1 1 Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter Nee, Staffan Norrga, Remus Teodorescu ISBN-10: Copyright Wiley 2016 Chapter 8 MMC-HVDC Standards and Commissioning Procedures

2 Outline (1) Introduction 8.2 CIGRE and IEC Activities for the Standardization of MMC-HVDC Technology Hierarchy of Available and Applicable Codes, Standards and Best Practice Recommendations for MMC-HVDC Projects 8.3 MMC-HVDC Commissioning and Factory and Site Acceptance Tests Pre-Commissioning Offsite Commissioning Tests or Factory Acceptance Tests Onsite Testing and Site Acceptance Tests Onsite Energizing Tests 8.4 Summary 2

3 Introduction Most of the modular multilevel converter high-voltage direct current (MMC- HVDC) projects are planned and developed as point-to-point transmission scheme projects, where the HVDC equipment are designed, manufactured, and installed by the same HVDC original equipment manufacturer (OEM). The HVDC project customers define the functional requirements, including the grid-code requirements that must be fulfilled by the procured equipment. During the bidding process, the HVDC OEM normally will document the compliance of the tendered HVDC scheme with the customer requirements through adequate system studies and simulations. This chapter provides an overview of standards applicable to HVDC equipment developed by professional associations in the field of MMC- HVDC technology. In addition, best practice recommendations for factory and site acceptance tests are presented. 3

4 CIGRE and IEC Activities for the Standardization of MMC-HVDC Technology Worldwide, various professional associations have taken initiatives to facilitate and develop the necessary recommendations and standards. Professional associations such as IEC, CIGRE, CENELEC, and IEEE are promoting and facilitating activities toward the standardization of MMC-HVDC technology worldwide. CIGRE, the Council on Large Electric Systems, was founded in 1921 and is an international non-profit association for promoting collaboration with experts from around the world by sharing knowledge and joining forces to improve the electric power systems of today and tomorrow. CIGRE Study Committee B4 (SC B4) addresses all aspects of power electronics, HVDC, and FACTS. 4

5 Hierarchy of Available and Applicable Standards for MMC-HVDC Projects IEC Instrument Transformers: Part 1: Current Transformers IEC Insulation Coordination IEC Power Transformers IEC Gapless Metal Oxide Surge Arresters for AC Systems IEC Surge Arresters: Selection and Application Recommendations IEC Insulated Bushings for AC Voltages above 1000 V IEC Voltage Sourced Converter (VSC) Valves for High Voltage Direct Current (HVDC) Power Transmission, Electrical Testing IEC Semiconductor Converters: General Requirements and Line Commutated Converters IEC Reactors IEC Coupling Capacitors and Capacitor Dividers IEC Terminology for HVDC Transmission IEC Common Specifications for High-Voltage Switchgear and Controlgear Standards IEC Power Electronic Capacitors: General IEC Determination of Power Losses in HVDC Converter Stations IEC Power Electronics for Electrical Transmission and Distribution Systems: Testing of Thyristors Valves for SVCs IEC Guide for Selection of Insulators in respect of Polluted Conditions IEC Characteristics of Indoor and Outdoor Post Insulators for Systems with Nominal Voltages greater than 1000 V IEC High-Voltage Fuses IEC Low-Voltage Switchgear and Controlgear Assemblies IEC Dimensions of Low-Voltage Switchgear and Controlgear IEC AC Disconnectors and Earthing Switches IEC High-Voltage Switches IEC : 2002 Radiated RF Immunity IEC : 2004 Conducted RF Immunity IEC : 2002 Fast Transients Immunity IEC : 2005 Damped Oscillatory Wave Immunity IEC : 2000 Dielectric Strength Immunity IEC : 2000 Impulse Voltage Withstand Immunity IEC : 2001 Electrostatic Discharge Immunity IEC Surge Protection IEC Surge Protection ISO 9001 Quality Systems Model for Quality Assurance in Final Design, Development, Production, Installation and Servicing NEMA CC-1 Electric Power Connectors for Substations IEEE 837 Standard for Qualifying Permanent Connections Used in Substation Grounding 5

6 MMC-HVDC Commissioning and Factory and Site Acceptance Tests The commissioning process consists of factory acceptance tests (FATs), or offsite tests, and site acceptance tests (SATs), or onsite tests. During the commissioning process, the HVDC manufacturer, together with the representatives of the customer, verifies and demonstrates the full functionality, operation, and compliance of the procured and installed equipment according to the functional requirements and specifications. 6

7 Typical test programs during FAT and SAT offsite testing (e.g. components and subsystem tests including control and protection tests, auxiliary equipment tests, dynamic performance tests); verification of onsite installation; onsite HVDC terminal energizing tests; operation of the HVDC terminal in STATCOM mode; controlled start-up and shutdown tests and emergency shutdown tests; steady-state power transmission tests, including power ramping; power quality and interference tests; black-start operation and loss of auxiliary (disturbance) tests. end-to-end system tests; AC network interaction tests (e.g. grid-code compliance tests, staged faults, reactive power and voltage control tests, and run-back and protection function tests). 7

