Residual Auction Revenue Rights Enhancement

Similar documents
Residual Auction Revenue Rights

Residual Auction Revenue Rights

Workshop on PJM ARR and FTR Market 2012/2013

Published: December 15, 2017 Revised: December 15, 2017

Published: December 15, 2016 Revised: December 15, 2016

Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission

Market Settlements Auction Revenue Rights & Financial Transmission Rights. March 2011 Henry Chu

Data Miner 2 Release Notes Release 18.09

I. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff)

Energy Imbalance Market Technical Workshop. BAA Real-Time Congestion Balancing Account August 12, 2013

Table of Contents. Preface. SECTION 1 Introduction 1. SECTION 3 Operating Reserve 65. SECTION 2 Energy Market 17

Guide 8. TCC Automated Market System User s Guide

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Southwest Power Pool Transmission Congestion Rights TCR System Market Participant User Manual. Version 3.4 Last Updated: February 2015

Midwest ISO Overview - ATC Customer Meeting. February 26, 2009

TCR RELEASE 3.1 Job Aid for Structured Testing

Southwest Power Pool Transmission Congestion Rights TCR System Market Participant User Manual. Version 2.0 Last Updated: November 2012

Bright Ideas: Member Feedback Process

Open Access Transmission Tariff of Southern Companies

MISO-PJM Cross-Border Planning. February 19, 2014 MISO-PJM JCM

Auction Calendar 2017/2018 for Capacity Allocation Mechanism Network Code

Network Integration Service

TECHNICAL SPECIFICATIONS FOR THE PROCESSING OF SEPA CREDIT TRANSFER ORDERS AND SEPA PAYMENT RETURN ORDERS

Appendix 6: Description of an example methodology and software for FTR grid design and determining FTR rentals

Revised Pilot Framework Guideline on Capacity Allocation Mechanisms E10-GWG December 2010

ARR Registration User Manual

Total Market Demand Wed Jul 26 Thu Jul 27 Fri Jul 28 Sat Jul 29 Sun Jul 30 Mon Jul 31 Tue Aug 01

Generation Interconnection Process. NEMSTF Education Session 1 January 19, 2012

FNM Expansion Training Webinar

Balancing Programme 1

Regulating and pricing network access

NEWFOUNDLAND AND LABRADOR BOARD OF COMMISSIONERS OF PUBLIC UTILITIES AN ORDER OF THE BOARD NO. P.U. 3(2018)

Market Participant User Guide ISO Reliability Requirements Application (IRR UI)

Frequently Asked Questions Real-Time Revenue Sufficiency Guarantee

Midwest ISO and PJM Joint Operating Agreement (JOA) Update. Joint Stakeholder Meeting November 14, 2008

Rocky Mountain Power Exhibit RMP (RTL-1) Docket No Witness: Rick T. Link BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH

Service Level Agreement (Broadband - Managed Services - Digital Voice - POTS)

DR Auction Setup in erpm. Capacity Market Operations March 2013

Public Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure

Designing Broadband Mobile Auctions Experiences from Pakistan

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting

Standard INT Dynamic Transfers

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

ICAP Automated Market User s Guide

Equipment Installment Plans for enterprise customers

All Baltic CCR TSOs amended proposal for the fallback procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 July

Western Area Power Administration (WAPA) Transmission System Network Upgrades Policy Document

Western Area Power Administration (WAPA) Transmission System Network Upgrades Policy Document

Auction Calendar 2016/2017 for Capacity Allocation Mechanism Network Code

_ Dear Secretary Bose: The attached. Folsom, CA

ORACLE UTILITIES OPOWER PROFESSIONAL SERVICES DESCRIPTIONS

20 December All TSOs of the Capacity Calculation Region Hansa, taking into account the following: Page 1 of 7

SEE CAO. User Documentation. User Guide for Capacity Traders

Business Practice. Non-Firm Transmission Service Request Processing

Standard INT Dynamic Transfers

The Auction Manager Owner s Manual. A quick guide to the tools and features available in BiddingforGood s Auction Manager.

REQUEST FOR PROPOSALS FOR INMATE TELEPHONE AND VIDEO VISITATION SYSTEM FOR THE COLUMBIA COUNTY JAIL. Questions from Vendors

MISO PJM Joint and Common Market Cross Border Transmission Planning

Oracle Managed Cloud Services for Software as a Service - Service Descriptions. February 2018

SPP Recommendation FERC Electronic Quarterly Report Data Dictionary Version 1.1

Procedures for cross-border transmission capacity assessments PROCEDURES FOR CROSS-BORDER TRANSMISSION CAPACITY ASSESSMENTS.

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Entergy Arkansas, Inc. Transition Plan Technical Conference #1

NETWORK INTEGRATION TRANSMISSION SERVICE. Preamble

Market Trials Review Group. May 2, 2012

Policy and regulatory framework: what are the next challenges to tackle?

