Greater Mekong Railway Association (GMRA) An Update

Similar documents
Draft GMS Health Cooperation Strategy Validating the Strategic Framework. December 13, 2017.

Power Trade in Greater Mekong Sub-region

ADB in Regional Integration: The Case of the Greater Mekong Subregion

Existing Initiative and its Challenges

The Implementation of National Single Window and ASEAN Single Window in Viet Nam

Update of the ASEAN Single Window

Consultation Workshop Twinning Partnership on Environmental Impact Assessment (EIA)

ASIAN DEVELOPMENT BANK

Integrating Climate Change and Sustainable Development in Development Planning and Budgeting

Master Plan on ASEAN Connectivity 2025: A Blueprint for a Stronger ASEAN

ASEAN MRA: The Philippine Compliance

Connecting the Connectivities Symposium 11 June Thailand

Memorandum of Understanding

Pilot Program for Climate Resilience in Tajikistan. Coordination Mechanism

CDIA Strategies for Sustaining and Up-scaling Interventions in Viet Nam

13543/17 PhL/at 1 DG G 3 B

Background Document for Agenda Item 3: Briefing from the Secretariat on launch of the Green Coalition on the Belt and Road Initiative

GUIDING PRINCIPLES I. BACKGROUND. 1 P a g e

Resolution adopted by the General Assembly. [on the report of the Second Committee (A/56/561/Add.2)]

Post Disaster Needs Assessment Guide and

Transport Trunk Corridor and Feeder Network Model Developing a Master Plan

ASEAN REGIONAL COOPERATION ON DISASTER MANAGEMENT

TERMS OF REFERENCE. Scaling-up Renewable Energy Program (SREP) Joint Mission. Lesotho

THE MADRID PROTOCOL. A single trademark registration supports regional economic integration. A Case Study

South Asia Subregional Economic Cooperation.

ADB s Energy Program in Myanmar

Expert Meeting on CYBERLAWS AND REGULATIONS FOR ENHANCING E-COMMERCE: INCLUDING CASE STUDIES AND LESSONS LEARNED March 2015

Brief Introduction of. Construction of China. October, 2014

GLOBAL HEALTH SECURITY AGENDA DETECT 1: NATIONAL LABORATORY SYSTEM ACTION PACKAGE UPDATE

China ITS Standardization

Economic Corridor Development for Connectivity ADB Experience

ASEAN COOPERATION ON DISASTER MANAGEMENT. Disaster Management & Humanitarian Assistance Division, ASEAN Secretariat

World Telecommunication Development Conference (WTDC- 14) Dubai, 30 March 10 April 2014

EA-01/01 List of EA Publications

EASTERN AFRICA POWER POOL EAPP Presentation to Afsec, Standardization needs for Integration of Power Pools of Africa August, 2010, South Africa By Jas

Asian Disaster Preparedness Center

8 th APEC Transportation Ministerial Meeting Tokyo, Japan SEPTEMBER 5, 2013 Ministerial Joint Statement

Governance Structure and Terms of Reference for Climate Technology Centre and its Network

REG: Greater Mekong Subregion. Summary of Proceedings: 17 th Meeting of the GMS Regional Power Trade Coordination Committee (RPTCC-17) December 2014

DOWNTOWN TUNNEL / MIDTOWN TUNNEL / MLK EXTENSION PROJECT PROCUREMENT PROCESS

What's New in CTPAT. Logo and Abbreviation Current Membership Trusted Trader Best Practices Minimum Security Criteria Outreach/Training

An Energy Community for the Future Key Findings of the Report of the High Level Reflection Group. Barbora Jaksova, Energy Community Secretariat

Item 4.4 Identification, isolation and elimination of major bottlenecks along international transport routes

ASEAN Perspective of Disaster Reduction Hyperbase (DRH)

Session 3:Funding and Financing of Air Cargo Infrastructure and Mobile Equipment. June 27, 2017

List of EA Publications. And International. Documents

Promoting accountability and transparency of multistakeholder partnerships for the implementation of the 2030 Agenda

Action Plan developed by Ordre des Comptables Professionnels Agréés d Haïti (OCPAH) BACKGROUND NOTE ON ACTION PLANS

DAPhNE Danube Ports Network Motivation & Project Status Q4 / 2018

Forum. Ningbo, China 25 February

FP7 Information & Communication Technologies. Rules of the Programme

Enhancing synergies towards climate action and sustainable development on the ground

Resolution adopted by the General Assembly. [on the report of the Second Committee (A/64/417)]

Current status and next steps. Haileyesus Getahun Coordinator IACG Secretariat World Health Organization

