Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study

Similar documents
Intelligent Work Zones on Traffic Critical Projects

Cedar Rapids ITS Deployment Project

Arizona State Troopers Highway Patrol Division Sergeant John Paul Cartier

Mountain Corridor Incident Management Program

TxDOT TMS PERFORMANCE MEASURES ITS TEXAS Texas Department of Transportation

SAFETY ON THE IH 35 EXPANSION PROJECTS. Andy Petter, P.E. - Waco District

North/West Passage Work Zone Management Practices for I-90/I-94

Smarter Work Zones Webinar Series

ALABAMA DEPARTMENT OF TRANSPORTATION (ALDOT) STATEWIDE OPERATIONS

SPECIAL PROVISION PROJECT # F-I80-1(61)24 PIN # SECTION 01554M TRAFFIC CONTROL. D. Portable Variable Speed Limit (PVSL) System and Equipment.

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Inside Southern part of 3rd Street Tunnel

Getting Results from Regional Traffic Incident Management Teams

Coordinated Highways Action Response Team

The Missouri Department of Transportation, in cooperation with its regional partners Illinois Department of Transportation, Metro and East West

I-95 Express Toll Lanes

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE

Treating Potential Back- of-queue Safety. Developed By:

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest

ROARING BROOK COMMUNITY INFORMATIONAL MEETING TACONIC STATE PARKWAY (TSP) AT PUDDING STREET INTERCHANGE

Portable Work Zone Data Collection. Blaine Van Dyke ODOT ITS Designer

-P~~. November 24, The Honorable Thomas V. Mike Miller, JI. Senate President State House, H-107 Annapolis, MD 21401

RTMS Solutions. Detection solutions to fit your city s needs.

Study Area and Location District PSA Ward ANC Phase Description B Planned Branch Avenue Northbound at Alabama Avenue Southeast

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound

Rutgers Interactive Lane Closure Application (RILCA) for Work Zone Planning User Manual. New Jersey Highway Authority. Garden State Parkway

Study Area and Location District PSA Ward ANC Phase Description A Existing 1700 Block North Portal Drive Northwest Southwest-bound

NCTCOG MTP Policy Bundle Application for TXDOT

Rapid Incident Scene Clearance (RISC) Annual Report

An Analysis of TDM Impacts on a Corridor Segment Research Findings

Site 40. Recreational Center

DAVID WOLFE TMC Operations & Incident Management Specialist

Rapid Incident Scene Clearance (RISC) Annual Report

Interactive Highway Safety Design Model (IHSDM) Workshop Nevada DOT Las Vegas, NV February 13, 2014

Rapid Incident Scene Clearance (RISC) Annual Report

Managing DC Work Zones: DDOT s Citywide Transportation Management Plan

Intelligent Transportation Systems (ITS)

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE

Tying Crash and Crime Data Together

A. INTRODUCTION B. PRINCIPAL CONCLUSIONS AND IMPACTS C. METHODOLOGY

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound

DISTRICT 6-0 REGIONAL OPERATIONS PLAN PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 6-0

Engaging Maryland toward CAV advancements Christine Nizer, Administrator

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound

Understanding the Potential for Video Analytics to Support Traffic Management Functions

San Antonio TransGuide: TOC Update ITS Texas 2009

South Central ROP Projects

Virginia Department of Transportation Hampton Roads Bridge-Tunnel Action Plan Implementing the Independent Review Panel Recommendations

Integrating the Healthcare Enterprise. IHE IT Infrastructure Technical Committee White Paper ID/ECON White Paper

Smarter Work Zones Webinar Series

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE

Model Concept of Operations - Remotely Operated and Dynamic Systems for Road Closures and Advisory Messages in Remote Areas

Virginia Connected Corridor

Final Report. Interstate-680 Bus-on-Shoulder Feasibility Assessment. prepared for

SIMULATION AND ANALYSIS OF ARTERIAL TRAFFIC OPERATIONS ALONG THE US 61 CORRIDOR IN BURLINGTON, IOWA FINAL REPORT

Pensacola SunGuide Center Monthly ITS Performance Report to Pensacola RTMC Monthly Report July 2016

