1 What the Government Needs from the Utility UESCs and VA s Performance Contracting Program Lara Spader Department of Veterans Affairs August 17, 2017 Tampa Convention Center Tampa, Florida
2 Agenda Resiliency and reliability issues for VA VA s energy performance contracting program Challenges Needs UESC project highlights 2
3 Resiliency considerations for VA Mission critical facilities: VA facilities that are required to continue operation during a natural or manmade extreme event or a emergency. Resiliency measures: N+1 redundancy and emergency power supply Duel fuel capability and reserve capacity Relocation of critical systems from flood-risk areas Distributed generation with islanding capability Solar with battery storage Flooding of VA New York Harbor Healthcare System s Manhattan facility after Hurricane Sandy Failure of electrical switches, mechanical systems, steam and the fire-suppression system 3
4 Reliability considerations for VA Aging infrastructure and building systems 1,700 VA properties with historic protections Facility condition assessment deficiencies Maintenance backlog (D s and F s) has been steadily increasing Appropriated funding has been insufficient to reduce backlog Correction costs have also been increasing Prevention is less expensive than correction Dependency on aging grid infrastructure 4
5 VA Energy Performance Contracting Overview: Awarded and Developing Portfolio (000 s) $1,600,000 $1,400,000 $1,200,000 $1,000,000 $800,000 $600,000 $356 million Awarded $450 million In development $800 million potential savings from projects in development $400,000 $200,000 $0 $642 million expected savings from awarded projects medical centers 36 M sq. ft. upgrades $26 M annual expected savings 42 medical centers ~ 41 M sq. ft. upgrades ~ $31 M annual potential savings AWARDED IN DEVELOPMENT 5
6 Awarded Contract Breakdown Award Value by Contract Type Number of contracts $62 M (17%) 5 (31%) $294 M (83%) 11 (69%) ESPC UESC ESPC UESC 6
7 Performance Contracting Program Challenges Declining program budget impacts ability to fund project support Third-party project facilitators Construction management and commissioning oversight Energy audits and retrocommissioning that drive new projects Hiring and retaining VISN energy managers and facility energy engineers who manage projects as technical leads Position downgrading has increased turnover Non-energy duties can create capacity constraints Vacancies and bandwidth can lead to delays Coordination of shifting requirements New directives and design requirements New IT security requirements Performance Assurance could improve assurance 7/18/2017 Predecisional -- Draft Energy Exchange: Connect Collaborate 7 Conserve
8 What VA UESCs Needs from Utilities Balance shifting priorities during a transitional period within VA Provide stronger performance assurance Enhance access to resiliency measures Address reliability vulnerabilities Creativity, flexibility, and patience 8
9 Project Highlight - VISN 6 UESC Hampton Awarded in December 2014 with Dominion Power and ESG for $11.5 million Projected to save over 63,500 MMBTU and $884,000 annually for VA Includes lighting retrofits, water conservation, AHU UV lights installation, boiler plant upgrades, steam system upgrades, controls upgrades, HVAC upgrades, electrical upgrades, compressed air upgrades, renewable solar hot water, and chapel window repair/insulation. Installing new magnetic bearing chiller Restoration of historic chapel windows Upgrade to LED lighting 9
10 Project Highlight - VISN 2 UESC Northport Cooling towers failed in April 2015, bringing chillers, condenser water pumps and cooling towers offline VA has needed to rent temporary chillers until repair complete Awarded in July 2016 for $12.6 million with National Grid and ConEdison Solutions Projected to create $1.1 million of annual savings and address critical infrastructure repair Construction will be complete in October 2017 Installing new cooling towers 10
11 Contact Information Thank you Lara (Gast) Spader Program Manager, VA Energy Performance Contracting 11
Track 11, Session 4 -- Campus Utility Distribution Systems
