1 What the Government Needs from the Utility UESCs and VA s Performance Contracting Program Lara Spader Department of Veterans Affairs August 17, 2017 Tampa Convention Center Tampa, Florida

2 Agenda Resiliency and reliability issues for VA VA s energy performance contracting program Challenges Needs UESC project highlights 2

3 Resiliency considerations for VA Mission critical facilities: VA facilities that are required to continue operation during a natural or manmade extreme event or a emergency. Resiliency measures: N+1 redundancy and emergency power supply Duel fuel capability and reserve capacity Relocation of critical systems from flood-risk areas Distributed generation with islanding capability Solar with battery storage Flooding of VA New York Harbor Healthcare System s Manhattan facility after Hurricane Sandy Failure of electrical switches, mechanical systems, steam and the fire-suppression system 3

4 Reliability considerations for VA Aging infrastructure and building systems 1,700 VA properties with historic protections Facility condition assessment deficiencies Maintenance backlog (D s and F s) has been steadily increasing Appropriated funding has been insufficient to reduce backlog Correction costs have also been increasing Prevention is less expensive than correction Dependency on aging grid infrastructure 4

5 VA Energy Performance Contracting Overview: Awarded and Developing Portfolio (000 s) $1,600,000 $1,400,000 $1,200,000 $1,000,000 $800,000 $600,000 $356 million Awarded $450 million In development $800 million potential savings from projects in development $400,000 $200,000 $0 $642 million expected savings from awarded projects medical centers 36 M sq. ft. upgrades $26 M annual expected savings 42 medical centers ~ 41 M sq. ft. upgrades ~ $31 M annual potential savings AWARDED IN DEVELOPMENT 5

6 Awarded Contract Breakdown Award Value by Contract Type Number of contracts $62 M (17%) 5 (31%) $294 M (83%) 11 (69%) ESPC UESC ESPC UESC 6

7 Performance Contracting Program Challenges Declining program budget impacts ability to fund project support Third-party project facilitators Construction management and commissioning oversight Energy audits and retrocommissioning that drive new projects Hiring and retaining VISN energy managers and facility energy engineers who manage projects as technical leads Position downgrading has increased turnover Non-energy duties can create capacity constraints Vacancies and bandwidth can lead to delays Coordination of shifting requirements New directives and design requirements New IT security requirements Performance Assurance could improve assurance 7/18/2017 Predecisional -- Draft Energy Exchange: Connect Collaborate 7 Conserve

8 What VA UESCs Needs from Utilities Balance shifting priorities during a transitional period within VA Provide stronger performance assurance Enhance access to resiliency measures Address reliability vulnerabilities Creativity, flexibility, and patience 8

9 Project Highlight - VISN 6 UESC Hampton Awarded in December 2014 with Dominion Power and ESG for $11.5 million Projected to save over 63,500 MMBTU and $884,000 annually for VA Includes lighting retrofits, water conservation, AHU UV lights installation, boiler plant upgrades, steam system upgrades, controls upgrades, HVAC upgrades, electrical upgrades, compressed air upgrades, renewable solar hot water, and chapel window repair/insulation. Installing new magnetic bearing chiller Restoration of historic chapel windows Upgrade to LED lighting 9

10 Project Highlight - VISN 2 UESC Northport Cooling towers failed in April 2015, bringing chillers, condenser water pumps and cooling towers offline VA has needed to rent temporary chillers until repair complete Awarded in July 2016 for $12.6 million with National Grid and ConEdison Solutions Projected to create $1.1 million of annual savings and address critical infrastructure repair Construction will be complete in October 2017 Installing new cooling towers 10

11 Contact Information Thank you Lara (Gast) Spader Program Manager, VA Energy Performance Contracting 11

Track 11, Session 4 -- Campus Utility Distribution Systems

Track 11, Session 4 -- Campus Utility Distribution Systems Track 11, Session 4 -- Campus Utility Distribution Systems ESCO Contract Vehicle approaches to implement VA requirements at VISN 21 Steven T. Smith, Senior Director, Engineering Federal Energy Systems

More information

Comprehensive Energy Management & Utility Master Plan

Comprehensive Energy Management & Utility Master Plan Comprehensive Energy Management & Utility Master Plan OVERVIEW University of Utah & Health Science Campus Overview Campus Transformation Value Drivers and Challenges Integrated Energy Planning Approach

More information

CASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO

CASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO 6 CASE STUDIES Brevard Community College: Florida Power & Light City of Miami Beach: Johnson Controls, Inc. Cape Canaveral Air Force Station: NORESCO Arbor Shoreline Office Park: Progress Energy Solutions

More information

Optimizing the Existing Building Cx Process:

Optimizing the Existing Building Cx Process: Optimizing the Existing Building Cx Process: Integrating EBCx into ESPCs Lia Webster, P.E. Senior Engineer Portland Energy Conservation, Inc. AIA Quality Assurance Learning Objectives 1. Identify ways

More information

Business Opportunities with VISN 23 Capital Assets Management. Cynthia A. Doolittle, PE Capital Assets Manager Eagan, MN (VISN 23)

Business Opportunities with VISN 23 Capital Assets Management. Cynthia A. Doolittle, PE Capital Assets Manager Eagan, MN (VISN 23) Business Opportunities with VISN 23 Capital Assets Management Cynthia A. Doolittle, PE Capital Assets Manager Eagan, MN (VISN 23) Overview VISN 23 Capital Assets Manager Veterans Health Administration,

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities UTILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the

More information

Resilience for Installations and Communities

Resilience for Installations and Communities Resilience for Installations and Communities Threats to Power Systems FY 18 NDAA Definition Resilience: The ability to avoid or prepare for, minimize, adapt to, and recover from anticipated and unanticipated

More information

GSA Deep Energy Retrofit Program

GSA Deep Energy Retrofit Program Public Private Partnerships GSA Deep Energy Retrofit Program Kinga Porst Hydras U.S. General Services Administration August 15, 2017 Tampa Convention Center Tampa, Florida GSA Portfolio 376 million square

More information

Ft Worth Data Center Power Metering for Real Time PUE Calculation. Scope of Work

Ft Worth Data Center Power Metering for Real Time PUE Calculation. Scope of Work Ft Worth Data Center Power Metering for Real Time PUE Calculation Scope of Work Prepared for the General Services Administration By Lawrence Berkeley National Laboratory Rod Mahdavi December 13, 2010 Executive

More information

a) Provision of a chilled water supply b) Provision of electric power supply and other fuels

a) Provision of a chilled water supply b) Provision of electric power supply and other fuels 10.0 UTILITIES ELEMENT The purpose of this element is to ensure coordinated provision of utility services required to meet the future needs of the University, consistent with current efforts to address

More information

Driving Proactive Facility Operations with Automated HVAC Diagnostics

Driving Proactive Facility Operations with Automated HVAC Diagnostics Driving Proactive Facility Operations with Automated HVAC Diagnostics Turn HVAC Data into Actionable Information AKA Monitoring Based Commissioning Ongoing Commissioning Automated Fault Detection & Diagnostics

More information

DoD Environmental Security Technology Certification Program (ESTCP) Tim Tetreault DoD August 15, 2017

DoD Environmental Security Technology Certification Program (ESTCP) Tim Tetreault DoD August 15, 2017 DoD Energy Testbed DoD Environmental Security Technology Certification Program (ESTCP) Tim Tetreault DoD August 15, 2017 Tampa Convention Center Tampa, Florida About ESTCP Established in 1995 to: Improve

More information

Concord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs

Concord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs Concord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs Project: Concord Hospital Infrastructure Upgrades Facility Size: 600,000+

More information

BUILDINGS AND FACILITIES

BUILDINGS AND FACILITIES EB-00-0 Exhibit C Tab Schedule Page of BUILDINGS AND FACILITIES FACILITIES AND ASSET MANAGEMENT OVERALL STRATEGY THESL s buildings and facilities (the facilities ) include operating centers (00 Commissioners,

More information

18 th National Award for Excellence in Energy Management. July 27, 2017

18 th National Award for Excellence in Energy Management. July 27, 2017 18 th National Award for Excellence in Energy Management July 27, 2017 ICICI Bank, Data Centre, August Hyderabad 30 & 31, 2017 ICICI Bank - Revolution in Digital Banking Over 100,000 Digital POS in 4 months

More information

T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management

T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management Name Doug Demian Title Application Engineer Date November 7 & 8, 2012 Rev 5058-CO900C Copyright 2012 Rockwell

More information

Energy Performance Contracting

Energy Performance Contracting Energy Performance Contracting December 2017 Outlines Section One: Jonson Controls as an Energy Service Company (ESCO) Reasons behind investment in Energy Efficiency Section Two: Funding Options of Energy

More information

ESPC Overview. Definition and Need. Program Description. Questions and Answers. Curt Murdock & Rod Bridgeman August 6

ESPC Overview. Definition and Need. Program Description. Questions and Answers. Curt Murdock & Rod Bridgeman August 6 Energy Savings Performance Contracting (ESPC) US Army Corps of Engineers Engineering and Support Center, Huntsville Curt Murdock, Energy Branch Chief Curt.e.murdock@usace.army.mil Roderick Bridgeman, Mechanical