Hartford Area Incident Management. Using ITS To Improve Safety on the Greater Hartford Area Expressways

Dulles Area Transportation Association

ARC-IT v8 Workshop ARC-IT TOOL SET

James L. Brown, Larry J. Buttler and William P. Ezzell

Site 59 W5-147 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

Road Intersections Near Level Crossings: Intersection Awareness in Illinois. Brian Vercruysse Illinois Commerce Commission

5 ROP Institutional Issues

INPUT DATA PROCEDURES

Traffic Impact Analysis Shotwell Road Residential Clayton, NC

Planning for Resiliency. June 20, 2017 Richard Tetreault, PE WSP USA Office Lead VT, NH, and ME

Paul DiGiacobbe, PE, DBIA MASER Consulting Ryan Putt, PE HNTB Corporation Kevin Poad, PE HNTB Corporation

South Central Pennsylvania Regional Operations Plan Candidate Project Listing (DRAFT)

Northwest Needs Improvements Survey

Intelligent Transportation Systems (ITS) for Critical Infrastructure Protection

ENHANCED PARKWAY STUDY: PHASE 3 REFINED MLT INTERSECTION ANALYSIS

Appendix D Supportive Transportation Materials

THE APPLICATIONS OF ADVANCED TECHNOLOGIES TO AUTOMATE TRAVEL TIMES Port Aransas Ferry Operations Project

2

Fusing Data Across the State of Florida to Support ATIS Services

CASE 1 TWO LANE TO FOUR LANE DIVIDED TRANSITION GEO-610-C NOT TO SCALE GEOMETRIC DESIGN GUIDE FOR MATCH LINE LINE MATCH. 2 (0.6m) shoulder transition

Vehicle Camera Systems

Dynamic Message Sign Message Design and Display Manual

DISTRIBUTION OF QUANTITIES

TMC of the Future. Matt Lee Associate Vice President

Emergency Response: How dedicated short range communication will help in the future. Matthew Henchey and Tejswaroop Geetla, University at Buffalo

Pennsylvania Safety Transportation and Research Track (PennSTART)

Macomb County Department of Roads. Presentation Overview

NCHRP 350 IMPLEMENTATION ARTBA May 11, 2001

Johnson City Regional ITS Architecture Update Review Workshop. March 12, 2015

Opening the New Woodrow Wilson Memorial Bridge: Planning & Implementing a Major Traffic Switch

Update on 2018 Security Goal Plans and Strategies

Establishing Enterprise-Wide Data Governance

Arizona TraCS. Traffic and Criminal Software P R E S E N T E D B Y: R I C K D. T U R N E R T R A F F I C R E C O R D S M A N A G E R

Mike Mollenhauer. Director of the Center for Technology

IOWA INCIDENT MANAGEMENT TEAM

Pennsylvania Safety Transportation and Research Track (PennSTART) April 10, 2018

Using GPS Based Origin-Destination Data to Improve Traffic Studies. Michael R. Wahlstedt, PE, PTOE OTEC October 11, 2017

Office of Roadway Engineering. Traffic Engineering Manual (TEM) Revision Log

Cornerstone of downtown; Gateway to the state

Study Area and Location District PSA Ward ANC Phase Description C Existing 3500 Block Massachusetts Avenue Northwest Eastbound

CITY OF DUBUQUE ADMINISTRATIVE POLICY REVISED OCTOBER 24, 2011 RETROACTIVE TO JANUARY 1, 2011

Dallas Horseshoe ATM Design. Mike Holt, PE, PTOE Senior ITS/Traffic Engineering Manager

Interstate 35W Bridge Collapse. The Collapse. Lessons Affirmed & Learned. Over 100 vehicles on the bridge at that time 13 fatalities 144 injured

Rural Expressway Intersection Characteristics that Contribute to Reduced Safety Performance

Transcription:

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study James Webb, P.E., Iowa Department of Transportation Liz Finarty, P.E., Iowa Department of Transportation James Armstrong, P.E., Iowa Department of Transportation

