EBB PILOT FOR THE LIVE CONNECTION OF UNMETERED EQUIPMENT TO OVERHEAD LINES
|
|
- Leonard Harmon
- 6 years ago
- Views:
Transcription
1 Network(s): Summary: ENGINEERING BULLETIN EBB PILOT FOR THE LIVE CONNECTION OF UNMETERED EQUIPMENT TO OVERHEAD LINES EPN, SPN This bulletin provides a framework for the pilot scheme for unmetered live connections to overhead lines and will enable ICPs operating on behalf of asset owners to replace street lighting attached to UK Power Networks owned assets. Author: Stephen Cuddihey Approved By: Paul Williams Approved Date: 09/03/2017 This document forms part of the Company s Integrated Business System and its requirements are mandatory throughout UK Power Networks. Departure from these requirements may only be taken with the written approval of the Director of Asset Management. If you have any queries about this document please contact the author or owner of the current issue. Applicable To UK Power Networks External Asset Management G81 Website Capital Programme UK Power Networks Services Connections Contractors Health & Safety ICPs/IDNOs Legal Meter Operators Network Operations Procurement Strategy & Regulation Technical Training THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE
2 Revision Record Version 4.0 Review Date 09/03/2018 Date 23/02/2017 Author S. Cuddihey Reason for update: Reviewed and updated as a result of business feedback What has changed: Sections 1 and 2 have been updated and the scope of the pilot widened. Renumbered from EBP to EBB and title amended. Version 3.0 Review Date 21/10/2017 Date 12/10/2016 Author S. Cuddihey Reason for update: Reviewed and updated as a result of business feedback What has changed: Section 6.5 now moved to Section 5.5, five wire networks open to authorised ICPs. Version 2.0 Review Date 07/07/2017 Date 18/03/2016 Author S. Cuddihey Reason for update: Reviewed and updated as a result of business feedback What has changed: Sections 5.2 and 6.2 amended to recognise acceptable condition data and on site testing criteria. Version 1.0 Review Date 18/11/2016 Date 18/11/2015 Author S. Cuddihey New document to cover the pilot scheme for live connection of unmetered equipment to UK Power Networks overhead lines by ICPs UK Power Networks 2017 All rights reserved 2 of 8
3 Contents 1 Introduction Scope Glossary and Abbreviations Requirements Pilot Approved Networks Overview Condition A LV Poles and Poles without Data ABC Networks Four-wire Open Networks Five-wire Networks Pilot Prohibited Networks Overview Condition S and D LV Poles Shared HV/LV Poles Four-wire Open Crossed Networks Split-phase Networks References UK Power Networks Standards National and International Standards Dependent Documents... 8 UK Power Networks 2017 All rights reserved 3 of 8
4 1 Introduction This bulletin provides a framework for the pilot scheme for limited live work upon overhead lines and will enable Independent Connection Providers (ICPs) operating on behalf of asset owners to shroud LV cables and replace street lighting attached to UK Power Networks owned assets, specifically ESQCR labelled LV distribution network poles. This bulletin also provides guidance for ICPs operating on overhead line supplied ground mounted unmetered equipment. This pilot shall be coordinated by the Highway Services team within UK Power Networks. 2 Scope This bulletin applies to the limited live work on overhead lines pilot carried out by ICPs on UK Power Networks EPN, LPN and SPN distribution networks. The pilot is limited to the following specific activities: Connection of ground mounted unmetered assets to LV overhead lines where no underground LV main is present. Replacement of LV pole-mounted unmetered assets on a like for like basis. Shrouding of LV overhead lines when conducting activity detailed in NOC Section Glossary and Abbreviations Term Definition ABC Ariel Bundle Conductor CDM Construction (Design and Management) Regulations 2015 DSR Distribution Safety Rules ESQCR Electricity Safety, Quality and Continuity Regulations 2002 HV ICP Voltages above 1000V; generally used to describe 11kV or 6.6kV distribution systems but may include higher or other legacy voltages Independent Connections Provider LV Voltages up to 1000V; generally used to describe 230/400V or 230/460V distribution systems POWRA SMS UK Power Networks Point of Work Risk Assessment Site Management Schedule UK Power Networks (Operations) Ltd consists of three electricity distribution networks: Eastern Power Networks plc (EPN). London Power Network plc (LPN). South Eastern Power Networks plc (SPN). UK Power Networks 2017 All rights reserved 4 of 8
