TOTAL PROJECT LIST Michael D. McCaffery (Reverse Chronological Order)

Similar documents
REINHARD G. SEIDL, P.E.

REGIONAL OFFICE / MEDICAL / HOTEL SITE AVAILABLE IN GREELEY, CO

FINAL REPORT AUGUST 2013

David Brandenburger CA RE License # Matt Heacox CA RE License #

3000 PEGASUS PARK DRIVE DALLAS, TX PEGASUS PLACE

FOR SALE BANK OWNED OFFICE CENTRAL LAKELAND HISTORIC DISTRICT

Arroyo Center. Pleasanton, California. »» Going In Double Digit Levered Yields via Accretive Debt Financing

Department Total Worker Count by Location/Budget Unit Count of Worker Row Labels Total 1100D Board of Supervisors

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician.

Redmond Facilities Strategic Management Plan Overview

RFP Information Security/Cybersecurity Services Pre-proposal Conference

CONNECTING AND TRANSFORMING CALIFORNIA. Frank Vacca, Chief of Rail Operations UNLV Symposium October 17, 2018 Las Vegas, Nevada


Inland Real Estate Commercial Brokerage, Inc Butterfield Road, Oak Brook, IL CALL FOR OFFERS

Former Novartis Pharmaceutical Production Campus

Critical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded

ROCKSIDE WOODS BLVD. INDEPENDENCE, OHIO 44131

ARTS DISTRICT 2018 E. 8 TH STREET, LOS ANGELES, CA

GoNevadaCounty.com JUNE 2013 & FINAL REPORT

6500 Harry Hines Boulevard Dallas, TX 75235

Newmark Cornish & Carey. Download your free your appstore. barcode app from /17

SUMMIT TECHNOLOGY CAMPUS 777 NW BLUE PARKWAY I 850 NW CHIPMAN ROAD LEE S SUMMIT MO 64086

Santa Clara County. San Francisco City and County. Marin County. Napa County. Solano County. Contra Costa County. San Mateo County

Bay Area Information Sharing Report

100 SIMPLEX DRIVE WESTMINSTER, MA

Downtown Lakeland Office Space For Lease

Wet Lab Facilities in North Carolina - Greater Charlotte Region

FAIRFIELD COUNTY S PREMIER TECHNOLOGY CENTER River Bend 2

INVESTMENT SALE. Industrial Warehouse E 49th Dr Commerce City, CO CONTACT: TOM MYERS JAKE COOK

TECHNOLOGY & RESEARCH

±3 ACRES MIXED-USE ZONED LAND LOCATED ALONG INTERSTATE 580 VIRBEL LANE, RENO, NEVADA

Capital Planning & Financing

PUBLIC WORKS ORGANIZATIONAL CHART

PROSPECTUS ALTERATION PHILLIP BURTON FEDERAL BUILDING & U.S. COURTHOUSE SAN FRANCISCO, CA

Section Table of Permissible Uses

10.1 BIBLIOGRAPHY Noise and Vibration Study Yard and

BENTON COUNTY CODE BENTON COUNTY CODE TABLE OF CONTENTS - COMPLETE CHAPTER 3.04 BCC RESTRICTIONS ORD. 386, EFFECTIVE DOGS AND DANGEROUS DOGS

Silicon Valley Power:

GORE BUILDING. 238 N. Massachusetts Avenue, Lakeland, FL 33801

EMPIRE LAKES. CORPORATE CENTER 9500 Cleveland Avenue Rancho Cucamonga, CA UP TO +51,000 SF CONTIGOUS THOMAS P. PIERIK, SIOR

5-Building Campus situated on 120 Acres Technology Boulevard Angleton, Texas Total Rentable Square Feet: +/- 398,252

TURN-KEY AND BUILD-TO-SUIT WHOLESALE DATA CENTER SOLUTIONS

I-4 DISTRIBUTION WAREHOUSE

Class A Office Available For Lease

Scott Ekman BAY AREA OFFICE/CAMPUS PROJECTS

41965 ECORSE ROAD VAN BUREN TOWNSHIP, MICHIGAN

Creating, Completing, and Utilizing B3 Benchmarking

210,000 rsf Typical floorplate 67,549 rsf

SCHENDT ENGINEERING PRIOR EXPERIENCE

100 SIMPLEX DRIVE WESTMINSTER, MA

San Mateo Medical Center Campus CM At Risk Prebid Conference

The following changes or clarifications shall be made part of the Bid Documents and shall be taken into consideration when submitting bids.

