MCH 2475 Ramp Metering Maintenance Handover Procedures

Size: px
Start display at page:

Download "MCH 2475 Ramp Metering Maintenance Handover Procedures"

Transcription

1 MCH 2475 Issue B March 2008 MCH 2475 Ramp Metering Maintenance Handover Procedures Crown Copyright 2008 First published 2008 Printed and published by the Highways Agency

2 Ramp Metering Maintenance Handover Procedures MCH 2475 B MCH 2475 with amendments Pete Kirby Dave Hunter Babar Malik Julian Steed 17/03/08 A Reissued as MCH 2475 Pete Kirby Rob Porter Babar Malik Julian Steed 07/02/08 03 Initial Issue Pete Kirby Rob Porter Babar Malik Julian Steed 29/11/07 02 Draft for Client Approval Peter Kirby Rob Porter Babar Malik Julian Steed 20/11/07 01b Minor changes to Appendix E, Draft for Client Comment Peter Kirby Mike McMahon Babar Malik Rob Porter 16/08/07 01 Draft for Client Comment Peter Kirby Mike McMahon Babar Malik Rob Porter 16/07/07 Originated Checked Reviewed Authorised Date Revision Purpose Description

3 Contents Section Executive Summary Page iii 1. Introductions Document Overview RM Deployment Fault Management and System Stakeholders Document Distribution The Primary Maintainer Document Validity Interim Maintenance Protocols Overview Peek Contract System Functionality Informal Fault Identification Mechanisms Traffic Management Considerations Full Maintenance Protocols Overview Fault Identification Fault Management System Components to Maintain Stakeholder Maintenance Responsibilities Response Times Spares Equipment 3-12 Appendix A Maintenance Sections of the Systems Specification (Contract) A-13 Appendix B Note for Switching a RM System Off B-16 Appendix C Detailed Fault Diagnosis and Rectification Protocols C-22 Appendix D Maintenance Matrix of Responsibility D-33 Appendix E Traffic Management Considerations E-35 March 2008 i MCH 2475

4 List of Tables Table D.1 - Maintenance Matrix of Responsibility D-34 List of Figures Figure Ramp Metering Scheme Life Cycle 1-2 Figure B.1 - Area 9 & 11 RM Sites IP Address Shortcuts B-16 Figure B.2 - Switch Off Process Steps 1 to 6 B-18 Figure B.3 - Switch Off Process - Steps 7 to 8 B-19 Figure B.4 - Switch Off Process - Steps 9 to 14 B-20 Figure B.5 - Switch Off Process - Steps 15 to 18 B-21 Figure C.1 - Site Monitor Page C-25 Figure C.2 - Fault Log C-26 Figure C.3 - Fault Tree - Key C-27 Figure C.4 - Fault Tree - System Faults C-28 Figure C.5 - Fault Tree - Comms Check C-29 Figure C.6 - Fault Tree - Slip Road Faults C-30 Figure C.7- Fault Tree - RMO Faults C-31 Figure C.8 - Fault Tree - MIDAS Faults C-32 Figure E.1 - The RM Vicinity E-35 Figure E.2 - Dealing with TM in the RM Vicinity E-36 March 2008 ii MCH 2475

5 Executive Summary The Highways Agency undertook a project to deliver 30 ramp metering (RM) systems by the end of March These systems are intended to increase the traffic flow capacity of existing motorway junctions by regulating the slip road traffic flows. This document provides the necessary procedures to identify and manage faults which occur on the RM systems. The maintenance regime begins with immediate affect and shall continue until June This document does not cover any periodic inspections or planned maintenance activities which are the subject of a separate document within the full handover pack. The various system stakeholders (multiple divisions of the Highways Agency, the RM system suppliers, network operators and the Highways Agency s transmission service providers) and the boundaries and overlaps between the stakeholder s interests and involvements within the RM project are defined. The system supplier, IPL/ Peek, currently operate a maintenance contract to support the first 30 installations. The contract began following the first installation and will continue until June The key deliverables and contractual arrangements are detailed for additional information to support the handover into maintenance procedures. The RM system is broken into its component parts and the stakeholders responsible for each component are defined. The mechanisms and processes to deal with the various types of faults are discussed. The stakeholder responsible for particular aspects of a fault is identified along with the corresponding response times. Further information to support these procedures is detailed within the appendices. The document highlights the importance of understanding how RM relies on the existing infrastructure and how changes to any traffic behaviour may have a detrimental affect on the RM operation. For traffic management and road space booking tasks, procedures for consulting the RM operation are advised and defined. March 2008 iii MCH 2475

6 1. Introductions 1.1 Document Overview This document has been prepared to inform the appropriate stakeholders of their roles and responsibilities in maintaining the RM throughout the maintenance period, with immediate affect until the end of June It forms part of a suite of documents describing the site selection, design, installation, calibration and maintenance of ramp metering sites on the HA s road network as illustrated in Figure RM Deployment The Highways Agency undertook a project to deliver 30 RM systems by the end of March The RM systems are located in the West Midlands and the North of England. The 30 sites have been installed in the following Highways Agency Areas. Area 9 (West Midlands) Area 10 (NW England) Area 11 (West Midlands) Area 12 (Yorkshire) 1.3 Fault Management and In order to ensure that the RM systems continue to offer the optimal benefit to the network, appropriate fault management and maintenance handover procedures need to be defined. The RM system blends elements of both technology and civil infrastructure. The technology and civils maintenance aspects require differing maintenance processes which are performed by various organisations. Further details about which organisation is responsible for which system component is provided in the following sections of these procedures. The RM system is a fully automatic system which utilises data from the existing technology infrastructure. An unusual RM system maintenance requirement is the need to understand which components of the existing infrastructure the RM system utilises. If traffic management is deployed or an incident occurs which may affect the everyday traffic patterns, the operation of the RM may suffer and unnecessary delays may result. These maintenance procedures detail the processes to be taken to ensure that the RM system does not operate inefficiently. March MCH 2475

7 Site Selection IAN 103/08 Advice Regarding the Assessment of Sites for Ramp Metering Operational Strategy MCH 2470 Ramp Metering Technical Design Guidelines Design MCH 2470 Ramp Metering Technical Design Guidelines Configuration Setup MCH 2472 Ramp Metering Configuration Setup and Management Guidelines Infrastructure Installation and Test MCH 2471 Ramp Metering Installation Guidelines System Installation and Commissioning System Procurement and Supply MCH 1965 Calibration MCH 2473 Ramp Metering Calibration Guidelines Configuration Management MCH 2472 Ramp Metering Configuration Setup and Management Guidelines Operation and Maintenance MCH 2475 Ramp Metering Maintenance Handover Procedures MCH 2474 Ramp Metering Operational Procedures Evaluation _04_02_027 Ramp Metering Operational Assessment Report Figure Ramp Metering Scheme Life Cycle March MCH 2475

8 1.4 System Stakeholders There are several stakeholders involved with the RM systems. The level of involvement of each party varies and covers a range of aspects such as site selection, design, construction, calibration etc. Whilst all these aspects are not core to a maintenance regime, it is important to ensure that all stakeholders are aware of the roles and responsibilities of the various parties. The following sections outline each of the stakeholders overall roles and responsibilities. Highways Agency The Highways Agency s national Traffic Operations (TO) and Standards and Safety Research (SSR) directorates both have key interests in the system. SSR were responsible for designing, procuring and evaluating the initial 30 systems. Through the local contract with the TechMAC & MAC / SuperMAC, the TO Areas were responsible for the construction of the initial 30 sites and ensuring that the RM systems operate as needed and provide benefits to the Area network. The Regional Control Centres (RCCs) also fall within TO and they will play a role in ensuring network performance, of which RM involvement is a small aspect. TechMAC & MAC / SuperMAC (the Primary Maintainer see Section 1.6) The local MAC and TechMAC were contracted to install the infrastructure and technology aspects of the sites. This includes, but is not limited to, the slip road loops, cabinets, ducts, chambers, safety barrier, anti-skid and the associated warning signs. The role of the SuperMAC is a single contract which encompasses both the TechMAC and MAC activities. In the context of this document, where Areas utilise an MA and a TMC contract, this should be considered the equivalent of a SuperMAC. IPL/Peek (System Suppliers) The contract to provide and install the RM system was let to IPL, with Peek acting as their subcontractor. IPL/Peek built the hardware and software, installed the equipment on site and was responsible for factory and site acceptance testing. IPL/Peek currently operate a maintenance contract with the Highways Agency to cover the aspects the RM system which they have supplied and installed. This includes the hardware and software for traffic signal controller and the RM controller, and the signal heads and all cabling to them. This contract began once the first RM site was installed and is scheduled to run until the end of June An extract from the contract is reproduced in Appendix A. National Roads Telecommunications Service (NRTS) At a national level, NRTS took responsibility for the Highways Agency s communications network during early 2007 (actual dates were Area-dependant). For this reason, NRTS had limited involvement in the initial 30 sites. As the NRTS contract start date had been known for some time, it was always considered that NRTS would eventually take on the responsibility for maintaining the RM communications aspects. March MCH 2475