5 4 Requirements The Incentive on Connections Engagement pilot shall be coordinated by the Highway Services team of UK Power Networks including all requests for information regarding street lighting and the LV distribution network as well as reports of variations to the overhead line LV distribution network. Consent for ICP working shall be requested from, and can only be granted by, the UK Power Networks Highway Services team for unmetered connection overhead line work within the UK Power Networks regions. In addition to relevant CDM, safety, working at height and regulatory restrictions and requirements, all overhead line street lighting and pole supplied ground mounted unmetered connection work shall be in accordance with the following: EDS Distribution Safety Rules. Overhead line construction manual. LV jointing manual. All work shall be to the approved construction standard and in compliance with all UK Power Networks procedures and practices. All existing pole bracket mounted street lighting shall be replaced on a like for like basis. No new pole bracket mounted street lighting shall be accepted on to UK Power Networks distribution network overhead line poles. UK Power Networks 2017 All rights reserved 5 of 8
6 5 Pilot Approved Networks 5.1 Overview The following sections of the overhead line LV distribution network are approved for ICP working during the pilot. Refer to the UK Power Networks Overhead Line manual for additional information. 5.2 Condition A LV Poles and Poles without Data The ICP working under the pilot is authorised to undertake work upon LV poles that are of condition A, without condition records or condition markings All poles shall be tested on site immediately prior to work commencing in accordance with the Overhead Line Construction manual; prior condition data or poles displaying a condition A marking is not sufficient evidence to guarantee pole condition. If a pole is found to have been recorded, marked as or is indicated by testing as either condition S or D refer to Section ABC Networks The ICP working under the pilot is authorised to upon overhead line LV distribution networks consisting of aerial bundled conductor. 5.4 Four-wire Open Networks The ICP working under the pilot is authorised to undertake work upon overhead line LV distribution networks consisting of four bare wire conductors where the lowest height conductor is the neutral conductor. If testing does not confirm that the lowest height conductor is the neutral conductor, refer to Section Five-wire Networks The ICP working under the pilot is authorised to undertake work on overhead line LV distribution networks where records indicate a fifth wire public lighting network is in operation in accordance with EDS However, if a fifth wire network is found on site, the network shall be reported to UK Power Networks. UK Power Networks 2017 All rights reserved 6 of 8
7 6 Pilot Prohibited Networks 6.1 Overview The following sections of the overhead line LV distribution network are not approved for ICP working during the pilot. Whilst this list covers most variations found on the overhead line LV distribution network it is not an exhaustive list. If other arrangements are found the ICP shall contact UK Power Networks. Refer to the UK Power Networks Overhead Line manual for additional information. 6.2 Condition S and D LV Poles The ICP working under the pilot is not authorised to undertake work upon LV poles recorded, marked or determined by testing as condition S and D. 6.3 Shared HV/LV Poles The ICP working under the pilot is not authorised to undertake work on UK Power Networks poles that carry both LV and HV conductors. Access to HV poles is prohibited. In addition, access to LV poles where HV conductors are present at a higher level but on separate supports, is also prohibited. 6.4 Four-wire Open Crossed Networks The ICP working under the pilot is not authorised to undertake work on overhead line LV distribution networks where records indicate the lowest height conductor is not a neutral conductor. If no records are available and the required on site phase / neutral demonstration indicates that the lowest conductor is a live line, the work shall not proceed on that section of LV distribution network. The tested LV network shall be reported to UK Power Networks. 6.5 Split-phase Networks The ICP working under the pilot is not authorised to undertake work on LV distribution networks where records indicate three-wire, two-wire, split-phase or other variations of overhead line LV distribution network that do not utilise a three-phase and neutral network. If any variations of overhead line LV distribution network are found on site the work shall not commence on that section of the overhead line LV distribution network. The network variation shall be reported to UK Power Networks. UK Power Networks 2017 All rights reserved 7 of 8
