Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center

Similar documents
DIT/BPR&BTD/OA/1206/

ADDENDUM #1. Date: 12/21/2018

Indian Institute of Technology Kanpur Samtel Centre for Display Technologies

RAMP DCIM Data Center Infrastructure Management Software

Construct Chiller Plant, Phase I

RFP Annex A Terms of Reference UNHCR HQ Data Centre Colocation Service

TENDER DOCUMENT NATIONAL INSTITUTE OF PUBLIC FINANCE AND POLICY. New Delhi SUPPLY OF LAN EQUIPMENTS AND INSTALLATION OF LAN IN THE CAMPUS

Schematic Design Overview Project Review Stakeholder Engagement Project Delivery Method Upcoming Milestones

A. The high quality, lightweight, varifocal manual iris lens shall be suitable for applications where scene and lighting requirements are consistent.

Data and Voice Line Installation Procedure. Revision History

M+W Group s Visionary Delta Datacenter

TENDER FOR RENEWAL OF EXISTING KASPERSKY ANTIVIRUS LICENSES FOR USE AT NIT, KARACHI

Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design.

Returnable Schedules

Reply to queries raised for Procurement of Bulk Services

ADDENDUM #1 RFP # , Districtwide Network Refresh Design

Course Description. Audience. Prerequisites. : Course CTDC : Certified TIA-942 Design Consultant. Course Outline :: CTDC ::

QUESTCDN - INSTRUCTIONS FOR POSTING BID DOCUMENTS

Purchasing Department Finance Group INVITATION TO BID

ADMINISTRATION DEPARTMENT TENDER FOR RENEWAL OF EXISTING KASPERSKY ANTIVIRUS TOTAL SECURITTY FOR BUSINESS LICENSES FOR USE AT NIT KARACHI

Air. CERTIFICATION PROCESS FOR CORE & SHELL v2.0. RESET Air PROCESS for Core & Shell v2.0. Copyright 2018 RESET

Purchasing Department Finance Group INVITATION TO BID

Nominee: Prefabricated, Pre Assembled Data Centre Modules by Schneider Electric

NOTICE INVITING TENDERS (NIT)

Mission Statement & Company Overview

Campus IT Modernization OPERATIONAL CONTINUITY FLEXIBLE TECHNOLOGY MODERNIZED SYSTEMS

RESPONSE TO QUERIES II

Hosted VoIP Unified Communications Service

St. Edmund s College

Request for Qualifications

The Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft

Invitation for Bids (Open Tender Bidding)

Data Center and Colocation RFP Template

INVITATION FOR BIDS For RO PLANT #2 PLC SYSTEMS UPGRADE (CIP# WTR1702)

DATA CENTER COLOCATION BUILD VS. BUY

1.0 Executive Summary. 2.0 Features and Benefits

AT&T Dedicated Internet (ADI formerly known as MIS) and Private Network Transport (PNT)

Department of Mechanical Engineering, Indian Institute of Technology Madras Chennai 36

WORKING WITH ESTATES AT BANGOR UNIVERSITY

RFQ No C014 Datacenter Colocation and Associated Support Services. December 4, 2017

Sub: Invitation of sealed quotations for Procurement of UPS systems for MDI Gurgaon

Lincoln County, Georgia. Office 365 & Antivirus

1.0 Executive Summary

Corrigendum I. Implementation of IP Based CCTV Solution at Medical Colleges. Tender Reference No: MCI/DMMP-II/2017. MCI CCTV: Corrigendem I

Certified Commissioning Technician (CxT) Application

TENDER CONTENTS 1. TECHNICAL BID

Request for Proposal for Technical Consulting Services

The Riser as a Contract Document. Peter Sharp, RCDD

Subject: Quotation for Setup/Up Gradation of Data Center in Karachi

Evaluation Criteria. 1) Evidence of Credentials / Certifications in all 4 Fields (Energy, GIS, Master Planning, and Real Property): 10 PTS

