1 CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013
2 MPC Upgrade Requirements Be able to deliver all 18 trigger primitives from the EMU peripheral crate to the upgraded Sector Processor Preserve e sorting capabilities of the Muon Port Card Preserve 3 old 1.6Gbps optical links to the existing CSCTF 2
3 Upgrade Developments Use existing Muon Port Card main board - TMB interface remains unchanged (2 LCTs per 80MHz) - 3 old optical links are still available Original design (2004) was based on Xilinx Virtex-E XCV600E FPGA New prototype (2012) is based on Xilinx Spartan-6 FPGA - Inexpensive FPGA ($280 for the fastest speed grade XC6SLX150T-3FFG900C device) - 8 embedded GTP serializers - 3.2Gbps/channel data rate - Modest power consumption (~1A Vccint; <1A GTPs) - Pluggable 12-channel optical transmitter 3
4 New Spartan-6 Mezzanine Top Bottom Pluggable optical transmitter 4
5 Optical Transmitter SNAP12 transmitter Avago AFBR-810 SNAP12 and Avago AFBR-810 are pluggable 12-channel devices Both use the same 10x10 low profile circuit, but pin assignment is different (Avago is intended for higher data rate) utca SP12 uses Avago AFBR820 receiver 5
6 Old and New Mezzanines Installed 6
7 Optical Tests at Rice, Three MPC boards with the new mezzanines SP10 prototype Test software is available, various PRBS and random patterns Random patterns from MPC FIFO to SP10 FIFO under slow VME control: 10K iterations (510 frames each); no errors, all boards PRBS t t OK BER<10 13 PRBS tests OK, BER<10-13 MPC SP10 CCB 7
8 Latency Measurements Present MPC-to-SP system at CMS: 580 ns - TLK2501 Transmitter (1.6Gbps - 80MHz) ~23 ns m optical MMF fiber ~500 ns - TLK2501 Receiver (1.6Gbps - 80MHz) ~57 ns New system (prototypes): 589 ns - Spartan-6 GTP Transmitter (3.2Gbps 160MHz) ~20 ns (without Tx buffer, measured) m optical MMF fiber ~500 ns - Virtex-6 GTX receiver (3.2Gbps 160MHz) ~69 ns (without Rx buffer, estimate) 8
9 Other Measurements Power consumption: - Spartan-6 FPGA ~1A Vccint (1.2V) ~0.15A Vccaux+Vcco (3.3V) ~ 0.8A GTPs (1.2V) - 3 MIC69501 voltage regulators on a mezzanine board passed reactor irradiation test at TAMU in MPC (main board + Spartan-6 mezzanine) 3.3V 3V 9
10 Optical Fibers for P.5 Trunk cable with 4 connectorized cords (similar to one proposed for the DT upgrade). Each cord has 12 fibers. Need 36 cables for 60 peripheral crates, one spare cord per crate. Cable sample was successfully tested at UF in April 2013 Purchase order has been placed through CERN in April
11 Irradiation Tests of the FPGA (1) 66 MeV proton accelerator at Crocker Nuclear Laboratory, UC Davis Wide range of beam fluxes typically from 10 4 to 10 9 p/cm 2 /s 11
12 Irradiation Tests of the FPGA (2) Irradiated with 1 krad at a rate of ~1 Rad/sec (convenient to detect SEU) 75 Single Event Upsets (SEU): 5 to 15 seconds between SEU Average dose to get an error ~13 Rad. With the accumulated fluence of 3*10 11 protons/cm 2, the cross section of SEU is 75 / 3x10 11 = 2.5x10-9 cm 2. Assuming 10-year fluence of ~10 11 neutrons per cm 2 [1] at full LHC design luminosity, the worst case SEU rate would be 2.5x10-9 cm 2 x neutrons/cm 2 / 5x10 7 sec = 5x10-6, or 1 SEU in ~ 55 hours per device [1] Irradiated with 30 krad at a rate 80 Rad/sec (10 years of LHC exposure in the ME1/1 area with a safety factor 3) Many upsets FPGA survived the test Irradiated with 100 krad at a rate of 360 Rad/sec Many upsets FPGA survived the test Irradiated with ~300 Rad at a rate of ~1 Rad/sec again (repeat of first test) 50 SEU in 5 minutes Average dose to get an error ~6 Rad, ~2 times higher than in test 1 FPGA is fully functional 12
13 Irradiation Tests of the EPROM Irradiated with 1 MeV equivalent fluence at ~10.5*10 12 n/cm 2 at the TAMU cyclotron in April 2013 Equivalent to ~30kRad, or 30 years of LHC exposure in ME1/1 area Device was read back; not a single bit change, as expected XCF32P PROM 13