8 7 References 7.1 UK Power Networks Standards DSR EDS HSS NOC LV Jointing Manual Overhead Line Construction Manual The UK Power Networks Distribution Safety Rules LV Customer Unmetered Supplies Advice to Third Parties Working in the Vicinity of Independent Connections Provider (ICP) Unmetered Connections (UMC) to (UC2OHL) Pilot Procedure 7.2 National and International Standards ESQCR Electricity Safety, Quality and Continuity Regulations 2002 (as amended) GS6 HSE Guidance Note GS6: Avoiding Danger from Overhead Power Lines 8 Dependent Documents This document is referenced in the following documents, any of which may be affected by updates. EDS NOC NOC a LV Customer Unmetered Supplies Independent Connection Provider (ICP) Unmetered Connections (UMC) to (UC2OHL) Pilot Procedure SORN Request Form for Unmetered Connections to Pilot UK Power Networks 2017 All rights reserved 8 of 8
EDS LV CUSTOMER UNMETERED SUPPLIES
Document Number: EDS 08-2102 Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-2102 LV CUSTOMER UNMETERED SUPPLIES EPN, LPN, SPN This standard details the requirements for unmetered single-phase
More informationEDS SCADA NUMBERING SYSTEM
Document Number: EDS 05-9007 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 05-9007 SCADA NUMBERING SYSTEM This standard describes the system for numbering SCADA wiring within switchgear
More informationIndependent Connections Provider (ICP) Unmetered Connections (UMC) Jointing to Services (UJ2S) Procedure
Independent Connections Provider () Unmetered Connections (UMC) Jointing to Services (UJ2S) Procedure Owner Name Title Neil Clarke Head of Highway Services Signature Date 16 August 2018 Authoriser Name
More informationEDS MW AND MVAR TRANSDUCER CONNECTION
Document Number: EDS 05-5001 Network(s): Summary: ENINEERIN DESIN STANDARD EDS 05-5001 MW AND MVAR TRANSDUCER CONNECTION EPN, LPN, SPN This standard details the convention to be used when wiring MW and
More informationECS LUCY GEMINI 3 CONFIGURATION PROCEDURE
Document Number: ECS 05-9541 Network(s): Summary: ENGINEERING CONSTRUCTION STANDARD ECS 05-9541 LUCY GEMINI 3 CONFIGURATION PROCEDURE EPN, LPN, SPN This document details the configuration procedure for
More informationEOS REMSDAQ CALLISTO NX TYPE E RTU
Document Number: EOS 05-9306 Network(s): Summary: ENGINEERING OPERATING STANDARD EOS 05-9306 REMSDAQ CALLISTO NX TYPE E RTU EPN, LPN, SPN This standard details the application, installation and operation
More informationECP SECONDARY SUBSTATION COMMISSIONING PROCEDURE
Document Number: ECP 11-0501 Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0501 SECONDARY SUBSTATION COMMISSIONING PROCEDURE EPN, LPN, SPN This procedure details the end-to-end process
More informationECP NORTROLL CABLETROLL 2350 FPI INSTALLATION AND COMMISSIONING PROCEDURE
Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0521 NORTROLL CABLETROLL 2350 FPI INSTALLATION AND COMMISSIONING PROCEDURE EPN, LPN, SPN This document details the installation, testing
More informationECP GPRS/3G/4G COMMS DEVICE CONFIGURATION AND COMMISSIONING PROCEDURE
Network(s): Summary: ENGINEERING COMMISSIONING PROCEDURE ECP 11-0601 GPRS/3G/4G COMMS DEVICE CONFIGURATION AND COMMISSIONING PROCEDURE EPN, LPN, SPN Configuration and commissioning procedure for the GPRS/3G/4G
More informationEDS LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES
Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-0150 LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES LPN This standard provides guidelines for the development of the 33kV distribution
More informationEOS LUCY GEMINI 3 TYPE E RTU
Document Number: EOS 05-9305 Network(s): Summary: ENGINEERING OPERATION STANDARD EPN, LPN, SPN EOS 05-9305 LUCY GEMINI 3 TYPE E RTU This standard details the application, installation and operation of
More informationEOS SCHNEIDER RINGMASTER 'C' RANGE SWITCHGEAR
Document Number: EOS 03-0018 Network(s): Summary: ENGINEERING OPERATION STANDARD EOS 03-0018 SCHNEIDER RINGMASTER 'C' RANGE SWITCHGEAR EPN, LPN, SPN This standard details the installation, commissioning
More informationEOS LUCY SABRE 'A' RANGE SWITCHGEAR
Document Number: EOS 03-0027 Network(s): Summary: ENGINEERING OPERATION STANDARD EOS 03-0027 LUCY SABRE 'A' RANGE SWITCHGEAR EPN, LPN, SPN This standard details the installation, commissioning and operation
More informationIn Company Abrasive Wheels Instructor / Examiner Training & Certification
Health & Safety Certification & Services Ltd Central Administration Office - 100 Princes Street, Kettering, Northamptonshire, NN16 8RR Tel: 01536 414966 Fax: 01536 416933 email: info@hscsltd.co.uk WEB
More informationEngineering Recommendation G87 Issue
PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Recommendation G87 Issue 2-2015 Guidelines for the Provision of Low Voltage Connections to Multiple Occupancy Buildings
More informationCompany Directive STANDARD TECHNIQUE : NC2D/2. Relating to Specification of Connection Assets
Company Directive STANDARD TECHNIQUE : NC2D/2 Relating to Specification of Connection Assets Policy Summary This document describes the procedure to be followed for specification and approval where a customer
More informationEDS GUIDANCE FOR THE APPLICATION OF ENA ENGINEERING RECOMMENDATIONS G88 AND G81 - INSET NETWORKS (IDNOS AND OTHER LICENSED DNOS)