R1 R2 R3 C/I RC/I AP LR SC/I RP SP RESIDENTIAL *Single-Family Dwelling,

Vantage 70 Frederick s Most Visible Location

Heavy Industrial / Corporate Office Campus

PROJECT DESCRIPTION. Solar RV/Boat Storage and Solar Self-Storage Pittsburg-Antioch Highway and Arcy Lane, Pittsburg, CA 8/30/2017

STEVEN T. TAYLOR, P.E. PRINCIPAL

METRO CENTER II COMMERCIAL SPACE 555 METRO PLACE NORTH DUBLIN, OH PROPERTY DESCRIPTION

California Cybersecurity Integration Center (Cal-CSIC)

Subdivision Application Form

INTERNAL RECRUITMENT: SYSTEMS ADMINISTRATOR APPLICATION DEADLINE: JANUARY 7, 5 PM

Repowering Downtown Austin

Earthquake Safety and Emergency Response Bond Program 2010 & 2014

Spruce Landing 19.4 Ac

SOUTHBRIDGE INNOVATION CENTER PROFILE

MEDIA RELEASE. For Immediate Release: Contact: David Ginsborg May 20, 2013 (408)

Facilities Strategic Planning. Community Centers Stakeholder Group October 16, 2017 Jeanne Justice

BUILDINGS AND FACILITIES

Platte County Courthouse Remodel Phase I Project

Operating Cast Stone and Precast Concrete Manufacturing Plant. 144 DISHMAN LANE Bowling Green, KY Perry Thessen, Realtor

BLUE RIBBON Facilities

STRATEGIC ADVISORY AND CAPITAL IMPROVEMENT OVERSIGHT

PACE Financing in Practice

LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST

SCOPE OF WORK. INVICTUS is supporting David Evans and Associates, Inc. in a FTA Indefinite Delivery/Indefinite Quantity (IDIQ),

a) Provision of a chilled water supply b) Provision of electric power supply and other fuels

OSCAR MAYER HEADQUARTERS NOW AVAILABLE FORMER HEAVY POWER 15 MW FROM TWO DIFFERENT SUBSTATIONS SECURITY ONSITE METRO BUS DEPOT ONSITE

Archway Portfolio South Bend, Indiana

Summary Information. Demographic Profile

BOARD OF SUPERVISORS APPOINTMENTS RE-ORGANIZATION FOR 2018 Adopted December 12, 2017

26 th Street North and Old Dominion Drive Master Planning Task Force

VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association

DATE: June 16, 2014 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

Coordinated Highways Action Response Team

Traverse City Asset Management Plan

Appendix F Notices

Custodian Test Study Guide San Francisco Airport READ ONLINE

Vanguard Modular Building Systems, LLC

7900 HARKINS ROAD Lanham, MD

1000 PARK DRIVE LAWRENCE, PA OFFICE BUILDING DATA CENTER LAND

MIKE NOVKOV LIC #

WAREHOUSE / DISTRIBUTION EXPERIENCE

FRONTCOUNTER USER GUIDE

98,000 sq. ft. Crescent Building For Sale. Sale Price: $5,500,000. Jim Koon, Managing Broker (208) or (208)

Welcome! Visioning Workshop. 24 March 2015

Environmental Impact Questionnaire

Capital Markets Group Canada

PROVIDENCE BUSINESS CENTER 53 ACRE FULLY ENTITLED INDUSTRIAL LAND DEVELOPMENT OPPORTUNITY FEATURING INDUSTRIAL, OFFICE & RETAIL

100 SIMPLEX DRIVE WESTMINSTER, MA

MCKAY BUILDING. 100 S. Kentucky Avenue, Lakeland, Fl 33801

Transcription:

City of Bend Community Development Department Toney Construction Co. City of Bend Engineering Inspector - Private Development Engineering Public Works Engineering Inspector for Private Development Construction (Phase 3 ADA Improvements) HCS West Consultant Research and selection of project information system software suite for local residential contractor Bend, OR 2.1 (est.) Bend, OR 0.1 Michael McCaffery Corwin Booth (C&C Investments) City of Redwood City HCS West (Previously Highlight Construction Services and Highlight Builders) Owner/Builder Developed four custom residences Bend, OR Davis, CA Nevada City, CA Group 211 Main Street; seismic retrofit and renovation of 17 story downtown San Francisco high-rise building Group New City Hall; 40,000 s.f. offices and council chambers (Performed as CM/GC) 2.8 San Francisco 27.2 City of Redwood City 15.1 Adaptec Group Building 7; 100,000 s.f. new office facility (shell and core) and associated sitework. Milpitas 7.9 Ultraclean Technology Group Renovation of existing spaces and creation of additional clean room space. Menlo Park 3.6 Hewlett Packard Group Building 45, Peppertree and Manzanita Cafes (300,000 s.f.) Cupertino 48.9 1 of 8 Updated 8/12/2015

City of Redwood City Group New Fire Station and Maintenance Facility (4000 s.f.) City of Redwood City 3.1 Stanford University DPR Construction Consultant to Stanford University in reorganization of their Facilities Project Management group Palo Alto 0.5 DPR Construction DPR Construction Champion for roll-out of web-based project management information systems and company wide scheduling software, plus miscellaneous marketing assignments. Better Building Systems, Inc. Highlight Construction Services Owner/Founder Developed and upgraded sales and marketing program for structural insulated panels systems for start-up company Redwood City, CA 0.3 Nevada City 0.3 Wells Fargo Bank Barnes Construction Northern California Data Center (80,000 s.f.) Roseville 7.5 Natomas Unified School District Barnes Construction Natomas High School; new 40 acre campus with nine wood frame and structural steel buildings. Sacramento 37.3 Stanford University Barnes Construction Green Library West; complete reconstruction and seismic bracing of existing main library Palo Alto 42.8 Luster Construction Management Luster Construction Management Highlight Construction Services Highlight Construction Services Owner/Founder Claim and schedule analysis for Kaiser Medical Center Owner/Founder Developed management information system for use by prime construction manager on Oakland main post office parking structure Vallejo 0.1 Oakland 0.1 2 of 8 Updated 8/12/2015

Dispatch center revisions at Sheriff's substation Truckee 0.3 Fleet maintenance and storage facility (5000 s.f.) Airpark Center terminal and office building (3000 s.f.) Municipal courthouse construction (13,000 s.f.) Nevada City 0.8 Grass Valley 0.9 Truckee 1.7 Airport improvements at Loma Rica airport Grass Valley 5.6 Truckee intermodal facility improvements (at Amtrak depot) Truckee 0.4 Nevada County Highlight Construction Services Owner/Founder Consultation on Truckee Intermodal Facility Truckee 0.1 Animal shelter (5000 s.f.) Grass Valley 1.5 Juvenile hall remodel Nevada City 0.5 American Baptist Homes of the West Group Continuing care retirement facility (263,000 s.f.) Los Gatos 52.7 3 of 8 Updated 8/12/2015

Packard Children's Hospital Monterey Bay Aquarium Group New children's hospital at Stanford Medical Ctr (274,000 s.f.) Group Research building and pier facility (27,000 s.f.) Research Institute Syntex Group Animal research, development, and laboratory facility (Building R-8; 85,000 s.f.) Kaiser Foundation Health Plan Group Regional resource center and automated material handling facility (317,000 s.f.) Palo Alto 85.3 Moss Landing 7.6 Palo Alto 38.9 Livermore 39.7 Kaiser Foundation Health Plan Group Medical office building (75,000 s.f. new; 47,000 s.f. remodel) Pleasanton 24.1 Clorox Group Data center and computer facility Pleasanton 13.5 Hewlett-Packard Group Office and light manufacturing facility (Building 54; 230,000 s.f.) Santa Clara 12.4 McCuen & Steele Group Central Library (440,000 s.f.) Sacramento 42.7 Chevron Group Office building at Chevron office park (Building "K"; 75,000 s.f.) Wells Fargo Group Remodel and alteration of seven story northern California operations center, including complete asbestos removal/containment (410,000 s.f.) San Ramon 16.8 San Francisco 25.7 4 of 8 Updated 8/12/2015

