Orange County Public Schools

Similar documents
Orange County Public Schools

North Marion School District Bond Projects

Energy Engineering: Tools and Trends

FACILITY COMPONENTS - MIDDLE SCHOOL

Pennington County Government Justice Center. Schematic Design - October 27, 2015

Site Level Deficiencies

where we are, where we could be, how we can get there. 12/14/2011

2014 Bond Technology Update Progress of the Technology Network Infrastructure Upgrades Long Range Planning Committee March 4, 2015

Maximizing Asset ROI for Self & Clients in a Public Sector Setting. July 16 th San Diego

Ohio Department of Transportation. SMS Update. District Bridge Engineers. Amjad Waheed, PE. Engineering Division Office of Structural Engineering

ICT PROFESSIONAL MICROSOFT OFFICE SCHEDULE MIDRAND

CNM Master Plan. Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18

Polycom Advantage Service Endpoint Utilization Report

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013

Polycom Advantage Service Endpoint Utilization Report

Consolidate CSF Space Requirements Create Shared Cybersecurity Facility for UCCS, NCC, and XI

2014 Bond Technology Infrastructure Status Report. March 10, 2016

COURSE LISTING. Courses Listed. with SAP Hybris Marketing Cloud. 24 January 2018 (23:53 GMT) HY760 - SAP Hybris Marketing Cloud

This report is based on sampled data. Jun 1 Jul 6 Aug 10 Sep 14 Oct 19 Nov 23 Dec 28 Feb 1 Mar 8 Apr 12 May 17 Ju

COURSE LISTING. Courses Listed. Training for Database & Technology with Modeling in SAP HANA. 20 November 2017 (12:10 GMT) Beginner.

Transform your Microsoft Project schedules into presentation reports with Milestones Professional.

Tour My School. Description: Goals: Objectives: Preparation and Skill Mastery: Exploring Multimedia Applications

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

Asks for clarification of whether a GOP must communicate to a TOP that a generator is in manual mode (no AVR) during start up or shut down.

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds

Streamlining Utility Billing Analysis and Reporting. Dagoberto Rodriguez, Energy Manager Marlene Z Rosenboom, Utility Analyst

Contractor Licensing Offered by Brightwood Career Institute, Harrisburg

Meeting Packet Special Meeting - Board of Education July 28, :00 Noon

software.sci.utah.edu (Select Visitors)

REPORT TO THE 2012 LEGISLATURE SEMI-ANNUAL REPORT ON HAWAI I CANCER RESEARCH SPECIAL FUND HRS 304A-2168

Ashburton Elementary School Addition

COURSE LISTING. Courses Listed. Training for Cloud with SAP Cloud Platform in Development. 23 November 2017 (08:12 GMT) Beginner.

COURSE LISTING. Courses Listed. Training for Database & Technology with Development in SAP Cloud Platform. 1 December 2017 (22:41 GMT) Beginner

CRAH Retrofit and Energy Savings Project

ASHRAE. Shaping Tomorrow s Built Environment Today

2014 ITS 3C Summit GDOT TMC Reconfiguration

DUBAI ENERGY EFFICIENCY TRAINING PROGRAM

UNIVERSITY OF BAHRAIN COLLEGE OF APPLIED STUDIES STATA231 LAB 4. Creating A boxplot Or whisker diagram

DWG ROOM ROOM SIGNAGE ROOM TYPE CODE AND DESCRIPTION REMARK Conference Service Exhibition Facility Service

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM

Creating, Completing, and Utilizing B3 Benchmarking

SCHENDT ENGINEERING PRIOR EXPERIENCE

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401

7th Annual Statewide Energy Efficiency Forum Applying Building Technologies to Realize Savings June 16, 2016

Why and How to Benchmark Building Energy Use in Office Buildings

MINNEAPOLIS PARK & RECREATION BOARD COMMUNITY ENGAGEMENT PLAN

Section 1.2: What is a Function? y = 4x

UAE PUBLIC TRAINING CALENDAR

ISO 50001/SEP. Superior Energy Performance at Schneider Electric. Design the Strategy Deliver Efficiency Sustain Results

API 510/570/653/571/580 PREPARATORY TRAINING

University of Central Florida Status of Projects April 2017

The City of Seattle s Mandatory Benchmarking and Disclosure Program

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

COOLING WHAT ARE THE OPTIONS AND THE PROS AND CONS FOR THE VARIOUS TYPES OF DATACENTRES SERVER AND COMMS ROOMS

Dashboard. Jan 13, Jan 8, 2012 Comparing to: Site. 12,742 Visits % Bounce Rate. 00:05:26 Avg. Time on Site.

THE RANCHESTER BUILDING HARWIN DRIVE, HOUSTON, TX 77036

18,000-19,000 square feet. ELEVATORS 16 passenger elevators in three banks 1 dedicated garage shuttle elevator 1 dedicated freight elevator

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

Delivering Safety in Education

SHADOW - Main Result. windpro EFFECTEN SLAGSCHADUW HERENTALS GEPLANDE WINDTURBINES HERENTALS. EDF Luminus Markiesstraat Brussel

Improving Situational Awareness for Utilities Operators and Energy Managers

COURSE LISTING. Courses Listed. with Governance, Risk and Compliance (GRC) SAP BusinessObjects. 19 February 2018 (15:13 GMT) GRC100 -

South Platte Summary January Compiled by Lee Cunning, P.E.

MIKE NOVKOV LIC #

100% Warm-Water Cooling with CoolMUC-3

Data Types. 9. Types. a collection of values and the definition of one or more operations that can be performed on those values

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY

The design and construction of the facility is anticipated to cost approximately $300,000.