14 What Needs to Be Done in Implement new data format MPC-to-SP - ready for MPC, but not tested with the utca SP Need to set up a test stand at Rice: Track Finder VME crate (exists) - MPC (special slot) - SP05 (to be able to check three old optical links) -CCB - TTCvi/vx New utca crate (exists) - controller (need to be purchased) - AMC13 card (one, currently at UF) - SP12 (from UF) Software to run utca Will need similar test stand at bld.904 at CERN by summer
15 PCB and Parts Mezzanine board: 10-layer PCB Optical transmitter board: 4-layer PCB Xilinx FPGA and EPROM are readily available from stock Optical transmitter: single source (Avago), several weeks delivery other parts not a concern 15
16 Muon Sorter Upgrade Upgraded mezzanine board provides direct optical link to the interim calorimeter trigger 16
CSC Trigger Motherboard
CSC Trigger Motherboard Functions of TMB Tests: Performance at summer 2003 test beam Radiation, magnetic fields, etc. Plans for TMB production and testing 1 Cathode LCT CSC Trigger Requirements Identify
More informationTrack-Finder Test Results and VME Backplane R&D. D.Acosta University of Florida
Track-Finder Test Results and VME Backplane R&D D.Acosta University of Florida 1 Technical Design Report Trigger TDR is completed! A large amount effort went not only into the 630 pages, but into CSC Track-Finder
More informationResults of Radiation Test of the Cathode Front-end Board for CMS Endcap Muon Chambers
Results of Radiation Test of the Cathode Front-end Board for CMS Endcap Muon Chambers B. Bylsma 1, L.S. Durkin 1, J. Gu 1, T.Y. Ling 1, M. Tripathi 2 1 Department of Physics, Ohio State University, Columbus,
More informationWBS Trigger. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Review June 5, 2002
WBS 3.1 - Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Review June 5, 2002 This talk is available on: http://hep.wisc.edu/wsmith/cms/trig_lehman_plen02.pdf W. Smith, U. Wisconsin,
More informationTrigger Layout and Responsibilities
CMS EMU TRIGGER ELECTRONICS B. Paul Padley Rice University February 1999 Trigger Layout and Responsibilities Basic Requirements z Latency: < 3.2 us z Fully pipelined synchronous architecture, dead time
More informationTrigger Report. W. H. Smith U. Wisconsin. Calorimeter & Muon Trigger: Highlights Milestones Concerns Near-term Activities CMS
Trigger Report W. H. Smith U. Wisconsin Calorimeter & Muon Trigger: Highlights Milestones Concerns Near-term Activities Calorimeter Trigger Highlights, Milestones, Activities: Receiver Card Prototype delivered
More informationMuon Trigger Electronics in the Counting Room
Muon Trigger Electronics in the Counting Room Darin Acosta University of Florida April 2000 US CMS DOE/NSF Review: April 11-13, 2000 1 Outline Overview of the CSC trigger system Sector Receiver (WBS: 3.1.1.2)
More informationWBS Trigger. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager. DOE/NSF Status Review November 20, 2003
WBS 3.1 - Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status Review November 20, 2003 This talk is available on: http://hep.wisc.edu/wsmith/cms/trig_lehman_nov03.pdf US CMS
More informationTrigger Server: TSS, TSM, Server Board
Trigger Server: TSS, TSM, Server Board Selection of two best muon candidates in one chamber and ghost suppression Parallel architecture Two stage processing to Sector Collector (LVDS link) Inside Minicrate
More informationEMU FED. --- Crate and Electronics. ESR, CERN, November B. Bylsma, S. Durkin, Jason Gilmore, Jianhui Gu, T.Y. Ling. The Ohio State University
EMU FED --- Crate and Electronics B. Bylsma, S. Durkin, Jason Gilmore, Jianhui Gu, T.Y. Ling The Ohio State University ESR, CERN, November 2004 EMU FED Design EMU FED: Outline FED Crate & Custom Backplane
More informationStatus of the CSC Trigger. Darin Acosta University of Florida
Status of the CSC Trigger Darin Acosta University of Florida Outline Status of the CSC Track-Finder Status of the CSC Local Trigger PHOS4 Experience TTC Jitter Measurements CPT Week, April 2002 2 Darin
