Asian Development Bank s Country Partnership Strategy with the Philippines Session: Infrastructure and Urbanization Improvement for Inclusive Development of Philippines: From Build Build Build to Link Link Link F. Kawawaki Deputy Director General, Southeast Asia Department 2 Content ADB-Philippines Country Partnership Strategy and Country Operations Business Plan Opportunities for Japanese Businesses ADB Sovereign Loan s ADB Transaction Advisory Mandates
ADB-Philippines Country Partnership Strategy, 2018-2023 3 Pillar 1: Accelerating Infrastructure and Long-Term Investments Pillar 2: Promoting Local Economic Development Pillar 3: Investing in People 3 Accelerating Infrastructure and Long-Term Investments 4 Infrastructure Policy and Finance Public infrastructure policy and planning Capital market reforms Introduce Green finance solutions Capacity Development Strengthen GoP capacity to prepare, implement, and monitor infrastructure investments Promote PPPs Foster competition in the domestic market ADB-financed Infrastructure Investments Livable cities initiative water, sewerage, drainage, solid waste management Physical connectivity investments (bridges, expressways, walkways, rail) Water resource management,
5 Lending Pipeline by Sector ADB Approvals 2011-2017 Total $5 billion or $800 million annually ANR, 4.5% EDU, 7.5% ENE, 0.0% FIN, 12.5% WUS, 7.6% WUS, 4.6% TRA, 2.2% PSM, 53.8% ADB Program 2018-2021 Total of $7.7 billion or $1.9 billion annually Top sectors: 1. PSM, 54% 2. Education, 15% 3. Finance, 12% ANR, 2.0% EDU, 15.4% ENE, 6.0% FIN, 12.0% TRA, HEA, 4.0% Top sectors: 1. Transport, 47% 2. PSM, 21% 3. Finance, 13% PSM, 20.5% 47.4% 6 Clark 35km Malolos Transport s in Metro Manila Malolos Clark Railway EDSA Greenways Metro Manila Bridges Tutuban MRT Line 4 Ortigas to Rizal Bataan Cavite Bridge 6 North South Commuter Rail South Line, Tutuban to Los Baños Laguna Lakeshore Road Transport Los Baños 20km
7 Mindanao s, 2018-2021 $ $500 1.15 million billion lending million pipeline Mindanao s Improving Growth Corridors in Mindanao Roads Sector (loan signed 2018) - $300 million South Central Mindanao Regional Development (2019) - $50 million Integrated Flood Risk Management Sector (2020) - Livable Cities Initiative Investment (2020) - $100 Mindanao Irrigation Investment (2021) - $100 million Mindanao Agro-Business Development (2021 standby) - $100 million Opportunities for Japanese Business For ADB Sovereign Loan s 8 High Quality Infrastructure/ High Level Technologies (i) Challenging Constructions (ii) High Technology Equipment/Systems (iii) Management
(i) Challenging Constructions Long Span Bridges 9 Image of Bataan-Cavite Bridge 10 (i) Challenging Constructions Long Tunnels Image of North Eastern Luzon Expressway
(ii) High technology equipment/systems Rolling Stocks/Electrical and Mechanical System 11 Copyright is not cleared (iii) Management Management/Construction Supervision Consulting Services 12
Office of Public Private Partnerships Transaction Advisory Mandates In tender 13 Name Brief Description Implementation status Opportunities New Clark City Water and Wastewater Selection of joint venture partner for design, implementation, operation and maintain of water and wastewater utility infrastructure and equipment for the New Clark City Tender complete; winning bidder identified Potential future opportunity to support water utility as the city expands New Clark City Power Distribution Design-Build-Finance-Operate- Maintain-Transfer (DBFOMT). The Joint-Venture bidding process will be to partner with BCDA to build and operate the power utility and possibly design an embedded power generation for future phases in New Clark City. Tender on-going, pre-qualification is closed Limited due to closed qualification. Sub-contracting and equipment supply. PNOC LNG Terminal consists of the design, financing, construction, and operation of an LNG terminal in the Batangas Bay. to be implemented as a JV. Pre-qualification on-going. LNG supply EPC contract Potential Upcoming PPP Opportunities 14 Name Brief Description Implementation status Cebu Waste Management Supporting the Cebu City Local Government Unit in the procurement of a solid waste management contracts, for collection and waste treatment facility. Pre-feasibility stage Opportunities BOT contract, Equipment supply New Clark City Philippine National Railway Commuter Line Selection of joint venture partner for design, implementation, operation and maintenance of infrastructure packages for the New Clark City, including ICT, power generation, bus rapid transit, etc. ADB and JICA are developing a commuter line from Clark through Manila to Los Baños, under the government s Build Build Build program. DoT is requesting ADB s support to bring an O&M operator for the project after it is built definition stage Detailed design / project preparation. O&M tender expected in 2019 BOT contract, Equipment supply Commuter rail operator and maintenance
Thank you.