Peter Sharp RCDD IBI Group

UNITED NATIONS DEVELOPMENT PROGRAMME TERMS OF REFERENCE

Notice inviting Tender for Web site design & Development

JUSTICE CENTER IMPLEMENTATION PLAN. Schedule of Project Activities

SECTION 10 CONTRACTING FOR PROFESSIONAL SERVICES CONSULTANT COMPETITIVE NEGOTIATION ACT (CCNA)

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

AT&T Switched Ethernet Service SM

Clarification Note 2 GSA internal reference: Procurement procedure: GSA/01/01/17 General ICT Support to the GSA

RfP No. APSFL/CCTVPMA/231/2016, Dated:

REQUEST FOR QUOTATION (RFQ) Provision of Internet Services for UN Women Indonesia Office

REQUEST FOR PROPOSAL CITY OF WARRENSBURG 102 SOUTH HOLDEN STREET WARRENSBURG, MISSOURI 64093

2.3 SCOPE OF WORK MATRIX TO BE INCLUDED IN DISTRICT PROJECTS

National Electric Power Regulatory Authority NEPRA. Purchase of 01 UPS for Datacenter Servers and 19 UPSs for Individual s Desktop Computers

IDBI Bank Limited Corrigendum to the RFP For Procurement of Treasury PCs RFP ref. no: IDBI/PCELL/RFP/ /017 dated : 30-Oct-2015

ATTACHMENT A Statement of Work

MT. PROSPECT PARK DISTRICT REQUEST FOR PROPOSAL REQUEST FOR STATEMENTS OF INTEREST, QUALIFICATIONS, PERFORMANCE DATA AND COST PROPOSAL

Ref. No. : MDI/ CCTV Cameras /2017 Date: May,9,2017

AT&T Dedicated Internet (ADI formerly known as MIS) and Private Network Transport (PNT)

NEXT GENERATION Data Centres FOR NEW GENERATION. Technology

RFP # ISD Modular/Container Based Recovery Data Center Questions and Answers

Qs & As from CSD RFP pre-submission conference

CORRIGENDUM- I. Sr. Page/Section Description Bidder s Query Clarification / Amendments. 1 Page 5 of Vol-I, and Page 15 of Vol-II

The European Programme for Energy Efficiency in Data Centres: The Code of Conduct

Optimize Your Data Center. Gary Hill VP, Business Development DVL Group, Inc.

APPROVE PROCUREMENT PROCESS FOR EQUIPMENT AND INSTALLATION

Community College of Beaver County. Request for Proposal. April 15, 2019

98 Years of Relentless Journey towards Engineering Advancement for Nation-building. Ref : SP/T-1623 Date : NOTICE INVITING TENDER

Introduction. Service and Support

COLOCATION SERVICE DESCRIPTION

IDBI BANK LIMITED IDBI TOWER, WTC COMPLEX, CUFFE PARADE MUMBAI

REQUEST FOR PROPOSALS FOR INMATE TELEPHONE AND VIDEO VISITATION SYSTEM FOR THE COLUMBIA COUNTY JAIL. Questions from Vendors

SCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS

HPC Solutions in High Density Data Centers

Contract Documents System CDS. Help Document

ART CENTER AND SATELLITE PLANT

CLEANROOM CERTIFICATION AND ACCEPTANCE PROCEDURES

GENERATOR ADDENDUM TO MAGNOLIA GARDENS ASSISTED LIVING COMPREHENSIVE EMERGENCY MANAGEMENT PLAN

ARCHITECTURAL GUIDELINES FOR INSTRUCTIONAL TECHNOLOGY

Sub : ADDENDUM/CORRIGENDUM for Request for Proposal for Providing Managed Networking Solutions using SDWAN Technology for ESIC Offices across India

TENDER NOTICE NO. A (01)/PSEB/ for Purchase and Installation of Office Equipment s /Items for PSEB, Islamabad Office

Town of Gilmanton, New Hampshire SELECTMENS OFFICE

CATEGORY 2 WIRELESS, WIRING, AND NETWORK EQUIPMENT FOR NEW CONSTRUCTION E-RATE RFP

Service Perfect all-round support package for your data centre

Installation Service. 1.0 Executive Summary. Factory Trained Technician Train Customer Support Staff On Basic Operation Of The Equipment

NOTICE INVITING TENDER FOR ISO CERTIFICATION

This manual describes how to prepare a site for the CTL 9712 DPS 7000 Integrated Library Unit (ILU).