More informationA 3-D Track-Finding Processor for the CMS Level-1 Muon Trigger
A 3-D Track-Finding Processor for the CMS Level-1 Muon Trigger D.Acosta, B.Scurlock*, A.Madorsky, H.Stoeck, S.M.Wang Department of Physics, University of Florida, Gainesville, FL 32611, USA V.Golovtsov,
More informationRPC Trigger Overview
RPC Trigger Overview presented by Maciek Kudla, Warsaw University RPC Trigger ESR Warsaw, July 8th, 2003 RPC Trigger Task The task of RPC Muon Trigger electronics is to deliver 4 highest momentum muons
More informationThe Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System
The Track-Finding Processor for the Level- Trigger of the CMS Endcap Muon System D. Acosta, A. Madorsky (Madorsky@phys.ufl.edu), B. Scurlock, S.M. Wang University of Florida A. Atamanchuk, V. Golovtsov,
More informationTiming distribution and Data Flow for the ATLAS Tile Calorimeter Phase II Upgrade
Timing distribution and Data Flow for the ATLAS Tile Calorimeter Phase II Upgrade Fernando Carrió Argos on behalf of the ATLAS Tile Calorimeter Group Tile Calorimeter Segmented calorimeter of steel plates
More informationCMX (Common Merger extension module) Y. Ermoline for CMX collaboration Preliminary Design Review, Stockholm, 29 June 2011
(Common Merger extension module) Y. Ermoline for collaboration Preliminary Design Review, Stockholm, 29 June 2011 Outline Current L1 Calorimeter trigger system Possible improvement to maintain trigger
More informationChallenges and performance of the frontier technology applied to an ATLAS Phase-I calorimeter trigger board dedicated to the jet identification
Challenges and performance of the frontier technology applied to an ATLAS Phase-I calorimeter trigger board dedicated to the jet identification B. Bauss, A. Brogna, V. Büscher, R. Degele, H. Herr, C. Kahra*,
More informationInvestigation of Proton Induced Radiation Effects in 0.15 µm Antifuse FPGA
Investigation of Proton Induced Radiation Effects in 0.15 µm Antifuse FPGA Vlad-Mihai PLACINTA 1,2, Lucian Nicolae COJOCARIU 1, Florin MACIUC 1 1. Horia Hulubei National Institute for R&D in Physics and
More informationATLAS Tile Calorimeter Interface Card. K. Anderson, A. Gupta, J. Pilcher, H. Sanders, F. Tang, R. Teuscher, H. Wu The University of Chicago
ATLAS Tile Calorimeter Interface Card K. Anderson, A. Gupta, J. Pilcher, H. Sanders, F. Tang, R. Teuscher, H. Wu The University of Chicago ABSTRACT This paper describes the ATLAS Tile Calorimeter Digitizer-to-Rod
More informationResults on Array-based Opto-Links
Results on Array-based Opto-Links, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, D. Pignotti, S. Smith, M. Strang The Ohio State University P. Buchholz, A. Wiese, M. Ziolkowski Universität
More informationCalorimeter Trigger Hardware Update
Calorimeter Trigger Hardware Update T. Gorski, P. Klabbers, W. H. Smith, S. Dasu,, J. Tikalsky, D. Seemuth, A. Farmahini-Farahani, A. Perugupalli University of Wisconsin November 15, 2012 1 UW CTP-6 MMC
More informationDTTF muon sorting: Wedge Sorter and Barrel Sorter
DTTF muon sorting: Wedge Sorter and Barrel Sorter 1 BS, it sorts the 4 best tracks out of max 24 tracks coming from the 12 WS of barrel Vienna Bologna PHTF 72 x Vienna Bologna Padova 12 WS, each one sorts
More informationDTTF muon sorting: Wedge Sorter and Barrel Sorter
DTTF muon sorting: Wedge Sorter and Barrel Sorter 1 BS, it sorts the 4 best tracks out of max 24 tracks coming from the 12 WS of barrel Vienna Bologna PHTF 72 x Vienna Bologna Padova 12 WS, each one sorts
More informationMPC-SP02 Jitter Budget
MPC-SP02 Jitter Budget TI App note Understanding Jitter and Bit Error for the TLK2500 TX TLK 2501 GTX RX MEDIA RX TLK 2501 TX GTX We cannot allow more jitter in a system than the UI, which is 625 ps, or
More informationRadiation test and application of FPGAs in the Atlas Level 1 Trigger.