Mountain West Transmission Group. WECC MIC Update October 17, 2017

802 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 19, NO. 2, MAY Role of Distribution Factors in Congestion Revenue Rights Applications

Strategic Reserve in Belgium Design and functioning

Standard INT Interchange Authority Distributes Arranged Interchange

Billing and Collection Agent Report For period ending January 31, To FCC Contract Oversight Sub-Committee. February 11, 2019

Wireless Services Allowance Procedure

VERIZON SELECT SERVICES INC. Page 1. SECTION 13 - EXHIBIT M - Network-Based IP VPN SERVICE

AT&T Dynamic Traffic Management Enterprise Attachment Last Revised 1/24/2018

AT&T OPERATING COMPANIES TARIFF NO. 1 Original Page 4-1 ADVANCED SERVICES

Midwest ISO Year in Review Accomplishments

SEE CCR TSOs Fallback Procedures in accordance with Article 44 of the Commission Regulation (EU) 2015/1222 of 24 Iuly 2015 establishing a guideline

DIGITAL SUBSCRIBER LINE (DSL) SERVICE GUIDE

GSD INTRADAY MRO OUTPUT FORMAT FOR ALL TYPES OF TRANSMISSION SYSTEMS - FILE 1018 March 13, 2012 TABLE OF CONTENTS

Business Practice Manual for Managing Full Network Model. Version 910

Uninstructed Deviation Penalty Charge Types 4470, and 4480

A TEXAS NODAL MARKET: FUNNY NAME, SERIOUS PROBLEM

FAMIS 2014 Reporting Industry Certifications 6/16/2014

2017 RTEP Assumptions for Western Sub-Region

Agreements and Queue Management

MSRS Roadmap. As of January 15, PJM 2019

Statement of Work IBM Support Services IBM Essential Care Service - Acquired from an IBM Business Partner -

CGM and Energy Data Architecture a TSO Perspective

Status and Next Steps NARUC Electricity Committee Hank Courtright, Senior VP July 15, 2014

BENCHMARKING PPP PROCUREMENT 2017 IN GABON

CIP Standards Development Overview

NOTICE OF AMENDMENT TO THE 2014 NACHA OPERATING RULES SUPPLEMENT #1-2014

October 30, Secretary. above. that. attached. Folsom, CA. 250 Outcropping Way

Energy Storage and Distributed Energy Resources (ESDER) Stakeholder Initiative. Revised Scope and Schedule

ATTACHMENT A Statement of Work

Western Area Power Administration Right of First Refusal Business Practice

Coordinate Interchange

Transcription:

Residual Auction Revenue Rights Enhancement Brian Chmielewski Sr. Analyst, Market Simulation Department Markets and Reliability Committee December 22, 2016

Solution Package Overview - Package A Proposed by Exelon and Direct Energy Can be supported by PJM Requires PJM to run another SFT proration with all negatively valued bids removed Can not be started until the monthly FTR auction is final Results will be posted upon completion of the final SFT Run May result in a delayed MSRS posting and settlement for residual ARRs only 2

Solution Package Components # Design Components Priority Status Quo A 1 Allocation of Network Residual ARR revenues Path level, shift with network load Status Quo 2 Inclusion of Stage 1B paths Currently all stage 1B prorated paths PJM to remove all paths with economic value of $0 or less 3 Timing of Residual ARR Markets Monthly Status Quo Monthly FTR Auction 24H Obligation prices Status Quo 4 Pricing methodology 5 Monthly Residual ARR clearing process SFT based on annual model SFT based on annual model run iteratively to exclude negative paths 6 Timing of posted results Before the first day of the effective month Upon completion of the final iteration of the SFT * * May result in delayed residual ARR posting and settlement 3

Draft OA Schedule 1 Language 7.9(f) The value of Residual Auction Revenue Rights awarded pursuant to this section, determined as specified in section 7.4.3(b) of Schedule 1 of this Agreement, shall be positive. Negatively valued Residual Auction Revenue Rights will not be awarded. 4

Draft M-06 Language 4.10 Prior to the effective month, PJM will remove all negatively valued Residual ARRs resulting from the corresponding Monthly FTR Auction and recalculate the Residual ARRs made available by the increased transmission capability for paths which were pro-rated in Stage 1 of the Annual ARR Allocation. PJM will allocate positively valued Residual ARRs only. 5

Appendix Residual ARR Educational Material

Overview Auction Revenue Rights (ARRs) prorated in Stage 1B of the annual ARR allocation maybe allocated residual ARRs on a monthly basis New upgrades and monthly re-serviced outages Residual ARR paths could receive negative values based on monthly FTR clearing prices Stakeholders are interested in exploring enhancements to reduce customer exposures to negatively priced residual ARRs 7

Residual ARR/FTR Relationship Residual ARRs could be positively or negatively valued based on the monthly FTR Auction clearing prices. This is the only relationship between the two markets. Incremental PJM System Capability Residual Monthly Allocation ARRs Allocated (MWs) Auction Revenue Rights Monthly FTR Auction FTRs Awarded To Bidders (MWs & Price) Auction Revenue 8