8 Pre-Commissioning The offsite commissioning starts with the pre-commissioning procedure. This consists of the inspection and documentation of manufactured equipment and subsystem test preparations. Subsystem tests include electrical and mechanical tests and simple functional tests confined to a subsystem. The objectives of these tests are to inspect the equipment s condition and verify the manufacturing, installation, and operation according to the technical requirements and standards. 8

9 Offsite Commissioning Tests or Factory Acceptance Tests Offsite commissioning tests (FATs) include end-to-end tests and verification of all subsystems, including complete HVDC control and protection systems. Normally at this stage, the high-voltage equipment and the ac networks are modeled and simulated with a real-time simulation RTS) tool. For the test actual control and protection cubicles will be wired to the RTS, and tested. The FATs should cover the steady-state operation and dynamic performance behavior of the HVDC converter during ac and dc network fault conditions. For these tests, different ac and dc network fault conditions are simulated, and the HVDC control and protection functionalities are verified and documented. 9

10 Onsite Testing and Site Acceptance Tests SATs normally consist of the following stages: mechanical and electrical verification of installed equipment; individual subsystem tests; single terminal energizing tests; operation in STATCOM mode; grid-code compliance tests; end-to-end power flow tests; heat run and the trial operation test. During SATs, as a minimum, the normal operation of all subsystems and the signaling between them are controlled, monitored, and documented, before high-voltage energizing tests are initiated.

11 Onsite Energizing Tests (1) After the approval and signoff of the onsite subsystem acceptance tests, the energizing of the HVDC terminal can be initiated. The energizing tests are normally initiated by energizing the ac switchyard and the substation transformers. The converter terminal tests constitute a set of verifications of the acbus-voltage control and reactive power control modes (STATCOM mode of operation) that are to be conducted when the converter terminal is connected to the adjacent ac network for the first time.

12 Onsite Energizing Tests (2) During the end-to-end tests, the following control modes should be verified: AC-bus-voltage control at both terminals; reactive power control at both terminals; DC-bus-voltage control at both terminals; DC power flow and step control response; independent control of active (P) and reactive (Q) powers at both terminals; system redundancy and changeover tests; trip tests; communication and operator control tests (e.g. transfer of HMI station and system functions between individual control locations, including local station control at both terminals).

This annex is valid from: to Replaces annex dated: Location(s) where activities are performed under accreditation

This annex is valid from: to Replaces annex dated: Location(s) where activities are performed under accreditation Location(s) where activities are performed under accreditation Head Office Utrechtseweg 310, Building no. R11 6812 AR Arnhem The Netherlands Location Abbreviation/ location code Utrechtseweg 310, Building

More information

Central Power Research Institute, Medipally PO, Uppal, Hyderabad, Telangana. Discipline Electrical Testing Issue Date

Central Power Research Institute, Medipally PO, Uppal, Hyderabad, Telangana. Discipline Electrical Testing Issue Date Last Amended on 31.07.2015 Page 1 of 11 I. SWITCHGEAR EQUIPMENT 1. High Voltage switchgear & control gear and AB switches Ratings upto 1200 kv system Switching Impulse Voltage (Dry & Wet) Power Frequency

More information

Switching Control Sentinel (SCS) TM For all ABB independent pole operated circuit breakers

Switching Control Sentinel (SCS) TM For all ABB independent pole operated circuit breakers Switching Control Sentinel (SCS) TM For all ABB independent pole operated circuit breakers Switching Control Sentinel (SCS) for circuit breakers Voltage and current transients generated during switching

More information

Quality assurance Test Facilities for Gapless ZnO Surge Arresters in High Voltage Division of CPRI, Bengaluru

Quality assurance Test Facilities for Gapless ZnO Surge Arresters in High Voltage Division of CPRI, Bengaluru Quality assurance Test Facilities for Gapless ZnO Surge Arresters in High Voltage Division of CPRI, Bengaluru Abstract: Surge arrester is one of the important power system network components which is neglected

More information

Specification Voltage Limiting Device

Specification Voltage Limiting Device Engineering Specification Electrical Networks L1-CHE-SPE-152 Specification Voltage Limiting Device Version: 1 Issued: 20 th April 2018 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering,

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60664-1 Edition 1.2 2002-06 Edition 1:1992 consolidated with amendments 1:2000 and 2:2002 Insulation coordination for equipment within low-voltage systems Part 1: Principles,

More information

Standards Update Notice (SUN) Issued: August 11, 2017

Standards Update Notice (SUN) Issued: August 11, 2017 Standard Information Standard Number: UL 621 Standard Name: Ice Cream Makers Standard Edition and Issue Date: 7 th Edition Dated May 7, 2010 Date of Revision: February 15, 2017 Date of Previous Revision

More information

National Standard of The People s Republic of China

National Standard of The People s Republic of China Translated English of Chinese Standard: GB/T17626.5-2008 Translated by: www.chinesestandard.net Wayne Zheng et al. Email: Sales@ChineseStandard.net ICS 33.100 L 06 GB National Standard of The People s