Track 11, Session 4 -- Campus Utility Distribution Systems ESCO Contract Vehicle approaches to implement VA requirements at VISN 21 Steven T. Smith, Senior Director, Engineering Federal Energy Systems
More informationComprehensive Energy Management & Utility Master Plan
Comprehensive Energy Management & Utility Master Plan OVERVIEW University of Utah & Health Science Campus Overview Campus Transformation Value Drivers and Challenges Integrated Energy Planning Approach
More informationCASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO
6 CASE STUDIES Brevard Community College: Florida Power & Light City of Miami Beach: Johnson Controls, Inc. Cape Canaveral Air Force Station: NORESCO Arbor Shoreline Office Park: Progress Energy Solutions
More informationOptimizing the Existing Building Cx Process:
Optimizing the Existing Building Cx Process: Integrating EBCx into ESPCs Lia Webster, P.E. Senior Engineer Portland Energy Conservation, Inc. AIA Quality Assurance Learning Objectives 1. Identify ways
More informationBusiness Opportunities with VISN 23 Capital Assets Management. Cynthia A. Doolittle, PE Capital Assets Manager Eagan, MN (VISN 23)
Business Opportunities with VISN 23 Capital Assets Management Cynthia A. Doolittle, PE Capital Assets Manager Eagan, MN (VISN 23) Overview VISN 23 Capital Assets Manager Veterans Health Administration,
More informationFLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities
UTILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the
More informationResilience for Installations and Communities
Resilience for Installations and Communities Threats to Power Systems FY 18 NDAA Definition Resilience: The ability to avoid or prepare for, minimize, adapt to, and recover from anticipated and unanticipated
More informationGSA Deep Energy Retrofit Program
Public Private Partnerships GSA Deep Energy Retrofit Program Kinga Porst Hydras U.S. General Services Administration August 15, 2017 Tampa Convention Center Tampa, Florida GSA Portfolio 376 million square
More informationFt Worth Data Center Power Metering for Real Time PUE Calculation. Scope of Work
Ft Worth Data Center Power Metering for Real Time PUE Calculation Scope of Work Prepared for the General Services Administration By Lawrence Berkeley National Laboratory Rod Mahdavi December 13, 2010 Executive
More informationa) Provision of a chilled water supply b) Provision of electric power supply and other fuels
10.0 UTILITIES ELEMENT The purpose of this element is to ensure coordinated provision of utility services required to meet the future needs of the University, consistent with current efforts to address
More informationDriving Proactive Facility Operations with Automated HVAC Diagnostics
Driving Proactive Facility Operations with Automated HVAC Diagnostics Turn HVAC Data into Actionable Information AKA Monitoring Based Commissioning Ongoing Commissioning Automated Fault Detection & Diagnostics
More informationDoD Environmental Security Technology Certification Program (ESTCP) Tim Tetreault DoD August 15, 2017
DoD Energy Testbed DoD Environmental Security Technology Certification Program (ESTCP) Tim Tetreault DoD August 15, 2017 Tampa Convention Center Tampa, Florida About ESTCP Established in 1995 to: Improve
More informationConcord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs
Concord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs Project: Concord Hospital Infrastructure Upgrades Facility Size: 600,000+
More informationBUILDINGS AND FACILITIES
EB-00-0 Exhibit C Tab Schedule Page of BUILDINGS AND FACILITIES FACILITIES AND ASSET MANAGEMENT OVERALL STRATEGY THESL s buildings and facilities (the facilities ) include operating centers (00 Commissioners,
More information18 th National Award for Excellence in Energy Management. July 27, 2017
18 th National Award for Excellence in Energy Management July 27, 2017 ICICI Bank, Data Centre, August Hyderabad 30 & 31, 2017 ICICI Bank - Revolution in Digital Banking Over 100,000 Digital POS in 4 months
More informationT66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management
T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management Name Doug Demian Title Application Engineer Date November 7 & 8, 2012 Rev 5058-CO900C Copyright 2012 Rockwell
