedure Manual Procedure: 85.00 Subject: Administration and Promotion of the Health and Safety Learning Series The Health and Safety Learning Series is a program designed and delivered by staff at WorkplaceNL to increase

More information

National Smart Metering Program Testing Framework Work Stream Actions Log

National Smart Metering Program Testing Framework Work Stream Actions Log - ustomer section of the table Description / Progress Source/Origin Workstream/ owner Who By When Status Reporting 20090923 4 TFWG need to feed into the BPPWG the issues about service levels and performance

More information

Embracing Competition Stakeholder Engagement Workshop no May 2018

Embracing Competition Stakeholder Engagement Workshop no May 2018 Embracing Competition Stakeholder Engagement Workshop no. 26 22 May 2018 Welcome and opening remarks Mark Adolphus, Director of Connections 2 Agenda 09:45 10:00 Coffee and registration 10:00 10:05 Welcome

More information

Submission. to the. Australian Communications and Media Authority. on the. Planning for mobile broadband within the 1.

Submission. to the. Australian Communications and Media Authority. on the. Planning for mobile broadband within the 1. Submission to the Australian Communications and Media Authority on the Planning for mobile broadband within the 1.5 GHz mobile band Submission by: Australian Mobile Telecommunications Association and Communications

More information

APACMed Workshop Update on UDI Implementation & ASPAC Regional Trend. Victoria Qu Sept. 22 nd, 2017

APACMed Workshop Update on UDI Implementation & ASPAC Regional Trend. Victoria Qu Sept. 22 nd, 2017 APACMed Workshop Update on UDI Implementation & ASPAC Regional Trend Victoria Qu Sept. 22 nd, 2017 1 Disclaimer / 免责声明 The views and opinions expressed in the following PowerPoint slides are those of the

More information

Improving the sampling standard and guidelines

Improving the sampling standard and guidelines Improving the sampling standard and guidelines Fourth CDM Roundtable Bonn, Germany, 8 June, 2012 UNFCCC secretariat SDM Programme Introduction EB 60 requested sampling guidelines and best practices examples

More information

Italy - Information Day: 2012 FP7 Space WP and 5th Call. Peter Breger Space Research and Development Unit

Italy - Information Day: 2012 FP7 Space WP and 5th Call. Peter Breger Space Research and Development Unit Italy - Information Day: 2012 FP7 Space WP and 5th Call Peter Breger Space Research and Development Unit Content Overview General features Activity 9.1 Space based applications and GMES Activity 9.2 Strengthening

More information

Welcome to today s Webcast. Thank you so much for joining us today!

Welcome to today s Webcast. Thank you so much for joining us today! Welcome to today s Webcast. Thank you so much for joining us today! My name is Michael Costa. I m a member of the DART Team, one of several groups engaged by HAB to provide training and technical assistance

More information

REGIONAL GAS MARKET COORDINATION GROUP. Progress report No. 2 December 2015 February 2017

REGIONAL GAS MARKET COORDINATION GROUP. Progress report No. 2 December 2015 February 2017 REGIONAL GAS MARKET COORDINATION GROUP Progress report No. 2 December 2015 February 2017 Approved by the Regional Gas Market Coordination Group on May 23, 2017 BACKGROUND European Union (EU) strives for

More information

2008 E-customs progress report

2008 E-customs progress report EUROPEAN COMMISSION DIRECTORATE-GENERAL TAXATION AND CUSTOMS UNION Customs Policy Customs policy and Electronic customs Taxud.c.1(2009)172599 2008 E-customs progress report Commission européenne, B-1049

More information

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast November 7, 2017

North American Portability Management, LLC Transition Oversight Manager. TOEP Webcast November 7, 2017 North American Portability Management, LLC Transition Oversight Manager TOEP Webcast November 7, 2017 Welcome to today s webcast Submit Questions for Q&A Webcast Issues Click the Q&A widget at the bottom

More information

Agenda and General Information

Agenda and General Information Agenda and General Information IEEE P802.3bt 4-Pair Power over Ethernet (4PPoE) Chad Jones Cisco Systems Geneva, CH January 24, 2018 Page 1 Agenda Welcome and Introductions (Secretary) Approve Agenda Approve

More information

Status update on REMIT implementation

Status update on REMIT implementation Status update on REMIT implementation Annamaria Marchi & Tomaž Zaplotnik Public Workshop on REMIT implementation Ljubljana, TITRE 3 April 2014 Outline.Background.REMIT policy implementation.remit IT implementation

More information

RTP Media Congestion Avoidance Techniques (rmcat)

RTP Media Congestion Avoidance Techniques (rmcat) RTP Media Congestion Avoidance Techniques (rmcat) Chairs: Anna Brunstrom Colin Perkins Martin Stiemerling Note Well Any submission to the

More information

Report from UN-GGIM: Europe A year in review

Report from UN-GGIM: Europe A year in review Report from UN-GGIM: Europe A year in review Carol Agius UN-GGIM: Europe Joint UN-GGIM: Europe ESS meeting on the Integration of Statistical and Geospatial Information March 2017 The aim of UN-GGIM: Europe

More information

Terms of Reference (ToR) for ICAT support to MRV in the Energy Sector in Kenya

Terms of Reference (ToR) for ICAT support to MRV in the Energy Sector in Kenya Terms of Reference (ToR) for ICAT support to MRV in the Energy Sector in Kenya The Agreement sets forth the terms and conditions of the cooperation between the Consultant and UNEP DTU Partnership for achieving

More information

Standardization mandate addressed to CEN, CENELEC and ETSI in the field of Information Society Standardization