TSMO and Highway Construction Congestion (Queuing) in highway construction work zones, and associated present risks and challenges: Increased potential for secondary crashes in lengthy queues, especially if no advance warning is present. User delays, both in convenience and actualized user costs. Safety Considerations Regarding Traffic Control Planning Lane Closures night only (Lane Closure Planning Tool) Separation Methods for head-to-head traffic Traffic Incident Management (TIM) Planning Considerations for emergency response to incidents Intelligent Work Zone (IWZ) Device Utilization

Case Study I-35 Project, Warren County, IA Reconstruction of southbound lanes of I-35 in vicinity of Iowa 92 Interchange (3.6 miles). Reconstruct bridge over Middle River in southbound lanes. Portland cement concrete pavement and grading on new alignment 2017 construction with calendar day completion (w/i/d clause)

Case Study I-35 Project, Warren County, IA Traffic maintained on northbound lanes of I-35 in head-to-head configuration (northbound lanes and interchange reconstructed in 2016). ADT (2015) = 22,700 vpd, 10% trucks Project located just south of Des Moines, with commuter traffic peaks in morning and evening rush periods Additional traffic increases identified on Thursday/Friday evenings in southbound direction

Previous I-35 Construction Projects in Warren County Companion project on I-35 in northbound lanes, constructed 2016, experienced queuing delays, and serious crashes, with injuries and a fatality Project at North River just north of work zone in 2016 experienced serious crash resulting in fatality Median pipe construction project south of work zone in 2016 experienced significant queuing delays Project in Cumming Interchange area in 2014 experienced major incident requiring 8 hour closure on I-35

Previous I-35 Construction Projects in Warren County Companion project experienced head-on collisions with serious injury and a fatality in multiple incidents Utilized standard traffic control measures to separate opposing traffic ( bricks and sticks ) Provided delineation of lane separation Minimal positive protection in an off-tracking situation

Previous I-35 Construction Projects in Warren County TSMO improvements added to companion project on I-35 in northbound lanes, following serious crash incidents Utilization of temporary barrier rail (TBR) between opposing lanes of traffic in the head-to-head condition Queue protection and response vehicles stationed on each entry point of the project to provide advance warning of queuing situations Contractor provided equipment on-call for quick response, repair and removal in the event of an incident within the work zone Speed limit between multiple works zones in 10 mile section of NB direction reduced to 55 mph to prevent differential speed limits between work zones

Development (Design) Phase Considerations Experience from 2016 project allowed for incorporation of many of the TSMO concepts in the development phase of the project Providing for the TSMO components in the design and other contract documents allowed for uniform bidding and better coordination of efforts User safety, emergency response, and traffic management were the primary considerations when developing the TSMO components for the project

Temporary Barrier Rail with Access Gaps Temporary Barrier Rail (TBR) utilized on centerline between opposing traffic. Replaced channelizer markers and tubular markers bricks and sticks. TBR provides positive barrier between opposing traffic flow, alleviates potential for head on collisions.

Temporary Barrier Rail with Access Gaps Provided four 30-foot long access gaps in barrier rail for emergency access. Impact attenuators on each side of 30-foot gap. Gaps intended to permit emergency vehicles (law, rescue, fire, towing) to access incident from opposite side of roadway. Spring load tubular markers in gap deter U-turns

Speed Feedback Trailers (SP-150166) Speed feedback trailers placed upstream of lane closures to reduce traffic speed entering lane taper and single lane traffic condition. Effective in reducing speeds entering the project. Project plan location of installations were inside taper; additional feedback trailers added upstream.

Traffic Monitoring with Incident Response (SP-150167) Modified the Standard Specification for Traffic Monitoring with Incident Response. Modelled the incident response vehicle after the Highway Helper vehicles providing assistance in work zone. Communication with Iowa DOT s TMC added for incident response.

Traffic Queue Protection and Response (SP-150167) Added to contract by Special Provision. Two trucks with Portable Dynamic Message Boards (PDMS) mounted to vehicles. Trucks stationed outside of the project limits (lane closures). Original requirement for TL-3 truck mounted attenuator this was eliminated for mobility.

Traffic Queue Protection and Response (SP-150167) As queue or other traffic incidents occur, trucks deploy upstream of queue. TMC provides messaging for PDMS. Queue response vehicles display warning messaging to incoming traffic. Stationed on shoulder, can move upstream if queue increases.