Radiation test and application of FPGAs in the Atlas Level 1 Trigger. V.Bocci (1), M. Carletti (2), G.Chiodi (1), E. Gennari (1), E.Petrolo (1), A.Salamon (1), R. Vari (1),S.Veneziano (1) (1) INFN Roma,
More informationThe CMS Global Calorimeter Trigger Hardware Design
The CMS Global Calorimeter Trigger Hardware Design M. Stettler, G. Iles, M. Hansen a, C. Foudas, J. Jones, A. Rose b a CERN, 1211 Geneva 2, Switzerland b Imperial College of London, UK Matthew.Stettler@cern.ch
More informationCMX Hardware Overview
Hardware Overview Chip Brock, Dan Edmunds, Philippe Laurens@MSU Yuri Ermoline @CERN Wojciech Fedorko @UBC Michigan State University 12-May-2014 Common Merger extended module () 12-May-2014 2 Overall project
More informationRT2016 Phase-I Trigger Readout Electronics Upgrade for the ATLAS Liquid-Argon Calorimeters
RT2016 Phase-I Trigger Readout Electronics Upgrade for the ATLAS Liquid-Argon Calorimeters Nicolas Chevillot (LAPP/CNRS-IN2P3) on behalf of the ATLAS Liquid Argon Calorimeter Group 1 Plan Context Front-end
More informationIEEE Nuclear Science Symposium San Diego, CA USA Nov. 3, 2015
The New Front-End Electronics For the ATLAS Tile Calorimeter Phase 2 Upgrade Gary Drake Argonne National Laboratory, USA On behalf of the ATLAS TileCal System IEEE Nuclear Science Symposium San Diego,
More informationPrototype Opto Chip Results
Prototype Opto Chip Results K.K. Gan, H.P. Kagan, R.D. Kass, J. Moore, S. Smith The Ohio State University Nov 5, 2008 K.K. Gan ATLAS Tracker Upgrade Workshop 1 Outline Introduction VCSEL driver chip PIN
More informationLevel-1 Data Driver Card of the ATLAS New Small Wheel Upgrade Compatible with the Phase II 1 MHz Readout
Level-1 Data Driver Card of the ATLAS New Small Wheel Upgrade Compatible with the Phase II 1 MHz Readout Panagiotis Gkountoumis National Technical University of Athens Brookhaven National Laboratory On
More informationCMX Hardware Status. Chip Brock, Dan Edmunds, Philippe Yuri Ermoline, Duc Bao Wojciech UBC
Hardware Status Chip Brock, Dan Edmunds, Philippe Laurens@MSU Yuri Ermoline, Duc Bao Ta @CERN Wojciech Fedorko @ UBC Michigan State University 25-Oct-2013 Outline Review of hardware project (Some) hardware
More informationRadiation-Hard ASICS for Optical Data Transmission in the First Phase of the LHC Upgrade
Radiation-Hard ASICS for Optical Data Transmission in the First Phase of the LHC Upgrade A. Adair, W. Fernando, K.K. Gan, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, S. Smith, M. Strang The
More informationThe Design and Testing of the Address in Real Time Data Driver Card for the Micromegas Detector of the ATLAS New Small Wheel Upgrade
The Design and Testing of the Address in Real Time Data Driver Card for the Micromegas Detector of the ATLAS New Small Wheel Upgrade L. Yao, H. Chen, K. Chen, S. Tang, and V. Polychronakos Abstract The
More informationAcquisition system for the CLIC Module.
Acquisition system for the CLIC Module. S.Vilalte on behalf the LAPP CLIC group. 1 1 LAPP CLIC group Annecy France The status of R&D activities for CLIC module acquisition are discussed [1]. LAPP is involved
More informationInitial Single-Event Effects Testing and Mitigation in the Xilinx Virtex II-Pro FPGA
Initial Single-Event Effects Testing and Mitigation in the Xilinx Virtex II-Pro FPGA J. George 1, S. Rezgui 2, G. Swift 3, C. Carmichael 2 For the North American Xilinx Test Consortium 1 The Aerospace
More informationUpgrading the ATLAS Tile Calorimeter electronics
ITIM Upgrading the ATLAS Tile Calorimeter electronics Gabriel Popeneciu, on behalf of the ATLAS Tile Calorimeter System INCDTIM Cluj Napoca, Romania Gabriel Popeneciu PANIC 2014, Hamburg 26th August 2014
More informationCMS Calorimeter Trigger Phase I upgrade
Journal of Instrumentation OPEN ACCESS CMS Calorimeter Trigger Phase I upgrade To cite this article: P Klabbers et al View the article online for updates and enhancements. Related content - CMS level-1
More informationSP605 GTP IBERT Design Creation
SP605 GTP IBERT Design Creation January 2010 Copyright 2009, 2010 Xilinx XTP066 Note: This Presentation applies to the SP605 SP605 IBERT Overview Xilinx SP605 Board Software Requirements Setup for the
More informationStatus and planning of the CMX. Wojtek Fedorko for the MSU group TDAQ Week, CERN April 23-27, 2012
Status and planning of the Wojtek Fedorko for the MSU group TDAQ Week, CERN April 23-27, 2012 : CMM upgrade Will replace CMM: Backplane rate 40 160Mbs Crate to system rate (LVDS) 40 160Mbs Cluster information
More informationRESPONSIBILITIES CIEMAT, MADRID HEPHY, VIENNA INFN, PADOVA INFN, BOLOGNA INFN, TORINO U. AUTONOMA, MADRID & LV, HV PS SYSTEMS.