9 There are several communications setups across the 30 sites as follows: Single BT line with broadband link to an individual RM system (no NRTS involvement). Single satellite with broadband link to an individual RM system (no NRTS involvement). Single BT line with broadband link serially, daisy-chained to connect to multiple sites. NRTS influenced the type of equipment procured and the techniques that were used to daisy-chain the communications at adjacent sites. 1.5 Document Distribution In order to ensure that the custodial maintenance period operates successfully with a minimum level of system downtime, the document will be distributed and agreed by all the system stakeholders who are as follows: Highways Agency SSR Highways Agency TO (on a national level) TechMAC (or SuperMAC) MAC (or SuperMAC) IPL/Peek NRTS 1.6 The Primary Maintainer The first line maintenance will be the responsibility of the Primary Maintainer. The Primary Maintainer will be responsible for resolving faults or passing faults to the appropriate third party for resolution. Section 3 and Appendix C details the Primary Maintainer s responsibilities and the processes for dealing with fault occurrences. 1.7 Document Validity The document covers the fault management procedures to be followed with immediate effect until the end of June This period is concurrent with the scheduled end date of the existing Peek maintenance contract. Beyond this time period, it is expected that a similar maintenance protocol will be utilised, however as this has not been confirmed, this document is valid only until 30 June 2008 when it will need to be reviewed and revised as necessary. This document does not cover any periodic inspections or planned maintenance activities which are the subject of a separate document. March MCH 2475

10 2. Interim Maintenance Protocols 2.1 Overview This section of the document outlines the interim maintenance procedures in place prior to handover. 2.2 Peek Contract The installation of the first RM system was completed in June From the point of installation until June 2008, Peek operates a maintenance contract with the Highways Agency which covers the system aspects which they were contracted to supply and install. The Peek contract does not cover the wider infrastructure elements which are in place to provide the safe environment in which the systems reside (such as anti-skid, safety barrier, cabinet sites), nor does it cover the slip road loops, Motorway Incident Detection and Automatic Signalling (MIDAS) outstations or remote communications. Further details of Peek s contractual requirements are located in Appendix A. Peek s contractual arrangement ties them into a system operational performance target. At the times when traffic conditions exist to switch on the RM (mainline occupancy is sufficiently high and mainline lane 1 speed is sufficiently low), Peek need to ensure that their equipment functions 99.5% of this time. To ensure that Peek can deliver this level of service, they dial over the internet into each site daily to interrogate the system fault logs and perform a general check of the site to confirm that each site is free from errors and able to meter traffic when conditions prevail. If faults are determined, Peek will log the fault and complete one of the following options: Fix the fault remotely. An example of this may involve issuing traffic signal controller commands or resetting the RM system software. Instruct one of their engineers to visit the site. This may include replacing lamps or traffic signal controller hardware. Although not Peek s contractual responsibility, Peek have been supportive by alerting Atkins or the local TechMAC / SuperMAC if the fault falls outside of Peek s responsibility. This may happen if MIDAS outstations were not communicating with the RM software. March MCH 2475

11 2.3 System Functionality The RM Controller (RMC) is equipped with an automatic ing system which alerts a nominated recipient of the faults of pre-determined categories. The system can deliver the fault notification to three separate accounts in the form of the following three reports: Report 1 Fault log contains ALL faults. Report 2 Fault log contains CRITICAL faults. Report 3 Fault log contains CRITICAL faults. The s can be sent on any specified day at a specified time to a single recipient. Standard client packages used by the recipient (e.g. MS Outlook) can be used to filter and manage fault notifications once they have been transmitted by the RMC. As the sites have not yet been handed over into maintenance, the alerts have not been fully configured as an agreement with the individual Area s Primary Maintainer is required. It is suggested that the most suitable configuration for the ed alerts is a daily as follows: Report 1 to the Primary Maintainer. Report 2 to IPL/ Peek. Report 3 unused. All faults have a user-configurable severity. The Primary Maintainer may chose to reallocate these addresses or manage them via an client as appropriate. The processes for managing faults are detailed in Appendix C. 2.4 Informal Fault Identification Mechanisms Historically, faults on the RM systems have also been reported to Atkins or the Primary Maintainers by the Highways Agency Traffic Officers as well as members of the public and members of the particular local authorities. 2.5 Traffic Management Considerations Early experience from one of the 30 sites highlighted a threat to the network s operation if the appropriate procedures are not undertaken when deploying traffic management in the vicinity of a RM system. In this particular example, the road space booking process did not consider the RM system operation. The resultant lane 2 closure of the slip road caused the RM system to release only half the vehicles from the stopline that the algorithm had calculated were required. This low flow from the stopline created considerable congestion on the local authority roads. The congestion problem was compounded by the system algorithms calculating that the occupancy of the slip road, and therefore the length of queue, was only half the true value. March MCH 2475

12 If traffic management is deployed on the mainline that results in vehicles running in the hard shoulder, the measured occupancy at the downstream site will not reflect the true conditions. This will lead to the RM signals delivering an inappropriate amount of traffic for that particular condition. Appendix E provides an overview of how the RM system relies on and interacts with the local environment. Following this overview, advice is given for traffic management and road space booking procedures to avoid similar operational problems in the future. Appendix B details the steps required to switch the RM systems on and off and should be read in conjunction with Appendix E. March MCH 2475

13 3. Full Maintenance Protocols 3.1 Overview This section of the document outlines the stakeholders responsibilities throughout the maintenance period. The information contained in this section merely indicates the general concept of responsibilities of system stakeholders. Details of the stepby-step protocols for fault resolution can be found at Appendix C. 3.2 Fault Identification There are a number of ways in which faults within the system can be identified. These are all used to maintain the system during the Interim Maintenance Period as described in Section 2. These are summarised as follows: Peek analysts checking health of the system. Automated fault notification. Scheme engineers, maintenance engineers, HA staff and members of the public identifying faults / incorrect signal sequencing. 3.3 Fault Management As the RM systems have been operating for some time now, an analysis of the faults received enables the type of faults and the frequency of them to be determined. The flow charts contained in Appendix C draw on this experience and is the suggested process by which the system stakeholders should address their responsibilities. The flow charts detail the lifecycle of a fault from determination to rectification and are simplified in the steps below. Consideration has been given to the: Paths by which fault recognition is achieved. Fault logging process. How that fault is distributed (organisational) for resolution. Technical steps required to be undertaken to rectify that fault. Feedback loop which ensures that no secondary faults have occurred. Reporting procedures to accommodate the successful clearance of faults. 3.4 System Components to Maintain A RM system consists of several aspects as follows: The hardware and software technology components required to operate this kind of traffic control technique. The wider infrastructure elements which are in place to provide the safe environment in which the systems operate. March MCH 2475