THIS IS AN UNCONTROLLED DOCUMENT, THE READER MUST CONFIRM ITS VALIDITY BEFORE USE ENGINEERING DESIGN STANDARD EDS 08-0113 GUIDANCE FOR THE APPLICATION OF ENA ENGINEERING RECOMMENDATIONS G88 AND G81 - INSET
More informationEDS KV, GRID AND PRIMARY SYSTEM PROTECTION AND CONTROL SCHEMES
Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 05-0001 132KV, GRID AND PRIMARY SYSTEM PROTECTION AND CONTROL SCHEMES EPN, LPN, SPN This engineering design standard describes the requirements for
More informationICP. Simplifying. Competition in Connections FOR UNMETERED, METERED AND DISTRIBUTED GENERATION CONNECTIONS
ICP Simplifying Competition in Connections FOR UNMETERED, METERED AND DISTRIBUTED GENERATION CONNECTIONS ICP Competition in Connections Did you know you have a choice of who provides your new electricity
More informationNetwork Asset Design Standard HV SUBSTATION FEEDER EXIT CIRCUITS ISOLATION POLICY
Network Asset Design Standard HV SUBSTATION FEEDER EXIT CIRCUITS ISOLATION POLICY Original Issue: September 2007 Prepared by: Lee Chan & Rob Rogerson This Revision: 0 October 2007 Date For Next Review:
More informationINFORMATION TECHNOLOGY SECURITY POLICY
INFORMATION TECHNOLOGY SECURITY POLICY Author Responsible Director Approved By Data Approved September 15 Date for Review November 17 Version 2.3 Replaces version 2.2 Mike Dench, IT Security Manager Robin
More informationSubstation Workshop. 7 th February 2018
Substation Workshop 7 th February 2018 1 Agenda Welcome and Introductions Antony White Substation Design Overview Andy Moore Question & Answer Session Break 1500kVA Transformers James Devriendt & Andy
More informationFlexible Urban Networks Low Voltage Successful and safe installation, commissioning and operation of LV switches and circuit breakers on LV networks
Flexible Urban Networks Low Voltage Successful and safe installation, commissioning and operation of LV switches and circuit breakers on LV networks (SDRC 9.2) Contents Executive Summary... 5 1. Introduction...
More informationError! No text of specified style in document.
Error! No text of specified style in document. Error! Use the Home tab to apply Section title to the text that you want to appear here. CFD Independent Auditor Report on CFD Allocation Round 2 4 September
More informationUE CONNECTION APPLICATION - POLE to PIT (Underground Electricity Supply)
Phone 1300 131 689 Business Hours 8:00AM 5:00PM United Energy ABN 70 064 651 029 Scan & Email undergroundsupply@ue.com.au Attn: Customer and Market Operations PO Box 449 Mount Waverley VIC 3149 Thank you
More informationOwner/Operator Forum 12 December
Owner/Operator Forum 12 December Steve Halsey DG Development Manager Today s Agenda Transition to DSO Breakout session What we do the role of the DNO Our vision Welcome and Introduction (DNO) Distribution
More informationGDA Step 2 Assessment of Security for Generic Design Assessment of Hitachi GE s UK Advanced Boiling Water Reactor (UK ABWR) OFFICIAL
GDA Step 2 Assessment of Security for Generic Design Assessment of Hitachi GE s UK Advanced Boiling Water Reactor (UK ABWR) Civil Nuclear Reactor Build - Generic Design Assessment Step 2 Assessment of
More informationIn Company & National Slinger Signaller Instructor / Examiner Training & Certification
Health & Safety Certification & Services Ltd Central Administration Office - 100 Princes Street, Kettering, Northamptonshire, NN16 8RR Tel: 01536 414966 Fax: 01536 416933 email: info@hscsltd.co.uk WEB
More informationNetwork Configuration Document Selection for New Substations Framework
Network Configuration Document Selection for New Substations Current version: 20/06/2018 EXTERNAL USE Page 1 of 14 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References...
More informationCRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS
CRITERIA FOR CERTIFICATION BODY ACCREDITATION IN THE FIELD OF RISK BASED INSPECTION MANAGEMENT SYSTEMS Approved By: Executive: Accreditation: Mpho Phaloane Revised By: RBI STC Working Group Members Date
More informationManual: Distribution Substation Manual (DSM) Section 1: Customer Supply Arrangements
Manual: Distribution Substation Manual (DSM) Section 1: Customer Supply Arrangements Standard Number: HPC-5DA-07-0001-2012 Document Control Author Name: Viswa Easwaran Position: Standards Engineer Document
More informationRECOGNITION POLICY (RPL)
1 RECOGNITION POLICY (RPL) POLICY In accordance with the Standards for RTOs 2015 MBA Group Training will recognize AQF qualifications and Statement of Attainment issued by other Registered Training Organisations
More informationCompleting this form accurately will help us process your application as quickly as possible. Please complete all sections relevant to your project.
APPLICATION FOR AN ECTRICITY CONNECTION FOR WORKS OVER 70 Completing this form accurately will help us process your application as quickly as possible. Please complete all sections relevant to your project.
