Microprocessor Module Replacement Kit for Multi-Zone Leak Monitors Instruction Manual

Similar documents
Portable Gas Monitor (PGM-IR) Infrared Sensor Replacement Instruction

BACnet Protocol Converter Kit for Use with Bacharach MultiZone Gas Monitors. Installation Manual

BACnet Protocol Converter Kit for Use with Bacharach MultiZone Gas Monitors. Installation Manual

Phase Loss Protection Upgrade. Phase Loss Protection Upgrade. In this bulletin:

EMC 10T "CE" Mechanical Upgrade Procedure

GPIB-232CT-A IBCL EPROM Installation Guide

Voice Evacuation Control Panel Main Circuit Board Replacement Product Installation Document

Replacing the PanelMate Power Pro 1785 Series, PanelMate epro 7585x-8 and 7685x-8 Series Backlight Assembly

FC-25/50DA Main Circuit Board Replacement Product Installation Document

Web Site: Forums: forums.parallax.com Sales: Technical:

Installing and Removing SDRAM and DRAM

PC9/P9 CPU Card Replacement

HARMONi G3. Quick Start Guide for HARMONi G3. imac Processor/FireWire Upgrade

An ISO 9001 Company. BOP 1KW-MG FIRMWARE RETROFIT KIT

Instruction Sheet WPC 2000 Option 1

TDM To MiniMech conversion ProceDure

ENCORE /ST G4. Processor Upgrade Card for Power Mac G4 AGP Graphics. Quick Start Guide for Encore/ST G4

E2460GS Oscilloscope Upgrade Kit

Procedure to Upgrade from B&W Maintenance Panel to TIB Color Touchscreen Door in a Working Maxum or Maxum II Analyzer Equipped With a SYSCON2

LCD Meter for Model 3051 Pressure Transmitters English Rev. AA

MicroTech III McQuay Chiller Unit Controller BACnet Communication Module (MS/TP)

Pro-Flo System Digital Controller EPROM Upgrade

MicroTech II McQuay Maverick II Rooftop Unit Controller BACnet Communication Module (MS/TP)

Replacement Instructions

V5420 Host Card Upgrade Kit for R3082D Quick Start Guide

Rack Installation Instructions

An ISO 9001 Company. BOP 1KW-MG FIRMWARE RETROFIT KIT

EPROM Replacement Instructions for Sprint ; Controller Assembly. and Replacement Instructions for Sprint Controller Assembly

3 1 ROM. Installation Manual

CRESCENDO /PB G3. Processor Upgrade Card for Macintosh PowerBook 1400 Series Computers. Quick Start Guide for Crescendo/PB G3

16MB Sound Flash Installation Instructions for E6400 Ultra, E4XT Ultra & E-Synth Ultra

Royal RVV-500 (B) Retrofit Kit

Validator Update Instructions for Rowe BC1200 $1 - $20

Power Xpert Meter 2000 Gateway Card Kit

*E * E E0606

3G Cell Modem Upgrade

MacBook Pro 13" Unibody Mid 2010 SSD Dual Drive Installation

A-dec 570L Dental Light on a DCS System INSTALLATION GUIDE

Snap Server 4400 Power Supply

Removal and Installation8

Installing MacBook Pro 17" Unibody Dual Hard Drive

INSTALLATION INSTRUCTIONS

Thank you for purchasing this Factory Service Manual CD/DVD from servicemanuals4u.com.

Memory (RAM) Replacement Instructions. apple PowerBook (FireWire) Tools Required. Electrostatic Discharge (ESD)

Service Manual - Memory Upgrade

120Ra-1 Pentium III Processor Installation Insert

Film-Tech. The information contained in this Adobe Acrobat pdf file is provided at your own risk and good judgment.

Installing a Power over Ethernet injector

Power Xpert Meter 2000 Gateway Card Kit

Dell Latitude V710/V740 Service Manual

Upgrading and Servicing Guide

To connect the AC adapter:

ENCORE /ST G4 DUET. Dual Processor Upgrade Card for Power Mac G4 AGP Graphics. Quick Start Guide for Encore/ST G4 Duet

Residential/Light Commercial Remote Control System

INSTRUCTION BULLETIN

Cube Installation Kit Manual ENCORE /ST G4

Installing MacBook Pro 15" Unibody Mid 2010 Dual Hard Drive

Installation Guide V290 (Color) This guide provides basic information for Unitronics LCD color touchscreen models V C30B and V T40B.