Standardization mandate addressed to CEN, CENELEC and ETSI in the field of Information Society Standardization Mandate/ 290 EN Standardization mandate addressed to CEN, CENELEC and ETSI in the field of Information Society Standardization 1 Title Mandate addressed to CEN, CENELEC and ETSI in support of the European

More information

Key Items: - Customer Premises Cabling - 1 ISO/IEC SC25/WG3 Meeting Singapore: January 2017

Key Items: - Customer Premises Cabling - 1 ISO/IEC SC25/WG3 Meeting Singapore: January 2017 1 ISO/IEC SC25/WG3 Meeting Singapore: 16-20 January 2017 - Customer Premises Cabling - Key Items: 1. ISO/IEC 11801 Ed.3 major revision - DIS ballot positive and progressing to FDIS - final draft (contains

More information

Agenda and General Information

Agenda and General Information Agenda and General Information IEEE 802.3 25 Gb/s Ethernet over single-mode fiber Study Group Meeting David Lewis, Lumentum Macau, China, March 14th, 2016 Agenda Welcome and Introductions Approve Agenda

More information

ENTSOG update and view on Germany

ENTSOG update and view on Germany ENTSOG update and view on Germany Ulrich Ronnacker Vienna, 8 th November 2011 2 Agenda ENTSOG ENTSOG work programme, processes, challenges View on Germany TRAC-X primary uniform capacity plattform Market

More information

Test Strategy for the June 11 BSC Systems Release

Test Strategy for the June 11 BSC Systems Release This involves the following Test Participants: for the June 11 BSC Systems Release ELEXON Engage Industry Logica This describes the testing approach used to ensure the quality of the changes included in

More information

Design and Implementation of Modern Programming Languages (Seminar)

Design and Implementation of Modern Programming Languages (Seminar) Design and Implementation of Modern Programming Languages (Seminar) Outline Administrivia Intro Schedule Topics GENERAL INFORMATION Intro Introduce students to the core techniques of scientific work Give

More information

IGO/INGO Identifiers Protection Policy Implementation. Meeting with the IRT 9 March 2016

IGO/INGO Identifiers Protection Policy Implementation. Meeting with the IRT 9 March 2016 IGO/INGO Identifiers Protection Policy Implementation Meeting with the IRT 9 March 2016 Agenda 1 2 3 Background on Policy and Current ICANN Work on IGO/INGO Protections Discussion of Implementation Deliverables

More information

IT Updates. Maryland Health Benefit Exchange Board Meeting April 15, Presented by: Isabel FitzGerald Secretary, DoIT

IT Updates. Maryland Health Benefit Exchange Board Meeting April 15, Presented by: Isabel FitzGerald Secretary, DoIT IT Updates Maryland Health Benefit Exchange Board Meeting April 15, 2014 Presented by: Isabel FitzGerald Secretary, DoIT A service of Maryland Health Benefit Exchange Agenda Overview of process for CT

More information

The Agency s Work Programme Outline for 2016

The Agency s Work Programme Outline for 2016 The Agency s Work Programme Outline for 2016 Alberto Pototschnig Director Volker Zuleger Head of Market Monitoring Department Dennis Hesseling Head of Gas Department Presentation for stakeholders, 3 June

More information

13543/17 PhL/at 1 DG G 3 B

13543/17 PhL/at 1 DG G 3 B Council of the European Union Brussels, 24 October 2017 (OR. en) 13543/17 UD 239 NOTE From: To: General Secretariat of the Council Permanent Representatives Committee/Council No. prev. doc.: ST 12287/5/17

More information

European Single Electronic Format (ESEF) Eurofiling workshop 8 June 2017

European Single Electronic Format (ESEF) Eurofiling workshop 8 June 2017 PUBLIC ESMA32-60-177 8 June 2017 European Single Electronic Format (ESEF) Eurofiling workshop 8 June 2017 Michael Komarek Background 2 Requirements: 2013 the Transparency Directive was amended to require

More information

IEEE Liaison report (Oct ) T v000 Tom Palkert, Macom

IEEE Liaison report (Oct ) T v000 Tom Palkert, Macom IEEE 802.3 Liaison report (Oct 5 2017) T11-2017-00328-v000 Tom Palkert, Macom IEEE 802.3 Base Standards in Force The current version in force is IEEE Std 802.3-2015. Subsequent approved amendments include:

More information

Proposal for an IEEE 802 EC Privacy Recommendation Study Group. 18 th of July 2014

Proposal for an IEEE 802 EC Privacy Recommendation Study Group. 18 th of July 2014 1 Proposal for an IEEE 802 EC Privacy Recommendation Study Group 18 th of July 2014 2 July 14 th Internet Privacy Tutorial Title: Pervasive Surveillance of the Internet Designing Privacy into Internet

More information

The Research Data Alliance (RDA): building global data connections CC BY-SA 4.0

The Research Data Alliance (RDA): building global data connections   CC BY-SA 4.0 The Research Data Alliance (RDA): building global data connections HILARY HANAHOE SECRETARY GENERAL RESEARCH DATA AL LIANCE HILARY.HANAHOE@GMAIL.COM WWW.RD-ALLIANCE.ORG - The Research Data Alliance vision

More information

e-submission Quick Reference Guide for Economic Operators

e-submission Quick Reference Guide for Economic Operators e-submission Quick Reference Guide for Economic Operators e-submission Quick Guide for Economic Operators Page 1 Last document update: 30/06/2017 Welcome to e-submission. This quick reference guide contains:

More information

Registration closed circuit

Registration closed circuit Registration closed circuit Practical overview 2 Topics Regulatory background and scope Objectives of the closed circuit Modification Royal Decree: obligations for users (Proposal) Registration process

More information