COM Operating Personnel Communications Protocols. October 31, 2013
|
|
- Mae Banks
- 5 years ago
- Views:
Transcription
1 COM Operating Personnel Communications Protocols October 31, 2013
2 Agenda Introductory Remarks: Mark Lauby Project Background COM Requirements Implementation Plan Compliance VSL/VRF by Requirement RSAW Notes Next Steps 2
3 Background 2003 Blackout Report Recommendation 26 Tighten communications protocols, especially for communications during alerts and emergencies FERC Order 693 directives on COM 002 Add Distribution Providers Require the Electric Reliability Organization (ERO) to establish tightened communications protocols, especially for communications during alerts and emergencies COM and COM development NERC Board of Trustees request for input from RISC, IERP and NERC Management 3
4 Background Standards Oversight and Technology Committee Recommendation to Board Standards Committee Waiver Development of COM by Standard Drafting Team 4
5 COM-002-4: Scope of Communications Operating Instruction A command by operating personnel responsible for the Real time generation control and operation of the interconnected Bulk Electric System to change or preserve the state, status, output, or input of an Element of the Bulk Electric System or Facility of the Bulk Electric System. A discussion of general information and of potential options or alternatives to resolve Bulk Electric System operating concerns is not a command and is not considered an Operating Instruction. A Reliability Directive is one type of an Operating Instruction. 5
6 COM-002-4: R1 Applies to Balancing Authorities, Reliability Coordinators, and Transmission Operators Requires minimum set of protocols that must be included in documented communications protocols. o Three part oral communications o Use of English language o Clarification for all call protocols o Instances where alpha numeric and time designations are required o Nomenclature for interface Elements and Facilities Allows entities the flexibility to specify additional protocols deemed necessary, but promotes uniformity in protocols Entities can draw on Operating Committee Guideline on communications for additional protocols 6
7 COM-002-4: R2 Applies to Distribution Providers and Generator Operators Requires minimum set of protocols that must be included in documented communications protocols o Three part communications o Use of English language o All call protocols These entities included to require three part participation for receivers of Operating Instructions 7
8 COM-002-4: R3, R4, R5 Requirements R3 and R4 require entities to implement the documented communications protocols. Requirement R5 requires BAs, RCs, and TOPs to implement a method to evaluate their communications protocols established in accordance with R1. 8
9 Implementation Plan Approval: COM Opera ng Personnel Communica ons Protocols Definition of Operating Instruction as well as addition to NERC Glossary of Terms Prerequisite Approval: Approval of definition of Reliability Directive as well as addition to NERC Glossary of Terms Retirements: COM Requirement R4 Telecommunications COM Communication and Coordination COM Communication and Coordination 9
10 Compliance Types of evidence entities may provide Descriptions of Management Practices Spreadsheets, memos, logs, independent review of operating personnel s adherence to protocols and remediation of exceptions Data Retention One Calendar Year for evidence demonstrating compliance for each applicable requirement Except for Voice Recordings, which are required to be kept for 90 days Auditor focus is primarily on communications protocols and their effectiveness, not the actual communications Recordings will be examined only if the auditor cannot gain reasonable assurance that the communications protocols are not being followed 10
11 VRF/VSL Range by Requirement Requirement VRF VSL Range 1 Low Low to Severe 2 Low Moderate to Severe 3 High High to Severe 4 High High to Severe 5 Low Severe 11
12 RSAW Notes RSAW for the two implementation Requirements R3 and R4: Entity must describe the management practices in place that provide the auditor reasonable assurance that protocols established are being followed. Evidence examples include spreadsheets, memos, or logs, evidencing periodic, independent review of operating personnel s adherence to the protocols established in Requirement R1 and the remediation of noted exceptions. Based on the assessment of risk and internal controls, audit approach could range from the exclusion of the implementation requirements from audit scope to the auditor reviewing a sample of voice recordings to ensure the protocols were followed. Sampling is not a part of the audit process unless the auditor determines that the communications protocols are not properly designed or are ineffective. 12