More information

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical Issued for Review Section 26 28 16.01 Air Circuit Breakers Page 1 of 7 PART 1 GENERAL 1.1 GENERAL.1 This specification serves to define requirements for a replacement of low voltage circuit breaker of

More information

Circuit Breaker Sentinel (CBS) for SF 6. power circuit breakers

Circuit Breaker Sentinel (CBS) for SF 6. power circuit breakers Circuit Breaker Sentinel (CBS) for SF 6 power circuit breakers Circuit Breaker Sentinel (CBS) for SF 6 power circuit breakers It is widely recognized that the concept of periodic equipment maintenance

More information

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. 3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV 16346-1 3a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to

More information

Medium Voltage Metal-Enclosed Harmonic Filter Systems

Medium Voltage Metal-Enclosed Harmonic Filter Systems 66 Carey Road Queensbury, NY 12804 Ph: (518) 792-4776 Fax: (518) 792-5767 www.nepsi.com sales@nepsi.com Medium Voltage Metal-Enclosed Harmonic Filter Systems General NEPSI s armorvar, medium voltage metal-enclosed

More information

Certification Exams. Detailed Content Outlines Level 2 Certified Assistant Technician Level 3 Certified Technician Level 4 Certified Senior Technician

Certification Exams. Detailed Content Outlines Level 2 Certified Assistant Technician Level 3 Certified Technician Level 4 Certified Senior Technician Detailed Content Outlines Level 2 Certified Assistant Technician Level 3 Certified Technician Level 4 Certified Senior Technician Certification Exams How to Use the Detailed Content Outlines These Detailed

More information

Call for Papers GCC POWER 2011 GCC Cigre s Leading Electric Power Conference & Exhibition In the Gulf Region

Call for Papers GCC POWER 2011 GCC Cigre s Leading Electric Power Conference & Exhibition In the Gulf Region Call for Papers GCC POWER 2011 GCC Cigre s Leading Electric Power Conference & Exhibition In the Gulf Region Kuwait - November 2011 GCC Cigre, is pleased to announce its 7 th International Conference GCC

More information

CIGRE STUDY COMMITTEE C4 BRANDON PETERSON SOUTH AFRICAN MEMBER SC C4 7 AUGUST 2017

CIGRE STUDY COMMITTEE C4 BRANDON PETERSON SOUTH AFRICAN MEMBER SC C4 7 AUGUST 2017 CIGRE STUDY COMMITTEE C4 BRANDON PETERSON SOUTH AFRICAN MEMBER SC C4 7 AUGUST 2017 1 WHERE SC C4 FITS IN A1 Rotating electrical machines A2 Transformers A3 High voltage equipment B1 Insulated cables B2

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 62305-4 Edition 2.0 2010-12 Protection against lightning Part 4: Electrical and electronic systems within structures INTERNATIONAL ELECTROTECHNICAL COMMISSION XC ICS 29.020;

More information

Installation Instructions

Installation Instructions Installation Instructions (Catalog Number 1771-OD) This document provides information on: Because of the variety of uses for the products described in this publication, those responsible for the application

More information

Relion 611 series. 611 series Type Test Certificate

Relion 611 series. 611 series Type Test Certificate Relion 611 series 611 series Document ID: 1MRS757466 Issued: 2016-02-22 Revision: B Product version: 2.0 Copyright 2016 ABB. All rights reserved Table of contents Table of contents Section 1 Section

More information

FL MC 2000E (SM40) LC

FL MC 2000E (SM40) LC IEC 61850 fiber optic converter with LC fiber optic connection (1310 nm) to convert 100Base-Tx to single- or multi-mode fiber glass Data sheet 3205_en_C 1 Description PHOENIX CONTACT 2014-04-04 2 Features

More information

Medium Voltage Metal-Enclosed Power Capacitor Banks

Medium Voltage Metal-Enclosed Power Capacitor Banks 66 Carey Road Queensbury, NY 12804 Ph: (518) 792-4776 Fax: (518) 792-5767 www.nepsi.com sales@nepsi.com Medium Voltage Metal-Enclosed Power Capacitor Banks General Northeast Power System s (NEPSI's) medium

More information

Study Committee SC A3

Study Committee SC A3 Prepared by Dagmar Kopejtkova in August 2010 Study Committee SC A3 Study Committee A3 HV Equipment Theory, design, construction and application of HV equipment components, equipment and equipment systems

More information

Type MVTT 14 and MVTT 15: Static Digital Time delay relays

Type MVTT 14 and MVTT 15: Static Digital Time delay relays Type MVTT 4 and MVTT 5: Static Digital Time delay relays Features 000/ setting range Time settings easily selected by means of thumbwheel switches Provide time delayed pick-up, or drop-off Compact construction

More information

Document Title Issue Date. TBE/KBE-DOC TBE/KBE Document List TBE/KBE-REV TBE/KBE Revision List