Hewlett-Packard Group Two story office and light assembly building (Building 15; 66,000 s.f.) Hewlett-Packard Group Advanced electronics research laboratory (Building 26, 255,000 s.f.) Hewlett-Packard Group Shipping/receiving module (loading dock) at existing Building 5 Hewlett-Packard Group Printed circuit facility (Building 2; 125,000 s.f.) SCCC Associates Group 14 story 500 room Doubletree Hotel and 5 story Techmart (300,000 s.f.) Joint venture with Huber, Hunt, and Nichols Clorox Company Group Technical center and research laboratory addition (126,000 s.f.) Interland Group Three story office building (77,000 s.f.) Palo Alto 13.9 Palo Alto 48.3 Roseville 2.7 Rohnert Park 30.1 Santa Clara 82.9 Pleasanton 28.3 Walnut Creek 9.7 Hewlett-Packard Group International sales office, computer facility, and cafeteria (Building 46; 204,000 s.f.) Hewlett-Packard Amdahl Corporation Electronic manufacturing and assembly building and full site development on new campus (Building 1; 250,000 s.f.) Cupertino 55.6 Rohnert Park 52.8 Amdahl Office Building 7 Santa Clara 14.8 5 of 8 Updated 8/12/2015

Intel Corporation Group Two story laboratory and office building Santa Clara 31.9 Mariani Financial Company The Cook Company Group Four projects for different tenants (VLSI, SEEQ, Sierra Electronics) in San Jose Industrial Business Park Group Two office and computer facilities (White Rock and Mayhew) San Jose 35.7 Sacramento, Rancho Cordova 23.9 Syntex Corporation Hewlett-Packard Animal research, development, and laboratory facility (Building R-7) Electronic manufacturing and assembly building (Building 5; 250,000 s.f.) Palo Alto 33.1 Roseville 34.9 Xerox Corporation Hewlett-Packard Three story 75,000 s.f. addition to Palo Alto Research Center, and 12,000 s.f. integrated circuit lab Electron beam installation and remodel and Hewlett Packard Laboratories (Building 25) Palo Alto 42.5 Palo Alto 3.9 Hewlett-Packard Hewlett-Packard Hewlett-Packard Executive area remodel in corporate headquarters building (Building 20; 17,000 s.f.) Electronic manufacturing and assembly building, and all new site development for the Roseville campus (Building 3; 155,000 s.f.) World corporate headquarters facility (Building 20; 480,000 s.f. on 31 acre site) Palo Alto 3.5 Roseville 37.4 Palo Alto 85.9 6 of 8 Updated 8/12/2015

Mary's Help Hospital (Seton Medical Center) El Camino Hospital Stanford University, Inc. Hewlett-Packard Project Engineer Hewlett-Packard, Inc. Marlin Cove Associates Preconstruction and construction services of additions and alterations to regional medical center (232,000 s.f.) Interior development of existing shelled space for laboratories and examination rooms (25,000 s.f.) Preconstruction, estimating, scheduling and value analysis on three projects: Seeley Mudd Chemistry Building, Green Main Library, and History Corner Remodel Electronic instrument assembly and test facility (Buildings 52 and 53; 210,000 s.f.) Research laboratory remodel, including clean rooms (Building 25) Commercial strip shopping center (sitework and most structures) Hewlett-Packard Project Engineer Integrated circuit manufacturing plant (Building 42; 169,000 s.f.) Daly City 93.1 Mountain View 5.7 Palo Alto 76.9 Santa Clara 35.1 Palo Alto 7.7 Foster City 9.2 Cupertino 16.4 San Jose State University Superintendent Corporation yard involving remodeling of brick cannery and warehouse San Jose 2.9 Lockheed Missiles and Space Corporation Special manufacturing facility, consisting of marine fitting dock and crane, manufacturing plant, and supporting site work and utilities (100,000 s.f.) Redwood City 4.2 7 of 8 Updated 8/12/2015

Replace HVAC systems in base housing (Sigonella N.A.F.) Sicily 4.6 L. A. County Los Angeles County Road Department Assistant Engineer Inspection, layout, and surveying on three highway bridge projects L. A. County 11.4 New warehouse for base exchange (Sigonella N.A.F.) Sicily 2.1 Long Beach Naval Hospital (350 Beds) Long Beach 62.1 Barracks and mess hall complex, Long Beach Naval Station Long Beach 37.3 Pier facilities and improvements, Long Beach Naval Shipyard Long Beach 19.9 U.S. Navy U. S. Navy Facilities Miscellaneous remodel projects, Naval Station and Shipyard Long Beach 8.7 Total Current Construction to Date (in Millions): $1,638 8 of 8 Updated 8/12/2015