2 RESPONSIBILITIES CIEMAT, MADRID HEPHY, VIENNA INFN, PADOVA INFN, BOLOGNA INFN, TORINO U. AUTONOMA, MADRID & LV, HV PS SYSTEMS 4 5 2 Crates w/bp 2 TIM 3 ROS-25 3 TRG SC 2 RO PP 6 SC crate: 3 units 2
More informationVersatile Link PLUS Transceiver Development
Versatile Link PLUS Transceiver Development Csaba SOOS EP-ESE-BE on behalf of the VL + collaboration Outline Versatile Link PLUS project introduction Key differences between VL and VL + Link architecture,
More informationData Acquisition in Particle Physics Experiments. Ing. Giuseppe De Robertis INFN Sez. Di Bari
Data Acquisition in Particle Physics Experiments Ing. Giuseppe De Robertis INFN Sez. Di Bari Outline DAQ systems Theory of operation Case of a large experiment (CMS) Example of readout GEM detectors for
More informationFrontend Control Electronics for the LHCb upgrade Hardware realization and test
First Prototype of the muon Frontend Control Electronics for the LHCb upgrade Hardware realization and test V. Bocci, G. Chiodi, P. Fresch et al. International Conference on Technology and Instrumentation
More informationA Possible Redundancy System for Opto-Links
A Possible Redundancy System for Opto-Links A. Adair, W. Fernando, K.K. Gan, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, S. Smith, M. Strang The Ohio State University P. Buchholz, A. Wiese,
More informationAn ATCA framework for the upgraded ATLAS read out electronics at the LHC
An ATCA framework for the upgraded ATLAS read out electronics at the LHC Robert Reed School of Physics, University of the Witwatersrand, Johannesburg, South Africa E-mail: robert.reed@cern.ch Abstract.
More informationFinal Assembly and Test (FAST) site Installation Manual.
Final Assembly and Test (FAST) site Installation Manual. Installation Before you begin: Check the power voltage selectors on all equipment, and set them to the power voltage for your country if necessary.
More informationUS CMS TriDAS US CMS Meeting. Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager April 8, 2006
US CMS TriDAS 2006 Click to edit Master title style US CMS Meeting Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager April 8, 2006 Outline: Calorimeter Trigger Status Endcap Muon Trigger Status
More informationMezzanine card specifications for Level-2 Calorimeter Trigger Upgrade
CDF/DOC/TRIGGER/CDFR/8533 Mezzanine card specifications for Level-2 Calorimeter Trigger Upgrade L. Sartori 1, A. Bhatti 2, A. Canepa 3, M. Casarsa 4, M. Covery 2, G. Cortiana 5, M. Dell Orso 1, G. Flanagan
More informationUSCMS HCAL FERU: Front End Readout Unit. Drew Baden University of Maryland February 2000
USCMS HCAL FERU: Front End Readout Unit Drew Baden University of Maryland February 2000 HCAL Front-End Readout Unit Joint effort between: University of Maryland Drew Baden (Level 3 Manager) Boston University
More informationDetector interface updates (SVD,ECL,EPID)
Detector interface updates(svd,ecl,epid) M. Nakao p.1 Detector interface updates (SVD,ECL,EPID) Mikihiko Nakao(KEK-IPNS) mikihiko.nakao@kek.jp December 16, 2010 Belle II DAQ meeting, KEK Detector interface
More informationStatus of Space Fibre Link Module development
Status of Space Fibre Link Module development Taisto Tuominen Patria Aviation Oy 1/12 Introduction ESA Contract for development of SpaceFibre EM-level modules, work started 09/2008 Prime Contractor: Patria,
More informationLHC Detector Upgrades
Su Dong SLAC Summer Institute Aug/2/2012 1 LHC is exceeding expectations in many ways Design lumi 1x10 34 Design pileup ~24 Rapid increase in luminosity Even more dramatic pileup challenge Z->µµ event
More informationAPV-25 based readout electronics for the SBS front GEM Tracker
APV-25 based readout electronics for the SBS front GEM Tracker Authors: Evaristo Cisbani, Paolo Musico Date: 26/June/2014 Version: 1.0 APV-25 based readout electronics for the SBS front GEM Tracker...
More informationIEEE TRANSACTIONS ON NUCLEAR SCIENCE, VOL. 52, NO. 4, AUGUST
IEEE TRANSACTIONS ON NUCLEAR SCIENCE, VOL. 52, NO. 4, AUGUST 2005 1061 Radiation Qualification of Electronics Components Used for the ATLAS Level-1 Muon Endcap Trigger System R. Ichimiya, S. Tsuji, Y.