14 The existing infrastructure which the system makes use of for operational purposes. The maintenance arrangements for these three aspects are all approached by considerably different mechanisms. The technology components will be looked after by a combination of the TechMAC / SuperMAC, NRTS and IPL/Peek. The wider infrastructure elements are the responsibility of the MAC / SuperMAC, whilst the existing infrastructure which the RM system makes use of is covered by the TechMAC / SuperMAC. To offer a more detailed level of RM system components, the following categories have been defined. A further breakdown of these aspects, and the ownership of them, is provided in Appendix D. Infrastructure Cabinets Cabling Loops and MIDAS Remote communications Ramp metering controller 3.5 Stakeholder Maintenance Responsibilities Highways Agency - SSR SSR are not tied to any maintenance responsibilities for the RM systems. SSR has been responsible for determining maintenance procedures and as such should remain involved to offer advice on any arising issues. Until the RM systems are in full maintenance, SSR are providing handover into maintenance documents to the various local TO Area. Highways Agency - TO The Local TO Area is responsible for ensuring that the RM systems offer benefits to the motorists and the local area. This is top-level responsibility is merely an extension to the Area s current regime of ensuring best-network performance. Until the RM systems are in full maintenance, the local TO Area are also responsible for funding all maintenance costs. TechMAC (or SuperMAC / MA & TMC) The TechMAC will be the Primary Maintainer for the RM systems. The TechMAC will identify faults via the mechanisms outlined in Section 3.3 and provided in further detail in Appendix C. Both the automated fault notification and the Peek routine health checks are reliant on the availability of remote Internet Protocol Communication with the RMC. Should the communications system fail, neither of these fault identification mechanisms will be effective. It is therefore essential that the TechMAC monitor the heath of the communications links on a daily basis. This may March MCH 2475

15 be achieved by using the modem supplier s health check software, or by manually logging onto each RMC. Once a fault has been identified, the TechMAC will be responsible for rectifying that fault, or passing that fault onto the appropriate party for them to resolve. The TechMAC will be responsible for verifying that the fault has been rectified once they have been appropriately notified by any third party. The TechMAC will maintain a log of all faults and will take responsibility for tracking fault progress and ensuring a timely fault resolution. The log of maintenance activities will be sufficiently maintained to assist with trend analysis and future maintenance regimes. Once the TechMAC have determined and investigated a fault, they will either rectify the fault themselves or pass the fault to the appropriate third party as detailed below. If that third party is IPL/Peek, then the TechMAC will also provide any traffic management required for the task. The TechMAC will also be responsible for ensuring that any works on the network are considerate of the vicinity of that work in relation to the RM system, and the network assets on which the RM system relies. Further information and guidance on these issues can be found in Section 2.5 and Appendix E. MAC (or SuperMAC / MA & TMC) (As advised by the TechMAC) the MAC will be responsible for the wider infrastructure elements which are in place to provide a safe operating environment for the RM system. The MAC will also be responsible for ensuring that any works on the network consider any RM system in the vicinity of the work, and the network assets on which the RM system relies. Further information and guidance on these issues can be found in Section 2.5 and Appendix E. IPL/Peek (As advised by the TechMAC) IPL/ Peek will be responsible for the system aspects as supplied and installed by them. This requirement falls under IPL/ Peek s existing contract with the Highways Agency. IPL/ Peek do not provide their own traffic management for any works they undertake which requires it. This traffic management will be provided by the TechMAC. NRTS (As advised by the TechMAC) NRTS will be responsible for all communication aspects of the RM systems. 3.6 Response Times There are several maintenance scenarios as follows: System shutdown. Fault rectification (restricting RM operation). March MCH 2475

16 Fault rectification (RM still operates). Knockdowns. All stakeholders will need to comply with the response times below for any equipment which falls under their responsibility. Appendix D details the stakeholders matrix of responsibilities System Shutdown A system shutdown would be required when an incident occurs on the network which affects how the RM system reacts to traffic conditions. If a vehicle was broken down in or around the merge area, there is a high chance that the normal operation of the RM system will be unsuitable until the incident has cleared. The RM system should be switched off in these circumstances. In the event of such an incident, it will be clear on-street if the system needs to be switched off Fault Rectification (restricting RM operation) There are several faults which, if they occur, will restrict the RM system from switching on. This may happen if the MIDAS outstations are not communicating with the RM controller, of if two red lamp failures have occurred. These faults require immediate attention to minimise any system downtime Fault Rectification (RM still operates) There are a number of faults which will still allow the RM system to operate if they occur, but the performance may not be optimal. Lamp dimming faults and single aspect failures fall within this category Knockdowns In the event of a knockdown, the site will need to be made safe. It is unlikely that a collision with the RM controllers will occur as the cabinets are all located behind safety barriers. The most likely knockdown would be to one of the passive poles which are not always located behind safety barriers. Once a pole has been struck, the site must be made completely safe, in terms of the dotplug electrical connections and the removal of any debris from within the carriageway Response Time Periods The fault scenarios detailed above require the following response times: System shutdown 1 hour. Fault rectification (restricting RM operation) 24 hours*. Fault rectification (RM still operates) 48 hours. Knockdowns 24 hours. *If the Main Carriageway Upstream Loop 1 was to fail, the TechMAC would have 28 days to resolve this particular fault. March MCH 2475

17 3.7 Spares Equipment The existing contract with IPL/ Peek requires them to hold sufficient spares in order to meet their maintenance obligations. It is recommended that each stakeholder holds a level of spares appropriate to their system maintenance responsibilities. March MCH 2475

18 Appendix A Maintenance Sections of the Systems Specification (Contract) 4 SCOPE OF SUPPLY The contractor shall provide, in accordance with the bill of quantities: Development, design, integration and project management (of the items described in this specification to produce a ramp metering system). Ramp metering controllers including application software and Human Machine Interface (Supervisory interface). Loop interface units (if required). LED signal heads. All interconnecting cabling with the exception of power, loop tails and existing longitudinal. Installation and commissioning services on-site. Maintenance services. Design, operational and maintenance documentation. Operational and maintenance training. The infrastructure, designed and implemented by others will provide: Inductive loops for vehicle detection. Roadside enclosure for the ramp metering controller. Roadside enclosure for the loop interface unit (if required). Buried ducts to carry cables. Mounting poles for signal heads. Fixed warning signs in advance of the stop line. Power supply to the ramp metering controller in the form of single phase mains supply. Communications to/from the ramp metering controller through a remote connection. MIDAS outstations where additional needed. 14 MAINTENANCE The contractor shall provide maintenance support of a form described below to maintain the specified availability for a period that starts upon commissioning the first system and continues for all systems until June 2008 after successful on-site commissioning of the final system. It can be assumed that systems will be deployed on any part of the English motorway network. March 2008 A-13 MCH 2475

19 Monthly performance payments are paid subject to meeting the service levels described below. The contractor can put forward a method for measuring service levels. The contractor shall hold a number and selection of spares to enable the specified availability to be achieved. A primary requirement of the system is the need to be easily enhanced and modified through evolution. Some of this evolution may take place during the maintenance period. In this case the contractor will only be responsible for the maintenance and performance of software, hardware and designs supplied by the contractor. As part of this, the contractor will be required to work on live carriageways and must therefore provide, in advance, a method statement showing how the safety of the contractor s workforce, road users and any others will be safeguarded. In order to maintain a safe working environment on site, the contractor must adhere to any relevant procedures put in place by the Highways Agency s Area Agent HARDWARE MAINTENANCE The contractor shall provide on-site service to rectify any fault and restore the system to its state upon completion of successful commissioning within 24 hours of receiving notification of the fault. The contractor may receive notification of faults by automated alert, sent by an individual, by telephone or written means. The contractor shall put in place a means of regularly and remotely monitoring the health of each installed system and shall investigate and resolve any indication that there is a problem. Each installed system shall be checked at least daily SOFTWARE MAINTENANCE The contractor will provide three types of software support: Issue resolution (non-critical). Issue resolution (critical). Software enhancement. A non-critical software issue is one where the software is preventing the system meeting the performance required in this specification, however it is still possible to operate ramp metering at that site for the benefit of road users. A critical software issue is one where the software is preventing the system meeting the performance required in this specification in such a way that it is not possible to perform ramp metering at that site. A software enhancement is a feature or function that is requested or required and that is not currently defined in this specification. March 2008 A-14 MCH 2475