More information

Resilient Chicago & A Flood Vulnerability Assessment for Critical Facilities

Resilient Chicago & A Flood Vulnerability Assessment for Critical Facilities Resilient Chicago & A Flood Vulnerability Assessment for Critical Facilities Molly Woloszyn Extension Climate Specialist University of Illinois Extension Program Goals Midwestern Regional Climate Center

More information

Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center

Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center Project: Beverly D. Grappone Hall Facility Size: 30,500 sq. ft. Location: Concord, New Hampshire

More information

POWER INFRASTRUCTURE PLAN 2016

POWER INFRASTRUCTURE PLAN 2016 POWER INFRASTRUCTURE PLAN 2016 Introduction LADWP has built a vast power generation, transmission and distribution system that spans five Western states, and delivers electricity to about 4 million people

More information

Must possess Universal EPA Section 608 certification; OR Type I AND Type II EPA Section 608 certification.

Must possess Universal EPA Section 608 certification; OR Type I AND Type II EPA Section 608 certification. Draft Senior HVAC Mechanic Central District Posting Date: December 14, 2015 Closing Date: December 28, 2015 Salary $18.91/hr to $30.41/hr Internal $18.91/hr to $20.88/hr Overview The Orange County, Florida,

More information

Prediction of Chilled Water Plant Failures and System Optimization Using Multivariate Modeling Techniques

Prediction of Chilled Water Plant Failures and System Optimization Using Multivariate Modeling Techniques Prediction of Chilled Water Plant Failures and System Optimization Using Multivariate Modeling Techniques Joel Urban Director of Quality Assurance Brady Services, Inc. Leah Lehman IoT Program Director

More information

A Case Study in Fuel Cell Market Transformation

A Case Study in Fuel Cell Market Transformation A Case Study in Fuel Cell Market Transformation Potential Opportunities for Fuel Cell Power at DOE Germantown Data Center * : The Pros and Cons of Energy Savings and Service Agreements Amy Manheim Market

More information

Emergency Management & Disaster Planning

Emergency Management & Disaster Planning Emergency Management & Disaster Planning What we re going to talk about What is Emergency Management and Disaster Planning? What are the key elements of an EM Plan? Where does the University Architect

More information

DOE Energy Savings Performance Contracts (ESPCs) and ESPC ENABLE

DOE Energy Savings Performance Contracts (ESPCs) and ESPC ENABLE Session: Third-Party Financing Options DOE Energy Savings Performance Contracts (ESPCs) and ESPC ENABLE Doug Culbreth Oak Ridge National Laboratory August 11, 2016 Rhode Island Convention Center Providence,

More information

Energy Integration Program Submarine Base New London, CT

Energy Integration Program Submarine Base New London, CT Utility Partnerships Helping the Agency Meet Strategic Goals Energy Integration Program Submarine Base New London, CT Craig S. Prather, PE, CEM, PMP, MBA Naval Facilities Engineering Command August 16,

More information

where we are, where we could be, how we can get there. 12/14/2011

where we are, where we could be, how we can get there. 12/14/2011 Central Plant Optimization ASHRAE National Capitol Chapter - PES Wednesday, Nov 7, 2011 Dave Klee, LEED AP Director, Optimized Building Solutions Johnson Controls, Inc. 1 1 J o http://www.johnsoncontrols.com/cpo

More information

Energy Assurance Plans

Energy Assurance Plans Energy Assurance Plans funded through the American Reinvestment and Recovery Act (ARRA) - Stimulus $$ to help create jobs to enhance energy reliability and facilitate recovery from disruptions to the energy

More information

ESC Conference: Energy Savings and Performance-Based Contracting Investment Initiative Update. Timothy D. Unruh PhD, PE, CEM.

ESC Conference: Energy Savings and Performance-Based Contracting Investment Initiative Update. Timothy D. Unruh PhD, PE, CEM. ESC Conference: Energy Savings and Performance-Based Contracting Investment Initiative Update July 29, 2014 Timothy D. Unruh PhD, PE, CEM Program Manager DOE FEMP 1 Energy Efficiency and Renewable Energy

More information

Cooling Contingency Planning. Planni ng for the U nexpected. Is Your Health Care Facility Prepared?

