Installation Guide for Mazak Mazatrol M - Plus, M-2, M32, T-Plus, T2

Similar documents
ATTENTION: OBSERVE PRECAUTIONS FOR HANDLING ESD-SENSITIVE DEVICES

Installation Guide for DV8 Off-Road Tailgate-Mounted Tire Carrier (18-19 Jeep Wrangler JL)

Foreseesons Monitor Installation Instructions

Installation Guide. Retrofit Kit for USB Ready Intraoral Systems

PoE/FPR Kit for Auto-Sync Time Clock. The Auto-Sync Time Clock is a validated time system with a Web interface and auto discovery.

DIGITAL OBSERVATION GUARD LOW PROFILE PAN TILT KIT USER MANUAL

E1135C PDU and Pod Upgrade Procedure

TDM To MiniMech conversion ProceDure

Upgrading a 2U CHP to an i7 Quad Core SBC

INSTALLATION INSTRUCTIONS

How To Install: C4000 EMV Upgrade Kit

ATTENTION: OBSERVE PRECAUTIONS FOR HANDLING ESD-SENSITIVE DEVICES

CommBox Interactive Table User Manual 1.0. Revision: 5

Installing a Power over Ethernet injector

imac Intel 21.5" EMC 2389 Stand Replacement

Instructions for installing your QuiltCam on your Gammill quilt machine.

Smart Multivariable Transmitter (SMV 3000) Electronics Module Replacement Kit Instruction

Rack Installation Instructions

Megatouch FORCE Monitor Chassis Board Replacement

Written By: senordingdong

ATTENTION: OBSERVE PRECAUTIONS FOR HANDLING ESD-SENSITIVE DEVICES

TECHKNOW, INC. Kiosk Order Confirmation System INSTALLATION MANUAL. Revision Date: July 11, 2012 Part # Version 3.2

1. Move the cardboard carton close to the installation site, making sure you have adequate space to remove all the contents of the box.

TABLE OF CONTENTS SECTION 1 TABLETOP CONFIGURATION SECTION 2 TABLETOP CONFIGURATION ACCESSORIES SECTION 3 SLIDE CONFIGURATION

Procedure to Install an IO Expansion Cage Assembly in a Maxum II Modular Oven Analyzer

Installation Instructions

Section. Service & Maintenance. - Core & Hard Disk Drive (HDD) - Amplifier - Monitor - UPS - Dollar Bill Acceptor - Fan Filter G - 1

Ion Memory Upgrade. Visit the AMI Entertainment Web site PM

Cutter Option Installation Instructions

G12/G12x USER S MANUAL

Assembly Instructions

EMC 10T "CE" Mechanical Upgrade Procedure

Table of Contents. Overview...3. Features...3. Packing List...4. Assembly...6. Installation...9. Front Panel...10

BoxLED DS Plus (Double Side) BX-DS-PL; BX12BA-W4F Signage Lighting System INSTALLATION GUIDE

Q2 XBee Handheld Controller Assembly Guide

EMC 10/4 "CE" Mechanical Upgrade Procedure

Upgrading the programmer supply unit of the BeeProg+/BeeProg2 programmer

Main Menu. Menu II. UNPACKING AND SETUP II-5. RADF MR-3021/3022

3M Add-On Terminals 4220P (100, 200, 300 & 400 pairs)

INSTALLATION INSTRUCTIONS

Peel/Rewind Upgrade Kit

Replacing the Power Supply

A-100G6 - Basic frame assembly diagram

X500 Parts Replacement Instructions

IBM. Rack Installation Instructions

7" Touch Screen Display

into the EMU E4 Classic and E4 Platinum Samplers

INSTALLATION INSTRUCTIONS:

CONSOLE CONNECTOR KIT 9501 INSTALLATION INSTRUCTIONS

Havis Integrated Control System Installation Instructions for Standard* Ford Police Interceptor Utility

Snap Server 4400 Power Supply

INSTALLATION INSTRUCTIONS

Plasma Panel Replacement Guide DU-42PX12X

Seeburg JCU-DEC Kit Convert Your Seeburg DEC Wallbox Into a Jukebox

Control Box Setup - PRSalpha

REMOTE HEAD ADAPTER INSTALLATION GUIDE

Star Trac Fitness E-ST 5090 Stepper. Install Guide

WEASEL N/B MAINTENANCE

Table of Contents. Overview...2. Features...2. Packing List...3. Assembly...5. Installation...8. Front Panel...9

NewScope-7B Operating Manual

How To Install: G2500 EMV Upgrade Kit

Instructions to Install Retrofit Kit 6/7000 Machine

Twisted Nitro Stunt Racing New Cabinet Design with Sintra Marquee Supplement to Operation & Service Manual

Golf Control Panel Conversion Instructions

Power Supply and Fan Module Installation

Installation Guide. Copyright 2005 MSI Computer Corp.

Please read thoroughly before starting installation and check that kit contents are complete.