Document Title Issue Date. TBE/KBE-DOC TBE/KBE Document List TBE/KBE-REV TBE/KBE Revision List Sid 1 (6) TBE/KBE DOCUMENT LIST Document Issue Date Supersedes TBE/KBE-DOC 12.0 2013-08-20 Issue 11.0 TBE/KBE-DOC TBE/KBE Document List 12.0 13-08-20 TBE/KBE-REV TBE/KBE Revision List 12.0 13-08-20 TBE/KBE

More information

Arc protection relay. Features Three-phase overcurrent function. Application

Arc protection relay. Features Three-phase overcurrent function. Application Arc protection relay REA 10_ Page 1 Issued: May 1999 Status: New Data subject to change without notice Features Three-phase overcurrent function Loop-type or radial sensor fibre for arc detection Two high-speed

More information

Sensitive Earth-fault Relay SPAJ 111 C. Product Guide

Sensitive Earth-fault Relay SPAJ 111 C. Product Guide Issued: April 1999 Status: Update Version: C/12.04.2006 Data subject to change without notice Features Sensitive low-set neutral overcurrent stage with definite time characteristic High-set neutral overcurrent

More information

SCADA Training - T&D Automation

SCADA Training - T&D Automation SCADA Training - T&D Automation Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq This course covers all the

More information

11 kv Indoor Switchgear - SCADA Controlled

11 kv Indoor Switchgear - SCADA Controlled Specification 11 kv Indoor Switchgear - SCADA Controlled Important Warning This document is one of a set of standards developed solely and specifically for use on the rail network owned or managed by the

More information

IEC NORMAS PUBLICADAS. As normas ISO/IEC já estão relacionadas em normas ISO Publicadas

IEC NORMAS PUBLICADAS. As normas ISO/IEC já estão relacionadas em normas ISO Publicadas IEC NORMAS PUBLICADAS As normas ISO/IEC já estão relacionadas em normas ISO Publicadas IEC/TC 2 - Rotating machinery IEC 60034-2-1 ed2.0 - Rotating electrical machines - Part 2-1: Standard methods for

More information

Today, utilities are focusing on improving or maintaining

Today, utilities are focusing on improving or maintaining TRANSFORMER MONITORING Trends in continuous on-line condition monitoring ABSTRACT The article describes new trends in the field of continuous on-line condition monitoring of transformers. These trends

More information

Substation Automation Systems

Substation Automation Systems Substation Automation Systems This document may be subject to changes. Contact ARTECHE to confirm the characteristics and availability of the products described here. Moving together INDEX 1. The value

More information

Analog output 520AOD01 Data sheet

Analog output 520AOD01 Data sheet RTU520 product line Analog output 520AOD01 Data sheet ERR RTU I/O bus Microcontroller RAM Flash Output register DC DC D D A A Adjustment Output range O1 O2 Adjustment Output range IOC UE Figure 1: Block

More information

Protection and control. Sepam range Sepam 100 RT. Merlin Gerin Square D Telemecanique

Protection and control. Sepam range Sepam 100 RT. Merlin Gerin Square D Telemecanique Protection and control epam range epam T Merlin Gerin quare D Telemecanique presentation contents page presentation connection characteristics installation ordering information epam T. on in in in in in

More information

SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016

SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016 SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016 BY H S W Karunaratne Assistant Director - Engineering Sri Lanka Standards Institution. 1 DEFINITIONS Ac module:

More information

Residual overvoltage relay

Residual overvoltage relay Page 1 Issued: April 1999 Status: New Data subject to change without notice Features Definite-time residual overvoltage earthfault protection and supervision Two independent operation stages, e.g. one

More information

RE22R2KMR Off-delay Timing Relay s 10min V AC/DC - 2C/O

RE22R2KMR Off-delay Timing Relay s 10min V AC/DC - 2C/O Characteristics Off-delay Timing Relay - 0.05s 10min - 24 240V AC/DC - 2C/O Main Range of product Product or component type Discrete output type Device short name Nominal output current Complementary Contacts

More information

KTH ROYAL INSTITUTE OF TECHNOLOGY. HVDC Grid Protection. Nordic Workshop on Power System Protection

KTH ROYAL INSTITUTE OF TECHNOLOGY. HVDC Grid Protection. Nordic Workshop on Power System Protection KTH ROYAL INSTITUTE OF TECHNOLOGY HVDC Grid Protection Nordic Workshop on Power System Protection 2016-05-25 Table of Contents 1. Motivation for MTDC grid 2. Protection requirements & constraints 3. Fault

More information

extending the boundaries of technology evolution of proven technology FEATURES

extending the boundaries of technology evolution of proven technology FEATURES extending the boundaries of technology evolution of proven technology FEATURES IEC 61850 compliant Advanced AC capabilities with comprehensive fault detection Integrated protection functions Disturbance

More information

ENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, OUR TEAM OF PROFESSIONALS HAVE WORKED TOGETHER

ENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, OUR TEAM OF PROFESSIONALS HAVE WORKED TOGETHER smallhydro PRIME ENGINEERING LIMITED IS AN ELECTRICAL ENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, IMPLEMENTATION AND MAINTENANCE. OUR TEAM OF PROFESSIONALS