Indian Institute of Technology, Kharagpur Kharagpur , WB, India

Best Practices for Managing Data Centres

Communications. UNM IT/Telecommunications Guide Specification Communications

Request For Quotation from Service Providers. for. Appointment of Consultant for Migration to ISO/IEC 27001:2013 alongwith Implementation for UTIITSL

Transcription:

Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center IIT Bombay Computer Center invites Data Center Consultants to submit their bids for the contract for the design and project management for building a state-of-the-art High Performance Computing Data Center on the Ground Floor of the old CSE building in IIT Bombay campus. The data centre will have about 5000 sq ft of floor space for computing infrastructure, is expected to have computing facility of 1.5 petaflop capacity requiring up to 2 MW of power. The work involves renovation of an allotted area in an existing building, should start soon after the contract is awarded, and is expected to be completed within two years. The overall outlay of the project is expected to be Rs 10-12 crore (expense does not include computing hardware). The scope of work for the consultant will be as follows. 1. Meet with the user groups, HPC Committee, and the Computer Centre staff and draw up the specifications for the Centre. 2. Identify the different stages from the defining of the centre to the final handoff of the completed Facility. Prepare a schedule of completion of these various stages. 3. Clearly specify the site preparation that IIT Bombay may be required to do before the vendors are selected. 4. Provide the Engineering Design for Interiors, Cabling, Electrical, Cooling Systems, BMS, fire detection and suppression, Utilities and any other facility that may be required at the Data Centre. a. The design should be adaptable for three possible type up of computing infrastructure: liquid cooled, on-board liquid cooled, air cooled b. Design of computing infrastructure will not be in the scope of work 5. Provide tender specifications, and evaluate contractors for various components of the facility as listed above. a. The consultant cannot be the contractor or vendor for the project. 6. Regularly supervise overall progress, construction processes and ensure that the specifications are met. This will include, but not limited to, the coordination among the vendors and various IITB stakeholders and ensure timely progress of the project. 7. Ensure that all the components of the facility are integrated correctly by suitably coordinating with the vendors and IITB stakeholders and ensuring that the Facility is commissioned on time. 8. Achieve project closure and prepare the final As-built specification/data sheet of the Facility, including the energy usage report of the facility.

The tendering for selection of the consultant will follow a standard two-step process of technical bid evaluation, resulting in scoring followed by commercial bid opening. The contract will be awarded to the bidder with the highest score based on a combination of the technical and commercial score. Consultants should satisfy the following eligibility criteria for bidding. Self-attested copies of all supporting documents should be submitted with the bid. They should have successfully completed at least two Data Center consultancy projects in the last five financial years, of which at least one should have had project cost of infrastructure (not including computing hardware) of Rs 1 crore. Consultants should be willing to come to IIT Bombay and present the details of their technical bid to the Selection Committee. As part of the technical bid, consultants should submit a document describing their expertise and experience in designing such Data Centers. This document should contain the following details at a minimum, and any other details that may be relevant. 1. Year of establishment of the firm 2. Company size: Number of Data center design consultants, number of other technical employees, number of other employees. 3. Number of previous Datacenters projects completed in the last five years, categorized by the following sizes of computing facility floor space only. a. 100-999 sq ft b. 1000-2000 sq ft c. 2000-20,000 sq ft d. > 20000 sq ft 4. Details of recent completed consulting assignments (up to ten) for Data centers. a. Customer details, with completion certificate and preferably recommendation letters. b. Primary consultant in charge. c. Tier level d. Square feet e. Cooling i. TR capacity ii. Design, technology chosen, redundancy design, efficiency design. iii. Green features f. Power i. MVA capacity ii. Electrical system design, cabling, redundancy design, captive power design, efficiency design