Office of Indian Energy Policy and Programs

Eng. Desire Nzayanga, Power Program Officer Nile Basin Initiative/NELSAP. 11 th EAPIC, Dar es Salaam, TANZANIA

Bridging Standardization Gap BDT Sylvester Cadette

How we do ehealth in NHS Scotland

ASEAN Connectivity and Infrastructure Financing Challenges

(Islamabad, March 2015) MEDIUM TERM VISION FOR ENERGY CONNECTIVITY IN THE SAARC REGION

The Africa-EU Energy Partnership (AEEP) The Role of Civil Society and the Private Sector. 12 February, Brussels. Hein Winnubst

Diana Korka Economic Affairs Officer, ICT Policy Section UNCTAD

EIM s comments on Best practices and challenges of cross border infrastructure management

Mekong River Commission

Globally Networked Customs Context, Concept, Rationale and Benefits - Indian Customs Perspective

CABINET PLANNING SYSTEM PROCUREMENT

ISO Energy Management System Standard

Organization/Office: Secretariat of the United Nations System Chief Executives Board for Coordination (CEB)

e-updates March September 2015 Volume 9, Issue Number 1 1

CONFERENCE OF EUROPEAN STATISTICIANS ACTIVITIES ON CLIMATE CHANGE-RELATED STATISTICS

Terms of Reference (ToR) for ICAT support to MRV in the Energy Sector in Kenya

Regional Seminar on Safe, Climate Adaptive and Disaster Resilient Transport for Sustainable Development 17 November 2015, Kathmandu, Nepal

List of EA Publications. Documents

4th Annual Modern Railways Nusa Dua Bali August Attracting Private Sector Involvement in Mega Rail Infrastructure Projects

THE WHITE HOUSE. Office of the Press Secretary. For Immediate Release September 23, 2014 EXECUTIVE ORDER

Global Infrastructure Connectivity Alliance Initiative

Funded by. Promotion of higher efficient equipment in ASEAN

Plan of action for Implementation of the Sendai Framework for Disaster Risk Reduction in Central Asia and South Caucasus Region

Proposed Regional ehealth Strategy ( )

Power Sector Development in Lao PDR

5G Forum: Status Quo. HAN Youngnam Chair, 5G Forum Executive Committee Professor, DoEE, KAIST Rome

GLOBAL COMPACT NETWORK RUSSIA. June, 2014

APEC Sectoral Ministerial Meetings 1997

JOINT MEDIA STATEMENT

Strengthen the Interconnection Cooperation, Promote ICT Development in ASP

GSEP Sectoral Working Groups (Power WG, Steel WG, Cement WG) Ministry Economy,Trade, and Industry

Governing Body 313th Session, Geneva, March 2012

ICAO Business Plan and the MRTD Programme

Certification Commission for Healthcare Information Technology. CCHIT A Catalyst for EHR Adoption

Innovation Beyond Boundaries GE in China title will go here

Enhancing Rural Disaster Resilience Through Effective Infrastructure Development

Symposium on Trustmark Guidelines in CBPR System

Disaster risk reduction in a changing climate

CONCLUSIONS OF THE WESTERN BALKANS DIGITAL SUMMIT APRIL, SKOPJE

Updates on ASEAN Cooperation on Disaster Management

TASK FORCE ON SERVICES STATISTICS

PROJECT FINAL REPORT. Tel: Fax:

Presented by AI Yuxin, Programme Officer, CSAM

Background Note on Possible arrangements for a Technology Facilitation Mechanism and other science, technology and innovation issues

WHO Secretariat Dr Oleg Chestnov Assistant Director-General Noncommunicable Diseases and Mental Health

Transcription:

Greater Mekong Railway Association (GMRA) An Update

Background of the GMRA ADB Technical Assistance: Connecting Greater Mekong Subregional Railways: A Strategic Framework (2010) Planning the GMS Railway Coordination Office (2013) 2 2

GMRA Mission To increase railway connectivity throughout the GMS in order to promote efficient, safe, and environmentally sustainable rail transport of goods and people with and beyond the subregion. 3 3

Key Agreements 4 Proposal to establish GMRA was ratified at the 18th GMS Ministerial Meeting, Nanning, PRC 12-13 December 2012. GMRA membership to comprise the 6 GMS countries as the founding members. GMRA to be established as a non-legal intergovernmental forum under the GMS Program. ADB to initially serve as Secretariat. 4

Goals and Priority Actions Ensure that all GMS countries are connected to a GMS rail network by 2020. Promote the development of a seamless GMS rail network by: Agreeing on technical standards of interoperability Streamlining and harmonizing procedures for cross border movement of goods and people. 5 5