20 The contractor shall resolve non-critical software issues within one month of notification. The contractor shall resolve critical software issues within five working days of notification. Resolution of software issues will be defined as tested and working software installed in all the relevant systems. The contractor shall provide the Highways Agency with an escalation process if there is insufficient progress in the resolution of issues within 75% of the stated response time. In response to a request for a specified software enhancement, the contractor shall respond within 10 working days with an estimate for the elapsed time and costed time to implement the requirement. March 2008 A-15 MCH 2475

21 Appendix B Note for Switching a RM System Off In certain circumstances it is necessary to switch off a ramp metering (RM) system at a particular junction. This is achieved by accessing the Supervisory Interface for that junction by using a login with the correct access level privileges. Once access to the site has been gained, the site activationmode within the SwitchOnOff algorithm is changed to ManualOff. This process is fully described in the following steps and shown diagrammatically in Figure B.22 to Figure B.5 5. Each RM junction has a unique external Internet Protocol (IP) address that is entered into the Internet Explorer 1 (IE) address bar to access the site these addresses may be stored as Favourites within Internet Explorer. Once all RM sites have a defined IP address then Atkins will provide a html file with all the IP addresses for the RM junctions in a HA Area (see Figure B.1). To switch off a RM system a User name, Password and Write Password is required and these will be notified to each organisation by Atkins. Each junction will have unique passwords. Figure B.1 - Area 9 & 11 RM Sites IP Address Shortcuts 1 The RM system only supports the Microsoft Internet Explorer browser. Other browsers may work but results cannot be guaranteed. March 2008 B-16 MCH 2475

22 Ramp Metering Switch Off Process (1) Enter the IP address of the site to be accessed in the IE address bar. (2) Press Enter or Select Go. (3) When the Security Alert dialog appears select Yes to continue to the Login page. (4) The Supervisory Interface login page for the RM site will be displayed. The name of the site appears in the top left had side. Check that the correct site has been accessed. (5) Complete the login information: (a) Enter a User name that has write access permissions. (b) Complete both the Password and the Write Password. (c) Press Enter or click Login. (6) Only one user can be logged in with write-access permissions. If someone is already logged in with write access permissions, repeat step (5) but tick the box to force the other user out. (Note, this will inhibit the other user making any further changes.) (7) When the Security Alert dialog appears select Yes to continue to the Supervisory Interface Home page. (8) In the Algorithms section click on the Configuration link to expand the options. (9) From the expanded Algorithms Configuration section click the SwitchOnOff link. (10) Wait for the SwitchOnOff Parameters page to be displayed. (11) Click the drop down box for the activationmode parameter. (12) Select ManualOff. (13) Scroll to the bottom of the page. (14) Click on the Submit button. (16) The screen will refresh and advise whether or not the update was successful. (17) The new activationmode is shown within the drop down menu. (18) Having completed the change of activationmode for the RM site, log out of the Supervisory Interface using the link at the top right hand side of the page. Ramp Metering Switch On Process Repeat steps (1) to (18) above but at step (12) Select timedoccupancy. March 2008 B-17 MCH 2475

23 Figure B.2 - Switch Off Process Steps 1 to 6 March 2008 B-18 MCH 2475

24 Figure B.3 - Switch Off Process - Steps 7 to 8 March 2008 B-19 MCH 2475

25 Figure B.4 - Switch Off Process - Steps 9 to 14 March 2008 B-20 MCH 2475

26 Figure B.5 - Switch Off Process - Steps 15 to 18 March 2008 B-21 MCH 2475

27 Appendix C Detailed Fault Diagnosis and Rectification Protocols The Fault Tree shown in Figure C.3 to Figure C.8 is provided as a basis by which system faults can be investigated and assigned to the appropriate party to resolve. It is not intended to prescribe a particular method of fault monitoring or diagnosis, but follow a logical sequence of steps that could be used to isolate the cause of a specific fault. The Fault Tree is based on the role of a Primary Maintainer who has first line responsibility for: Receiving any fault notifications. Logging the faults and updates to the fault progress. Carrying out sufficient investigations to determine the cause(s) of the fault(s). Assigning the fault to the relevant organisation to resolve. Receiving notification of clearance of faults. Confirming the system is operational after the fault has been cleared. Logging the clearance of the fault. The Fault Tree defines the Primary Maintainer as the TechMAC or SuperMAC (dependant on Area conventions). System Faults Page The Primary Maintainer would receive notification of a fault with the RM system by various means: Notification by third party (System Supplier, Regional Control Centre, colleagues on the network). alert when fault first raised; and Scheduled fault log (sent daily, weekly or monthly as required). The notification of faults to the Primary Maintainer is dependant on the communications link to the site being operational and the equipment at the site being in a state whereby it can generate s. If the communications link fails there would be no automatic notification of faults and thus the communications link needs to be checked regularly (for example, once a day). Once notified of a fault, the Primary Maintainer would investigate and assign the fault to a party based by following the Fault Tree, starting with Figure C.4. They would log in to the system in order to check the Site Monitor (Figure C.1) and Fault Log (Figure C.2) for information about current faults. Should they be unable to access the site, they would check the communications link following the steps in Figure C.5. March 2008 C-22 MCH 2475

28 If the site is accessible remotely then a review of the Site Monitor and Fault Log will give a good indication as to the cause of the fault and to whom it should be assigned, based on three main categories: Slip Road Loop Faults generally for the TechMAC to resolve but could be a System Supplier issue (see Figure C.6 - Fault Tree - Slip Road Faults) Ramp Metering Outstation Faults generally for the System Supplier to resolve but there could be power issues for the TechMAC to resolve (see Figure C.7- Fault Tree - RMO Faults) MIDAS/OAL Faults generally for the TechMAC to resolve but there could be issues for NRTS or the System Supplier to resolve (see Figure C.8 - Fault Tree - MIDAS Faults) The TechMAC/SuperMAC may have to do some further investigation, as shown in the Fault Tree, before finally assigning a fault to a third party (e.g. confirming power to the site). When the TechMAC/SuperMAC attends to a device/site to investigate a fault, they should record (and subsequently pass on) the status of any indicators (e.g. LEDs) that might aid a third party when the faults are transferred to them. On rectification of a fault, the TechMAC/SuperMAC should be notified. They would then check that the fault has been cleared, confirm that no secondary faults have arisen, check that the system is operational again and log the clearance of the fault. Comms Check Page As the method by which communications to a RM site is provided varies from Area to Area the steps in Figure C.5 are intended to cover all current permutations. It is acceptable for each Area maintainer to amend the processes to suit their specific arrangements based on subsequent experience of fault finding communications problems. If a site is inaccessible remotely, there could be a number of reasons for this: Fault with the physical BT line or satellite link to that site (pass to NRTS). Problems with the Internet account (pass to NRTS). Problems with power to the hardware that provides the end to end communications link to a site (TechMAC/SuperMAC). Problems with the hardware that provides the end to end communications link to a site (pass to NRTS). Problems with the cabling that provides the end to end communications link to a site (pass to NRTS). Problems with the ramp metering outstation (pass to the system supplier). If a site cannot be accessed the first step would be to try to connect to the ADSL modem/ firewall at the start of the communications link. If its configuration page can be accessed, this confirms that the BT or satellite link and associated Internet connection are operational. March 2008 C-23 MCH 2475