More informationEnergy Performance Contracting
Energy Performance Contracting December 2017 Outlines Section One: Jonson Controls as an Energy Service Company (ESCO) Reasons behind investment in Energy Efficiency Section Two: Funding Options of Energy
More informationESPC Overview. Definition and Need. Program Description. Questions and Answers. Curt Murdock & Rod Bridgeman August 6
Energy Savings Performance Contracting (ESPC) US Army Corps of Engineers Engineering and Support Center, Huntsville Curt Murdock, Energy Branch Chief Curt.e.murdock@usace.army.mil Roderick Bridgeman, Mechanical
More informationResilient Chicago & A Flood Vulnerability Assessment for Critical Facilities
Resilient Chicago & A Flood Vulnerability Assessment for Critical Facilities Molly Woloszyn Extension Climate Specialist University of Illinois Extension Program Goals Midwestern Regional Climate Center
More informationBeverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center
Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center Project: Beverly D. Grappone Hall Facility Size: 30,500 sq. ft. Location: Concord, New Hampshire
More informationPOWER INFRASTRUCTURE PLAN 2016
POWER INFRASTRUCTURE PLAN 2016 Introduction LADWP has built a vast power generation, transmission and distribution system that spans five Western states, and delivers electricity to about 4 million people
More informationMust possess Universal EPA Section 608 certification; OR Type I AND Type II EPA Section 608 certification.
Draft Senior HVAC Mechanic Central District Posting Date: December 14, 2015 Closing Date: December 28, 2015 Salary $18.91/hr to $30.41/hr Internal $18.91/hr to $20.88/hr Overview The Orange County, Florida,
More informationPrediction of Chilled Water Plant Failures and System Optimization Using Multivariate Modeling Techniques
Prediction of Chilled Water Plant Failures and System Optimization Using Multivariate Modeling Techniques Joel Urban Director of Quality Assurance Brady Services, Inc. Leah Lehman IoT Program Director
More informationA Case Study in Fuel Cell Market Transformation
A Case Study in Fuel Cell Market Transformation Potential Opportunities for Fuel Cell Power at DOE Germantown Data Center * : The Pros and Cons of Energy Savings and Service Agreements Amy Manheim Market
More informationEmergency Management & Disaster Planning
Emergency Management & Disaster Planning What we re going to talk about What is Emergency Management and Disaster Planning? What are the key elements of an EM Plan? Where does the University Architect
More informationDOE Energy Savings Performance Contracts (ESPCs) and ESPC ENABLE
Session: Third-Party Financing Options DOE Energy Savings Performance Contracts (ESPCs) and ESPC ENABLE Doug Culbreth Oak Ridge National Laboratory August 11, 2016 Rhode Island Convention Center Providence,
More informationEnergy Integration Program Submarine Base New London, CT
Utility Partnerships Helping the Agency Meet Strategic Goals Energy Integration Program Submarine Base New London, CT Craig S. Prather, PE, CEM, PMP, MBA Naval Facilities Engineering Command August 16,
More informationwhere we are, where we could be, how we can get there. 12/14/2011
Central Plant Optimization ASHRAE National Capitol Chapter - PES Wednesday, Nov 7, 2011 Dave Klee, LEED AP Director, Optimized Building Solutions Johnson Controls, Inc. 1 1 J o http://www.johnsoncontrols.com/cpo
More informationEnergy Assurance Plans
Energy Assurance Plans funded through the American Reinvestment and Recovery Act (ARRA) - Stimulus $$ to help create jobs to enhance energy reliability and facilitate recovery from disruptions to the energy
More informationESC Conference: Energy Savings and Performance-Based Contracting Investment Initiative Update. Timothy D. Unruh PhD, PE, CEM.
ESC Conference: Energy Savings and Performance-Based Contracting Investment Initiative Update July 29, 2014 Timothy D. Unruh PhD, PE, CEM Program Manager DOE FEMP 1 Energy Efficiency and Renewable Energy
More informationCooling Contingency Planning. Planni ng for the U nexpected. Is Your Health Care Facility Prepared?