More information

P Information Technology -- Service Management -- Part 1: Service Management System Requirements Recommendation: Approve PAR withdrawal

P Information Technology -- Service Management -- Part 1: Service Management System Requirements Recommendation: Approve PAR withdrawal NesCom Recommendations IEEE-SA Standards Board New Standards Committee (NesCom) Recommendations [SASB approval date: 6-Dec-2017] [All votes unanimous unless noted otherwise.] Withdrawal Requests IEEE Computer

More information

RE22R2QGMR Star-Delta Timing Relay s 300h V AC/DC - 2C/O

RE22R2QGMR Star-Delta Timing Relay s 300h V AC/DC - 2C/O Characteristics Star-Delta Timing Relay - 0.05s 300h - 24 240V AC/DC - 2C/O Main Range of product Product or component type Discrete output type Device short name Nominal output current Complementary Contacts

More information

RE22R2QTMR Star-Delta Timing Relay s 300h V AC/DC - 2C/O

RE22R2QTMR Star-Delta Timing Relay s 300h V AC/DC - 2C/O Characteristics StarDelta Timing Relay 0.05s 300h 24 240V AC/DC 2C/O Main Range of product Product or component type Discrete output type Device short name Nominal output current Zelio Time Modular timing

More information

INSTRUCTION MANUAL TRIP CIRCUIT SUPERVISION RELAY GKAD1

INSTRUCTION MANUAL TRIP CIRCUIT SUPERVISION RELAY GKAD1 INSTRUCTION MANUAL TRIP CIRCUIT SUPERVISION RELAY GKAD1 TOSHIBA Corporation 2004 All Rights Reserved. ( Ver. 1.6 ) Safety Precautions Before using this product, please read this chapter carefully. This

More information

Features. Applications and Benefits TRC ELECTRONICS, INC

Features. Applications and Benefits TRC ELECTRONICS, INC Features Gelo LED power supplies are designed specifically for use in LED lighting, particularly well-suited for refrigeration, retail display and sign applications. The industry standard footprint and

More information

Type VRLTC tap changer

Type VRLTC tap changer Report No. 1ZUA938502-AGC 2, Rev 0 Date: 6 November 2012 Type VRLTC tap changer Ruggedized electronics systems specification & type test data Product Style No Rating By Type VRLTC, on-tank, vacuum reactance

More information

Externally Gapped Line Arresters Smart Solution for Stable Power Supply

Externally Gapped Line Arresters Smart Solution for Stable Power Supply Smart Solution for Stable Power Supply Metal-oxide surge arresters with external series gaps improve the reliability of transmission systems, and help eliminate not only lightning damages of transmission

More information

Scout-S Station Controller

Scout-S Station Controller Scout-S Station Controller Substation Automation Scout-S Station Controller The Scout-S Station Controller is a SCADA enabled remote terminal unit (RTU) with a data concentrator, event reporter, and built-in

More information

IEC Test Equipment Requirements

IEC Test Equipment Requirements OMICRON K02 03 20060309 IEC 61850 Test Equipment Requirements Dr. Alexander Apostolov K02 03 20060309 Page: 1 Intelligent Substation Automation Systems OMICRON K02 03 20060309 Page: 2 Intelligent Sensor

More information

Externally Gapped Line Arresters Smart Solution for Stable Power Supply

Externally Gapped Line Arresters Smart Solution for Stable Power Supply Smart Solution for Stable Power Supply Metal-oxide surge arresters with external series gaps improve the reliability of transmission systems, and help eliminate not only lightning damages of transmission

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 62040-3 First edition 1999-03 Uninterruptible power systems (UPS) Part 3: Method of specifying the performance and test requirements This English-language version is derived

More information

ELG4125: System Protection

ELG4125: System Protection ELG4125: System Protection System Protection Any power system is prone to 'faults', (also called short-circuits), which occur mostly as a result of insulation failure and sometimes due to external causes.

More information

This 4200-RM Rack Mount Kit is for installation in 4200-CAB series cabinets only.

This 4200-RM Rack Mount Kit is for installation in 4200-CAB series cabinets only. Keithley Instruments, Inc. 28775 Aurora Road Cleveland, Ohio 44139 (440) 248-0400 Fax: (440) 248-6168 www.keithley.com Model 4200-RM Rack Mount Kit Packing List Introduction NOTE This 4200-RM Rack Mount

More information

RE22R2CMR Off-delay Timing Relay s 300h V AC/DC - 2C/O

RE22R2CMR Off-delay Timing Relay s 300h V AC/DC - 2C/O Characteristics Off-delay Timing Relay - 0.05s 300h - 24 240V AC/DC - 2C/O Main Range of product Product or component type Discrete output type Device short name Nominal output current Complementary Contacts

More information

The Efficient Way. SVC PLUS Innovation meets experience. Answers for energy.