29 When there are a number of devices/sites that form part of the link to a particular site, a logical step would be to check which of those devices/sites are accessible and which are not. This would narrow down the point at which the link fails. However, as the main purpose of the Fault Tree is to assign fault types to the appropriate party, the approach shown in Figure C.5 is to confirm the external communications to the first device (as described above) and check the status from the last point in the link (i.e. the RM controller). If the first device in the link (ADSL modem/ firewall) cannot be contacted from the last point in the link then the fault is with the intermediate communications devices and/or cabling and thus would be transferred to NRTS (once TechMAC/SuperMAC have confirmed that power to these devices, for which TechMAC/SuperMAC are responsible, exists). If the first device in the link (ADSL modem/ firewall) can be contacted from the last point in the link then the problem is likely to be with the ramp metering controller which can be confirmed by trying to access it locally this fault would be transferred to the system Supplier. Slip Road Faults Page If one or more faulty loops are reported, the TechMAC/SuperMAC would attend site to isolate the loop and loop feeder from the ramp metering controller in order to determine whether these items were operating to specification. If the loop and/or loop feeder are faulty then the TechMAC/SuperMAC would arrange for their repair including any traffic management and possibly temporary Traffic Regulation Orders required. NOTE: Certain slip road loop faults could cause the RM system to switch off until the fault has been cleared. If the loop and loop feeder are operating within specification then the fault could lie with system supplier cabling, detection cards or related hardware. The fault would be transferred to the system supplier. RMO Faults Page Most faults reported in the fault log, with the exception of loop faults and MIDAS / Outstation Auxiliary Link (OAL) faults, would be transferred to the system supplier for resolution. However, if the problem was due to lack of power to the site then this would be for the TechMAC/SuperMAC to investigate, though it may get passed to the system supplier if their equipment is found to be tripping the incoming supply. MIDAS Faults Page As the MIDAS outstations used by RM are part of COBS (Control Office Based System) and report faults to Highways Agency LOGging ENvironment (HALOGEN) then any MIDAS Faults reported by the RM systems should be checked on COBS/HALOGEN to help verify the cause of the fault. However, as COBS/HALOGEN does not cover OAL faults then further investigation will generally be required. March 2008 C-24 MCH 2475

30 If one or more mainline loops are faulty then this would be for the TechMAC/SuperMAC to resolve. NOTE: Certain mainline loop faults could cause the RM system to switch off till the fault is cleared. If there are problems with one or more MIDAS Outstations (e.g. no link to a specific Outstation or no data from it) then further investigation is required to determine who to assign the fault to. The fault would only be assigned to the System Supplier if all configured MIDAS Outstations were reported faulty by the RM Controller. If the RM Controller can communicate with one device on that OAL circuit then this indicates that the RMC is operational. The RMC can be checked by isolating it from the OAL circuit and monitoring its output with a MIDAS Outstation Testing Equipment (MOTE) or equivalent device. NOTE: The RMC has two OAL ports but the Fault Tree assumes that only one OAL port is used as that is generally the case (valid for the first 30 installed sites). If the RM controller is not at fault then the TechMAC/SuperMAC has to determine whether the fault is with the MIDAS Outstation(s) (hardware, software or configuration) for which they are responsible for maintaining or whether the issue lies with the cabling (quads, longitudinal or End Of Line resistors) which NRTS maintain. Figure C.1 - Site Monitor Page March 2008 C-25 MCH 2475

31 Figure C.2 - Fault Log March 2008 C-26 MCH 2475

32 Figure C.3 - Fault Tree - Key March 2008 C-27 MCH 2475

33 Figure C.4 - Fault Tree - System Faults March 2008 C-28 MCH 2475

34 Figure C.5 - Fault Tree - Comms Check March 2008 C-29 MCH 2475

35 Figure C.6 - Fault Tree - Slip Road Faults March 2008 C-30 MCH 2475

36 Figure C.7- Fault Tree - RMO Faults March 2008 C-31 MCH 2475

37 Figure C.8 - Fault Tree - MIDAS Faults March 2008 C-32 MCH 2475

38 Appendix D Maintenance Matrix of Responsibility SuperMAC IPL/Peek (System Supplier) (Area Team) TechMAC MAC (Area Team) (Area Team) NRTS Routine Duties Daily logging into site (normal working days) (contractual) (advisable) Fault logging and management including allocation of Faults to other parties Emergency shut down (24hr response) Standard Routine Maintenance as per existing contract Cabinet Site and Access (including steps, handrail, paving) Note, this responsibility may be Area dependant Infrastructure Barrier Road Surfacing and White Lining Fixed Plate Signs and associated poles (lit and unlit) Active Queue Warning Message Sign Local Ducts and Chambers (if duct includes NRTS cabling to a local SDP) Longitudinal Ducts and Chambers Signal Heads 1. Make safe in event of knockdown. 2. Provide TM for Peek if required. Pre-wired Signal Poles Pre-wired Pole Signal Foundations Solar Cells Breakaway Plugs Cabinets Power Cabinet (including fireman s switch where fitted) RMC Cabinet (including modem shelf and mains distribution) Satellite Poles Cabling Traffic Signal Cables March 2008 D-33 MCH 2475

39 IPL/Peek (System Supplier) SuperMAC (Area Team) TechMAC MAC (Area Team) (Area Team) NRTS Quad: MIDAS C2 (OAL) Quad: RMC C2 (remote communications) Quads: RMC Interface Cabinet (BT/ITM/Fire station) Power: EI to P Power: P to RMC Power: Street Lighting and Lit Signs Loop Feeders: Slip detection loops Quad: RMC to Active Queue Warning Message Sign Power: P to Active Queue Warning Messages Sign Loops and MIDAS Slip Road Loops Mainline MIDAS Loops MIDAS Outstations on mainline (Under current TechMAC maintenance) (Under current TechMAC maintenance) Remote communications Satellites plus associated Firewalls and cabling SHDSL network equipment BT lines plus associated Modems, Firewalls and Cabling Ramp Metering Controller (within RCC) (Direct to roadside or into Transmission Station) TSC 1. Make safe in event of knockdown. 2. Provide TM for Peek if required. Peek Chameleon 1. Make safe in event of knockdown. 2. Provide TM for Peek if required. RMC Site Data Table D.1 - Maintenance Matrix of Responsibility March 2008 D-34 MCH 2475

40 Appendix E Traffic Management Considerations A typical RM system comprises of four traffic signal heads, ten pairs of slip road loops and five main carriageway MIDAS outstations. The RM controller is located either on the nearside of the slip road or the nearside of the mainline within a standard communications cabinet. The slip road loops and outstations continually read traffic data from the slip road and the mainline. The RM system operation relies on this continuous stream of traffic data and varies the vehicle release flow over the stopline (via the RM signal sequences) according to the data values obtained from the road side. If traffic management is deployed within the vicinity of the RM system, the traffic behaviour will become altered in the area. As the RM system is finely calibrated at each site to reflect the individual characteristics of that site, significant changes to the traffic behaviour will affect the RM system operation in a negative way. The Figure F.1 below highlights the parts of the network ( the Vicinity ) which feed data to the RM system. If any traffic management is required to be deployed in the vicinity, the TechMAC should be advised so that the appropriate action may be taken. Pairs of slip road loops Ramp Metering Enclosure Traffic Signals 500m No TM ½ mile No TM ¼ mile ~ 500m MIDAS Outstations Diagram not to scale This is the area in which TM can affect RM operation. In the Flow Chart below, this area is termed the vicinity of RM Figure E.1 - The RM Vicinity Office protocols to support Works within the vicinity of a RM system It is advised that the local Area Road Space Booking applications are modified to include a section relating to the potential impacts on RM. Figure F.2 below illustrates the information that needs to be obtained and how various TM interactions with a RM system are to be handled. March 2008 E-35 MCH 2475

41 Figure E.2 - Dealing with TM in the RM Vicinity March 2008 E-36 MCH 2475

Service Level Agreement

Service Level Agreement Service Level Agreement General This document is a Service Level Agreement (SLA) setting out the levels of services to be provided to you by Luminet. This document must be read in conjunction with our

More information

Service Level Agreement

Service Level Agreement General This document is a (SLA) setting out the indicative levels of services to be provided to you by Luminet. This document must be read in conjunction with our standard Terms and Conditions of Service

More information

SEC Appendix AG. Deleted: 0. Draft Version AG 1.1. Appendix AG. Incident Management Policy

SEC Appendix AG. Deleted: 0. Draft Version AG 1.1. Appendix AG. Incident Management Policy Draft Version AG 1.1 Deleted: 0 Appendix AG Incident Management Policy 1 Definitions In this document, except where the context otherwise requires: Expressions defined in section A of the Code (Definitions