Cooling Contingency Planning. Planni ng for the U nexpected. Is Your Health Care Facility Prepared? Cooling Contingency Planning Planni ng for the U nexpected Is Your Health Care Facility Prepared? R isk Management Unexpected events, such as natural disasters, can expose organizations to risks. Even

More information

Power Infrastructure Plan

Power Infrastructure Plan Power Infrastructure Plan 2015 Introduction Background LADWP has built a vast power generation, transmission and distribution system that spans five Western states, and delivers electricity to about 4

More information

LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST

LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST SYSKA BOSTON provides full-range, high-performance MEP/FP engineering, vertical transportation, sustainable design and commissioning services

More information

IBM Bromont Plant Technology for a Smarter Planet

IBM Bromont Plant Technology for a Smarter Planet IBM Plant Technology for a Smarter Planet McGill University February 23rd, 2011 Agenda IBM Canada IBM Smarter planet initiative IBM manufacturing plant Our continuous improvement journey MiQro Innovation

More information

Business Continuity: How to Keep City Departments in Business after a Disaster

Business Continuity: How to Keep City Departments in Business after a Disaster Business Continuity: How to Keep City Departments in Business after a Disaster Shannon Spence, PE Red Oak Consulting, an ARCADIS group Agenda Security, Resilience and All Hazards The Hazards Cycle and

More information

Office for Capital Facilities Guidance Document

Office for Capital Facilities Guidance Document Guidance Document September 17, 2018 Telecommunications Site Manager Agreement A reference guide to assist in the use of the NYS Police Crown Castle Telecommunications Agreement Contents Overview Benefits

More information

Retro-Cx Program at Air National Guard Bases Civil Engineering Technical Service Center (CETSC) Presenter: Kurt Blemel ARCADIS/Malcolm Pirnie May 11,

Retro-Cx Program at Air National Guard Bases Civil Engineering Technical Service Center (CETSC) Presenter: Kurt Blemel ARCADIS/Malcolm Pirnie May 11, Retro-Cx Program at Air National Guard Bases Civil Engineering Technical Service Center (CETSC) Presenter: Kurt Blemel ARCADIS/Malcolm Pirnie May 11, 2011 CETSC Initiative Description Utilize industry

More information

Proposed New Jersey Energy Resilience Bank ERB

Proposed New Jersey Energy Resilience Bank ERB Proposed New Jersey Energy Resilience Bank ERB Disclaimer The information contained herein is for the purpose of initiating a discussion on the proposed New Jersey Energy Resilience Bank (ERB). Any proposals

More information

nuclearsafety.gc.ca Implications of the Fukushima Daiichi Accidents for the New Builds Design Requirements in Canada

nuclearsafety.gc.ca Implications of the Fukushima Daiichi Accidents for the New Builds Design Requirements in Canada Implications of the Fukushima Daiichi Accidents for the New Builds Design Requirements in Canada R.P. Rulko () IAEA Technical Meeting on Evaluation of Nuclear Power Plant Design Safety in the Aftermath

More information

Energy supply for mission critical facilities: Tiered requirements and capabilities of supporting energy systems Panel Discussion:

Energy supply for mission critical facilities: Tiered requirements and capabilities of supporting energy systems Panel Discussion: NAVFAC SOUTHWEST Energy supply for mission critical facilities: Tiered requirements and capabilities of supporting energy systems Panel Discussion: Energy Planning for Resilient Military Installations

More information

MultiPlan Selects CyrusOne for Exceptional Colocation and Flexible Solutions

MultiPlan Selects CyrusOne for Exceptional Colocation and Flexible Solutions CASE STUDY MultiPlan Selects CyrusOne for Exceptional Scalable, secure and reliable data center solution keeps healthcare company operating seamlessly MultiPlan Inc., the industry s most comprehensive

More information

Energy Solutions for Buildings

Energy Solutions for Buildings Energy Solutions for Buildings Making energy safe, reliable, efficient, productive and green Make the most of your energy SM 1 Solutions to enable and sustain energy savings Technology is crucial to make

More information

REPORT TO THE BUSINESS ADMINISTRATION COMMITTEE

REPORT TO THE BUSINESS ADMINISTRATION COMMITTEE REPORT TO THE BUSINESS ADMINISTRATION COMMITTEE RECOMMENDATION TO AWARD A SOLE SOURCE CONTRACT FOR MAINTENANCE AND TECHNICAL SUPPORT OF THE CENTRAL HEATING AND COOLING PLANT S DISTRIBUTED CONTROL SYSTEM

More information

ASSURING BUSINESS CONTINUITY THROUGH CONTROLLED DATA CENTER

ASSURING BUSINESS CONTINUITY THROUGH CONTROLLED DATA CENTER ASSURING BUSINESS CONTINUITY THROUGH CONTROLLED DATA CENTER IT Audit, Information Security & Risk Insight Africa 2014 Johnson Falana CISA,MIT,CEH,Cobit5 proverb814@yahoo.com Overview Information technology

More information

Santa Clara County. San Francisco City and County. Marin County. Napa County. Solano County. Contra Costa County. San Mateo County

Santa Clara County. San Francisco City and County. Marin County. Napa County. Solano County. Contra Costa County. San Mateo County Marin County Santa Clara County San Francisco City and County Sonoma County Napa County Contra Costa County San Mateo County Solano County Alameda County ABAG History In 1961, Bay Area leaders recognized

More information

Regional Seminar Series Orlando. Critical Facilities Update

Regional Seminar Series Orlando. Critical Facilities Update Regional Seminar Series Orlando Critical Facilities Update November 4, 2009 Robert Wheatley, OSIsoft Alexis Stobbe, OSIsoft Empowering Business in Real Time. Copyright 2009, OSIsoft, LLC. All rights Reserved.