More informationAbout using FPGAs in radiation environments
About using FPGAs in radiation environments Tullio Grassi (FNAL / Univ. of MD) Motivations We may need some "glue logic" between the Front-End ASICs and the GBT (see talk from Chris Tully HB/HE Strawman
More informationALICE inner tracking system readout electronics prototype testing with the CERN ``Giga Bit Transceiver''
Journal of Instrumentation OPEN ACCESS ALICE inner tracking system readout electronics prototype testing with the CERN ``Giga Bit Transceiver'' Related content - The ALICE Collaboration - The ALICE Collaboration
More informationNeutron Radiation Tolerance Tests of Optical and Opto-electronic Components for the CMS Muon Barrel Alignment
Neutron Radiation Tolerance Tests of Optical and Opto-electronic Components for the CMS Muon Barrel Alignment Baksay, L. Bencze, Gy. L. 3 Brunel, L. 4 Fenyvesi, A. 2 Molnár, J. 2 Molnár, L. Novák, D. 5
More informationPhysics Procedia 00 (2011) A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade
Physics Procedia 00 (2011) 000 000 Physics Procedia www.elsevier.com/locate/procedia The Technology and Instrumentation in Particle Physics 2011 (TIPP 2011) conference A high speed serializer ASIC for
More informationModule Performance Report. ATLAS Calorimeter Level-1 Trigger- Common Merger Module. Version February-2005
Module Performance Report ATLAS Calorimeter Level-1 Trigger- Common Merger Module B. M. Barnett, I. P. Brawn, C N P Gee Version 1.0 23 February-2005 Table of Contents 1 Scope...3 2 Measured Performance...3
More informationFELI. : the detector readout upgrade of the ATLAS experiment. Soo Ryu. Argonne National Laboratory, (on behalf of the FELIX group)
LI : the detector readout upgrade of the ATLAS experiment Soo Ryu Argonne National Laboratory, sryu@anl.gov (on behalf of the LIX group) LIX group John Anderson, Soo Ryu, Jinlong Zhang Hucheng Chen, Kai
More informationThe First Integration Test of the ATLAS End-Cap Muon Level 1 Trigger System
864 IEEE TRANSACTIONS ON NUCLEAR SCIENCE, VOL. 50, NO. 4, AUGUST 2003 The First Integration Test of the ATLAS End-Cap Muon Level 1 Trigger System K. Hasuko, H. Kano, Y. Matsumoto, Y. Nakamura, H. Sakamoto,
More informationVirtex 6 FPGA Broadcast Connectivity Kit FAQ
Getting Started Virtex 6 FPGA Broadcast Connectivity Kit FAQ Q: Where can I purchase a kit? A: Once the order entry is open, you can purchase your Virtex 6 FPGA Broadcast Connectivity kit online or contact
More informationGPS time synchronization system for T2K
GPS time synchronization system for T2K Hans Berns and Jeff Wilkes University of Washington, Seattle SK Collaboration meeting Nov 8, 2007 11/8/07: GPS 1 11/8/07: GPS 2 T2K GPS Time Synchronization: overview
More informationSpaceWire IP Cores for High Data Rate and Fault Tolerant Networking
SpaceWire IP Cores for High Data Rate and Fault Tolerant Networking E. Petri 1,2, T. Bacchillone 1,2, N. E. L Insalata 1,2, T. Cecchini 1, I. Del Corona 1,S. Saponara 1, L. Fanucci 1 (1) Dept. of Information
More informationValidation of the front-end electronics and firmware for LHCb vertex locator.
Validation of the front-end electronics and firmware for LHCb vertex locator. Antonio Fernández Prieto Universidade de santiago de compostela, Spain E-mail: antonio.fernandez.prieto@cern.ch Pablo Vázquez
More informationHCAL TPG and Readout
HCAL TPG and Readout CMS HCAL Readout Status CERN Drew Baden University of Maryland March 2002 http://macdrew.physics.umd.edu/cms/ see also: http://tgrassi.home.cern.ch/~tgrassi/hcal/ CMS/CERN. Mar, 2002
More informationATLAS Level-1 Calorimeter Trigger
ATLAS EDMS Number: ATL-DA-ER-0030 EDMS Id: 1150213 ATLAS Level-1 Calorimeter Trigger Document Version: 0.8 Document Date: 23 June 2011 Prepared by: L1Calo CMX collaboration Document Change Record Version
More informationThe ATLAS Level-1 Muon to Central Trigger Processor Interface
The ATLAS Level-1 Muon to Central Processor D. Berge a, N. Ellis a, P. Farthouat a, S. Haas a, P. Klofver a, A. Krasznahorkay a,b, A. Messina a, T. Pauly a, G. Schuler a, R. Spiwoks a, T. Wengler a,c a
More informationCMS Trigger/DAQ HCAL FERU System
CMS Trigger/DAQ HCAL FERU System Drew Baden University of Maryland October 2000 http://macdrew.physics.umd.edu/cms/ Honest assessment: About 3 months behind schedule. TRIDAS Overall Project Timelines Expected