Removing and Replacing Parts

Series 3700 Screw Terminal Assemblies Installation Instructions

Z-Truck (Vertical Moving) Z-truck Flag. Y-Truck (Horizontal Moving) FIGURE 1: VIEW OF THE Z-TRUCK. Flexshaft Assembly

Smart Multivariable Transmitter (SMV 3000) Electronics Module Replacement Kit Instruction

USB MODEM UPGRADE INSTALLATION/SETUP PROCEDURES (MODELS RL/FT5000/RT2000)

P1 PowerStation Backlight Bulb

3710 ACM 3750 PDC 3800 RTU. ISOCOM Communications Card Retrofit Instructions

Presario 1200 Series Models: XL101-XL113, XL115, XL118-XL127. This section explains the removal and replacement procedures for the 1200XL unit.

SITRANS F. Flowmeters SysCom Upgrade Kit IP65 (NEMA 4X) Multi-Channel. Introduction 1. Installing/Mounting 2. Hardware Installation Instructions

Allen-Bradley Motors

Thank you for purchasing this Factory Service Manual CD/DVD from servicemanuals4u.com.

EAP110-Outdoor. Installation Guide. 300Mbps Wireless N Outdoor Access Point

S200 Series Brushless Servo Drive EPROM Upgrade

TCM-4 Data Logger Battery Replacement Instructions

WARNING: Remove all power sources to the panel before installation. Leave the external and main power OFF until installation is complete.

INSTALLATION OF THE REMOTE SUPERVISORY CONTROL OUTPUT (RSC) OPTION FOR VERBATIM, VMP-4 MAIN BOARD

Intel NUC 7 Home, a Mini PC with Windows 10 NUC7i3BNHXF. Intel NUC 7 Home, a Mini PC with Windows 10 NUC7i5BNHXF

REMOTE HEAD ADAPTER INSTALLATION GUIDE

Power Supply, 17-inch

TRC-190 User s Manual

Replacing the Power Supply

Procedure to Install an IO Expansion Cage Assembly in a Maxum II Modular Oven Analyzer

Upgrading and Servicing Guide

Installation Guide. Wyse Rx0L Thin Client Flash and RAM Upgrade Option Kit. Issue: PN: L Rev. A

CRESCENDO /7200 G3. Quick Start Guide for Crescendo /7200. Processor Upgrade Card for Power Macintosh 7200/8200 Computers

D Issue D Original. Instruction Manual. Micro Tool Interface

MicroTech III Water Source Heat Pump BACnet MS/TP Communication Module

Written By: Andrew Optimus Goldberg

User Guide. Intel NUC 7 Home, a Mini PC with Windows 10 NUC7i5BNKP. Intel NUC 7 Enthusiast, a Mini PC with Windows 10 NUC7i7BNKQ

Setup Guide. Confirming the Installation Space. Installation space (W x D x H) 70.5 x 66.3 x 61.5 inches (1790 x 1684 x 1560 mm) 23.

User Guide. Intel NUC 8 Business, a Mini PC with Windows 10 NUC8i7HNKQC. Intel NUC 8 Enthusiast, a Mini PC with Windows 10 NUC8i7HVKVA

MicroTech II McQuay Maverick II Rooftop Unit Controller BACnet Communication Module, Ethernet or IP

Power Xpert Meter 2000 Gateway Card Kit

MicroTech III Chiller Unit Controller BACnet IP Communication Module

Magnitude TM Chiller Unit Controller BACnet Communication Module (MS/TP, IP, Ethernet)

INSTALLATION MANUAL DATAVAULT DATAVAULT - BARE JOBSITE STORAGE SOLUTIONS

Dell Edge Gateway. Service Manual Series

User Guide for NUC7i3DNHNC. Intel NUC7 Business, a Mini PC with Windows 10 NUC7i3DNHNC. User Guide

Replacement Instructions

I/O Expansion Board. Control Made Simple

imac Intel 21.5" EMC 2389 SSD Dual Drive

Replacing an Advanced Power and Cooling (APC) Unit

Transcription:

621 Hunt Valley Circle New Kensington, PA 15068 3015-5547 Tel: 724-334-5000 Revision 4 Fax: 724-334-5001 May 17, 2013 Microprocessor Module Replacement Kit for Multi-Zone Leak Monitors Instruction Manual 1. Scope The Bacharach Multi-Zone family of fixed point monitors is designed for easy maintenance and enhancement. One element of that design is the ability to replace system programming (firmware) with a simple plug-in microprocessor module, minimizing downtime. This instruction manual describes how to replace or upgrade the microprocessor module in your Multi-Zone leak monitoring equipment. It is assumed that the user is familiar with the operation of the appropriate monitor. If necessary, refer to the instructions for detailed operation and maintenance information for each Multi-Zone model. 2. Items Required Replacement Microprocessor Module Kit (P/N: 3015-5546) Medium Phillips head screwdriver Medium standard slotted screwdriver Wrench for lock nut CAUTION Failure to comply with these instructions may void the warranty. 3. Retrieving Setup and Configuration Data Your Multi-Zone monitor has been configured for your specific installation. Prior to beginning this procedure it is highly recommended to collect setup and configuration data from your monitor so it can be reloaded after the new microprocessor module is installed. Use the table that follows to record the necessary parameters. NOTE: Note that a system hardware failure may make these values inaccessible or may reset them to default values in a fail safe mode. If the values are not accessible or do not match your installation, you should skip this step. If you need assistance, contact Bacharach Technical Support at (800) 736-4666 or (724) 334-5000. NOTE: The node address of your Multi-Zone device can be found on page 2 of the System Setup Screen. 3015-5547 Rev 4 1

NODE ADDRESS = NUMBER OF ZONES = ZONE (From screen) LOCATION (Based on your physical installation) GAS LENGTH OF TUBING TEMP AT ZONE LEAK LEVEL STORED ALARM LEVELS SPILL LEVEL EVAC LEVEL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 4. Removal Preparation Prepare to remove the old microprocessor module by following the steps below. a. Disconnect power to the leak monitor and confirm that no power is present. WARNING Failure to remove power can cause damage to the monitor and can cause personal injury or death. b. Remove the two screws on the left edge of the front panel. c. Open the front panel and ground your body by touching an area of bare metal. WARNING Failure to touch the grounding area can allow static electricity on your clothing or body to damage the monitor or modules. Such damage is not covered under warranty. d. Disconnect the 12-position screw terminal to prevent activating alarm equipment. 2 3015-5547 Rev 4

e. Locate the microprocessor module, socketed on the bottom right side of the main circuit board. Refer to Figure 1. f. Note the orientation of the module, specifically the gold tab and hole oriented on the bottom left of the board. Refer to Figure 2. 12-position Screw Terminal Block Microprocessor Module Figure 1. Locations of Terminal Block and Microprocessor Module Inside the Multi-zone Cabinet Note Position of Gold Tab and Hole (Bottom Left) Figure 2. Orientation of Microprocessor Module 3015-5547 Rev 4 3

5. Microprocessor Removal Remove the installed microprocessor module by following the steps below. a. Grasp the left and right edges of the microprocessor module and gently pull straight out while rocking left to right, until it comes free of the socket. b. Dispose of the removed microprocessor module in accordance with local regulations for electronic equipment. 6. Installing the New Microprocessor Module Install the new microprocessor module by following the steps below. Depending on your hardware and the replacement kit that you receive, there are two different installation procedures. One method accommodates different hole sizes in the microprocessor board and the mother board, and uses two screws (0001-1552) and a female-threaded spacer (0304-8289). The other method accommodates the newer microprocessor board and mother board which have the same size holes, and uses a snap-in spacer (0304-8459). Follow the installation option that corresponds to the hardware that is supplied with your kit. OPTION A: Threaded Spacer and Two Screws a. Remove the main board from the enclosure by disconnecting all main board connectors, removing mounting screws, and carefully lifting the main board from the enclosure standoffs. (Note that this and other steps may not be required if your microprocessor board is already mounted as shown in Option A.) b. Attach the threaded standoff to the top of main board by routing one of the screws up through the underside of the main board and securing it to the standoff. Use Figure 3 as a guide. c. Remove the new microprocessor module from its packaging, handling the board by the edges only. d. Orient the new microprocessor so the gold tab and hole are at the bottom left corner (refer to Figure 2). e. Carefully align the two rows of pins on the back of the processor with the mating socket on the main circuit board in the Multi-Zone, then carefully press the microprocessor module firmly into the socket. NOTE As a guide, align the larger hole on the microprocessor module with hole in the standoff. CAUTION Be sure not to skip or offset the pins to the socket. f. Feed the second securing screw through the hole in the processor board into the top of the threaded standoff and secure it using the screwdriver. See the figure below. Figure 3. Option A Installation g. Re-attach the main board to the enclosure by carefully placing the main board onto the enclosure standoffs and securing it with the screws removed earlier. h. Re-attach only the main board connectors that you removed in step (a). i. Continue with Step 7: Power-up and Initialization. 4 3015-5547 Rev 4