Vertiv VR Rack 1.0 GENERAL

Removal and Installation8

Screened Ribbon Cables for MV DELTA s Part Number : MVC , MVC & MVC

E2460GS Oscilloscope Upgrade Kit

CAMERA ASSEMBLY. Removal/Replacement of the Camera Box Assembly APR-CA. Install Camera Assembly. Remove Camera Assembly

FLEXBOX. Installation Guide

KM6-II Subracks. APW Electronic Solutions. 152 APW Electronic Solutions Toll Free (800) Fax: (858)

Instructions to Install Retrofit Kit RVMC 4/5000 Machine (MDB Only)

Z-Truck (Vertical Moving) Z-truck Flag. Y-Truck (Horizontal Moving) FIGURE 1: VIEW OF THE Z-TRUCK. Flexshaft Assembly

Quick Start. This document describes how to install the Juniper Networks PTX5000 Packet Transport

FIELD REPLACEABLE UNIT DOCUMENTATION

MASTERLINE Ultimate Hybrid High Voltage 4/12 (MLUH HV 4/12) blunt cut at BTS side

Rack Installation Instructions

HDMI Upgrade for the Showcase DVD

Replacement Keyswitch Assembly

KM-4800w. Installation Guide

Print Mechanism Maintenance Kit

Outdoor PTZ. Mounting on the Ceiling Using Pendant Mount. Installation Guide. For Models: I93, I94, I95, I96, KCM /12/03

SCXI-1345 Shielded Cable

PDC / ECIS. Display Update update with conversion kit Display Update. Contents. General information. Important notes.

Installation Instructions

Microsystems. SCI-6 Sound Card Interface Kit Version 1.09 January 2015

Floor Standing Pedestal

View Wall Interface. Dynamic Glass INSTALLATION GUIDE. Description. System Requirements. Installation Overview

TSMIU Wireless Bridge Installation and Configuration

REMOVE COVERS. 1. Remove three screws from the Side Panel (L). 2. Slide the Side Panel (L) backward, and raise it to remove from the printer.

527F Dual PC Option Installation Guide as replacement for 32MP made by Fadal

MacBook Pro 15" Core Duo Model A1150 ExpressCard Cage Replacement

Written By: Miroslav Djuric

INSTRUCTIONS FOR THE INSTALLATION OF THE INFINITY "L" DISPLAY HOOD (INTO PREVIOUSLY INSTALLED INFINITY "L" SYSTEMS)

Upgrade Instructions. P/N Revision A. October Printer Terminal Holder * *

ANIxx. Installation Manual.

Validator Update Instructions for Rowe BC1200 $1 - $20

Transcription:

1 Installation Guide for Mazak Mazatrol M - Plus, M-2, M32, T-Plus, T2 Tsubis Part Number: LCD12-0046 Power Down 1. Power down the controller. 2. Power down the complete machine by turning off the rear isolator switch. Old CRT Monitor Removal 3. Using a 4mm Allen key, remove the two screws on the right hand side of the screen panel. 4. Hinge open the screen door.

2 5. Using a 5mm Allen Key, remove the two bolts at the lower front of the Monitor mounting tray. 6. Using a 5mm Alley Key on a 40cm extension, remove the two bolts at the rear of the mounting tray.

3 7. Slide the monitor tray forward about 5cm. Using a posi drive screwdriver, remove the screw holding the earth lead at the front right of the monitor tray. 8. Carefully slide the tray forward sufficiently to enable you to reach the rear cable connectors which are on the right rear of the display. 9. Remove the 3 rear connectors by pressing in the side release tabs and then pulling out the connectors. 10. Fully withdraw the old CRT monitor and put to one side.

4 Preparing the connections 11. Identification of the three connections on the rear of the old CRT monitor. a. The 3 pin AC power connector. b. The video connector. c. The third connector (below) is now redundant and will not be reused with the new monitor. Tape off the end of the connector that went to this socket and tie wrap it to the main cable to keep it stowed safely out of the way. 12. The Video connector - from the accessories pack, select the appropriate adaptor cable that matches the number of pins in the video connector of your old monitor (step 11b). In this example, it is the cable circled in red in this picture.

5 a. Attach the video adaptor cable to the existing video cable on the machine (the cable removed in step 9). 13. AC Power connector cut off the old AC Power connector (CN2). Strip back the 3 wires and fit to the new AC Power connector provided in the kit (the socalled kettle connector). a. Red = LIVE b. White = Neutral c. Black = Earth (centre pin on the kettle connector) Preparing the Replacement LCD Monitor 14. Fit the two metal mounting plates to the sides of the LCD screen using the 4 metal thumb screws supplied. 15. Remove the nut and washers on the rear panel earth stud (just above the AC power connector). 16. Adjust switch S8 to the up position. 17. Adjust switch 9 to the up position ( H+V). 18. Ensure all 4 switches on S10 are in the down (off) position. 19. Note the location of the 3 On-Screen-Display adjustment buttons, Mode, Plus, and Minus. These will be used to set up the display later by reaching under the display and pressing the buttons.

6 Installing the New Monitor 20. Offer the assembled LCD screen up to the controller housing. 21. Attach the earth wire to the rear earth stud on the LCD. 22. Connect the 9 pin video cable to connector X6. 23. Plug in the AC power cable. 24. Slide the LCD assembly fully into the controller housing. 25. Secure the mounting brackets using to two front 5mm bolts. Power Up 26. Power up the machine in the normal way 27. The new display will automatically sync and find the video signal. The screen should display the text and graphics in the same way as the original CRT screen. a. If there is no picture on the display, check the cables connections and switch settings. Display Set Up 28. Use the OSD (On Screen Display) buttons on the rear of the unit to adjust the horizontal and vertical position of the play, as necessary. Use the mode button to select the different modes, and the plus and minus buttons to make the adjustment. You can restore the screen to the original factory settings using the Restore mode. 29. Check the display alignment on the various different pages of the display that you use. 30. After completing the adjustments the settings are automatically saved and will be used again on power up. So no future adjustments should be needed after this initial set up. We hope you enjoy your new Tsubis monitor from Stour Valley Systems. If you encounter any problems during the installation please feel free to call Bob at Stour Valley Systems on +44 (0) 7711 289545.