Engelwood Elementary School Replacement 100 Percent Design Community Meeting May 16, 2016 1
Meeting Agenda May 16, 2016 Welcome School Board Member Daryl Flynn Introductions Project Update - Architect: Rhodes+Brito Architects Construction Manager: CPPI Questions and Answers Adjournment 2
Planned Facility: NEW Campus To Meet District Standards for Elementary Schools: Prototypical Core Spaces Enhanced Learning Environment: Latest Technology Planned Site Circulation Safety Community Asset 3
Planned Facility: NEW Campus To Meet District Standards for Elementary Schools: Prototypical Core Spaces Enhanced Learning Environment: Latest Technology Planned Site Circulation Safety Community Asset 4
Master Site Plan 5
Site Plan 6
Site Plan 6
Example - Classroom 10
Example - Classroom 11
Planned Facility: Technology : Campus The technology package will include: Student and teacher computers (3 laptops) Interactive Flat Panel White boards Video on demand Two computer laboratories Secure card access Security cameras Wireless Access Audio Enhancement 12
Planned Facility: Media Center The Media Center will include: Lab with 22 student laptops Library tables for an entire class Story-telling area CCTV studio Professional library Audio Enhancement Example - Media Center 13
Planned Facility: Cafeteria The Cafeteria will include: New Kitchen Two Serving Lines Teacher Dining Elevated Stage Extended Day Office Restrooms Example - Cafeteria 14
Planned Facility: Specialty Classrooms Art Classroom with kiln Science Classroom Music Classroom Example - Music Classroom 15
Planned Facility: Administration The administrative area includes: Single point of entry during school hours Lobby Administrative offices, workroom & storage Large conference room Clinic Teacher planning areas Example - Administration / Lobby 16
Planned Facility: Physical Education Physical Education will include: PE Office and storage Covered play structure Basketball Courts Tot lot play structure Youth lot play structure Playfields Example - Play Equipment 17
Planned Facility: Site Circulation On-site car stacking (142 cars) On-site parking (129 spaces) Bus loop Covered walkways Safe pedestrian paths Bike racks Example - Main Entry 18
Sustainable Features Site: Low Impact Design (LID) stormwaterdesign Native/low water plants reduce water consumption Building: 10% more energy efficient than ASHRAE 90.1 standard High Efficiency Chillers (8% energy reduction) Light colored roof to reduce heat gain and improves energy performance Energy Star rated equipment Water saving toilets, faucets, and fixtures All general classrooms have daylighting Over 75% of ALL spaces have daylighting Thermal efficient windows/glazing Fully automated building controls system10% more energye Sustainable Features 19
SOUTH ELEVATION 20
WEST ELEVATION 21
NORTH ELEVATION 22
EAST ELEVATION 23
Southwest / Main Entry Elevation 24
May 2016 Jun 2016 Jul 2016 Aug 2016 Sep 2016 Oct 20156 Nov 2016 Dec 2016 Jan 2017 Feb 2017 Mar 2017 Apr 20167 May 2017 Jun 2017 Jul 2017 Aug 2017 Orange County Public Schools Schedule Task Duration Completed Design Bidding Start Construction Building Construction Move-in Date Preliminary Site Utilization Plan 25
Preliminary Site Utilization Plan 26
Main Entry 27
QUESTIONS? 28