More information

Registration Data Incident Management Policy

Registration Data Incident Management Policy Registration Data Incident Management Policy Author: DCC Operational Policy Draft Version 1 Date: 1 st May 2014 Page 1 of 23 Contents 1 Document History 4 1.1 Document Location 4 1.2 Review Dates 4 1.3

More information

Fibre & ADSL Broadband - Specific Terms and Conditions

Fibre & ADSL Broadband - Specific Terms and Conditions Fibre & ADSL Broadband - Specific Terms and Conditions Issue date: 1 st March 2018 1 DEFINITIONS 1.1 These Specific Terms and Conditions are to be read in conjunction with TNBN Ltd Terms and Conditions

More information

3 More detail and justification for the recommendations

3 More detail and justification for the recommendations Meeting name UMSUG Date of meeting 25 May 2010 Paper title Alcatel Lucent Cabinets Purpose of paper For Decision UMSUG MAY/06 Summary Alcatel Lucent would like to apply for Charge Codes for their telecommunication

More information

WEM ECC Contracts - User guide

WEM ECC Contracts - User guide WEM ECC Contracts - User guide Introduction... 3 ECC Project Managers / Contractors Guide... 7 Contract Data Explained... 7 Pain / Gain... 8 Updating project incentivised cost forecasts... 11 Access to

More information

AUTHORITY FOR ELECTRICITY REGULATION

AUTHORITY FOR ELECTRICITY REGULATION SULTANATE OF OMAN AUTHORITY FOR ELECTRICITY REGULATION SCADA AND DCS CYBER SECURITY STANDARD FIRST EDITION AUGUST 2015 i Contents 1. Introduction... 1 2. Definitions... 1 3. Baseline Mandatory Requirements...

More information

Standdards of Service

Standdards of Service Standards of Service for the Provision and Maintenance of; THUS Demon Business 2000, Business 8000, Business 2+, Business 2 + Pro, Demon Business Lite, Demon Business Lite +, Demon Business Unlimited,

More information

Stopsley Community Primary School. Data Breach Policy

Stopsley Community Primary School. Data Breach Policy Stopsley Community Primary School Data Breach Policy Contents Page 1 Introduction... 3 2 Aims and objectives... 3 3 Policy Statement... 4 4 Definitions... 4 5 Training... 5 6 Identification... 5 7 Risk

More information

Clearswift Managed Security Service for

Clearswift Managed Security Service for Clearswift Managed Security Service for Email Service Description Revision 1.0 Copyright Published by Clearswift Ltd. 1995 2019 Clearswift Ltd. All rights reserved. The materials contained herein are the

More information

Information Bulletin

Information Bulletin Application of Primary and Secondary Reference Documents Version 1.1 Approved for release July 2014 Table of Contents 1.0 Purpose statement... 3 2.0 Audience... 3 3.0 BCA requirements and referenced documents...

More information

Auckland Traffic Management Unit Traffic Signal Design Review Guidelines. Version 1.0

Auckland Traffic Management Unit Traffic Signal Design Review Guidelines. Version 1.0 Auckland Traffic Management Unit Traffic Signal Design Review Guidelines Version 1.0 August 2010 Disclaimer This document is subject to Copyright Laws. The concepts and information contained in this document

More information

Network Security Policy

Network Security Policy Network Security Policy Date: January 2016 Policy Title Network Security Policy Policy Number: POL 030 Version 3.0 Policy Sponsor Policy Owner Committee Director of Business Support Head of ICU / ICT Business

More information

Ulster University Policy Cover Sheet

Ulster University Policy Cover Sheet Ulster University Policy Cover Sheet Document Title DATA CENTRE ACCESS POLICY 3.2 Custodian Approving Committee Data Centre & Operations Manager ISD Committee Policy approved date 2017 09 08 Policy effective

More information

PS Mailing Services Ltd Data Protection Policy May 2018

PS Mailing Services Ltd Data Protection Policy May 2018 PS Mailing Services Ltd Data Protection Policy May 2018 PS Mailing Services Limited is a registered data controller: ICO registration no. Z9106387 (www.ico.org.uk 1. Introduction 1.1. Background We collect

More information

"PPS" is Private Practice Software as developed and produced by Rushcliff Ltd.

PPS is Private Practice Software as developed and produced by Rushcliff Ltd. Rushcliff Ltd Data Processing Agreement This Data Processing Agreement ( DPA ) forms part of the main terms of use of PPS, PPS Express, PPS Online booking, any other Rushcliff products or services and

More information

Engineering Document Control

Engineering Document Control Division / Business Unit: Function: Document Type: Enterprise Services All Disciplines Procedure Engineering Document Control Applicability ARTC Network Wide SMS Publication Requirement Internal / External

More information

Data Protection Policy

Data Protection Policy Data Protection Policy Data Protection Policy Version 3.00 May 2018 For more information, please contact: Technical Team T: 01903 228100 / 01903 550242 E: info@24x.com Page 1 The Data Protection Law...

More information

MESP TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V DC TRACTION SYSTEM

MESP TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V DC TRACTION SYSTEM Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V Version: 1 Issued: March 2014 Owner: Electrical Networks Asset

More information

ONE OFFICE LITE - PRODUCT SPECIFICATION

ONE OFFICE LITE - PRODUCT SPECIFICATION 1. INTRODUCTION ONE OFFICE LITE - PRODUCT SPECIFICATION This document contains product information for the One Office Lite service. If you require more detailed technical information, please contact your

More information

Error Handling Strategy

Error Handling Strategy Error Handling Strategy Author: DCC Operational Policy Draft Version 1 Date: 1 st May 2014 Page 1 of 13 Contents 1. Document History 3 1.1 Document Location 3 1.2 Review Dates 3 1.3 Revision History 3

More information

SAFECOM SECUREWEB - CUSTOM PRODUCT SPECIFICATION 1. INTRODUCTION 2. SERVICE DEFINITION. 2.1 Service Overview. 2.2 Standard Service Features APPENDIX 2

SAFECOM SECUREWEB - CUSTOM PRODUCT SPECIFICATION 1. INTRODUCTION 2. SERVICE DEFINITION. 2.1 Service Overview. 2.2 Standard Service Features APPENDIX 2 APPENDIX 2 SAFECOM SECUREWEB - CUSTOM PRODUCT SPECIFICATION 1. INTRODUCTION This document contains product information for the Safecom SecureWeb Custom service. If you require more detailed technical information,

More information

Secure Messaging Mobile App Privacy Policy. Privacy Policy Highlights

Secure Messaging Mobile App Privacy Policy. Privacy Policy Highlights Secure Messaging Mobile App Privacy Policy Privacy Policy Highlights For ease of review, Everbridge provides these Privacy Policy highlights, which cover certain aspects of our Privacy Policy. Please review

More information

NHS Gloucestershire Clinical Commissioning Group. Business Continuity Strategy

NHS Gloucestershire Clinical Commissioning Group. Business Continuity Strategy NHS Gloucestershire Clinical Commissioning Group 1 Document Control Title of Document Gloucestershire CCG Author A Ewens (Emergency Planning and Business Continuity Officer) Review Date February 2017 Classification

More information

Verification Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015

Verification Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015 Verification Plan: Mitchell Hammock Road Adaptive Traffic Signal Control System Red Bug Lake Road from Slavia Road to SR 426 Mitchell Hammock Road from SR 426 to Lockwood Boulevard Lockwood Boulevard from

More information

Information Security Strategy

Information Security Strategy Security Strategy Document Owner : Chief Officer Version : 1.1 Date : May 2011 We will on request produce this Strategy, or particular parts of it, in other languages and formats, in order that everyone

More information

Severn Trent Water. Telecommunications Policy and Access Procedure

Severn Trent Water. Telecommunications Policy and Access Procedure Severn Trent Water Telecommunications Policy and Access Procedure Contents STW Telecommunications Policy: 5-12 Health and Safety: 13-18 Access Procedures:19-30 2 STW LSH Sites Access Policy [Controlled

More information

CORPORATE GLOBAL ROAMING PRODUCT SPECIFICATION

CORPORATE GLOBAL ROAMING PRODUCT SPECIFICATION CORPORATE GLOBAL ROAMING PRODUCT SPECIFICATION 1. INTRODUCTION This document contains information on the Corporate Global Roaming service. If you require more detailed technical information, please contact

More information

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement Decision 21617-D01-2016 Crystal Lake 722S Substation October 5, 2016 Alberta Utilities Commission Decision 21617-D01-2016 Crystal Lake 722S Substation Proceeding 21617 Application 21617-A001 October 5,

More information

Access to personal accounts and lawful business monitoring

Access to personal  accounts and lawful business monitoring Access to personal email accounts and lawful business monitoring Contents Policy statement... 2 Access to personal emails... 2 Manager suspects misuse... 3 Lawful business monitoring... 4 Additional information...