More informationSwitching Process and Rules Systems Operations Framework. Document Number:
Switching Process and Rules Systems Operations Framework Document Number: 4808076 TABLE OF CONTENTS 1. INTRODUCTION... 5 1.1 PURPOSE... 5 1.2 HIERARCHY... 5 2. PROCESSES... 7 2.1 SWITCHING OPERATOR AUTHORISATION
More informationSCHEDULE 22 COMMON CONNECTION CHARGING METHODOLOGY
SCHEDULE 22 COMMON CONNECTION CHARGING METHODOLOGY Introduction 1. This Schedule 22 sets out the Common Connection Charging Methodology (CCCM). The CCCM is the whole of this Schedule 22 excluding only
More informationData Sharing Agreement. Between Integral Occupational Health Ltd and the Customer
Data Sharing Agreement Between Integral Occupational Health Ltd and the Customer 1. Definitions a. Customer means any person, organisation, group or entity accepted as a customer of IOH to access OH services
More informationRecording and Reporting of High Voltage and Low Voltage Switching
1 SCOPE This document details the procedures to be adopted prior to, during, and on completion of Switching operations, and details the manner in which HV and LV Switching shall be recorded in order to
More informationISO/IEC INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO/IEC 27006 Second edition 2011-12-01 Information technology Security techniques Requirements for bodies providing audit and certification of information security management systems
More informationLOUGHBOROUGH UNIVERSITY RESEARCH OFFICE STANDARD OPERATING PROCEDURE. Loughborough University (LU) Research Office SOP 1027 LU
LOUGHBOROUGH UNIVERSITY RESEARCH OFFICE STANDARD OPERATING PROCEDURE Loughborough University (LU) Research Office SOP 1027 LU Process for Writing Study Protocols for NHS Research Sponsored by Loughborough
More informationMicrogeneration Installation Standard: MCS
Microgeneration Installation Standard: MCS 001-02 MCS Contractor Certification Scheme Requirements Part 2: The Certification Process Issue 3.1 This Microgeneration Installation Standard is the property
More informationSapphire Wind Farm 330/33kV Substation
Signature projects: Projects: Project Edison AusNet Sapphire Wind Farm 330/33kV Substation TransGrid Zinfra constructed 330/33kV substation and transmission line as part of the cut in works for the Sapphire
More informationDCC Connection Guidance
DCC Connection Guidance Guidance to assist SEC Parties understand the connections and connection types that are required to connect to the DCC Service Author: Operations Date: 19/01/2015 DCC PUBLIC Page
More informationCity of London Stakeholder Consultation
City of London Stakeholder Consultation 15 May 2013 2011. UK Power Networks. All rights reserved Safety and Housekeeping No planned fire alarms Emergency exits Fire assembly points Toilets Mobile phones
More informationInformation technology Security techniques Guidance on the integrated implementation of ISO/IEC and ISO/IEC
Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO/IEC 27013 Second edition 2015-12-01 Information technology Security techniques Guidance on the integrated implementation of ISO/IEC 27001 and ISO/IEC
More informationEDS HV NETWORK DESIGN
Document Number: EDS 08-3000 Network(s): Summary: EPN, LPN, SPN ENGINEERING DESIGN STANDARD EDS 08-3000 HV NETWORK DESIGN This standard details the guidelines for the design and development of the 11kV
More informationFinancial Adviser Standards and Ethics Authority Ltd
Financial Adviser Standards and Ethics Authority Ltd Corporations (Relevant Providers Exams Standard) Determination 2019 Explanatory Statement Corporations (Relevant Providers Exams Standard) Determination
More informationWe may change the privacy notice from time to time by amending this page.
Holland & Odam Updated 4 th May 2018 This privacy notice sets out how we will process personal data we collect from or about you, or which you provide to us. Please read this notice carefully to understand
More information(Above 100km Distance) (Streetlight Pole) (Above 100km Distance) (Streetlight Pole)
Part 9 Miscellaneous Drawing Register Number Description M1-1 SSN Network Device with LV Aerial Supply (ABC) Arrangement M1-2 SSN Network Device with LV Aerial Supply Arrangement M1-3 SSN Network Device
More informationSTCP 18-3 Issue 006 TEC Changes
STCP 18-3 Issue 006 TEC Changes STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc. Scottish Hydro-Electric
More informationDid you know you have a choice? What do you need to do? nienetworks.co.uk Connecting multiple supplies
multiple supplies Did you know you have a choice? From 28 March 2018 you can select NIE Networks to undertake all of the works associated with your connection or an Independent Connections Provider (ICP)
More informationISO27001:2013 The New Standard Revised Edition
ECSC UNRESTRICTED ISO27001:2013 The New Standard Revised Edition +44 (0) 1274 736223 consulting@ecsc.co.uk www.ecsc.co.uk A Blue Paper from Page 1 of 14 Version 1_00 Date: 27 January 2014 For more information
More informationGuide to the implementation and auditing of ISMS controls based on ISO/IEC 27001
Guide to the implementation and auditing of ISMS controls based on ISO/IEC 27001 Information Security Management Systems Guidance series The Information Security Management Systems (ISMS) series of books
More informationNew connections. You have a choice. It is your choice
New connections You have a choice If you need a new connection in an area where we own the electricity network, did you know you had a choice? Just because we own the network, it does not mean you have
More informationAs set out in the Hong Kong ID card, or any relevant identification document referred to in 1(g) above.