13 Next Steps Oct 25 th Nov 4 th : Ballot and Non binding Poll Nov 7 th : NERC Board of Trustees Meeting 13
14 14
Unofficial Comment Form Project Operating Personnel Communications Protocols COM-002-4
Project 2007-02 Operating Personnel Communications Protocols COM-002-4 Please DO NOT use this form. Please use the electronic comment form to submit comments on the proposed draft COM 002 4 (Operating
More informationUnofficial Comment Form Project Operating Personnel Communications Protocols COM Operating Personnel Communications Protocols
Project 2007-02 Operating Personnel Communications Protocols COM-002-4 Operating Personnel Communications Protocols Please DO NOT use this form. Please use the electronic comment form to submit comments
More informationNERC Management Response to the Questions of the NERC Board of Trustees on Reliability Standard COM September 6, 2013
NERC Management Response to the Questions of the NERC Board of Trustees on Reliability Standard COM-003-1 September 6, 2013 At the August 14-15, 2013 meeting of the Board of Trustees ( Board ) of the North
More informationA. Introduction. B. Requirements and Measures
A. Introduction 1. Title: Communications 2. Number: COM-001-3 3. Purpose: To establish Communication capabilities necessary to maintain reliability. 4. Applicability: 4.1. Functional Entities: 4.1.1. Transmission
More informationTOP-010-1(i) Real-time Reliability Monitoring and Analysis Capabilities
A. Introduction 1. Title: Real-time Reliability Monitoring and Analysis Capabilities 2. Number: TOP-010-1(i) 3. Purpose: Establish requirements for Real-time monitoring and analysis capabilities to support
More informationprimary Control Center, for the exchange of Real-time data with its Balancing
A. Introduction 1. Title: Reliability Coordination Monitoring and Analysis 2. Number: IRO-002-5 3. Purpose: To provide System Operators with the capabilities necessary to monitor and analyze data needed
More informationStandard CIP 007 4a Cyber Security Systems Security Management
A. Introduction 1. Title: Cyber Security Systems Security Management 2. Number: CIP-007-4a 3. Purpose: Standard CIP-007-4 requires Responsible Entities to define methods, processes, and procedures for
More informationStandard CIP 005 4a Cyber Security Electronic Security Perimeter(s)
A. Introduction 1. Title: Cyber Security Electronic Security Perimeter(s) 2. Number: CIP-005-4a 3. Purpose: Standard CIP-005-4a requires the identification and protection of the Electronic Security Perimeter(s)
More informationProject Posting 8 Frequently Asked Questions Guide
Project 2007-02 Posting 8 Frequently Asked Questions Guide General Questions 1. What were the inputs that drove the development of posting 8 of Project 2007-02? The NERC Board of Trustees November 7 th,
More informationStandard COM Communication and Coordination
A. Introduction 1. Title: Communication and Coordination 2. Number: COM-002-3 3. Purpose: To ensure Emergency communications between operating personnel are effective. 4. Applicability 4.1. Reliability
More informationImplementation Plan for COM-001-2
Defined Terms in the NERC Glossary The RC SDT proposes the following new definitions: Interpersonal Communication: Any medium that allows two or more individuals interact, consult, or exchange information.
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).
More informationStandard CIP Cyber Security Incident Reporting and Response Planning
A. Introduction 1. Title: Cyber Security Incident Reporting and Response Planning 2. Number: CIP-008-4 3. Purpose: Standard CIP-008-4 ensures the identification, classification, response, and reporting
More information5. Effective Date: The first day of the first calendar quarter after applicable regulatory approval.
Introduction 1. Title: IROL and SOL Mitigation in the ERCOT Region 2. Number: IRO-006-TRE-1 3. Purpose: To provide and execute transmission loading relief procedures that can be used to mitigate SOL or
More informationProject , COM Operating Personnel Communications Protocols Rationale and Technical Justification
Project 2007-02, COM-002-4 Operating Personnel Communications Protocols Rationale and Technical Justification Posting 8: Background and Justification for COM-002-4 Requirements The purpose of the proposed
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).