Goals and Priority Actions Develop the institutions and procedures to effectively integrate the national railways across the GMS. Ensure that railways, rolling stock and equipment are modern and sufficient to meet the demand for rail services. Involve the private sector, as required, in the planning and development of the GMS railway network. 6 6

GMRA Event Highlights Memorandum of Understanding (MoU) MoU has been signed by all member countries Board of Directors have been nominated by each member country 7 7

GMRA Related Technical Assistance (TAs) TA 8529 Support for the Establishment of the Greater Mekong Railway Association (April 2014 June 2016) TA 9123 Connecting the Railways of the Greater Mekong Subregion (On-going) TA 8748 Support for Implementing the Action Plan for Transport and Trade Facilitation in the Greater Mekong Subregion Subproject 2 (On-going) 8 8

TA 8529 Support for the Establishment of the Greater Mekong Railway Association (April 2014 June 2016) Provide secretariat and capacity building support to the newly signed GMRA 2 year funding from the ADB amounting to US $225,000 MOU states that countries should decide on organizational structure of the GMRA as well as it s funding for continued operations after 2 years 9 9

TA Accomplishment Agreed on Priority Missing Links Link 5: LAO PRC Boten/Mohan Link 9: VIE PRC Hekou/Lao Cai Link 4: MYA PRC Muse/Ruili Link 3: MYA THA Dawei/ Banpunamron Link 1: CAM THA Poipet/Border Bridge/ Aranyaprathet 10 Link 6: LAO VIE Thakhek/Mu Gia/ Vung Ang Link 7: THA LAO VIE Chongmek/ Vangtau Lao Bao Link 8: LAO CAM Dong Kralor/ Voun Kam Link 2: CAM VIE Snoul/ Loc Ninh 10

11 Group 1. Network Connectivity Country Leads: Cambodia and Viet Nam 2. Network Integration and Inter operability Country Leads: Lao PDR and Thailand 3. Partnerships and GMRA Operation Country Leads: PRC and Myanmar TA Accomplishment Working Groups Objectives (ToR) Develop plan for completing missing links (ADB has proposed TA to look at pre feasibility/feasibility studies including costs and timelines) Develop investment requirements and identify financing options Develop marketing program to sell to potential financiers Define reporting requirements and data to be collected Develop agreements/ recommendations o Intergovernmental o Bilateral/Technical to define Equipment and infrastructure specifications and standards Safety standards Modifications to customs, immigration and quarantine (CIQ) systems to ensure enhance connectivity Institutions ticketing and freight billing Train inter operability Identify various membership options, including outside GMS member countries Develop approach & methods for attracting private participation/funding in the GMRA, to include best practices of UIC and OSJD Identify GMRA operational requirements and funding options, especially 11 post ADB support (ending 2016)

TA Events Two General Meetings March 2015 (Kunming, PRC) September 2016 (Beijing, PRC) Technical Working Group Meetings 12 Oct 2014 (CAM) - Mar 2016 (CAM) Nov 2014 (THA) - Sept 206 (PRC) Jan 2015 (THA) Mar 2015 (PRC) Jun 2015 (LAO) Sept 2015 (VIE) Dec 2015 (MYA) Jun 2016 (THA) 12

TA 9123 REGIONAL: Connecting the Railways of the Greater Mekong Subregion (On-going) 13 To support the GMRA mission to ensure that all GMS countries are connected to a GMS rail network. Promote rail as an attractive and viable mode of transport. Assess network impacts of rail connections TA amount US$ 500,000 13

Status Working for the outputs including: Update studies prepared for the nine rail priority links Develop criteria to assess and prioritize the financing options for the viable rail links Identify potential financing modalities for the viable rail links Conceive network impact scenarios for alternate regional rail development 14 14

TA 8748 Support for Implementing the Action Plan for Transport and Trade Facilitation in the Greater Mekong Subregion Subproject 2 (On-going) Requested for TA support to look into the formulation of a high level cross border agreement in the GMS rail sector The agreement will provide a high level strategic context, supplemented by a series of existing or new bilateral agreements, as required. 15 15

Status Inception meeting last May 2017 to discuss what the countries would like to see in the High Level Cross Border Rail Agreement Draft sent to all member country representatives for their review last 4 July Follow-up meeting held just this week, 17-18 July to discuss the thoroughly the draft high level document 16 16

17 Issues Investment required to develop a connected railway network could cost as much as $40B Need to ensure that the both national networks and regional connections are upgraded and operating efficiently With the current TAs, Working Group 3 on GMRA Operations and Membership is currently not being funded. secretariat operations structure of the organization conditions for participation by other organizations and private companies 17

THANK YOU 17 18