OPTION B: Snap-in Spacer a. Insert the plastic snap-in spacer into the securing hole on the mother board. See figure below. Figure 4. Option B Installation b. Remove the new microprocessor module from its packaging, handle the board by the edges only. c. Orient the new microprocessor so the gold tab and hole are at the bottom left corner (refer to Figure 2). d. Carefully align the two rows of pins on the back of the processor with the mating socket on the main circuit board of the Multi-Zone, while simultaneously aligning the snap tab on the spacer with the hole in the microprocessor board. NOTE As a guide, align the larger hole on the microprocessor module with the top of the snap-in spacer. If aligned properly, the pins will align with the main board socket and the hole in the microprocessor board will align with the top connector of the snap-in spacer. CAUTION Be sure not to skip or offset the pins to the socket. e. Ensuring that the pins are properly aligned and the snap-in spacer is in place and properly aligned, press the microprocessor module firmly into the socket while simultaneously securing it to the snap-in spacer. j. Continue with Step 7: Power-up and Initialization. 7. Power-up and Initialization Apply power and initialize the leak monitor by following the steps below. a. Apply power to the leak monitor and wait for the power-up sequence to complete. Note that the yellow fault light may flash at this time. The green power LED will flash to indicate that the monitor is in Warm Up Mode. b. With the monitor in either Warm Up Mode (flashing green LED) or Sampling Mode (solid green LED), access the Setup Menu by pressing the ENTER key twice. 3015-5547 Rev 4 5

Figure 5. Sampling Mode Screen with Key Functions c. Scroll to the bottom right of the screen (see Figure 6) to select the Service Mode Entry option. Figure 6. Main Setup Screen Showing Location of Service Mode Entry Option d. With the Service Mode Entry option highlighted, press ENTER twice to enter Service Mode. e. Scroll to the SYSTEM option and press ENTER. f. Scroll to the MORE option (see below) and press ENTER. Note that MORE will flash when it is selected. Figure 7. HGM Setup Screen Showing MORE Option g. Scroll to and select the Model option (see below) and press ENTER. 6 3015-5547 Rev 4

Figure 8. Setup Screen When in Service Mode h. Use the UP and DOWN arrow keys to select the model type of your monitor from the scrolling list (for example, REF for refrigerant). With the proper model selected, press ENTER to save that change. i. Press ESC to get to the System Menu. Scroll to IN SERVICE QUIT and press ENTER twice to leave Service Mode. Press ESC once and allow the instrument to complete a pressure check and purge cycle (approximately 2 minutes). j. With the monitor in either Warm Up Mode (flashing green LED) or Sampling Mode (solid green LED), access the Setup Menu by pressing the ENTER key twice. Figure 9. Sampling Mode Screen k. Scroll to the bottom right of the screen (see Figure 8) to select Service Mode Entry. Figure 10. Main Setup Screen Showing Location of Service Mode Entry Option l. With Service Mode Entry highlighted, press ENTER twice to enter Service Mode. 3015-5547 Rev 4 7

m. Scroll to the SYSTEM option and press ENTER. n. Scroll to the MORE option (see below) and press ENTER. Note that MORE will flash when it is selected. Figure 11. HGM Setup Screen Showing MORE Option o. Scroll to and select the IR DIGIPOT option (see below) and press ENTER. Figure 12. Setup Screen When in Service Mode p. Use the UP and DOWN arrows to adjust the MW reading to 450 (or as close as possible). When at the proper value, press ESC once. DIGIPOT= 180 IR VOLT= 4.21 V= 4.7 MA= 96 R= 49 MW= 450 Figure 13. Sample DIGIPOT Readings 8 3015-5547 Rev 4