As set out in the Hong Kong ID card, or any relevant identification document referred to in 1(g) above. B (1)B (2) * In the case of a non-hong Kong ID cardholder, state the passport number or any identification
More informationISO/IEC INTERNATIONAL STANDARD
INTERNATIONAL STANDARD ISO/IEC 27006 First edition 2007-03-01 Information technology Security techniques Requirements for bodies providing audit and certification of information security management systems
More informationIECEx Certificate of Conformity
INTERNATIONAL ELECTROTECHNICAL COMMISSION IEC Certification Scheme for Explosive Atmospheres for rules and details of the IECEx Scheme visit www.iecex.com Certificate No.: Status: IECEx UL 15.0032X Current
More informationOFFICIAL COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE
Title of document ONR GUIDE COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE Document Type: Unique Document ID and Revision No: Nuclear Security Technical Assessment Guide CNS-TAST-GD-4.4 Revision
More informationWorking Near The Electricity Network. Our Services
Working Near The Electricity Network Our Services COVER PHOTOGRAPH: Working through the night to take down overhead power lines crossing the M32 in Bristol. 2 Contents Welcome From Our CEO 2 Introduction
More informationProQual External Quality Assurance Qualifications. Level 4 Award in the External Quality Assurance of Assessment Processes and Practice
ProQual External Quality Assurance Qualifications Level 4 Award in the External Quality Assurance of Assessment Processes and Practice Level 4 Certificate in Leading the External Quality Assurance of Assessment
More informationALGORITHMIC TRADING AND ORDER ROUTING SERVICES POLICY
ALGORITHMIC TRADING AND ORDER ROUTING SERVICES POLICY Please respond to: Trading Operations THE LONDON METAL EXCHANGE 10 Finsbury Square, London EC2A 1AJ Tel +44 (0)20 7113 8888 Registered in England no
More informationSTRATHCONA AREA TRANSMISSION UPGRADE PROJECT
STRATHCONA AREA TRANSMISSION UPGRADE PROJECT September 2017 ProjeCt InFormation You are receiving this information because you are a landowner, resident, business owner, or occupant of property near a
More informationABB Limited. Table of Content. Executive Summary
21 CFR Part 11 Electronic Records; Electronic Signatures Guidance for Industry Scope of Application Position Paper: A Summary and Interpretation of the Guidance Note: This document has been prepared based
More informationGuidance version control
Guidance version control Guidance version control Contents v2.0 2 v3.0 3 v4.0 4 v5.0 6 v6.0 8 v7.0 9 v8.0...12 v9.0...13 National Grid EMR Delivery Body Page 1 v2.0 Slide 79 If the CMU is new and you want
More informationGuideline for the Connection of Micro Embedded Generators to the TasNetworks Distribution Network
Tasmanian Networks Pty Ltd ABN 24 167 357 299 Guideline for the Connection of Micro Embedded Generators to the TasNetworks Distribution Network (AS4777 Compliant) NG R PD 09 Version 2.0 July 2014 TABLE
More informationCorporate Information Security Policy
Overview Sets out the high-level controls that the BBC will put in place to protect BBC staff, audiences and information. Audience Anyone who has access to BBC Information Systems however they are employed
More information8. AUTOMATED DECISION MAKING DURING DATA PROCESSING FURTHER INFORMATION FURTHER INFORMATION AND GUIDANCE CONTACT US...
Contents 1. DEFFINITIONS... 2 2. INTRODUCTION... 2 3. WHO WE ARE... 2 4. JUSTIFICATION FOR PROCESSING PERSONAL DATA... 2 5. LAWFUL BASIS FOR COLLECTING AND PROCESSING PERSONAL DATA... 3 5.1 LEGITIMATE
More informationAudit Report. English Speaking Board (ESB)
Audit Report English Speaking Board (ESB) 21 June 2017 Contents 1 Background 1 1.1 Scope 1 1.2 Audit Report and Action Plan Timescales 2 1.3 Summary of Audit Issues and Recommendations 3 1.4 Risk Rating
More informationLevel 5 Award in the Independent Auditing of External Quality Assurance. Qualification Specification
Level 5 Award in the Independent Auditing of External Quality Assurance Qualification Specification ProQual 2019 Contents Page Introduction 3 Qualification aims 3 Qualification profile 4 Candidate entry
More informationMobile Communication Policy
Mobile Communication Policy Document Type Author Owner (Dept) Mobile Communication Policy Chief Executive Health & Safety Date of Review June 2015 List of Contents Page No 1. Summary of Duties... 3 2.