More informationNovember 9, Revisions to the Violation Risk Factors for Reliability Standards IRO and TOP
!! November 9, 2016 VIA ELECTRONIC FILING Jim Crone Director, Energy Division Manitoba Innovation, Energy and Mines 1200-155 Carlton Street Winnipeg MB R3C 3H8 RE: Revisions to the Violation Risk Factors
More informationModifications to TOP and IRO Standards
Modifications to TOP and IRO Standards Jason Smith, Southwest Power Pool Industry Webinar July 22, 2016 NERC Antitrust Guidelines It is NERC's policy and practice to obey the antitrust laws to avoid all
More informationReliability Standard Audit Worksheet 1
Reliability Standard Audit Worksheet 1 CIP-012-1 Cyber Security Communications between Control Centers This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered Entity:
More informationViolation Risk Factor and Violation Severity Level Justifications Project Modifications to CIP Standards
Violation Risk Factor and Violation Severity Level Justifications Project 2016-02 Modifications to CIP Standards This document provides the standard drafting team s (SDT s) justification for assignment
More informationDRAFT Reliability Standard Audit Worksheet 1
DRAFT Reliability Standard Audit Worksheet 1 PRC-025-2 Generator Relay Loadability This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered Entity: NCR Number: Compliance
More informationStandard CIP 007 3a Cyber Security Systems Security Management
A. Introduction 1. Title: Cyber Security Systems Security Management 2. Number: CIP-007-3a 3. Purpose: Standard CIP-007-3 requires Responsible Entities to define methods, processes, and procedures for
More informationCIP Cyber Security Configuration Change Management and Vulnerability Assessments
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationThis section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationThis section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft
More informationModifications to TOP and IRO Standards
Modifications to TOP and IRO Standards Jason Smith, Mgr Reliability Standards Development SPP RTO Compliance Forum September 21-22, 2016 Project 2016-01 Background FERC issued Order No. 817 in November
More informationViolation Risk Factor and Violation Severity Level Justification Project Modifications to CIP-008 Cyber Security Incident Reporting
Violation Risk Factor and Justification Project 2018-02 Modifications to CIP-008 Cyber Security Incident Reporting This document provides the standard drafting team s (SDT s) justification for assignment
More informationStandard CIP Cyber Security Critical Cyber As s et Identification
A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification
More informationCIP Cyber Security Configuration Change Management and Vulnerability Assessments
CIP-010-2 Cyber Security Configuration Change Management and Vulnerability Assessments A. Introduction 1. Title: Cyber Security Configuration Change Management and Vulnerability Assessments 2. Number:
More informationCIP Cyber Security Configuration Change Management and Vulnerability Assessments
CIP-010-2 3 Cyber Security Configuration Change Management and Vulnerability Assessments A. Introduction 1. Title: Cyber Security Configuration Change Management and Vulnerability Assessments 2. Number:
More informationProject Cyber Security - Order No. 791 Identify, Assess, and Correct; Low Impact; Transient Devices; and Communication Networks Directives
Project 2014-02 - Cyber Security - Order No. 791 Identify, Assess, and Correct; Low Impact; Transient Devices; and Communication Networks Directives Violation Risk Factor and Justifications The tables
More informationStandard INT Dynamic Transfers
Standard INT-004-3.1 Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3.1 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately
More informationStandard TOP Transmission Operations
A. Introduction 1. Title: Transmission Operations 2. Number: TOP-001-34 3. Purpose: To prevent instability, uncontrolled separation, or Cascading outages that adversely impact the reliability of the Interconnection
More informationStandard Development Timeline
CIP 003 7 Cyber Security Security Management Controls Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard
More informationCOM Interpersonal Communications Capabilities
COM-001-3 Interpersonal Communications Capabilities 1 Background In the FERC Notice of Proposed Rulemaking (NOPR) for COM-001-2, the Commission asked for comments on whether the standard should be modified
More informationReliability Standard Audit Worksheet 1
Reliability Standard Audit Worksheet 1 PRC-004-3 Protection System Misoperation Identification and Correction This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered
More informationNB Appendix CIP NB-0 - Cyber Security Recovery Plans for BES Cyber Systems
This appendix establishes modifications to the FERC approved NERC standard CIP-009-6 for its specific application in New Brunswick. This appendix must be read with CIP-009-6 to determine a full understanding
More informationStandard INT Dynamic Transfers
A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately in congestion management procedures.