Cooling Contingency Planning Planni ng for the U nexpected Is Your Health Care Facility Prepared? R isk Management Unexpected events, such as natural disasters, can expose organizations to risks. Even
More informationPower Infrastructure Plan
Power Infrastructure Plan 2015 Introduction Background LADWP has built a vast power generation, transmission and distribution system that spans five Western states, and delivers electricity to about 4
More informationLEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST
LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST SYSKA BOSTON provides full-range, high-performance MEP/FP engineering, vertical transportation, sustainable design and commissioning services
More informationIBM Bromont Plant Technology for a Smarter Planet
IBM Plant Technology for a Smarter Planet McGill University February 23rd, 2011 Agenda IBM Canada IBM Smarter planet initiative IBM manufacturing plant Our continuous improvement journey MiQro Innovation
More informationBusiness Continuity: How to Keep City Departments in Business after a Disaster
Business Continuity: How to Keep City Departments in Business after a Disaster Shannon Spence, PE Red Oak Consulting, an ARCADIS group Agenda Security, Resilience and All Hazards The Hazards Cycle and
More informationOffice for Capital Facilities Guidance Document
Guidance Document September 17, 2018 Telecommunications Site Manager Agreement A reference guide to assist in the use of the NYS Police Crown Castle Telecommunications Agreement Contents Overview Benefits
More informationRetro-Cx Program at Air National Guard Bases Civil Engineering Technical Service Center (CETSC) Presenter: Kurt Blemel ARCADIS/Malcolm Pirnie May 11,
Retro-Cx Program at Air National Guard Bases Civil Engineering Technical Service Center (CETSC) Presenter: Kurt Blemel ARCADIS/Malcolm Pirnie May 11, 2011 CETSC Initiative Description Utilize industry
More informationProposed New Jersey Energy Resilience Bank ERB
Proposed New Jersey Energy Resilience Bank ERB Disclaimer The information contained herein is for the purpose of initiating a discussion on the proposed New Jersey Energy Resilience Bank (ERB). Any proposals
More informationnuclearsafety.gc.ca Implications of the Fukushima Daiichi Accidents for the New Builds Design Requirements in Canada
Implications of the Fukushima Daiichi Accidents for the New Builds Design Requirements in Canada R.P. Rulko () IAEA Technical Meeting on Evaluation of Nuclear Power Plant Design Safety in the Aftermath
More informationEnergy supply for mission critical facilities: Tiered requirements and capabilities of supporting energy systems Panel Discussion:
NAVFAC SOUTHWEST Energy supply for mission critical facilities: Tiered requirements and capabilities of supporting energy systems Panel Discussion: Energy Planning for Resilient Military Installations
More informationMultiPlan Selects CyrusOne for Exceptional Colocation and Flexible Solutions
CASE STUDY MultiPlan Selects CyrusOne for Exceptional Scalable, secure and reliable data center solution keeps healthcare company operating seamlessly MultiPlan Inc., the industry s most comprehensive
More informationEnergy Solutions for Buildings
Energy Solutions for Buildings Making energy safe, reliable, efficient, productive and green Make the most of your energy SM 1 Solutions to enable and sustain energy savings Technology is crucial to make
More informationREPORT TO THE BUSINESS ADMINISTRATION COMMITTEE
REPORT TO THE BUSINESS ADMINISTRATION COMMITTEE RECOMMENDATION TO AWARD A SOLE SOURCE CONTRACT FOR MAINTENANCE AND TECHNICAL SUPPORT OF THE CENTRAL HEATING AND COOLING PLANT S DISTRIBUTED CONTROL SYSTEM
More informationASSURING BUSINESS CONTINUITY THROUGH CONTROLLED DATA CENTER
ASSURING BUSINESS CONTINUITY THROUGH CONTROLLED DATA CENTER IT Audit, Information Security & Risk Insight Africa 2014 Johnson Falana CISA,MIT,CEH,Cobit5 proverb814@yahoo.com Overview Information technology
More informationSanta Clara County. San Francisco City and County. Marin County. Napa County. Solano County. Contra Costa County. San Mateo County
Marin County Santa Clara County San Francisco City and County Sonoma County Napa County Contra Costa County San Mateo County Solano County Alameda County ABAG History In 1961, Bay Area leaders recognized
More informationRegional Seminar Series Orlando. Critical Facilities Update
Regional Seminar Series Orlando Critical Facilities Update November 4, 2009 Robert Wheatley, OSIsoft Alexis Stobbe, OSIsoft Empowering Business in Real Time. Copyright 2009, OSIsoft, LLC. All rights Reserved.