More informationIT Governance ISO/IEC 27001:2013 ISMS Implementation. Service description. Protect Comply Thrive
IT Governance ISO/IEC 27001:2013 ISMS Implementation Service description Protect Comply Thrive 100% guaranteed ISO 27001 certification with the global experts With the IT Governance ISO 27001 Implementation
More informationUNDERGROUND CONSTRUCTION MANUAL SERVICES
UNDERGROUND CONSTRUCTION MANUAL ack to MAIN INDEX Go to SECTION INDEX CONSTRUCTION DESCRIPTION DWG CONSTRUCTION DESCRIPTION DWG Construction code guide - Underground service from overhead system 53 SERVICE
More informationITC Level 3 Award in Teaching and Assessing First Aid Qualifications G50.T. Qualification Specification Guidance for Centres
G50.T ITC L3 Award in Teaching and Assessing First Aid Qualifications Guidance for Centres [1] ITC Level 3 Award in Teaching and Assessing First Aid Qualifications Qualification Number: 603/0886/2 G50.T
More informationShort Guide to using the Report Template (Version 3)
INTRODUCTION 1. This short guide explains how staff should use the Report Template (Version 3) when preparing reports for consideration at the Mersey Care s Board of Directors or any of its committees,
More informationInformation technology Security techniques Requirements for bodies providing audit and certification of information security management systems
Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO/IEC 27006 Third edition 2015-10-01 Information technology Security techniques Requirements for bodies providing audit and certification of information
More informationIdentification and Authentication
Identification and Authentication Example Policy Author: A Heathcote Date: 24/05/2017 Version: 1.0 Copyright 2017 Health and Social Care Information Centre. The Health and Social Care Information Centre
More informationSubject: Kier Group plc Data Protection Policy
Kier Group plc Data Protection Policy Subject: Kier Group plc Data Protection Policy Author: Compliance Document type: Policy Authorised by: Kier General Counsel & Company Secretary Version 3 Effective
More informationPS Mailing Services Ltd Data Protection Policy May 2018
PS Mailing Services Ltd Data Protection Policy May 2018 PS Mailing Services Limited is a registered data controller: ICO registration no. Z9106387 (www.ico.org.uk 1. Introduction 1.1. Background We collect
More informationPOWER AND WATER CORPORATION POLICY MANAGEMENT OF EXTERNAL SERVICE PROVIDERS
POWER AND WATER CORPORATION POLICY MANAGEMENT OF EXTERNAL SERVICE PROVIDERS Prepared by: Approved by: Chief Procurement Officer John Baskerville Chief Executive File number: D2015/65737 June 2015 MANAGEMENT
More informationINTERIM ADVICE NOTE 132/11
INTERIM ADVICE NOTE 132/11 Selection of the appropriate Electricity Supplier for new and upgraded electricity connections (Exit Points) for roadside equipment Summary This document contains guidance on
More informationGeneral Data Protection Regulation BT s amendments to the proposed Regulation on the protection of individuals with regard to the processing of
General Data Protection Regulation BT s amendments to the proposed Regulation on the protection of individuals with regard to the processing of personal data and on the free movement of such data (General
More informationNUCLEAR DIRECTORATE GENERIC DESIGN ASSESSMENT NEW CIVIL REACTOR BUILD
Health and Safety Executive NUCLEAR DIRECTORATE GENERIC DESIGN ASSESSMENT NEW CIVIL REACTOR BUILD STEP 3 SECURITY ASSESSMENT OF THE WESTINGHOUSE AP1000 DIVISION 5 ASSESSMENT REPORT NO. AR 09/042-P HSE
More informationMOBILE PHONES & DRIVING POLICY
Ref: UA005 Issue: 1 Date: March 2016 Page: 1 of 6 MOBILE PHONES & DRIVING POLICY Synopsis This document sets out University of Aberdeen Policy on the use of mobile phones whilst driving on University business
More informationILM Whistle-blowing Policy for Centres, Providers and Candidates
ILM Whistle-blowing Policy for Centres, Providers and Candidates V1 November 2017 Contents Document Change History 2 Scope 3 Definition 3 How to report a concern 4 What happens next? 4 Confidentiality
More informationMMBF Underground Gas Storage Project
MMBF Underground Gas 10 May 2017 MMBF Mott MacDonald Átrium Park F7 Váci út 45 1134 Budapest Hungary T +36 1 288 2020 F +36 1 288 2010 mottmac.com MMBF 1037 Budapest Montevideo u 16/B MMBF Underground
More informationProcedure for the Selection, Training, Qualification and Authorisation of Marine Management Systems Auditors