More informationReliability Standard Audit Worksheet 1
Reliability Standard Audit Worksheet 1 PRC-004-3 Protection System Misoperation Identification and Correction This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered
More informationCIP Cyber Security Security Management Controls. Standard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationStandard CIP Cyber Security Security Management Controls
A. Introduction 1. Title: Cyber Security Security Management Controls 2. Number: CIP-003-4 3. Purpose: Standard CIP-003-4 requires that Responsible Entities have minimum security management controls in
More informationStandard CIP Cyber Security Systems Security Management
A. Introduction 1. Title: Cyber Security Systems Security Management 2. Number: CIP-007-4 3. Purpose: Standard CIP-007-4 requires Responsible Entities to define methods, processes, and procedures for securing
More informationERO Certification and Review Procedure
ERO Certification and Review Procedure Reliability Assurance December 15, 2016 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com 1 of 16 Table of Contents Table
More informationStandard CIP-006-4c Cyber Security Physical Security
A. Introduction 1. Title: Cyber Security Physical Security of Critical Cyber Assets 2. Number: CIP-006-4c 3. Purpose: Standard CIP-006-4c is intended to ensure the implementation of a physical security
More informationThis section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationStandard CIP Cyber Security Electronic Security Perimeter(s)
A. Introduction 1. Title: Cyber Security Electronic Security Perimeter(s) 2. Number: CIP-005-2 3. Purpose: Standard CIP-005-2 requires the identification and protection of the Electronic Security Perimeter(s)
More informationERO Enterprise Strategic Planning Redesign
ERO Enterprise Strategic Planning Redesign Mark Lauby, Senior Vice President and Chief Reliability Officer Member Representatives Committee Meeting February 10, 2016 Strategic Planning Redesign Current
More informationCIP Cyber Security Configuration Management and Vulnerability Assessments
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationCIP Cyber Security Configuration Change Management and Vulnerability Assessments
CIP 010 1 Cyber Security Configuration Change Management and Vulnerability Assessments A. Introduction 1. Title: Cyber Security Configuration Change Management and Vulnerability Assessments 2. Number:
More informationAdditional 45-Day Comment Period September Final Ballot is Conducted October/November Board of Trustees (Board) Adoption November 2014
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationCIP Cyber Security Recovery Plans for BES Cyber Systems
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationStandard Development Timeline
CIP-008-6 Incident Reporting and Response Planning Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard
More informationStandard CIP Cyber Security Critical Cyber Asset Identification
Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed
More informationCIP Cyber Security Personnel & Training
A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-6 3. Purpose: To minimize the risk against compromise that could lead to misoperation or instability in the Bulk Electric
More informationStandard CIP 005 2a Cyber Security Electronic Security Perimeter(s)
A. Introduction 1. Title: Cyber Security Electronic Security Perimeter(s) 2. Number: CIP-005-2a 3. Purpose: Standard CIP-005-2 requires the identification and protection of the Electronic Security Perimeter(s)
More informationNB Appendix CIP NB-0 - Cyber Security Personnel & Training
This appendix establishes modifications to the FERC approved NERC standard CIP-004-5.1 for its specific application in New Brunswick. This appendix must be read with CIP-004-5.1 to determine a full understanding
More information1. SAR posted for comment on January 15, Standard Drafting Team appointed on January 29, 2014
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationQuébec Reliability Standards Compliance Monitoring and Enforcement Program Implementation Plan Annual Implementation Plan
Québec Reliability Standards Compliance Monitoring and Enforcement Program Implementation Plan 2017 Annual Implementation Plan Effective Date: January 1, 2017 Approved by the Régie: December 1, 2016 Table
More informationImplementation Plan for Version 5 CIP Cyber Security Standards
Implementation Plan for Version 5 CIP Cyber Security Standards April 10September 17, 2012 Note: On September 17, 2012, NERC was alerted that some references in the Initial Performance of Certain Periodic
More informationCIP Cyber Security Personnel & Training
A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-5.1 3. Purpose: To minimize the risk against compromise that could lead to misoperation or instability in the BES from individuals
More informationStandards. Mark Lauby, Vice President and Director of Standards Board of Trustees Meeting November 7, 2013
Standards Mark Lauby, Vice President and Director of Standards Board of Trustees Meeting November 7, 2013 Geomagnetic Disturbance Operations EOP-010-1 Reliability benefits Enhance operating response to
More informationStandard CIP 004 3a Cyber Security Personnel and Training