More information

Present Status of Development of the NuScale SMR

Present Status of Development of the NuScale SMR Present Status of Development of the NuScale SMR Innovation for Cool Earth Forum October 10. 2018 Dr. José N. Reyes, Jr. Co-Founder and Chief Technology Officer NuScale Nonproprietary Copyright 2018 NuScale

More information

DHS Overview of Sustainability and Environmental Programs. Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs

DHS Overview of Sustainability and Environmental Programs. Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs DHS Overview of Sustainability and Environmental Programs Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs DHS Mission DHS Organization Getting to Know DHS Mission: Secure

More information

The Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft

The Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft The Project Charter Project Title: VDI Data Center Design and Build Project Sponsor: South Alberta Data Centers Inc. (SADC Inc.) Project Customer: The City of Calgary Project Manager: Moe Yousof Document

More information

Campus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE

Campus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE Campus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE Campus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE Key Factors of Resilient Electrical

More information

Reliability & Resiliency in the US Capitol Region/Hardening the Grid One Year after Hurricane Sandy

Reliability & Resiliency in the US Capitol Region/Hardening the Grid One Year after Hurricane Sandy 1 Reliability & Resiliency in the US Capitol Region/Hardening the Grid One Year after Hurricane Sandy 2 Pepco D.C. Distribution System 260,000 Customers 175,000 Customers Supplied by Underground System

More information

Critical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded

Critical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded Section Contents Five-Year Capital Plan FY 2017-18 through FY 2021-22 Project Funding Type Five-Year Plan Total ($ 000s) Critical Maintenance for Community Colleges bonded $235,000 Health and Safety bonded

More information

siemensgovt.com Pocket Guide to Federal Contracts

siemensgovt.com Pocket Guide to Federal Contracts siemensgovt.com Pocket Guide to Federal Contracts Army Corps of Engineers Utility Monitoring & Control Systems (UMCSiii) SATOC (Single Award Task Order Contract) Contract Number: W912DY-10-D-0034 Program

More information

Construct Chiller Plant, Phase I

Construct Chiller Plant, Phase I Page 1 of 6 Construct Chiller Plant, Phase I project 1 of 1 Virginia Polytechnic Institute and State University (208) General Information Project Type: New Construction Project Code: 17657 Start Year:

More information

Federal Utilities, Postage and Communication Costs FY FY FY 2003 Request. FY 2002 Actual

Federal Utilities, Postage and Communication Costs FY FY FY 2003 Request. FY 2002 Actual UTILITIES, POSTAGE, AND COMMUNICATIONS (+$2,997,000) For FY 2004, the Institution requests an increase of $2,997,000 for utilities, postage, and communications to cover additional costs attributable to

More information

Cleanroom Energy Benchmarking In High-Tech and Biotech Industries

Cleanroom Energy Benchmarking In High-Tech and Biotech Industries ACEEE 2001 Paper #66 Cleanroom Energy Benchmarking In High-Tech and Biotech Industries William Tschudi; Lawrence Berkeley National Laboratory Kathleen Benschine, Stephen Fok; Pacific Gas and Electric Company

More information

Memorandum APPENDIX 2. April 3, Audit Committee

Memorandum APPENDIX 2. April 3, Audit Committee APPENDI 2 Information & Technology Dave Wallace, Chief Information Officer Metro Hall 55 John Street 15th Floor Toronto, Ontario M5V 3C6 Memorandum Tel: 416 392-8421 Fax: 416 696-4244 dwwallace@toronto.ca

More information

Agenda. What would a 30% reduction in energy use do for your budget? The next generation of energy and infrastructure projects in MI

Agenda. What would a 30% reduction in energy use do for your budget? The next generation of energy and infrastructure projects in MI What would a 30% reduction in energy use do for your budget? The next generation of energy and infrastructure projects in MI Presented by: Scott Mason 1 Agenda Traditional energy efficiency Next generation

More information

DATA CENTER COLOCATION BUILD VS. BUY

DATA CENTER COLOCATION BUILD VS. BUY DATA CENTER COLOCATION BUILD VS. BUY Comparing the total cost of ownership of building your own data center vs. buying third-party colocation services Executive Summary As businesses grow, the need for