iii. Green features g. Computing: i. Number of racks, servers, cores per server, storage capacity h. Networking bandwidth i. PUE j. Time of allotment of the contract, time of start of execution, time of completion k. Civil work, interior i. Design of false flooring, ceiling, cabling conduit, lighting design ii. Insulation design iii. Fire detection & suppression systems l. Civil work exterior i. Acoustic insulation ii. Cooling system structural design iii. DG foundation design iv. Electrical panel infrastructure design Eligible bidders will be invited for a presentation to the Selection Committee and other bidders. As part of the presentation, the consultants may review the information provided above, as well as present their initial ideas of designs, technologies, processes, etc that they will use for the present work. The presentations will also be evaluated and will contribute to the overall technical score. Above attributes will be evaluated based on 1. A detailed document addressing all the above points 2. A presentation based on this document, to evaluation committee and vendors. After submission of the bid, eligible bidders will be required to come to IIT Bombay and make this presentation. The document and the presentation will result in a technical evaluation score out of 100. The committee may also use any other relevant information in arriving at the final technical score. Let this score be T. The commercial bid should be a lump-sum Design and Project Management and consultancy charge for the whole project. The commercial bid evaluation will also result in a score out of hundred for each bidder as follows: Maximum bid will be determined. Let this be B max. Let minimum bid be B min Let a specific bid be B. Then the commercial score for a bid B is calculated as :

[(B max - B)/(B max - B min ) ] x 100 Let this score be C. The final score S will be = 0.7 x T + 0.3 x C The bidder with the maximum value of S will be awarded the contract.

IIT Bombay HPC-BYOH Data Center Design and Project Management Detailed Scope of Work Design and Engineering 1. Conceptual Design Phase a) Preliminary evaluation and confirmation of the MEP (Mechanical, Electrical and Plumbing) portion of the Project Program and Construction Budget b) Updated Basis of Design document c) Written analysis of calculated load demands for both the new plumbing, electrical as well as cooling systems. d) Descriptive outline specifications indicating proposed MEP systems e) Schematic single lines of the MEP systems to identify site location and quantity of major mechanical and electrical equipment. f) Written description of the proposed computer room cooling system. g) Interior design such as elevated flooring, ramp access, fire rated doors with vision panel, lighting. h) Integration of all key components to a suitably designed building management system (BMS) including security system. 2. Design Development Phase a) Updated Basis of Design document b) Single line drawings (SLDs) of the MEP/FP (Fire Protection) systems c) Major equipment room layouts d) Major system routing e) Major equipment capacities/zoning f) Preliminary equipment schedules g) Major system diagrams indicating intent h) Estimated device locations and quantities, including not only the computing devices, and major electrical devices (DG Set, transformer etc) i) A complete set of drawings depicting the CRT (Custom Report Type) layout, outlet locations, pathways, telecom spaces layout and elevations j) Outline MEP specifications 3. Construction Document Phase a) Updated Basis of Design with 2 options

b) Complete construction drawings and specifications for bidding, permit and construction c) Equipment sizes/layouts, distribution systems, and other elements of the MEP/FP design shall be updated. d) Completed MEP plans e) Completed equipment schedules f) Completed MEP sections and details g) Specifications completed MEP sections h) Final MEP calculations i) Final short circuit and coordination study j) Good For Construction Drawings Project Management Consultancy 1. Construction Stage a) Overall Coordination of the Project b) Time management c) Cost Management d) Quality Management e) Change Management f) Risk Management g) Measurements and Billing h) Documents Control 2. Post Construction Stage a) Prepare, track & complete execution of punch lists for each package. b) Coordinate with client project team for final inspections, final punch lists and coordinate timely execution of the same. c) Certification of works completion for all packages. d) Co-ordinate delivery of all hand over documents from contractors & consultants. e) Follow ups for As- Build Drawings. f) Preparation of Handing over Documents and all reports. g) Collection of all warranty documents from contractor. h) To prepare the project completion report. i) Review status of outstanding variations to contracts and finalize the same through discussions with contractors and client. j) Detailed checking & reconciliation of Final bills / invoices of each contractor.

Payment Plan 1. Conceptual Design Phase - 5% of payment 2. Design Development Phase 5% 3. Construction Document Phase 10% 4. Complete prepared RFP/Tender document 10% 5. Evaluation of the bidding document 10% 6. Periodic update of project - 50% (quarterly payment based on the project execution) 7. Final commissioning of the project -10%