The Efficient Way. SVC PLUS Innovation meets experience. Answers for energy. The Efficient Way SVC PLUS Innovation meets experience Answers for energy. Enhancement of Grid Efficiency Improved dynamic stability and power quality of power systems in a new, highly economical manner

More information

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS SECTION 264313 - TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and

More information

GE Power. elumina. Control System for HVDC Schemes

GE Power. elumina. Control System for HVDC Schemes GE Power elumina TM Control System for HVDC Schemes TODAY S ENVIRONMENT Todays transmission grid is changing and becoming more complex to manage as utilities globally are experiencing grid challenges such

More information

Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power Transformers

Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power Transformers Session Five: IEC61850 Based Process Bus Protection Solution for Remote Located Power 1. Abstract Dinesh Mithanthaya Design Manager, Horizon Power Higher capacity substation power transformers ( 5MVA),are

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 60099-5 Edition 3.0 2018-01 colour inside Surge arresters Part 5: Selection and application recommendations INTERNATIONAL ELECTROTECHNICAL COMMISSION ICS 29.120.50; 29.240.10

More information

Autodaptive Capacitor Control M 2501B

Autodaptive Capacitor Control M 2501B CONTROLS Autodaptive Capacitor Control M 2501B Capacitor Control for Pole-Top Capacitor Banks Increases effectiveness of installed capacitors for voltage control to reduce system losses Adapts reference

More information

SPECIFIC INTERCONNECTION PROTECTION REQUIREMENTS... 5

SPECIFIC INTERCONNECTION PROTECTION REQUIREMENTS... 5 Central Hudson Gas & Electric Corporation (CHG&E) Interconnection Protection Requirements for Distributed Generators of Greater than 300 kva Connected in Parallel with the CHG&E Electrical Delivery System

More information

Relion 605 series. Self-powered feeder protection REJ603 Product Guide

Relion 605 series. Self-powered feeder protection REJ603 Product Guide Relion 605 series Relion 605 series Relion 605 series Self-powered feeder protection Product Guide Product version: 3.0 Contents 1. Description... 3 2. Relay functions... 3 3. Protection functions... 4

More information

Voltage regulator. SPAU 341 C 1MRS MBG Issued: July 1998 Status: Revised Version: C/ Data subject to change without notice

Voltage regulator. SPAU 341 C 1MRS MBG Issued: July 1998 Status: Revised Version: C/ Data subject to change without notice Issued: July 1998 Status: Revised Version: C/08.10.2003 Data subject to change without notice Features Comprehensive voltage regulation for power transformers with on-load tapchangers in distribution substations

More information

Gelo LED Driver 100W, Single output, Constant Voltage RGLD100-24

Gelo LED Driver 100W, Single output, Constant Voltage RGLD100-24 Features Gelo LED power supplies are designed specifically for use in LED lighting, particularly well-suited for refrigeration, retail display and sign applications. The industry standard footprint and

More information

ABB 520BID01 Binary Input datasheet

ABB 520BID01 Binary Input datasheet ABB 520BID01 Binary Input datasheet http://www.manuallib.com/abb/520bid01-binary-input-datasheet.html The binary input module 520BID01 provides 16 galvanic isolated inputs for up to 16 binary process signals.

More information

MINER-S Station Controller

MINER-S Station Controller MINER-S Station Controller Substation Automation MINER-S Station Controller The MINER-S Station Controller is a SCADA enabled fixed point remote terminal unit (RTU) with a data concentrator, event reporter,

More information

Universal Contact Input Adapter M 3908

Universal Contact Input Adapter M 3908 PROTECTION Universal Contact Input Adapter M 908 Converts seven internally wetted contacts to be compatible with Beckwith MXX protective relays and M Motor Bus Transfer System contact inputs Operates with

More information

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment.

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment. SECTION 26 43 00 SURGE PROTECTION DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment. 1.2 DEFINITIONS A. ATS:

More information

Final Report. Mini Project TET Group nr 7 - Project nr 4. Students: Hans Lavoll Halvorson, NTNU

Final Report. Mini Project TET Group nr 7 - Project nr 4. Students: Hans Lavoll Halvorson, NTNU Final Report Mini Project TET4190 28.10.2010 Optimal Distance for connection of offshore wind farm with AC cable with SVC or STATCOM To increase the distance compensation technologies such as SVC and STATCOM

More information

RT4F-120V/20A-WAC RECTIFIER

RT4F-120V/20A-WAC RECTIFIER The RT4F-120V/20A-WAC is a switched mode rectifier/charger module designed to provide up to 20A of output current into a 120V nominal system. This charger has been designed for use in conjunction with

More information

SMVector Additional I/O Module Installation and Operation Manual

SMVector Additional I/O Module Installation and Operation Manual SMVector Additional I/O Module Installation and Operation Manual About These Instructions This documentation applies to the optional Additional I/O module for the SMVector inverter and should be used in