A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-3a 3. Purpose: Standard CIP-004-3 requires that personnel having authorized cyber or authorized unescorted physical access
More informationCOM Communications and Coordination
COM-002-2 Communications and Coordination February 27, 2014 Lonnie Lindekugel ~ SPP Jim Nail ~ City of Independence INTRODUCTION NERC Reliability Standard COM-002-2 (Communications and Coordination) serves
More informationCyber Security Standards Drafting Team Update
Cyber Security Standards Drafting Team Update Michael Assante, VP & Chief Security Officer North American Electric Reliability Corp. February 3, 2008 Overview About NERC Project Background Proposed Modifications
More informationCIP Cyber Security Recovery Plans for BES Cyber Systems
A. Introduction 1. Title: Cyber Security Recovery Plans for BES Cyber Systems 2. Number: CIP-009-5 3. Purpose: To recover reliability functions performed by BES Cyber Systems by specifying recovery plan
More informationStandard COM-002-2a Communications and Coordination
A. Introduction 1. Title: Communication and Coordination 2. Number: COM-002-2a 3. Purpose: To ensure Balancing Authorities, Transmission Operators, and Generator Operators have adequate communications
More informationImpacts and Implementation: NERC Reliability Standards, Compliance Initiatives, and Regulatory Activities
Impacts and Implementation: NERC Reliability Standards, Compliance Initiatives, and Regulatory Activities NRECA TechAdvantage March 2014 Patti Metro Manager, Transmission & Reliability Standards NRECA
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).
More informationCIP Cyber Security Recovery Plans for BES Cyber Systems
A. Introduction 1. Title: Cyber Security Recovery Plans for BES Cyber Systems 2. Number: CIP-009-6 3. Purpose: To recover reliability functions performed by BES Cyber Systems by specifying recovery plan
More informationCIP Cyber Security Security Management Controls. A. Introduction
CIP-003-7 - Cyber Security Security Management Controls A. Introduction 1. Title: Cyber Security Security Management Controls 2. Number: CIP-003-7 3. Purpose: To specify consistent and sustainable security
More informationThis draft standard is being posted for an initial comment and ballot. The draft includes modifications to meet the directives of FERC Order No. 791.
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft
More informationStandard CIP Cyber Security Critical Cyber Asset Identification
Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed
More informationReliability Standard Audit Worksheet 1
Reliability Standard Audit Worksheet 1 FAC-003-4 Transmission Vegetation Management. Registered Entity Name: Applicable Function(s): Applicable only for TO and GO Compliance Monitoring Method: RSAW Version:
More informationDisclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission...
CIP-002-4 Cyber Security Critical Cyber Asset Identification Rationale and Implementation Reference Document September, 2010 Table of Contents TABLE OF CONTENts Disclaimer... 3 Executive Summary... 4 Introduction...
More informationA. Introduction 1. Title: 2. Number: 3. Purpose: 4. Applicability: 4.1. Functional Entities: Balancing Authority Distribution Provider
The Background, VRF/VSLs, and Guidelines and Technical Basis Sections have been removed for this informal posting. The Project 2016-02 is seeking comments around the concept of the Requirement/Measure
More informationrequirements in a NERC or Regional Reliability Standard.
A. Introduction 1. Title: Cyber Security Information Protection 2. Number: CIP 011 1 3. Purpose: To prevent unauthorized access to BES Cyber System Information by specifying information protection requirements
More informationCritical Infrastructure Protection Version 5
Critical Infrastructure Protection Version 5 Tobias Whitney, Senior CIP Manager, Grid Assurance, NERC Compliance Committee Open Meeting August 9, 2017 Agenda Critical Infrastructure Protection (CIP) Standards
More informationPhysical Security Reliability Standard Implementation
Physical Security Reliability Standard Implementation Attachment 4b Action Information Background On March 7, 2014, the Commission issued an order directing NERC to submit for approval, within 90 days,
More informationAgenda Event Analysis Subcommittee Conference Call
Agenda Event Analysis Subcommittee Conference Call August 14, 2013 11:00 a.m. 1:00 p.m. Eastern Ready Talk Conference Call and Web Meeting Information: Dial-In: 1-866-740-1260 Access Code: 6517175 Security
More informationCIP Cyber Security Systems Security Management
A. Introduction 1. Title: Cyber Security System Security Management 2. Number: CIP-007-5 3. Purpose: To manage system security by specifying select technical, operational, and procedural requirements in
More informationStandard CIP-006-3c Cyber Security Physical Security
A. Introduction 1. Title: Cyber Security Physical Security of Critical Cyber Assets 2. Number: CIP-006-3c 3. Purpose: Standard CIP-006-3 is intended to ensure the implementation of a physical security
More informationStandards Authorization Request Form
Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.