More information

NDIS Quality and Safeguards Commission. Incident Management System Guidance

NDIS Quality and Safeguards Commission. Incident Management System Guidance NDIS Quality and Safeguards Commission Incident Management System Guidance Version 1 - May 2018 Acknowledgment This guidance is published by the Australian Government, using resources developed by the

More information

GRAMPIAN SCG PUBLIC COMMUNICATIONS PLAN

GRAMPIAN SCG PUBLIC COMMUNICATIONS PLAN Page 1 of 11 Page 1 of 11 Communications Plan GRAMPIAN SCG PUBLIC COMMUNICATIONS PLAN Version: Communications Liaison Group Approval Planned Review Chair SCG Plans Workstream Protective Marking: Planned

More information

BT Product and Services Agreement (PSA) Apps from BT Service Schedule

BT Product and Services Agreement (PSA) Apps from BT Service Schedule 1 Definitions The following definitions apply, in addition to those in the General Terms and Conditions. Application means a software program designed to carry out operations for specific tasks. Availability

More information

Guidance for Accident Reporting

Guidance for Accident Reporting Guidance for Accident Reporting Produced by Date approved and agreed Health, Safety and Wellbeing 1 st February 2016 Review Date 1 st February 2017 Version 1.0 Document reference HSW/GN/AR If you need

More information

Submitting a Corridor Access Request

Submitting a Corridor Access Request Quick Reference for Submitting a Corridor Access Request Contents Overview... Logging In... How to Create a Project... How to Set up a Worksite... Worksite Details... Add Work Item... Adding a Traffic

More information

Communications Room Policy

Communications Room Policy Information Security Policies Communications Room Policy Author : David Rowbotham Date : 01/07/2014 Version : 1.1 Status : Initial Release MAG Information Security IT Policies Page: 1 1 Table of contents

More information

REVISION HISTORY DATE AMENDMENT DESCRIPTION OF AMENDMENT

REVISION HISTORY DATE AMENDMENT DESCRIPTION OF AMENDMENT REVISION HISTORY DATE AMENDMENT DESCRIPTION OF AMENDMENT IFC SERVICE DESCRIPTION 17 OCTOBER 2016 Page 1 of 9 SERVICE DESCRIPTION 2-14: INTERNATIONAL FALCON CONNECTION SERVICE (IFC Service) 1. THE SERVICE

More information

Office 365. Claranet Service Description

Office 365. Claranet Service Description Claranet Service Description Office 365 Provides a highly configurable Email, Collaboration and Unified Communications platform, hosted by Microsoft, that can be deployed for a customer organisation to

More information

Security Annex for DDoS Additional Terms for DDoS Protection

Security Annex for DDoS Additional Terms for DDoS Protection CONTENTS 1 Glossary of Terms & Definitions... 2 2 Service Description... 2 2.1 Installation and Service Provision... 2 2.2 Cleaning and Mitigation... 3 2.3 Mitigation Limitations... 3 2.4 DDoS Attack Monitoring...

More information

Network Configuration Document Selection for New Substations Framework

Network Configuration Document Selection for New Substations Framework Network Configuration Document Selection for New Substations Current version: 20/06/2018 EXTERNAL USE Page 1 of 14 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References...

More information

BT Compute Protect Schedule to the General Terms

BT Compute Protect Schedule to the General Terms BT Compute Protect Schedule to the General Terms Contents A note on you... 2 Words defined in the General Terms... 2 Part A The BT Compute Protect Service... 2 1 Service Summary... 2 2 Standard Service

More information

Luminet - Service Level Agreement

Luminet - Service Level Agreement Service Level Agreement General This document is a Service Level Agreement (SLA) setting out the levels of services to be provided to you by Luminet. This document must be read in conjunction with our

More information

Complaint Handling Procedure and Escalation Policy

Complaint Handling Procedure and Escalation Policy Complaint Handling Procedure and Escalation Policy COPYRIGHT STATEMENT This document is the property of Nottingham Rehab Ltd. and may not, without our express written consent, be copied in whole or in

More information

I. PURPOSE III. PROCEDURE

I. PURPOSE III. PROCEDURE A.R. Number: 2.11 Effective Date: 2/1/2009 Page: 1 of 5 I. PURPOSE This policy outlines the procedures that third party organizations must follow when connecting to the City of Richmond (COR) networks

More information

NMCS2 MIDAS Outstation Algorithm Specification

NMCS2 MIDAS Outstation Algorithm Specification traffic systems and signing TR 2177 Issue H NMCS2 MIDAS Outstation Algorithm Specification Crown Copyright 2009 First published 1994 Printed and published by the Highways Agency Page 1 NOTE: This document

More information

Policy. London School of Economics & Political Science. Remote Access Policy. IT Services. Jethro Perkins. Information Security Manager.

Policy. London School of Economics & Political Science. Remote Access Policy. IT Services. Jethro Perkins. Information Security Manager. London School of Economics & Political Science IT Services Policy Remote Access Policy Jethro Perkins Information Security Manager Summary This document outlines the controls from ISO27002 that relate

More information

Accreditation & Certification Supplier Guide

Accreditation & Certification Supplier Guide Accreditation & Certification Supplier Guide Network Connectivity Products and Services Connected Health Version 1.0 Table of Contents 1 PREFACE... 3 1.1 AUDIENCE...3 1.2 PURPOSE...3 1.3 SCOPE...3 2 CONNECTED

More information

Sure Broadband Services Service Specific Terms and Conditions

Sure Broadband Services Service Specific Terms and Conditions Sure Broadband Services Service Specific Terms and Conditions SURE (GUERNSEY) LIMITED ( SURE ) BROADBAND SERVICES DESCRIPTION Sure s Broadband services provide always-on Internet connections. They are

More information

ANZSCO Descriptions The following list contains example descriptions of ICT units and employment duties for each nominated occupation ANZSCO code. And

ANZSCO Descriptions The following list contains example descriptions of ICT units and employment duties for each nominated occupation ANZSCO code. And ANZSCO Descriptions The following list contains example descriptions of ICT units and employment duties for each nominated occupation ANZSCO code. Content 261311 - Analyst Programmer... 2 135111 - Chief

More information

MASTER SERVICES AGREEMENT SERVICE DESCRIPTION

MASTER SERVICES AGREEMENT SERVICE DESCRIPTION : SMART SIP PART A PRODUCT OVERVIEW The Smart SIP service employs Session Initiation Protocol (SIP) for voice and multimedia communication sessions and connects to a range of end user phone systems such

More information

Privacy Impact Assessment

Privacy Impact Assessment Automatic Number Plate Recognition (ANPR) Deployments Review Of ANPR infrastructure February 2018 Contents 1. Overview.. 3 2. Identifying the need for a (PIA).. 3 3. Screening Questions.. 4 4. Provisions

More information

OFFICIAL COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE

OFFICIAL COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE Title of document ONR GUIDE COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE Document Type: Unique Document ID and Revision No: Nuclear Security Technical Assessment Guide CNS-TAST-GD-4.4 Revision

More information

NORTH WEST Super-fast Broadband Strategy Condition 21 November 2012

NORTH WEST Super-fast Broadband Strategy Condition 21 November 2012 NORTH WEST Super-fast Broadband Strategy Condition 21 November 2012 November 2012 North West Cambridge Development Site Wide Strategy Superfast Broadband Site Wide Strategy for Superfast Broadband Contents

More information

Policies, Procedures, Guidelines and Protocols. John Snell - Head of Workforce Planning, Systems and Contributors

Policies, Procedures, Guidelines and Protocols. John Snell - Head of Workforce Planning, Systems and Contributors Policies, Procedures, Guidelines and Protocols Document Details Title Staff Mobile Phone Policy Trust Ref No 2036-39774 Local Ref (optional) N/A Main points the document Procurement, allocation and use

More information

Satellite Broadband Customer Terms and Conditions

Satellite Broadband Customer Terms and Conditions Satellite Broadband Customer Terms and Conditions In these terms and conditions, when we refer to Satellite Broadband the reference includes Satellite Broadband and Phone services unless otherwise stated.