More informationPresent Status of Development of the NuScale SMR
Present Status of Development of the NuScale SMR Innovation for Cool Earth Forum October 10. 2018 Dr. José N. Reyes, Jr. Co-Founder and Chief Technology Officer NuScale Nonproprietary Copyright 2018 NuScale
More informationDHS Overview of Sustainability and Environmental Programs. Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs
DHS Overview of Sustainability and Environmental Programs Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs DHS Mission DHS Organization Getting to Know DHS Mission: Secure
More informationThe Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft
The Project Charter Project Title: VDI Data Center Design and Build Project Sponsor: South Alberta Data Centers Inc. (SADC Inc.) Project Customer: The City of Calgary Project Manager: Moe Yousof Document
More informationCampus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE
Campus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE Campus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE Key Factors of Resilient Electrical
More informationReliability & Resiliency in the US Capitol Region/Hardening the Grid One Year after Hurricane Sandy
1 Reliability & Resiliency in the US Capitol Region/Hardening the Grid One Year after Hurricane Sandy 2 Pepco D.C. Distribution System 260,000 Customers 175,000 Customers Supplied by Underground System
More informationCritical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded
Section Contents Five-Year Capital Plan FY 2017-18 through FY 2021-22 Project Funding Type Five-Year Plan Total ($ 000s) Critical Maintenance for Community Colleges bonded $235,000 Health and Safety bonded
More informationsiemensgovt.com Pocket Guide to Federal Contracts
siemensgovt.com Pocket Guide to Federal Contracts Army Corps of Engineers Utility Monitoring & Control Systems (UMCSiii) SATOC (Single Award Task Order Contract) Contract Number: W912DY-10-D-0034 Program
More informationConstruct Chiller Plant, Phase I
Page 1 of 6 Construct Chiller Plant, Phase I project 1 of 1 Virginia Polytechnic Institute and State University (208) General Information Project Type: New Construction Project Code: 17657 Start Year:
More informationFederal Utilities, Postage and Communication Costs FY FY FY 2003 Request. FY 2002 Actual
UTILITIES, POSTAGE, AND COMMUNICATIONS (+$2,997,000) For FY 2004, the Institution requests an increase of $2,997,000 for utilities, postage, and communications to cover additional costs attributable to
More informationCleanroom Energy Benchmarking In High-Tech and Biotech Industries
ACEEE 2001 Paper #66 Cleanroom Energy Benchmarking In High-Tech and Biotech Industries William Tschudi; Lawrence Berkeley National Laboratory Kathleen Benschine, Stephen Fok; Pacific Gas and Electric Company
More informationMemorandum APPENDIX 2. April 3, Audit Committee
APPENDI 2 Information & Technology Dave Wallace, Chief Information Officer Metro Hall 55 John Street 15th Floor Toronto, Ontario M5V 3C6 Memorandum Tel: 416 392-8421 Fax: 416 696-4244 dwwallace@toronto.ca
More informationAgenda. What would a 30% reduction in energy use do for your budget? The next generation of energy and infrastructure projects in MI
What would a 30% reduction in energy use do for your budget? The next generation of energy and infrastructure projects in MI Presented by: Scott Mason 1 Agenda Traditional energy efficiency Next generation
More informationDATA CENTER COLOCATION BUILD VS. BUY
DATA CENTER COLOCATION BUILD VS. BUY Comparing the total cost of ownership of building your own data center vs. buying third-party colocation services Executive Summary As businesses grow, the need for
More informationAddressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona
Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Christopher M. Kopach, AVP, The University of Arizona; APPA President Phillip Saieg, Regional Technical
More informationTelecommunications Network Reliability
Telecommunications Network Reliability Office of Telecommunications NYS Department of Public Service Background Major Outages in 1999, 2000, and 2001 9/11 Telecommunications Severely Disrupted Infrastructure
More informationEnergy Assurance Energy Assurance and Interdependency Workshop Fairmont Hotel, Washington D.C. December 2 3, 2013
+ Energy Assurance Energy Assurance and Interdependency Workshop Fairmont Hotel, Washington D.C. December 2 3, 2013 Jeffrey R. Pillon, Director, Energy Assurance Programs National Association of State
More informationAchieving Operational Excellence
Achieving Operational Excellence Energy Efficient Operations in a Shrinking Budget Environment 2010 Energy/Facilities Connections Conference Innovative Approaches for a New Decade DID YOU KNOW? Nine out
More informationWELCOME TO A SILVER JACKETS WEBINAR ON:
WELCOME TO A SILVER JACKETS WEBINAR ON: Flood Vulnerability Assessment for Critical Facilities For audio, call 877-336-1839 Access code: 8165946 Security Code: 4567 MOLLY WOLOSZYN Extension Climate Specialist
More informationDLA Energy Panel: Energy Resiliency and Assurance
DLA Energy Panel: Energy Resiliency and Assurance U.S. Air Force Office of Energy Assurance Mr. Shawn Bennett, Senior Advisor 12 April 2017 Installation Energy Is Mission Critical AVIATION ~5,517 Aircraft
More informationFACILITIES CAPITAL. FY 2007 Appropriation $98,554,760 FY 2008 Estimate $105,429,240 FY 2009 Estimate $128,000,000
FACILITIES CAPITAL FY 2007 Appropriation $98,554,760 FY 2008 Estimate $105,429,240 FY 2009 Estimate $128,000,000 STRATEGIC GOAL: ENHANCED MANAGEMENT EXCELLENCE Federal Resource Summary by Performance Objective
More informationHPE Energy Efficiency Certification Service
Data sheet HPE Energy Efficiency Certification Service HPE Technology Consulting As power consumption and heat generation in the data center increase due to information explosion, big data, e-commerce,
More informationCity Reso-A Requests FY 2018 (City Council and Borough Presidents)
Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan FY 2017-18 through FY 2021-22 Project Funding Type Five-Year Plan Total ($ 000s) Replacement of Unit Ventilation
More informationNuclear Generation Event Response: Strengthening Safety After Fukushima. Jim Scarola Executive Director US Industry Fukushima Response
Nuclear Generation Event Response: Strengthening Safety After Fukushima Jim Scarola Executive Director US Industry Fukushima Response 1 Industry Response Coordination The Way Forward Fukushima Response
More information1200 West 7th Street, Los Angeles, CA Smart.
Overview 1200 West 7th Street, Los Angeles, CA 90017 West 7 Center is conveniently located at 1200 West 7th Street in downtown Los Angeles near the 10 and 110 freeway. This tier III datacenter facility
More informationFLOOD VULNERABILITY ASSESSMENT FOR CRITICAL FACILITIES
FLOOD VULNERABILITY ASSESSMENT FOR CRITICAL FACILITIES Lisa Graff GIS Team Manager Prairie Research Institute Illinois State Water Survey University of Illinois OUTLINE Motivation Project details Partners
More informationOur portfolio of equipment includes 1,027 pieces of leased equipment and 9,963 of owned equipment for a total equipment count of 10,990.