More information

ABM Status Input Active Burden Module

ABM Status Input Active Burden Module Technical Bulletin ABM Status Input Active Burden Module Features Improve security of sensitive, high speed digital status inputs Provides capacitor discharge protection for solid state status inputs to

More information

PanelView Plus/VersaView CE Terminals and Display Modules

PanelView Plus/VersaView CE Terminals and Display Modules Installation Instructions PanelView Plus/VersaView CE Terminals and Display Modules (Catalog Numbers 2711P-xxxxxx, 6182H-xxxxxx) English Inside: Overview...2 For More Information...2 Modular Components...3

More information

Verified and validated

Verified and validated Verified and validated ABB has its own system verification and vaildation center STEPHAN GERSPACH, PETER WEBER When the IEC 61850 standard was introduced, ABB not only implemented it in its product portfolio,

More information

This is a preview - click here to buy the full publication

This is a preview - click here to buy the full publication TECHNICAL REPORT IEC TR 61850-7-500 Edition 1.0 2017-07 colour inside Communication networks and systems for power utility automation Part 7-500: Basic information and communication structure Use of logical

More information

TRENDS IN SWITCHGEAR SPECIFICATIONS

TRENDS IN SWITCHGEAR SPECIFICATIONS TRENDS IN SWITCHGEAR SPECIFICATIONS What changes are we seeing in equipment specifications? What s being discussed in client meetings? What s happening in the market to support these requests? EQUIPMENT

More information

Lightning and Surge Arresters

Lightning and Surge Arresters Lightning and Surge Arresters 5/4 Product overview 5/5 Lightning arresters, requirement category I (B) 5/6 Combined arresters, requirement category I (B) and II (C) 5/7 Single-pole surge arrester, requirement

More information

Earth-fault Relay SPAJ 110 C. Product Guide

Earth-fault Relay SPAJ 110 C. Product Guide Issued: April 1999 Status: Updated Version: C/12.04.2006 Data subject to change without notice Features Low-set neutral overcurrent stage with definite time or inverse time characteristic High-set neutral

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers on. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a generating plant with the Oncor

More information

Control and Protection System Win-TDC

Control and Protection System Win-TDC HVDC Control & Protection Control and Protection System Win-TDC HVDC Aysen -SIC Basics of HVDC Basic Design Equipment Info Control & Protection Station Design Logistics Project Management Maintenance 1

More information

Installation Instructions

Installation Instructions Installation Instructions (1771-ODD Series B) Use this document as a guide when installing the catalog number 1771-ODD series B output module. The ac isolated output module is shipped in static-shielded

More information

SECTION APPENDIX B SFC DOCUMENT SUBMITTAL SCHEDULE

SECTION APPENDIX B SFC DOCUMENT SUBMITTAL SCHEDULE SECTION 16262 - APPENDIX B SFC DOCUMENT SUBMITTAL SCHEDULE PART 1 - GENERAL 1.01 RELATED SECTIONS A. Section 01300 Submittals B. Section 16262 Static Frequency Converter C. Section 16262A Appendix A SFC

More information

NI REM Remote I/O Overview DATASHEET. Digital Input Module for Remote I/O

NI REM Remote I/O Overview DATASHEET. Digital Input Module for Remote I/O DATASHEET NI REM-11154 Digital Input Module for Remote I/O Read digital input frequencies up to 5 khz Adjustable filter time to improve measurement quality Spring-terminal connectors allow fast wiring

More information

Sensitive definite time or inverse time earth-fault stage for back-up residual earthfault

Sensitive definite time or inverse time earth-fault stage for back-up residual earthfault Issued: April 1999 Status: Updated Version: B/09.11.2001 Data subject to change without notice Features Sensitive restricted earth-fault protection stage for fast, selective earth-fault protection Sensitive

More information

Introduction to new ABB STATCOM portfolio Power Grid Integration FACTS

Introduction to new ABB STATCOM portfolio Power Grid Integration FACTS INNOVATION DAY AT CERN, MAY 10 TH 2017 Introduction to new ABB STATCOM portfolio Power Grid Integration FACTS Bjoern Oedegard, Principal Engineer System & Power Electronics FACTS Flexible AC Transmission

More information

CertaDrive. LED indoor drivers. May, Design-in guide - Philips CertaDrive Indoor LED drivers

CertaDrive. LED indoor drivers. May, Design-in guide - Philips CertaDrive Indoor LED drivers CertaDrive LED indoor drivers 1 Published versions 2 Contents Contents 3 Introduction to this guide 4 Applications 4 Information or support 4 Safety precautions 5 Safety warnings and installation instructions

More information

Installation Instructions

Installation Instructions Installation Instructions Cat. No. 1771-IQ16 Series C This document provides information on: The dc isolated input module is shipped in static-shielded packaging to guard against electrostatic discharge

More information

Moxa White Paper. Requirements for Ethernet Networks in Substation Automation. Certification and Hardware Requirements. Alvis Chen

Moxa White Paper. Requirements for Ethernet Networks in Substation Automation. Certification and Hardware Requirements. Alvis Chen Requirements for Ethernet Networks in Substation Automation Alvis Chen Introduction Ethernet offers numerous advantages that make it the communication medium of choice for substation automation systems

