Commissioning Mission Critical Facilities

Similar documents
INT 492 : Selected Topic in IT II (Data Center System Design) 3(3-0-6)

Retro-Commissioning of Data Centers

Certified Commissioning Technician (CxT) Application

Critical Facilities Existing Building Commissioning (EBCx)

Datacenter Cooling Market Map 2016

HPE Energy Efficiency Certification Service

Energy Performance Contracting

Installation Service. 1.0 Executive Summary. Factory Trained Technician Train Customer Support Staff On Basic Operation Of The Equipment

Engineered Energy Solutions An Overview. Controls, Automation and Energy Conservation

A Practical Guide to Avoiding Disasters in Mission-Critical Facilities. What is a Disaster? Associated Business Issues.

Avoid Failures and Delays on Data Center Capital Projects

Case Study: Two New High-Rise Buildings ABN AMRO Plaza, Chicago, IL

An Operational Cyber Security Perspective on Emerging Challenges. Michael Misumi CIO Johns Hopkins University Applied Physics Lab (JHU/APL)

Adaptive Frequency Drive Superior Chiller Performance

T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management

Service, Maintenance, Support

COMMISSIONING YOUR DATA CENTER FOR GREATER AVAILABILITY, SAFETY AND EFFICIENCY WHILE REDUCING COSTS THROUGHOUT THE LIFECYCLE

UESCs and VA s Performance Contracting Program Lara Spader Department of Veterans Affairs August 17, 2017

Commissioning In Healthcare

MEIengineering, inc. mechanical electrical industrial consultants South Main Street, Harrisonburg, VA (540)

HVAC&R Technical Requirements for The Commissioning Process. Charles E Dorgan, PE, PhD, CxAP Professor Emeritus University of Wisconsin - Madison

Federal Government. Each fiscal year the Federal Government is challenged CATEGORY MANAGEMENT IN THE WHAT IS CATEGORY MANAGEMENT?

Existing Building Commissioning Guidelines (ASHRAE Guidelines 0.2 & 1.2) Mark F. Miller, PE, CCP Principal - Strategic Building Solutions, LLC

DR and EE Standards for SCE Buildings

Trane mytest Water-cooled Chiller Performance Validation What you spec is what you get *

Must possess Universal EPA Section 608 certification; OR Type I AND Type II EPA Section 608 certification.

Cooling Contingency Planning. Planni ng for the U nexpected. Is Your Health Care Facility Prepared?

: Course CDFOM : Certified Data Centre Facilities Operations Manager

Silicon Valley Power Data Center Program Rebate Application

Engineering and Design Services Mechanical HVAC Plumbing Electrical Chemical/Process Structural Instrumentation

ASHRAE. Shaping Tomorrow s Built Environment Today

Campus IT Modernization OPERATIONAL CONTINUITY FLEXIBLE TECHNOLOGY MODERNIZED SYSTEMS

Nominee: Prefabricated, Pre Assembled Data Centre Modules by Schneider Electric

ASSURING BUSINESS CONTINUITY THROUGH CONTROLLED DATA CENTER

EUROPEAN DATA CENTRE STANDARDS

Precision Controls of Indianapolis

Calculating Total Power Requirements for Data Centers

Interested in conducting your own webinar?

Energy Efficiency as Competitive Advantage. Houston, TX September 14, 2010

Server room guide helps energy managers reduce server consumption

Interfacing with Packaged Equipment

Foundation. Become a ITIL Foundation Certified Professional from our exclusive 2 full day. conducted by authorized faculties from APMG.

COMMERCIAL AIR CONDITIONERS Flooded Type Water Cooled Screw Chiller 2012

2.4 The inspection and certification orders are processed in the order in which the documents and/or information are received.

ANSI/AHRI Standard (Formerly ARI Standard ) 2002 Standard for Air-Conditioning and Refrigerating Equipment Nameplate Voltages

1.0 Executive Summary. 2.0 Available Features & Benefits

Why This Major Automaker Decided BlackBerry Cybersecurity Consulting was the Right Road to Protecting its Connected Cars

Energy Solutions for Buildings

7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016

ACCREDITATION COMMISSION FOR CONFORMITY ASSESSMENT BODIES

FACILITY SERVICES UILDINBUILDG

Presentation. Guaranteed Energy Savings Performance Project

Energy Assurance Plans

BROCHURE. Coromatic Operations We manage the operation of your mission critical sites

OUR HISTORY OUR MISSION. We believe that good service is based on good communications

Firewalls (IDS and IPS) MIS 5214 Week 6

Technical Conference on Critical Infrastructure Protection Supply Chain Risk Management

Chiller Replacement and System Strategy. Colin Berry Account Manager

Install Motor Controller User Manual

Modeling and Simulation (An Introduction)

Maximising Energy Efficiency and Validating Decisions with Romonet s Analytics Platform. About Global Switch. Global Switch Sydney East

THE ADVANTAGE MISSION CRITICAL JOKAKE CONSTRUCTION. INSPIRE. BUILD. PARTNER. INSPIRE. BUILD. PARTNER.