More information

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Christopher M. Kopach, AVP, The University of Arizona; APPA President Phillip Saieg, Regional Technical

More information

Telecommunications Network Reliability

Telecommunications Network Reliability Telecommunications Network Reliability Office of Telecommunications NYS Department of Public Service Background Major Outages in 1999, 2000, and 2001 9/11 Telecommunications Severely Disrupted Infrastructure

More information

Energy Assurance Energy Assurance and Interdependency Workshop Fairmont Hotel, Washington D.C. December 2 3, 2013

Energy Assurance Energy Assurance and Interdependency Workshop Fairmont Hotel, Washington D.C. December 2 3, 2013 + Energy Assurance Energy Assurance and Interdependency Workshop Fairmont Hotel, Washington D.C. December 2 3, 2013 Jeffrey R. Pillon, Director, Energy Assurance Programs National Association of State

More information

Achieving Operational Excellence

Achieving Operational Excellence Achieving Operational Excellence Energy Efficient Operations in a Shrinking Budget Environment 2010 Energy/Facilities Connections Conference Innovative Approaches for a New Decade DID YOU KNOW? Nine out

More information

WELCOME TO A SILVER JACKETS WEBINAR ON:

WELCOME TO A SILVER JACKETS WEBINAR ON: WELCOME TO A SILVER JACKETS WEBINAR ON: Flood Vulnerability Assessment for Critical Facilities For audio, call 877-336-1839 Access code: 8165946 Security Code: 4567 MOLLY WOLOSZYN Extension Climate Specialist

More information

DLA Energy Panel: Energy Resiliency and Assurance

DLA Energy Panel: Energy Resiliency and Assurance DLA Energy Panel: Energy Resiliency and Assurance U.S. Air Force Office of Energy Assurance Mr. Shawn Bennett, Senior Advisor 12 April 2017 Installation Energy Is Mission Critical AVIATION ~5,517 Aircraft

More information

FACILITIES CAPITAL. FY 2007 Appropriation $98,554,760 FY 2008 Estimate $105,429,240 FY 2009 Estimate $128,000,000

FACILITIES CAPITAL. FY 2007 Appropriation $98,554,760 FY 2008 Estimate $105,429,240 FY 2009 Estimate $128,000,000 FACILITIES CAPITAL FY 2007 Appropriation $98,554,760 FY 2008 Estimate $105,429,240 FY 2009 Estimate $128,000,000 STRATEGIC GOAL: ENHANCED MANAGEMENT EXCELLENCE Federal Resource Summary by Performance Objective

More information

HPE Energy Efficiency Certification Service

HPE Energy Efficiency Certification Service Data sheet HPE Energy Efficiency Certification Service HPE Technology Consulting As power consumption and heat generation in the data center increase due to information explosion, big data, e-commerce,

More information

City Reso-A Requests FY 2018 (City Council and Borough Presidents)

City Reso-A Requests FY 2018 (City Council and Borough Presidents) Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan FY 2017-18 through FY 2021-22 Project Funding Type Five-Year Plan Total ($ 000s) Replacement of Unit Ventilation

More information

Nuclear Generation Event Response: Strengthening Safety After Fukushima. Jim Scarola Executive Director US Industry Fukushima Response

Nuclear Generation Event Response: Strengthening Safety After Fukushima. Jim Scarola Executive Director US Industry Fukushima Response Nuclear Generation Event Response: Strengthening Safety After Fukushima Jim Scarola Executive Director US Industry Fukushima Response 1 Industry Response Coordination The Way Forward Fukushima Response

More information

1200 West 7th Street, Los Angeles, CA Smart.

1200 West 7th Street, Los Angeles, CA Smart. Overview 1200 West 7th Street, Los Angeles, CA 90017 West 7 Center is conveniently located at 1200 West 7th Street in downtown Los Angeles near the 10 and 110 freeway. This tier III datacenter facility

More information

FLOOD VULNERABILITY ASSESSMENT FOR CRITICAL FACILITIES

FLOOD VULNERABILITY ASSESSMENT FOR CRITICAL FACILITIES FLOOD VULNERABILITY ASSESSMENT FOR CRITICAL FACILITIES Lisa Graff GIS Team Manager Prairie Research Institute Illinois State Water Survey University of Illinois OUTLINE Motivation Project details Partners

More information

Our portfolio of equipment includes 1,027 pieces of leased equipment and 9,963 of owned equipment for a total equipment count of 10,990.