More informationPoS(EPS-HEP2017)523. The CMS trigger in Run 2. Mia Tosi CERN
CERN E-mail: mia.tosi@cern.ch During its second period of operation (Run 2) which started in 2015, the LHC will reach a peak instantaneous luminosity of approximately 2 10 34 cm 2 s 1 with an average pile-up
More informationFront End Electronics. Level 1 Trigger
0. CMS HCAL rigger and Readout Electronics Project he overall technical coordination for the HCAL trigger and readout electronics (ri- DAS) project will be located in the Maryland HEP group, led by Drew
More informationSP605 GTP IBERT Design Creation
SP605 GTP IBERT Design Creation October 2010 Copyright 2010 Xilinx XTP066 Revision History Date Version Description 10/05/10 12.3 Recompiled under 12.3. ARs Present in Spartan-6 IBERT Design: AR36775 Delay
More informationLevel-1 Regional Calorimeter Trigger System for CMS
Computing in High Energy and Nuclear Physics, La Jolla, CA, USA, March 24-28, 2003 1 Level-1 Regional Calorimeter Trigger System for CMS P. Chumney, S. Dasu, J. Lackey, M. Jaworski, P. Robl, W. H. Smith
More informationAnode LCT 2001 Design
Anode LCT 2001 Design UCLA and U. Florida High Energy Physics Version 2.4 NOTE: this version adapted from v2.2 by AM, some discrep s with v2.3 by JH may exist and need to be reconciled. April 14, 2003
More informationSP02 to/from DT Interface Test
1. Hardware SP to/from DT Interface Test 9U VME Track Finder Crate Clock and Control Board (CCB), running under the TTC clock of 4.79 MHz (otherwise the SP PLL will not lock to the CCB clock!) Sector Processor
More informationQUALITY ASSURANCE FOR SPACE INSTRUMENTS BUILT WITH COTS
QUALITY ASSURANCE FOR SPACE INSTRUMENTS BUILT WITH COTS Peter Buch Guldager, Gøsta G. Thuesen, John Leif Jørgensen ØRSTED*DTU, Measurement and Instrumentation Systems, Building 327, Technical University
More informationThe LHCb upgrade. Outline: Present LHCb detector and trigger LHCb upgrade main drivers Overview of the sub-detector modifications Conclusions
The LHCb upgrade Burkhard Schmidt for the LHCb Collaboration Outline: Present LHCb detector and trigger LHCb upgrade main drivers Overview of the sub-detector modifications Conclusions OT IT coverage 1.9
More informationDevelopment of a digital readout board for the ATLAS Tile Calorimeter upgrade demonstrator
Journal of Instrumentation OPEN ACCESS Development of a digital readout board for the ATLAS Tile Calorimeter upgrade demonstrator To cite this article: S Muschter et al View the article online for updates
More informationCMS Internal Note. The content of this note is intended for CMS internal use and distribution only. The CSC Track Finder Installation
Available on CMS information server CMS IN-2008/045 CMS Internal Note The content of this note is intended for CMS internal use and distribution only 29 October 2008 The Track Finder Installation D. Acosta,
More informationSummary of Optical Link R&D
Summary of Optical Link R&D K.K. Gan The Ohio State University November 6, 2008 K.K. Gan ATLAS Tracker Upgrade Workshop 1 Outline Introduction Plan for insertable B-layer Status of Versatile Link Project
More informationOptimizing latency in Xilinx FPGA Implementations of the GBT. Jean-Pierre CACHEMICHE
Optimizing latency in Xilinx FPGA Implementations of the GBT Steffen MUSCHTER Christian BOHM Sophie BARON Jean-Pierre CACHEMICHE Csaba SOOS (Stockholm University) (Stockholm University) (CERN) (CPPM) (CERN)
More informationMiniDAQ1 A COMPACT DATA ACQUISITION SYSTEM FOR GBT READOUT OVER 10G ETHERNET 22/05/2017 TIPP PAOLO DURANTE - MINIDAQ1 1
MiniDAQ1 A COMPACT DATA ACQUISITION SYSTEM FOR GBT READOUT OVER 10G ETHERNET 22/05/2017 TIPP 2017 - PAOLO DURANTE - MINIDAQ1 1 Overview LHCb upgrade Optical frontend readout Slow control implementation
More informationLow Voltage Floating Power Supply Systems for LHC Experiments
Low Voltage Floating Power Supply Systems for LHC Experiments M. Plein, A. Köster WIENER- Plein & Baus GmbH, 51399 Burscheid, Germany Abstract A water cooled, Magnetic field and Radiation Tolerant New
More informationConstruction of the Phase I upgrade of the CMS pixel detector
Forward Pixel Barrel Pixel TECHNOLOGY AND INSTRUMENTATION IN PARTICLE PHYSICS 2017, May 22-26, 2017 Construction of the Phase I upgrade of the CMS pixel detector Satoshi Hasegawa Fermi National Accelerator