ARR Settlements Residual ARR target credits are netted daily with Annual ARR target credits within a portfolio Net negative portfolios are a liability to the holder Not reassigned if load shifts away from the LSE If sufficient FTR Auction revenues are collected for a day, ARR Credits equal ARR Targets for all ARR holders Remaining Auction Revenues from each day get included in the End-of-Month allocation of Congestion Credits to FTR Holders 9

ARR Settlements cont. It is possible PJM does not collect enough FTR Auction revenue to fulfill all ARR Targets for a day, although this has never happened Example: If Annual ARR Allocation did not model a Major Long Term Emergency outage that was included in Annual FTR (i.e. outage started after Annual ARR but before Annual FTR) If this were to happen, negative valued ARRs would be collected first to increase the proration to positive ARR Targets Unfulfilled ARR Targets would get uplifted at the end of the planning period as part of the existing uplift process 10

FTR Settlements Revenue collected to fund FTR Target credits: Day-ahead congestion revenue Balancing congestion revenue (subject to change) Market-to-market payments (subject to change) FTR Auction revenue surplus After all ARR Targets are fulfilled 11

FTR Auction Revenue Surplus FTR Auction revenue and surplus values should not significantly change with the removal of counter flow ARRs SFT will clear less prevailing flow MWs to offset the removal of counter flow MWs ARR portfolio values could be different for each member, although impact to total FTR Auction surplus bucket should be minimal Possible +/- change due to ARR paths not being equal and opposite 12

Impact Summary Potential Impacts: Prevailing Flow Residual ARRs Less will clear since counter flows are removed from the SFT ARR Portfolio values could change, although total for PJM should be minimal Less Possible Impacts: Full Funding of ARR Target credits ARR Target credits have always been 100% funded No Impacts: FTR Auction clearing prices Total PJM FTR funding 13

Feb 2016 Analysis Compared outages to annual model vs. February 2016 Smaller outage set allowed for increased transmission capability and ARRs Several zonal pnodes cleared less than the historical generator pnodes in that zone for the FEB 2016 FTR Auction (Sink Source) calculation for residual ARR resulted in a negative value All outages modeled and auction results are publically posted on PJM.com 14

Residual ARR Credits 15

Residual ARR Path Count 16

Cleared Residual ARR Path Count 17

Solution Package A Based on the current monthly FTR schedule, performing a second iteration of the monthly Residual ARR market will require significant administrative work in only a few days Adjusting the monthly FTR schedule will have multiple effects including: Base case set-up time for PJM Availability of FTR auction user data postings Credit timeline impacts and potential for locking credit longer than normal Potential member impacts PJM would prefer to give members option to include bid rather than zero out 18

PJM Solution Package Package B - Provide flexibility for ARR holders to remove bids prior to the simultaneous feasibility test (SFT) run each month Gives ARR holders option each month whether or not to include ARR bids for evaluation Does not require significant additional administrative work - Will not require adjusting FTR/ARR monthly market timelines 19

ARRs are allocated to Network & Firm Transmission Service Customers ARR Review ARRs entitle the holder to receive an allocation of FTR Auction revenues ARRs are reassigned on a proportional basis within a zone as load switches between LSEs within the planning period ARRs must be simultaneously feasible Residual ARRs may be available within a planning period for increased transmission capability 20

Residual ARR Overview - ARRs prorated in Stage 1B of the Annual Allocation may be allocated Residual ARRs for the following: Increased transmission capability made available by certain transmission upgrades made during the planning year that were not modeled in the Annual ARR Allocation Increased transmission capability made available for periods when Annual ARR modeled transmission outages are not out of service 21

Residual ARR Characteristics Residual ARR MWs plus previously awarded Stage 1 and Stage 2 MWs cannot exceed the Network Service Peak Load value for a particular participant Residual ARRs are effective the first month the increased transmission capability is modeled in the Monthly FTR Auction Economic value of Residual ARRs are based on the MW amount and the nodal clearing price difference between the source and sink nodes for the FTR Obligations resulting from each monthly FTR Auction the Residual ARR is effective 22

Clearing Residual ARR MWs - Market is created with prorated stage 1B requests from Annual Allocation All ARR requests from stage 1B that did not fully clear - Proration is done manually by operator until violated facilities are minimized as much as possible Constraint basis residual requests that impact violated constraints are prorated 23

Residual ARR Results Residual ARRs are valued based on the nodal clearing prices from the corresponding monthly FTR Auction Results are posted in eftr roughly same time as monthly FTR Auction Residual ARRs will shift with load within a zone Settlements calculates a daily rate billed weekly evenly throughout month 24

Monthly Vs. Annual Clearing Prices Market Residual MW Total Total Value (Annual)* Total Value (Monthly) 2014/2015 ARR 22,532.90 $ 4,894,781.83 $ 8,160,918.27 2015/2016 ARR 37,043.80 $ 8,138,975.75 $ 8,620,612.69 *Represents the total cleared Residual ARR MWs priced at the average 4-round annual clearing prices divided by 12. 25