Our portfolio of equipment includes 1,027 pieces of leased equipment and 9,963 of owned equipment for a total equipment count of 10,990. Department of Fleet and Facility Management 2017 Budget Statement to the City Council Commissioner David J. Reynolds Good morning, Vice Chairman Ervin, and members of the City Council. Thank you for allowing

More information

December 5, Avinash Srivastava, Principal, Design + Planning + Economics Calum Thompson, Associate, Building Engineering

December 5, Avinash Srivastava, Principal, Design + Planning + Economics Calum Thompson, Associate, Building Engineering Workshop: Energy Supply for Mission Critical Facilities: Tiered Requirements and Capabilities of Supporting Energy Systems December 5, 2017 Avinash Srivastava, Principal, Design + Planning + Economics

More information

Optimize Your Data Center. Gary Hill VP, Business Development DVL Group, Inc.

Optimize Your Data Center. Gary Hill VP, Business Development DVL Group, Inc. Optimize Your Data Center Gary Hill VP, Business Development DVL Group, Inc. Data Center Age Profile Gartner Group Survey Legacy Data Centers Challenges Under Powered - Room or Racks Inadequate Air Delivery

More information

V A Physical Security Assessments LESSONS LEARNED

V A Physical Security Assessments LESSONS LEARNED 1 V A Physical Security Assessments LESSONS LEARNED 2 Program Goals What threats should be guarded against? How best to evaluate healthcare, cemetery, as well as office facilities against these threats?

More information

Demand for sustainable power is growing worldwide. Energy producers are broadening their offerings for a quickly evolving marketplace.

Demand for sustainable power is growing worldwide. Energy producers are broadening their offerings for a quickly evolving marketplace. Power delivery Demand for sustainable power is growing worldwide. Energy producers are broadening their offerings for a quickly evolving marketplace. Forward-thinking power grid design This evolution has

More information

GOAL 1: To develop an on-campus chilled water generation and distribution system that adequately serves the future campus population needs.

GOAL 1: To develop an on-campus chilled water generation and distribution system that adequately serves the future campus population needs. CHILLED WATER SUB-ELEMENT GOAL 1: To develop an on-campus chilled water generation and distribution system that adequately serves the future campus population needs. OBJECTIVE 1.1: To ensure that there

More information

A Practical Guide to Avoiding Disasters in Mission-Critical Facilities. What is a Disaster? Associated Business Issues.

A Practical Guide to Avoiding Disasters in Mission-Critical Facilities. What is a Disaster? Associated Business Issues. A Practical Guide to Avoiding Disasters in Mission-Critical Facilities Todd Bermont What is a Disaster? An event that can unexpectedly impact the continuity of your business Anything that injures or has

More information

Community-Based Water Resiliency

Community-Based Water Resiliency Community-Based Water Resiliency Helping Water Utilities Build Stronger Communities Presentation to the Mid-Atlantic APWA Chapter Conference Virginia Beach, VA May 10, 2013 What is Community-Based Water

More information

Analysis of FY 2012 Physical Plant Rates (numbers in thousands) FY 2012

Analysis of FY 2012 Physical Plant Rates (numbers in thousands) FY 2012 Analysis of FY 2012 Physical Plant Rates (numbers in thousands) FY 2012 FY12 Budget from 2011 Revenues Heat & Power Income -24,247-578 -3.23-0.09 2.9% Water Income -3,376-93 -0.45-0.01 3.3% McCorkle Surcharge

More information

State and Local Partners for a Clean and Green California

State and Local Partners for a Clean and Green California State and Local Partners for a Clean and Green California Statewide Energy Efficiency Collaborative Conference, Sacramento, California Mark Ferron California Public Utilities Commission June 20, 2013 1

More information

Energy Action Plan 2015

Energy Action Plan 2015 Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015

More information

Testimony of Donald D. Kittell Executive Vice President Securities Industry Association

Testimony of Donald D. Kittell Executive Vice President Securities Industry Association Testimony of Donald D. Kittell Executive Vice President Securities Industry Association "Government and Industry Efforts to Protect Our Money During Blackouts, Hurricanes and Other Disasters" Opening Remarks

More information

FY Janette Pell Department Director. Information and Communications Technology. Administration and Finance

FY Janette Pell Department Director. Information and Communications Technology. Administration and Finance FY 2018 19 Janette Pell Department Director Administration and Finance Capital Projects Facilities and Real Estate Management Fleet Operations Information and Communications Technology Purchasing, Surplus

More information

NORTH CAROLINA NC MRITE. Nominating Category: Enterprise IT Management Initiatives

NORTH CAROLINA NC MRITE. Nominating Category: Enterprise IT Management Initiatives NORTH CAROLINA MANAGING RISK IN THE INFORMATION TECHNOLOGY ENTERPRISE NC MRITE Nominating Category: Nominator: Ann V. Garrett Chief Security and Risk Officer State of North Carolina Office of Information