FREQUENTLY ASKED QUESTIONS

UC DAVIS THERMAL ENERGY STORAGE (TES) TANK OPTIMIZATION INVESTIGATION MATTHEW KALLERUD, DANNY NIP, MIANFENG ZHANG TTP289A JUNE 2012

2018 Bond Technology Standards

Hauppauge Tri-State Library Consultancy. March 25 & 26, 2010

Getting in Gear with the Service Catalog

Rural Intersection Collision Avoidance System (RICAS)

All King County Summary Report

Comprehensive Energy Management & Utility Master Plan

Eindhoven University of Technology - FTP Site Statistics. Top 20 Directories Sorted by Disk Space

Access Control and Physical Security Management. Contents are subject to change. For the latest updates visit

ACTIVE MICROSOFT CERTIFICATIONS:

Michigan State University Engineering Lecture Smart Communities October 24 th, 2018 Kerstin Shestin Wilson Performance Infrastructure Account

WPS Building Committee Ai3 Architects, LLC Daedalus Projects, Inc October 17, 2018

Preliminary Camera Survey August 2016

HPE Aruba. Course Training Year 2017 By IT Green

Deployments Teacher Workstation and Classroom Summary

ACTIVE MICROSOFT CERTIFICATIONS:

CURRICULUM MAPPING FORM


The Maryland Transit Administration. A Plan to Connect Baltimore

Yield Reduction Due to Shading:

Mesquite Jr High School & Gilbert Classical Academy. Campus Integration Plan. Gilbert Public Schools. Final Report 2016

BANGLADESH UNIVERSITY OF PROFESSIONALS ACADEMIC CALENDAR FOR MPhil AND PHD PROGRAM 2014 (4 TH BATCH) PART I (COURSE WORK)

LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST

YOUR BUSINESS Networking Lunch & Vendor Fair

Library. Summary Report

Agenda (Items may be taken out of order) A. Active Construction Project Status Report (for receive and file only)

New Wisconsin Energy Code: What it Means for Me?

Turn Stacked Summarized Bars into One Bridged Bar. Document No: SB001-P3 Revision No: Last Updated: March 18, 2003

Seattle (NWMLS Areas: 140, 380, 385, 390, 700, 701, 705, 710) Summary

Trane Engineering News Chiller Plant Case Study: Variable-Primary Flow Series Chillers with Free Cooling

Transcription:

Engelwood Elementary School Replacement 100 Percent Design Community Meeting May 16, 2016 1

Meeting Agenda May 16, 2016 Welcome School Board Member Daryl Flynn Introductions Project Update - Architect: Rhodes+Brito Architects Construction Manager: CPPI Questions and Answers Adjournment 2

Planned Facility: NEW Campus To Meet District Standards for Elementary Schools: Prototypical Core Spaces Enhanced Learning Environment: Latest Technology Planned Site Circulation Safety Community Asset 3

Planned Facility: NEW Campus To Meet District Standards for Elementary Schools: Prototypical Core Spaces Enhanced Learning Environment: Latest Technology Planned Site Circulation Safety Community Asset 4

Master Site Plan 5

Site Plan 6

Site Plan 6

Example - Classroom 10

Example - Classroom 11

Planned Facility: Technology : Campus The technology package will include: Student and teacher computers (3 laptops) Interactive Flat Panel White boards Video on demand Two computer laboratories Secure card access Security cameras Wireless Access Audio Enhancement 12

Planned Facility: Media Center The Media Center will include: Lab with 22 student laptops Library tables for an entire class Story-telling area CCTV studio Professional library Audio Enhancement Example - Media Center 13

Planned Facility: Cafeteria The Cafeteria will include: New Kitchen Two Serving Lines Teacher Dining Elevated Stage Extended Day Office Restrooms Example - Cafeteria 14

Planned Facility: Specialty Classrooms Art Classroom with kiln Science Classroom Music Classroom Example - Music Classroom 15

Planned Facility: Administration The administrative area includes: Single point of entry during school hours Lobby Administrative offices, workroom & storage Large conference room Clinic Teacher planning areas Example - Administration / Lobby 16

Planned Facility: Physical Education Physical Education will include: PE Office and storage Covered play structure Basketball Courts Tot lot play structure Youth lot play structure Playfields Example - Play Equipment 17

Planned Facility: Site Circulation On-site car stacking (142 cars) On-site parking (129 spaces) Bus loop Covered walkways Safe pedestrian paths Bike racks Example - Main Entry 18

Sustainable Features Site: Low Impact Design (LID) stormwaterdesign Native/low water plants reduce water consumption Building: 10% more energy efficient than ASHRAE 90.1 standard High Efficiency Chillers (8% energy reduction) Light colored roof to reduce heat gain and improves energy performance Energy Star rated equipment Water saving toilets, faucets, and fixtures All general classrooms have daylighting Over 75% of ALL spaces have daylighting Thermal efficient windows/glazing Fully automated building controls system10% more energye Sustainable Features 19

SOUTH ELEVATION 20

WEST ELEVATION 21

NORTH ELEVATION 22

EAST ELEVATION 23

Southwest / Main Entry Elevation 24

May 2016 Jun 2016 Jul 2016 Aug 2016 Sep 2016 Oct 20156 Nov 2016 Dec 2016 Jan 2017 Feb 2017 Mar 2017 Apr 20167 May 2017 Jun 2017 Jul 2017 Aug 2017 Orange County Public Schools Schedule Task Duration Completed Design Bidding Start Construction Building Construction Move-in Date Preliminary Site Utilization Plan 25

Preliminary Site Utilization Plan 26

Main Entry 27

QUESTIONS? 28