Continuous Commissioning at Sandia National Laboratories

Data ownership within governance: getting it right

Driving Proactive Facility Operations with Automated HVAC Diagnostics

Remote Monitoring. for Building HVAC Systems. A unique combination of human expertise and technology helps ensure optimum operation.

BROCHURE. Coromatic Maintenance We provide 24/7/365 maintenance of your mission critical sites

IXcellerate Moscow One Datacentre - Phase 1 & 2 Overview

NHS Gloucestershire Clinical Commissioning Group. Business Continuity Strategy

nspire n ELECTROMECHANICAL WORKS LLC

Defence services. Independent systems and technology advice that delivers real value. Systems and Engineering Technology

Executive summary. by Michel Bonnet, Maximilien Laforge, and Jean-Baptiste Samuel

Future of Cooling High Density Equipment. Steve Madara Vice President and General Manager Liebert Precision Cooling Business Emerson Network Power

Data Center Site Infrastructure Tier Standard: Topology

Maintenance Qualification: Improving Compliance and Performance in Pharmaceutical Manufacturing

Predictive Maintenance in a Mission Critical Environment

Data Centers & Technology:

The Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft

Indirect Adiabatic and Evaporative Data Center Cooling

where we are, where we could be, how we can get there. 12/14/2011

Avoid a DCIM Procurement Disaster

Railroad Infrastructure Security

CUSTOMER. Data Center Functional Testing [location] Data Center. Prepared by: Leading Edge Design Group. Prepared For: [CUSTOMER] [address] [address]

EXCEEDING EXPECTATIONS

Instructions for Participating in ASHRAE s. Commissioning Process Management Professional (CPMP) Certification Program

STRATEGY ATIONAL. National Strategy. for Critical Infrastructure. Government

LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST

CENTRAL PLANT OPTIMIZATION. The heart of building efficiency

Why would you want to use outdoor air for data center cooling?

healthy built environment HBE provides services and products to ensure a healthy built environment

This will allow candidates for whom travelling to a Prometric Test Center is not convenient or possible an opportunity to pursue EDGE certification.

Energy Action Plan 2015

Constru January 15, 2013

DELL EMC POST STANDARD SUPPORT

DOE EM Web Refresh Project and LLNL Building 280

Hurricane and Storm Commercial Damage Assessment

Energy Integration Program Submarine Base New London, CT

NEXT GENERATION Data Centres FOR NEW GENERATION. Technology

EPRO. Electric Infrastructure Protection Initiative EPRO BLACK SKY SYSTEMS ENGINEERING PROCESS

ONTARIO BUILDING CODE BREAKFAST. Cracking The Code - Establishing A Winning Strategy For SB-10 Compliance April 29, 2014

Transcription:

Commissioning Mission Critical Facilities HH Angus and Associates Limited Consulting Engineers 1127 Leslie Street Toronto, ON M3C 2J6 416 443 8200 info@hhangus.com www.hhangus.com

Commissioning Mission Critical Facilities Commissioning is a process that involves the inspection, testing and performance verification of operational components such as instruments, equipment, sub-systems and systems to ensure that they are safe, reliable and are performing as required at the set design conditions. There are industry standards for conducting commissioning activities on facilities. An example of some of the reference entities for commissioning methodologies for buildings and facilities are: 1) ASHRAE - American Society of Heating and Air-Conditioning Engineers 2) BCxA - Building Commissioning Association 3) NETA - National Electrical Testing Association 4) Green Building Councils (US or Canada) - Particularly in LEED certified buildings 5) The Uptime Institute - Particularly relevant in Tier-certified Data Centers.

Mission Critical Facilities These are facilities that are critical in nature to the extent where the failure of part or the complete facility will cause disruption to the business or government operation, or cause danger to the public. Examples are: 1) Telecommunication Facilities 2) Data Centers 3) Transit Facilities 4) Traffic Control Centers 5) Laboratories 6) Defense and Military Facilities Commissioning Approach for Mission Critical Facilities In comparison with the average residential/commercial building commissioning practice, the main objective of commissioning mission critical facilities is to ensure continuous uptime year-long or in other words, 24x7 operation of the facility without unplanned interruption at a specified efficiency. The three most critical systems in a mission critical facility that are typically commissioned thoroughly are: 1) Power Systems (Generators, UPS, etc.) 2) Cooling Systems (Chillers, Pumps, AHUs, etc.) 3) Security Systems (Fire Protection, Controls, etc.)