More informationCommon Software for Controlling and Monitoring the Upgraded CMS Level-1 Trigger
Common Software for Controlling and Monitoring the Upgraded CMS Level-1 Trigger Giuseppe Codispoti, Simone Bologna, Glenn Dirkx, Christos Lazaridis, Alessandro Thea, Tom Williams TIPP2017: International
More informationStatus of CSC Track-Finder
Status of CSC rack-finder arin Acosta, Alex adorsky, obby Scurlock, Holger Stoeck, Song ing Wang University of Florida Victor Golovtsov, isha Kan, Evgeny Nikolaev, Lev Uvarov PNPI CSC rack-finder Crate
More informationTTC/TTS Tester (TTT) Module User Manual
TTC/TTS Tester (TTT) Module User Manual Eric Hazen hazen@bu.edu, Christopher Woodall cwoodall@bu.edu, Charlie Hill chill90@bu.edu May 24, 2013 1 Contents 1 Overview 3 2 Quick Start Guide 4 3 Hardware Description
More informationElectronics, Trigger and Data Acquisition part 3
Electronics, Trigger and Data Acquisition part 3 Summer Student Programme 2016, CERN Roberto Ferrari Instituto Nazionale di Fisica Nucleare roberto.ferrari@pv.infn.it Event Building 2 Two Philosophies
More informationModules and Front-End Electronics Developments for the ATLAS ITk Strips Upgrade
Modules and Front-End Electronics Developments for the ATLAS ITk Strips Upgrade Carlos García Argos, on behalf of the ATLAS ITk Collaboration University of Freiburg International Conference on Technology
More informationHCAL Trigger Readout
HCAL Trigger Readout HTR Status and Clocking Issues D. Baden, T. Grassi http://www.physics.umd.edu/hep/esr_dec_2002.pdf 1 FE/DAQ Electronics S-Link: 64 bits @ 25 MHz Trigger Primitives READ-OUT Crate CAL
More informationThe Use of LabVIEW FPGA in Accelerator Instrumentation.
The Use of LabVIEW FPGA in Accelerator Instrumentation. Willem Blokland Research Accelerator Division Spallation Neutron Source Introduction Spallation Neutron Source at Oak Ridge National Laboratory:
More informationThe Compact Muon Solenoid Experiment. Conference Report. Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland
Available on CMS information server CMS CR -2015/307 The Compact Muon Solenoid Experiment Conference Report Mailing address: CMS CERN, CH-1211 GENEVA 23, Switzerland 17 November 2015 (v2, 27 November 2015)
More informationAssociative Memory Pattern Matching for the L1 Track Trigger of CMS at the HL-LHC
Associative Memory Pattern Matching for the L1 Track Trigger of CMS at the HL-LHC Giacomo Fedi 1,a on behalf of the CMS collaboration 1 INFN Sezione di Pisa, Italy Abstract. The High Luminosity LHC (HL-LHC)
More informationAn Upgraded ATLAS Central Trigger for 2015 LHC Luminosities
An Upgraded ATLAS Central Trigger for 2015 LHC Luminosities ICALEPCS, Oct 6-11 2013, San Francisco Christian Ohm on behalf of the ATLAS TDAQ Collaboration CERN Oct 10, 2013 C. Ohm (CERN) An Upgraded ATLAS
More informationStatus of Control System. Hiroshi Kaji
Status of Control System Hiroshi Kaji 2 Introduction The aim of control system is to increase integrated luminosity, which directly affects the accuracy of physics results. Our control system are required
More informationStreaming Readout, the JLab perspective. Graham Heyes Data Acquisition Support Group Jefferson Lab
Streaming Readout, the JLab perspective Graham Heyes Data Acquisition Support Group Jefferson Lab Introduction After the 12 GeV accelerator upgrade all four halls took production data in Spring of this
More informationRadiation tests of key components of the ALICE TOF TDC Readout Module
Radiation tests of key components of the ALICE TOF TDC Readout Module A. Alici 1, P. Antonioli 1*, A. Mati 2, S. Meneghini 1, M. Pieracci 2, M. Rizzi 1, C. Tintori 2 (1) INFN Bologna, Via Irnerio 46, Bologna,
More informationATMEL ATF280E Rad Hard SRAM Based FPGA. Bernard BANCELIN ATMEL Nantes SAS, Aerospace Business Unit
ATMEL ATF280E Rad Hard SRAM Based FPGA Bernard BANCELIN ATMEL Nantes SAS, Aerospace Business Unit Overview Atmel FPGA Key Points and Architecture ATF280E Radiation Test Results 2 Overview Atmel FPGA Key
More informationA Novel Approach to a High Speed, Large Memory Spacecraft Data Storage Unit
A Novel Approach to a High Speed, Large Memory Spacecraft Data Storage Unit L. Piché, B. Gordon - Routes AstroEngineering L. Laba, K. Magnussen - MDA 1 Presentation Outline Description of Cascade System
More information