Intelligent Work Zone (IWZ) Tools Intelligent Work Zone (IWZ) tools used throughout work zone. Part of Iowa DOT s Traffic Critical Project (TCP) Program. Coordinated with TMC, Traffic Operations (Central and District), Iowa State University (InTrans). Real time information provided to 511 system and other traffic management portals. Identified equipment prior to project start up and additional equipment additions/modifications as traffic is evaluated in work zone.

Intelligent Work Zone (IWZ) Tools Traffic cameras (including streaming video) Queue detection sensors Portable dynamic message boards (PDMS s) INRIX data

Extra Enforcement Efforts Iowa DOT Extra Enforcement Program utilizes law enforcement to use extra patrols in traffic critical projects. Identified projects each year, funding pays for overtime for law enforcement to perform extra patrols. Iowa DOT Motor Vehicle Enforcement, Iowa State Patrol, Local Law Enforcement.

Traffic Incident Management (TIM) Plan Traffic Incident Management (TIM) Plan developed for I-35 in Warren County in years prior to this project. Identifies designated detour routes in the event of traffic incidents on I-35. Plan is very detailed, including messaging for PDMS s, specific detour routes based on location of incident.

Traffic Incident Management (TIM) Plan Plans developed with input of all shareholders: Iowa DOT, Local Government, Law Enforcement, Rescue Services, Towing Services, and others as necessary. Plans periodically updated. Clears roadway reduces chances of queues/secondary crashes.

Traffic Management Center (TMC) Located in Iowa DOT s Ankeny Complex. Operates 24-7-365. Operation Center monitors transportation systems. Responds to incidents. Coordinates assistance and traffic control activities. Can operate all message boards remotely.

Traffic Management Center (TMC) For project, telephone communication between project staff and TMC coordinates operations during incidents. PDMS messaging, 511 entries, TIM route recommendations, deployment of local Maintenance staff, notification to DOT key staff for collaboration, notification to local responders.

Pre-Construction Pre-Action Meeting Pre-Action Meeting held in advance of primary traffic switch. All shareholders invited Iowa DOT (Central/District), Law Enforcement (State/Local), Responders/Rescuers, Contractors, Towing Services. Discussion Items: Project Staging and Schedule TSMO Concepts and Responsibilities Communications with TMC, Contractor, DOT Staff, Law Enforcement, Others TIM Plan preferred detours based on other construction in area Utilization of gaps

After Action Reviews After Action Reviews (AAR s) held following significant incidents. All Shareholders invited to participate. Review of incident and traffic management. What went well? What could be improved? Results have included modified traffic control setups or TIM detour selection. Great tool to initiate dialogue.

Review and Adjust Traffic Control Incidents in area approaching chute added TBR on outside to north Additional speed feedback trailers - placed further upstream of lane tapers. Weekly meetings allowed for discussion and review of traffic safety and traffic control setup as project progresses. Analysis of traffic data on TCP website (ISU/IDOT) heat map, queuing incidents, etc.

TCP Traffic Data Includes Heat Map data from Work Zones to identify queuing events

TSMO Efforts Results to Date

Positive Results of TSMO Efforts on Project No head on crashes have occurred in the work zone despite the headto-head configuration. TBR contacts observed. No serious injuries to date from crashes on project site. No secondary crashes to date identified. Reduction in queuing events in project site compared to 2016 project. Queuing situations reduced or eliminated in traffic incident situations with assistance of TIM plan utilization, enforcement efforts, and advance queue notification messaging. Better communication channels between partners in construction, traffic operations, law enforcement, towing services, and better incident management has resulted.

Areas for Improvement and Review Design and Location of Access Gaps in the TBR: Turning radius issues with 30 gap for larger tow units and trucks. Potential for snagging impact issue at impact attenuators. Best location determination for gaps with respect to emergency response. Queue Protection and Response Vehicles: Appropriate size and configuration of units. Utilization and number of units (stationary or moving). Reporting of Activities Traffic Monitoring and Queue Protection Documentation of response and assistance activities needs standardization.

Thank You!