Department of Fleet and Facility Management 2017 Budget Statement to the City Council Commissioner David J. Reynolds Good morning, Vice Chairman Ervin, and members of the City Council. Thank you for allowing
More informationDecember 5, Avinash Srivastava, Principal, Design + Planning + Economics Calum Thompson, Associate, Building Engineering
Workshop: Energy Supply for Mission Critical Facilities: Tiered Requirements and Capabilities of Supporting Energy Systems December 5, 2017 Avinash Srivastava, Principal, Design + Planning + Economics
More informationOptimize Your Data Center. Gary Hill VP, Business Development DVL Group, Inc.
Optimize Your Data Center Gary Hill VP, Business Development DVL Group, Inc. Data Center Age Profile Gartner Group Survey Legacy Data Centers Challenges Under Powered - Room or Racks Inadequate Air Delivery
More informationV A Physical Security Assessments LESSONS LEARNED
1 V A Physical Security Assessments LESSONS LEARNED 2 Program Goals What threats should be guarded against? How best to evaluate healthcare, cemetery, as well as office facilities against these threats?
More informationDemand for sustainable power is growing worldwide. Energy producers are broadening their offerings for a quickly evolving marketplace.
Power delivery Demand for sustainable power is growing worldwide. Energy producers are broadening their offerings for a quickly evolving marketplace. Forward-thinking power grid design This evolution has
More informationGOAL 1: To develop an on-campus chilled water generation and distribution system that adequately serves the future campus population needs.
CHILLED WATER SUB-ELEMENT GOAL 1: To develop an on-campus chilled water generation and distribution system that adequately serves the future campus population needs. OBJECTIVE 1.1: To ensure that there
More informationA Practical Guide to Avoiding Disasters in Mission-Critical Facilities. What is a Disaster? Associated Business Issues.
A Practical Guide to Avoiding Disasters in Mission-Critical Facilities Todd Bermont What is a Disaster? An event that can unexpectedly impact the continuity of your business Anything that injures or has
More informationCommunity-Based Water Resiliency
Community-Based Water Resiliency Helping Water Utilities Build Stronger Communities Presentation to the Mid-Atlantic APWA Chapter Conference Virginia Beach, VA May 10, 2013 What is Community-Based Water
More informationAnalysis of FY 2012 Physical Plant Rates (numbers in thousands) FY 2012
Analysis of FY 2012 Physical Plant Rates (numbers in thousands) FY 2012 FY12 Budget from 2011 Revenues Heat & Power Income -24,247-578 -3.23-0.09 2.9% Water Income -3,376-93 -0.45-0.01 3.3% McCorkle Surcharge
More informationState and Local Partners for a Clean and Green California
State and Local Partners for a Clean and Green California Statewide Energy Efficiency Collaborative Conference, Sacramento, California Mark Ferron California Public Utilities Commission June 20, 2013 1
More informationEnergy Action Plan 2015
Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015
More informationTestimony of Donald D. Kittell Executive Vice President Securities Industry Association
Testimony of Donald D. Kittell Executive Vice President Securities Industry Association "Government and Industry Efforts to Protect Our Money During Blackouts, Hurricanes and Other Disasters" Opening Remarks
More informationFY Janette Pell Department Director. Information and Communications Technology. Administration and Finance
FY 2018 19 Janette Pell Department Director Administration and Finance Capital Projects Facilities and Real Estate Management Fleet Operations Information and Communications Technology Purchasing, Surplus
More informationNORTH CAROLINA NC MRITE. Nominating Category: Enterprise IT Management Initiatives
NORTH CAROLINA MANAGING RISK IN THE INFORMATION TECHNOLOGY ENTERPRISE NC MRITE Nominating Category: Nominator: Ann V. Garrett Chief Security and Risk Officer State of North Carolina Office of Information
More informationService, Maintenance, Support