(Rev.0 July 2009) (Rev.1 Sep 2012) (Rev.2 Nov 2014) Procedure for the Selection, Training, Qualification and Authorisation of Marine Management Systems Auditors Note: 1. This procedural requirement applies
More informationAMENDMENT NO.: 3 INVITATION FOR BID. IFB FQ16005 requesting bids for the above referenced project is hereby changed in part as listed below:
Invitation for Bid (IFB) FQ16005/WJG Date of Issue: October 23, 2015 Amendment One: November 16, 2015 Amendment Two: November 19, 2015 November 25, 2015 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY (WMATA)
More informationParticipation Agreement for the ehealth Exchange
Participation Agreement for the ehealth Exchange This Participation Agreement for the ehealth Exchange ("Agreement") is entered into as of the last date written below ( Effective Date ) by and between
More informationManual: Distribution Substation Manual (DSM) Section 4: Equipment Installation Guide
Manual: Distribution Substation Manual (DSM) Section 4: Equipment Installation Guide Standard Number: HPC-5DA-07-0004-2012 Document Control Author Name: Viswa Easwaran Position: Standards Engineer Document
More informationQUALITY ASSURANCE POLICY. Quality Assurance Policy. September 2016 Version 2.0 Policy authorised by Responsible Officer
Quality Assurance Policy September 2016 Version 2.0 Policy authorised by Responsible Officer 1 Table of Contents 1.0 Introduction...3 2.0 Scope of policy...3 3.0 Policy statement...3 4.0 Quality assurance
More informationCONTROL SYSTEMS DESIGN SPECIFICATION
CONTROL SYSTEMS DESIGN SPECIFICATION Version : 1.00 This document aims to identify clearly and precisely what CooperVision seeks to achieve with this project/system. It defines the function of the system
More informationEmsi Privacy Shield Policy
Emsi Privacy Shield Policy Scope The Emsi Privacy Shield Policy ( Policy ) applies to the collection and processing of Personal Data that Emsi obtains from Data Subjects located in the European Union (
More informationDomestic Electrical Installation (Part P)
Domestic Electrical Installation (Part P) Qualification handbook Cert-ain Certification Ltd. Introduction Cert-ain Certification Ltd. is a certification body accredited by the regulatory authorities to
More informationStreet Works Qualifications, Training and Accreditation Update
Street Works Qualifications, Training and Accreditation Update Mid / North Wales HAUC Roadshow 10 th July 2018 Update on behalf of the HAUC (UK) Training and Accreditation Working Group (TAG) Update given
More informationUWTSD Group Data Protection Policy
UWTSD Group Data Protection Policy Contents Clause Page 1. Policy statement... 1 2. About this policy... 1 3. Definition of data protection terms... 1 4. Data protection principles..3 5. Fair and lawful
More informationEA-7/05 - EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits
Publication Reference EA-7/05 EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits PURPOSE This document has been prepared by a task force under the direction of the European Cooperation
More informationInformation technology Process assessment Concepts and terminology
Provläsningsexemplar / Preview INTERNATIONAL STANDARD ISO/IEC 33001 Second edition 2015-03-01 Information technology Process assessment Concepts and terminology Technologies de l information Évaluation
More informationSTCP Amendment Proposal Form
STCP Amendment Proposal Form PA036 1. Title of Amendment Proposal STCP 09-2 Incorporation material currently within SPT SCS and making standard for both TOs. 2. Description of the Proposed Amendment (mandatory
More informationTHE CONNECTION AND USE OF SYSTEM CODE TEMPORARY TEC EXCHANGE RATE REQUEST FORM
CUSC EXHIBIT W THE CONNECTION AND USE OF SYSTEM CODE TEMPORARY TEC EXCHANGE RATE REQUEST FORM DIRECTLY CONNECTED POWER STATION EMBEDDED POWER STATION INTERCONNECTOR OWNER DISTRIBUTION INTERCONNECTOR Please
More informationAUTHORITY FOR ELECTRICITY REGULATION
SULTANATE OF OMAN AUTHORITY FOR ELECTRICITY REGULATION SCADA AND DCS CYBER SECURITY STANDARD FIRST EDITION AUGUST 2015 i Contents 1. Introduction... 1 2. Definitions... 1 3. Baseline Mandatory Requirements...
More informationTruRead Plug and Play Pulse Splitter Type L4SK0. Document Version 1.02
Type L4SK0 Document Version 1.02 Introduction TruRead Plug and Play Pulse Splitter This document describes the requirements and considerations for installation of the L4SK0 Plug and Play Passive Pulse
More information