More information

RE22R2AMR On-delay Timing Relay s 300h V AC/DC - 2C/O

RE22R2AMR On-delay Timing Relay s 300h V AC/DC - 2C/O Characteristics On-delay Timing Relay - 0.05s 300h - 24 240V AC/DC - 2C/O Main Range of product Product or component type Discrete output type Device short name Nominal output current Complementary Contacts

More information

Thermistor motor protection relay CM-MSS.11

Thermistor motor protection relay CM-MSS.11 Data sheet Thermistor motor protection relay CM-MSS.11 The thermistor motor protection relay CM-MSS.11 monitors the winding temperature of motors and protects them from overheating, overload and insufficient

More information

RT4F-110V/25A RECTIFIER

RT4F-110V/25A RECTIFIER The RT4F-110V/25A is a hot-pluggable switched mode rectifier (SMR) module designed to provide up to 25A of output current into a 110V nominal system. Examples of such systems are 60 cells lead acid (136V

More information

RE22R2AMR On-delay Timing Relay s 300h V AC/DC - 2C/O

RE22R2AMR On-delay Timing Relay s 300h V AC/DC - 2C/O Characteristics Ondelay Timing Relay 0.05s 300h 24 240V AC/DC 2C/O Main Range of product Product or component type Discrete output type Device short name Nominal output current Zelio Time Modular timing

More information

Synchro-check relay. Application

Synchro-check relay. Application Issued: April 1999 Status: Updated Version: B/08.11.2001 Data subject to change without notice Features Two identical operation stages allowing the closing conditions of two separate circuit breakers to

More information

RT12-240V/2.4kW Rectifier Specification

RT12-240V/2.4kW Rectifier Specification The RT12-240V/2.4kW is a switched mode rectifier (SMR) module that delivers up to 2.4kW of output power (and up to 11A output current) into a 240V nominal DC system. The RT12 suits AC supply voltages between

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 61131-2 Third edition 2007-07 Programmable controllers Part 2: Equipment requirements and tests Reference number IEC 61131-2:2007(E) THIS PUBLICATION IS COPYRIGHT PROTECTED Copyright

More information

Electronic timer CT-ARE OFF-delayed without auxiliary voltage, 1 c/o (SPDT) contact

Electronic timer CT-ARE OFF-delayed without auxiliary voltage, 1 c/o (SPDT) contact Data sheet Electronic timer CT-ARE OFF-delayed without auxiliary voltage, 1 c/o (SPDT) contact The CT-ARE is an electronic time relay with OFF-delay. It is from the CT-E range. The CT-E range is the economic

More information

CPU6501 REV1.0 1 WILLOWGLEN MSC BERHAD

CPU6501 REV1.0 1 WILLOWGLEN MSC BERHAD CPU6501 REV1.0 1 RESPONSIBLE PERSON REVISION RELEASE DATE COMPOSER JOB TITLE APPROVALS JOB TITILE 0.0 10 th MAR 2016 SIDEK MANAGER NIK AZLAN CTO 1.0 26/10/2016 Farm Zheng Lin HW Engineer Mohd Sidek HW

More information

Series 370 S SoftwSystem are Qui Switch/Mult ck Start G imeter uide Quick Start Guide

Series 370 S SoftwSystem are Qui Switch/Mult ck Start G imeter uide Quick Start Guide Series ACS 3700A Software System Quick Switch/Multimeter Start Guide Quick Start Guide Safety precautions Observe the following safety precautions before using this product and any associated instrumentation.

More information

Contact protection relay

Contact protection relay Contact protection relay Ordering details SVR 450 08 F0000 The protects sensitive control contacts from excessive load. It can be used with latching function or without. Bounce time of control contacts

More information

MiCOM Agile P99x. Grid Solutions. Testing & Commissioning. Test Block, Multi-finger Test Plug and Single-finger Test Plug. Design Flexibility

MiCOM Agile P99x. Grid Solutions. Testing & Commissioning. Test Block, Multi-finger Test Plug and Single-finger Test Plug. Design Flexibility GE Grid Solutions MiCOM Agile P99x Test Block, Multi-finger Test Plug and Single-finger Test Plug The MiCom Agile P991 test block offers safe and configurable facilities for monitoring and secondary injection

More information

Multilin P30 Phasor Data Concentrator

Multilin P30 Phasor Data Concentrator Multilin P30 Phasor Data Concentrator Secure high performance Phasor Data Concentrator (PDC) for wide area monitoring and dynamic disturbance analysis KEY BENEFITS Reduce deployment and operation cost

More information

SE Engineering, PC strives to be a leader in the power system engineering field by providing our customers with the highest level of quality,

SE Engineering, PC strives to be a leader in the power system engineering field by providing our customers with the highest level of quality, SE Engineering, PC strives to be a leader in the power system engineering field by providing our customers with the highest level of quality, integrity, and innovation. Our mission is to offer the safest,

More information