More informationStandard CIP Cyber Security Electronic Security Perimeter(s)
A. Introduction 1. Title: Cyber Security Electronic Security Perimeter(s) 2. Number: CIP-005-1 3. Purpose: Standard CIP-005 requires the identification and protection of the Electronic Security Perimeter(s)
More informationCIP Cyber Security Physical Security of BES Cyber Systems
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationCIP Cyber Security Physical Security of BES Cyber Systems
A. Introduction 1. Title: Cyber Security Physical Security of BES Cyber Systems 2. Number: CIP-006-5 3. Purpose: To manage physical access to BES Cyber Systems by specifying a physical security plan in
More informationIndividual William H. Chambliss, Operating Committee Virginia State Corporation Commission
or group. (77 Responses) Name (51 Responses) Organization (51 Responses) Group Name (26 Responses) Lead Contact (26 Responses) IF YOU WISH TO EXPRESS SUPPORT FOR ANOTHER ENTITY'S COMMENTS WITHOUT ENTERING
More informationMember Representatives Committee. Pre-Meeting and Informational Webinar January 16, 2013
Member Representatives Committee Pre-Meeting and Informational Webinar January 16, 2013 Objectives Review preliminary agenda topics for February 6 Member Representatives Committee (MRC) meeting. Review
More informationReliability Standard Audit Worksheet 1
Reliability Standard Audit Worksheet 1 CIP-002-5.1 Cyber Security BES Cyber System Categorization This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered Entity: NCR
More informationCIP V5 Updates Midwest Energy Association Electrical Operations Conference
CIP V5 Updates Midwest Energy Association Electrical Operations Conference May 2015 Bob Yates, CISSP, MBA Principal Technical Auditor ReliabilityFirst Corporation Agenda Cyber Security Standards Version
More informationConsideration of Issues and Directives Federal Energy Regulatory Commission Order No. 791 June 2, 2014
Federal Energy Regulatory Commission Order No. 791 June 2, 2014 67 and 76 67. For the reasons discussed below, the Commission concludes that the identify, assess, and correct language, as currently proposed
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft
More informationReliability Standard Audit Worksheet 1
Reliability Standard Audit Wksheet 1 EOP-008-2 Loss of Control Center Functionality This section to be completed by the Compliance Enfcement Authity. Audit ID: Registered Entity: NCR Number: Compliance
More informationCIP Cyber Security Configuration Change Management and Vulnerability AssessmentsManagement
The Background, VRF/VSLs, and Guidelines and Technical Basis Sections have been removed for this informal posting. The Project 2016-02 is seeking comments around the concept of the Requirement/Measure
More informationTOP for Transmission Operators
Meeting Title Date TOP-001-4 for Transmission Operators Compliance Team Lead, Keith Smith Background Effective July 1, 2018 Replaces currently effective TOP-001-3 Modified to address reliability concerns
More informationCIP Cyber Security Information Protection
A. Introduction 1. Title: Cyber Security Information Protection 2. Number: CIP-011-2 3. Purpose: To prevent unauthorized access to BES Cyber System Information by specifying information protection requirements
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft
More informationCIP Cyber Security Standards. Development Update
CIP Cyber Security Standards Development Update John Lim Consolidated Edison Co. of New York Rob Antonishen Ontario Power Generation September 21-22, 2010 1 Disclaimer This NPCC TFIST workshop provides
More informationCIP Cyber Security Electronic Security Perimeter(s)
A. Introduction 1. Title: Cyber Security Electronic Security Perimeter(s) 2. Number: CIP-005-5 3. Purpose: To manage electronic access to BES Cyber Systems by specifying a controlled Electronic Security
More informationDraft CIP Standards Version 5
Draft CIP Standards Version 5 Technical Webinar Part 1 Project 2008-06 Cyber Security Order 706 Standards Drafting Team November 15, 2011 Agenda Opening Remarks John Lim, Consolidated Edison, Chair V5
More information