So what is different in Mission Critical facilities? Commissioning mission critical facilities involves: 1) Higher witness rates 2) Multiple number of tests and iterations (every possible scenario is usually considered) 3) Higher level of complexity 4) Testing multiple operation, failure and maintenance scenarios Overview of Commissioning Levels Level 1 Review and Factory Witness Tests Level 2 Pre-Functional Testing Level 3 Functional Testing Level 4 Individual System Test (IST) Level 5 Integrated Systems Operational Test (ISOT) Level 6 End of Warranty Commissioning (W/CX)

Level 1 Review and Factory Witness Tests 1) Review of Pre-Design documents such as Owner Project Requirements (OPRs) which should dictate the Basis of Design (BOD). 2) Review of design documents such as drawings and specifications to ensure that they are reflective of the OPRs. Ensuring that commissioning is taken into consideration in the contract documents and the design is capable of being fully commissioned. 3) FWT and FAT (Factory Witness Test and Factory Acceptance Test). It has to be clear if factory testing will be on a sample or all components. Factory testing is an integral part to avoid project delays and contractual risks after equipment delivery to site. Some of the lessons learned from factory testing: 1. Level set expectations 2. Ensure proper test equipment is available in the factory 3. Avoid partial equipment tests 4. Don t be too quick to release equipment with minor deficiencies 5. Don t be afraid to walk away if equipment is not ready 6. Record deficiency list at the factory Level 2 Pre-Functional Testing Occurs after equipment and components are connected and contractors have completed major works to the extent that components and systems are ready for functional and operational testing. Testing procedures, forms and start-up report templates are reviewed in preparation for functional testing. It is important to ensure that relevant forms are used. Having the right forms in place is critical to the commissioning process. These forms should be checked for accuracy and relevance to the specific system being commissioned. Unfortunately, many times they are simply filed in the project binder and the commissioning moves on. A component/system pre-functional checklist is an integral part of this phase which confirms that availability and readiness of the component or system for functional commissioning.

Level 3 Functional Testing The intent is to test the sub-systems before they are put together in the overall system. Test all elements of equipment capabilities. Ensure systems and equipment are operating per design requirements; for example, testing a chilled water pump before it is integrated in the chilled water system with chillers and cooling towers. Level 3 testing is similar to Factory Witness Tests (FWT) previously done at Level 1. The expectation is that test results will be similar. So why repeat them? The answer is that many things could happen between shipping the equipment from the factory and the time it arrives on site. Physical damage is one possibility. Another is damage to internal components from vibration during transportation. Level 4 Individual System Test (IST) This level of testing should not be confused with the Integrated Systems Operation Test (ISOT). At this level, the purpose is to confirm that components that performed to specification at Level 3 in isolation continue to perform as specified when combined with other components as part of the overall system. The IST process attempts to look at ALL the iterations of maintenance and failure that the facility may experience. The opportunity is incredible for the operations group at this Level to get their hands on the equipment and see all the alternative modes of operations of a facility that they may not get to do until an emergency scenario. Level 5 Integrated Systems Operational Test (ISOT) At this level, the key operational tests conducted are the: 1) Pull the Plug test what happens with complete power loss 2) Black Start test starting the facility from complete failure While some owners believe that these tests are risky, such tests are critical to ensure that all stakeholders, especially the owners, are aware of how the system will behave under a real power cut in the future. The test will give insight into how long it takes to bring the system back into full operation, problems that might occur, bottle necks that might affect the restart of the system, etc. Importantly, this allows owners to evaluate and understand the costs and risks associated with a power loss. For example, consider the costs and risks associated with losing a data center running thousands of ATM machines.

Level 6 End of Warranty Commissioning In essence, this is the last opportunity for the owner to check the system for any defects and claim repairs under the manufacturers warranty. In addition to that, a review of set points, operating conditions and sequences is conducted to ensure that the facility is being operated as specified and the resulting outputs are as expected or guaranteed by the engineering/contractor/supplier teams. Closing Remarks Commissioning is a key activity in the design/construction of any facility. The level of detail in commissioning will vary depending on the criticality of the facility, client requirements, available funds to conduct commissioning, building codes and requirements, and other project-specific factors. Certainly, when commissioning a nuclear submarine, one would expect that every single component and system will be commissioned. But when 1,000 cars are produced from one production line, one would expect that a sample only is tested or commissioned. For critical facilities, a data center built to store data might be commissioned differently than a data center built to process the New York Exchange Stock market transactions. There are also other commissioning practices that are implemented in specific projects. One example is seasonal commissioning where equipment and systems are commissioned at different seasons to confirm operational performance (for example, summer vs. winter). All in all, it is important that owners, engineers, contractors, suppliers and other project stakeholders are aware of the importance of commissioning, plan for it at the early stages of a project, and ensure that commissioning is executed properly during the different stages of the project lifecycle. It is not an activity that ends with project completion; re-commissioning is common in many facilities aiming at continuously evaluating operational efficiency and that the operators are actually operating the facility as specified in the original design, and if not, understand why. ----------------------------------------------------------------------------------------------------------------------- Author: Mohammad Abusaa, B.Sc., Mech. Engineering, P.Eng., M.B.A., PMP, LEED Green Associate, ATS, ASDP, HH Angus & Associates Limited Content developed in cooperation with Craig Sievenpiper, P.Eng., LEED AP, Principal, and John de Sousa, P.Eng.,Principal, HH Angus and Associates Limited.