q. Scroll to DET DIGIPOT and press ENTER. r. Use the UP and DOWN arrows to adjust the IR VOLT reading to 4.20 (or as close as possible). When at the proper value, press ESC once. IMPORTANT! If IR VOLT does not reach 4.200 ±0.100 volts when adjusting the DIGIPOT, return to step (n) to lower the IR emitter setting. If the IR emitter setting is 450 ±20 mw, adjust the new IR emitter setting to 375 ±20 mw. Repeat step (p) with the new IR emitter setting. s. Press ESC to save. t. Press ESC to get to the System Menu. Scroll to Service Mode and press ENTER twice to leave Service Mode. Press ESC once and allow the instrument to complete a pressure check and purge cycle (approximately 2 minutes). If there are no faults the IR bench has been successfully configured. 3015-5547 Rev 4 9

8. Reload Setup Parameters Reload the previously saved setup parameters and configuration data by following the steps below. a. With the monitor in either Warm Up Mode (flashing green LED) or Sampling Mode (solid green LED), access the Setup Menu by pressing the ENTER key twice. Figure 14. Sampling Mode Screen b. Scroll to the SYSTEM option and press ENTER. Figure 15. Main Setup Screen c. Use the UP and DOWN arrow keys to select the LOCATION setting and press ENTER. (Note: This is the location of the Multi-Zone unit, and NOT the location of the individual zones.) Use the LEFT and RIGHT arrow keys to select the letter to be changed, and use the UP and DOWN arrow keys to choose the new letter or number for that position. Press ENTER to save the changes, or ESC to abort the changes. Figure 16. HGM Setup Screens 10 3015-5547 Rev 4

d. Use the UP and DOWN arrow keys to select the NUM ZONES INSTALLED setting and press ENTER. e. Use the UP and DOWN arrow keys to choose the number of physical zones (solenoids) installed in your Multi-Zone (i.e., 4, 8, 12, or 16 zones). Press ENTER to save the changes, or ESC to abort the changes. NOTE The NUM ZONES INSTALLED setting defines the maximum number of zones that your Multi-Zone is capable of measuring (i.e., a hardware parameter), NOT the number of zones defined by your application. For example, your Multi-Zone may be equipped with 16 hardware solenoids (zones), but your application uses only 13 of those zones. In this case, NUM ZONES INSTALLED is set to 16. You must set the tubing length to 0 ft for the other 3 unused zones. f. Using steps (c) through (e) as guides, change the other system settings as required. The other system settings are: ALM ACK MODE REZERO MODE AUDIBLEALARM RS485 BAUD ZONE HOLD NODE ADDRESS DETECTION LIMIT PASSWORD. LOOP2 FACTOR g. When all changes are complete, press ESC to return to the Main Setup Screen. Figure 17. Main Setup Screen h. Use the DOWN arrow key to select the ZONES setting and press ENTER. There is a Setup Menu for each zone specified by the NUM ZONES INSTALLED setting set previously. Figure 18. Zone #1 Setup Screens 3015-5547 Rev 4 11

i. Use the LEFT and RIGHT arrow keys to scroll through all Zone Setup Screens. j. Select and change the zone settings as required or as recorded earlier in the table on page 2. The zone settings are: LOCATION LOG INTERVAL REFRIGERANT LEAK LEVEL DISTANCE (length of tubing) SPILL LEVEL TEMP AT ZONE EVAC LEVEL. k. When all changes are complete, press ESC to return to the Main Setup Screen. l. Press ESC to return to the Main Run Screen. m. After configuring all parameters, press the CPU reset button on the bottom edge at the center of the main circuit board (refer to Figure 19). The monitor will restart and enter the warm-up state. CPU Reset Button Figure 19. Location of CPU Reset Button n. Confirm that there are no faults indicated, and reconnect the 12-position screw terminal. o. Close the front panel and reinstall the panel screws. Headquarters: 621 Hunt Valley Circle, New Kensington, PA 15068-7074 Toll Free: 1-800-736-4666 Tel: +1-724-334-5000 Fax: +1-724-334-5001 Website: www.mybacharach.com E-mail: help@mybacharach.com Printed in U.S.A. Registered Trademark of Bacharach Inc. 12 3015-5547 Rev 4