Service, Maintenance, Support About CRITICAL Was founded in 2011, the activities are in design, supply, installation, repair, service and maintenance of Mechanical, Electrical and Process (MEP) utilities
More informationMetering and Energy Retrofits for the GSA
Metering and Energy Retrofits for the GSA 2012 Rocky Mountain Chapter ASHRAE Technical Conference Leadership in HVAC&R April 20 th, 2012 Juan Moreno and Christian Marsh-Frydenlund 1 1 Agenda Project Overview
More informationEXTENDING THE LIFECYCLE OF AGEING DATA CENTRES:
EXTENDING THE LIFECYCLE OF AGEING DATA CENTRES: HOW AND WHAT SHOULD DC s DO FOR RETROFITS Jonathan Price 4 th August 2015 KEY DRIVERS FOR UPGRADING A DATA CENTRE Capacity Resilience Efficiency Lifecycle
More informationPresentation. Guaranteed Energy Savings Performance Project
Presentation Guaranteed Energy Savings Performance Project Greg Spiro, PE, CEM, LEED-AP Georgia Institute of Technology Senior Mechanical Engineer Facilities Design & Construction 470-351-9867151 6th Street
More information1.0 Executive Summary. 2.0 Available Features & Benefits
Statement Of Work Energy Management Services Table of Contents 1.0 Executive Summary 2.0 Available Features & Benefits 3.0 Assessment Deliverables Selection 4.0 On Site Assessment Activities 5.0 Exclusions
More informationCHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM
CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable) Commercial Buildings New or Existing Institutional Buildings: Educational Facilities New
More informationAll-Hazards Approach to Water Sector Security & Preparedness ANSI-HSSP Arlington, VA November 9, 2011
All-Hazards Approach to Water Sector Security & Preparedness ANSI-HSSP Arlington, VA November 9, 2011 Copyright 2009 American Water Works Association Copyright 2011 American Water Works Association Security
More informationFactsheet. Power Generation Service Energy efficiency in power generation and water
Factsheet Power Generation Service Energy efficiency in power generation and water Opportunity identification Opportunity identification overview The opportunity identification phase of Industrial Energy
More informationService Plan for Infrastructure Engineering
Service Plan for Infrastructure 2016-2019 Capital Regional District Date submitted: Revised: August 14, 2017 Table of Contents 1 Overview... 1 1.1 Division & Service Summary... 1 1.2 Organization Chart...
More informationVERTIV SERVICE CAPABILITY
VERTIV SERVICE CAPABILITY VERTIV SERVICE CAPABILITY Service Offering Manage the health of your entire critical infrastructure with a service partner who can offer you business continuity. Exactly the level
More informationREPORT 2015/149 INTERNAL AUDIT DIVISION
INTERNAL AUDIT DIVISION REPORT 2015/149 Audit of the information and communications technology operations in the Investment Management Division of the United Nations Joint Staff Pension Fund Overall results
More informationFigure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended
Chapter 3 Section 3.05 Metrolinx Regional Transportation Planning Standing Committee on Public Accounts Follow-Up on Section 4.08, 2014 Annual Report In November 2015, the Standing Committee on Public
More informationIntroduction to the NYISO
Introduction to the NYISO Power Control Center Guilderland, NY July 21, 2011 1 Today s Topics NYISO History NYISO Roles & Governance NYISO Markets Building Reliability Emerging Trends 2 Evolution of the
More informationMDCSystems. MICHAEL A. BAKER, P.E., M.S.E.M. Consulting Engineer
MDCSystems Providing Expert Solutions for Projects Worldwide MICHAEL A. BAKER, P.E., M.S.E.M. Consulting Engineer Education Drexel University, M.S., Engineering Management, Technology Assessment Brown
More informationAgile and 360 Digital: Path to the Future of Energy. Michael Carlson
Agile and 360 Digital: Path to the Future of Energy unrestricted Siemens AG 2016 usa.siemens.com/digitalgrid Michael Carlson 21 st Century Challenges Facing Utilities: Maintain Reliability, Resiliency,
More information