More information

Service, Maintenance, Support

Service, Maintenance, Support Service, Maintenance, Support About CRITICAL Was founded in 2011, the activities are in design, supply, installation, repair, service and maintenance of Mechanical, Electrical and Process (MEP) utilities

More information

Metering and Energy Retrofits for the GSA

Metering and Energy Retrofits for the GSA Metering and Energy Retrofits for the GSA 2012 Rocky Mountain Chapter ASHRAE Technical Conference Leadership in HVAC&R April 20 th, 2012 Juan Moreno and Christian Marsh-Frydenlund 1 1 Agenda Project Overview

More information

EXTENDING THE LIFECYCLE OF AGEING DATA CENTRES:

EXTENDING THE LIFECYCLE OF AGEING DATA CENTRES: EXTENDING THE LIFECYCLE OF AGEING DATA CENTRES: HOW AND WHAT SHOULD DC s DO FOR RETROFITS Jonathan Price 4 th August 2015 KEY DRIVERS FOR UPGRADING A DATA CENTRE Capacity Resilience Efficiency Lifecycle

More information

Presentation. Guaranteed Energy Savings Performance Project

Presentation. Guaranteed Energy Savings Performance Project Presentation Guaranteed Energy Savings Performance Project Greg Spiro, PE, CEM, LEED-AP Georgia Institute of Technology Senior Mechanical Engineer Facilities Design & Construction 470-351-9867151 6th Street

More information

1.0 Executive Summary. 2.0 Available Features & Benefits

1.0 Executive Summary. 2.0 Available Features & Benefits Statement Of Work Energy Management Services Table of Contents 1.0 Executive Summary 2.0 Available Features & Benefits 3.0 Assessment Deliverables Selection 4.0 On Site Assessment Activities 5.0 Exclusions

More information

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable) Commercial Buildings New or Existing Institutional Buildings: Educational Facilities New

More information

All-Hazards Approach to Water Sector Security & Preparedness ANSI-HSSP Arlington, VA November 9, 2011

All-Hazards Approach to Water Sector Security & Preparedness ANSI-HSSP Arlington, VA November 9, 2011 All-Hazards Approach to Water Sector Security & Preparedness ANSI-HSSP Arlington, VA November 9, 2011 Copyright 2009 American Water Works Association Copyright 2011 American Water Works Association Security

More information

Factsheet. Power Generation Service Energy efficiency in power generation and water

Factsheet. Power Generation Service Energy efficiency in power generation and water Factsheet Power Generation Service Energy efficiency in power generation and water Opportunity identification Opportunity identification overview The opportunity identification phase of Industrial Energy

More information

Service Plan for Infrastructure Engineering

Service Plan for Infrastructure Engineering Service Plan for Infrastructure 2016-2019 Capital Regional District Date submitted: Revised: August 14, 2017 Table of Contents 1 Overview... 1 1.1 Division & Service Summary... 1 1.2 Organization Chart...

More information

VERTIV SERVICE CAPABILITY

VERTIV SERVICE CAPABILITY VERTIV SERVICE CAPABILITY VERTIV SERVICE CAPABILITY Service Offering Manage the health of your entire critical infrastructure with a service partner who can offer you business continuity. Exactly the level

More information

REPORT 2015/149 INTERNAL AUDIT DIVISION

REPORT 2015/149 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/149 Audit of the information and communications technology operations in the Investment Management Division of the United Nations Joint Staff Pension Fund Overall results

More information

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended Chapter 3 Section 3.05 Metrolinx Regional Transportation Planning Standing Committee on Public Accounts Follow-Up on Section 4.08, 2014 Annual Report In November 2015, the Standing Committee on Public

More information

Introduction to the NYISO

Introduction to the NYISO Introduction to the NYISO Power Control Center Guilderland, NY July 21, 2011 1 Today s Topics NYISO History NYISO Roles & Governance NYISO Markets Building Reliability Emerging Trends 2 Evolution of the

More information

MDCSystems. MICHAEL A. BAKER, P.E., M.S.E.M. Consulting Engineer

MDCSystems. MICHAEL A. BAKER, P.E., M.S.E.M. Consulting Engineer MDCSystems Providing Expert Solutions for Projects Worldwide MICHAEL A. BAKER, P.E., M.S.E.M. Consulting Engineer Education Drexel University, M.S., Engineering Management, Technology Assessment Brown

More information

Agile and 360 Digital: Path to the Future of Energy. Michael Carlson

Agile and 360 Digital: Path to the Future of Energy. Michael Carlson Agile and 360 Digital: Path to the Future of Energy unrestricted Siemens AG 2016 usa.siemens.com/digitalgrid Michael Carlson 21 st Century Challenges Facing Utilities: Maintain Reliability, Resiliency,

More information