More information

New Zealand Telecommunications Forum. Code for Vulnerable End Users of Telecommunication Services. ( Vulnerable End User Code )

New Zealand Telecommunications Forum. Code for Vulnerable End Users of Telecommunication Services. ( Vulnerable End User Code ) New Zealand Telecommunications Forum Code for Vulnerable End Users of Telecommunication Services ( Vulnerable End User Code ) Code Status: Code Classification: Date: Review Status: For Public Consultation

More information

Network Services Enterprise Broadband

Network Services Enterprise Broadband Contents 1. 2. ADSL/Broadband Provisions 3. Network Services Customer Responsibilities 4. Network Services General 5. Service Management Boundary 6. Defined Terms Network Services Where the Customer selects

More information

QUICKLINE PREMIUM CLASS SERVICE LEVEL AGREEMENT Includes the non-financially backed Premium Class and Premium Plus SLA

QUICKLINE PREMIUM CLASS SERVICE LEVEL AGREEMENT Includes the non-financially backed Premium Class and Premium Plus SLA QUICKLINE PREMIUM CLASS SERVICE LEVEL AGREEMENT Includes the non-financially backed Premium Class and Premium Plus SLA Rev SLAQPC06052016SJ Please Note: This may not be the newest version of this document;

More information

Certificate of Acceptance

Certificate of Acceptance Specific Conditions The following Conditions are specific to the approved product/s contained within this Certificate. These conditions must be adhered to in addition to the Network Rail General Conditions

More information

BHIG - Mobile Devices Policy Version 1.0

BHIG - Mobile Devices Policy Version 1.0 Version 1.0 Authorised by: CEO Endorsed By: Chief Operations Officer 1 Document Control Version Date Amended by Changes Made 0.1 20/01/2017 Lars Cortsen Initial document 0.2 29/03/2017 Simon Hahnel Incorporate

More information

SECTION 2-13: CARRIER PRESELECTION ACCESS SERVICE

SECTION 2-13: CARRIER PRESELECTION ACCESS SERVICE SECTION 2-13: CARRIER PRESELECTION ACCESS SERVICE 1 THE SERVICE The Carrier PreSelection Access Service is an inter-operator service which supports the circumstances such that an End User s National Services

More information

University of Sunderland Business Assurance PCI Security Policy

University of Sunderland Business Assurance PCI Security Policy University of Sunderland Business Assurance PCI Security Policy Document Classification: Public Policy Reference Central Register IG008 Policy Reference Faculty / Service IG 008 Policy Owner Interim Director

More information

Collaborative Intelligent Transportation Systems (ITS) Initiatives with Neighbouring Jurisdictions

Collaborative Intelligent Transportation Systems (ITS) Initiatives with Neighbouring Jurisdictions STAFF REPORT ACTION REQUIRED Collaborative Intelligent Transportation Systems (ITS) Initiatives with Neighbouring Jurisdictions Date: March 21, 2011 To: From: Wards: Reference Number: Public Works and

More information

Security Annex for Firewalls Additional Terms for Firewall Service

Security Annex for Firewalls Additional Terms for Firewall Service CONTENTS 1 Glossary of Terms & Definitions... 2 2 Service Description... 2 2.1 Firewall Service... 2 2.2 Provisioning... 2 3 Firewall throughput... 3 4 Vendor Change... 3 5 Charges... 3 5.1 Charges payable

More information

DSCC ONLINE USER GUIDE Revised 2018

DSCC ONLINE USER GUIDE Revised 2018 DSCC Website User Guide April 2018 DSCC ONLINE USER GUIDE Revised 2018 Version Issue date Last review date Owned by 1 19/11/13 19/11/13 Capita 2 11/04/2018 11/04/2018 Capita - 1 - Contents Abbreviations

More information

Information Security Controls Policy

Information Security Controls Policy Information Security Controls Policy Classification: Policy Version Number: 1-00 Status: Published Approved by (Board): University Leadership Team Approval Date: 30 January 2018 Effective from: 30 January

More information

IoT & SCADA Cyber Security Services

IoT & SCADA Cyber Security Services RIOT SOLUTIONS PTY LTD P.O. Box 10087 Adelaide St Brisbane QLD 4000 BRISBANE HEAD OFFICE Level 22, 144 Edward St Brisbane, QLD 4000 T: 1300 744 028 Email: sales@riotsolutions.com.au www.riotsolutions.com.au

More information

TARGET2-SECURITIES INFORMATION SECURITY REQUIREMENTS

TARGET2-SECURITIES INFORMATION SECURITY REQUIREMENTS Target2-Securities Project Team TARGET2-SECURITIES INFORMATION SECURITY REQUIREMENTS Reference: T2S-07-0270 Date: 09 October 2007 Version: 0.1 Status: Draft Target2-Securities - User s TABLE OF CONTENTS

More information

Information Security Incident

Information Security Incident Good Practice Guide Author: A Heathcote Date: 22/05/2017 Version: 1.0 Copyright 2017 Health and Social Care Information Centre. The Health and Social Care Information Centre is a non-departmental body

More information

Mobile / Smart Phone Policy

Mobile / Smart Phone Policy Mobile / Smart Phone Policy Policy reviewed by: Philippa Mills Review date: September 2017 Next review date: September 2018 School refers to Cambridge International School; parents refers to parents, guardians

More information

Information backup - diagnostic review Abertawe Bro Morgannwg University Health Board. Issued: September 2013 Document reference: 495A2013

Information backup - diagnostic review Abertawe Bro Morgannwg University Health Board. Issued: September 2013 Document reference: 495A2013 Information backup - diagnostic review Abertawe Bro Morgannwg University Health Board Issued: September 2013 Document reference: 495A2013 Status of report This document has been prepared for the internal

More information

Smart Meters Programme Schedule 6.3. (Development Process) (CSP North version)

Smart Meters Programme Schedule 6.3. (Development Process) (CSP North version) Smart Meters Programme Schedule 6.3 (Development Process) (CSP North version) Schedule 6.3 (Development Process) (CSP North version) Amendment History Version Date Status v.1 Signature Date Execution copy

More information

WAN/MPLS SLA Fault Reporting

WAN/MPLS SLA Fault Reporting WAN/MPLS SLA Fault Reporting How to report a fault to us Call: 0 550 - Option, Option 5 Email: fixedlinefaults@onecom.co.uk We ll need the below information to log your fault: Company name and your name

More information

DESCRIPTION OF UK LINK. July Version 1.1 For Approval. Deleted: June Formatted: Highlight. Formatted: Highlight

DESCRIPTION OF UK LINK. July Version 1.1 For Approval. Deleted: June Formatted: Highlight. Formatted: Highlight DESCRIPTION OF UK LINK July 2017 Version 1.1 For Approval Deleted: June Formatted: Highlight Formatted: Highlight Version Control Version COR Date of Change Changes 1 Draft - June 2017 Update to reflect

More information

The City of Mississauga may install Closed Circuit Television (CCTV) Traffic Monitoring System cameras within the Municipal Road Allowance.

The City of Mississauga may install Closed Circuit Television (CCTV) Traffic Monitoring System cameras within the Municipal Road Allowance. Policy Number: 10-09-02 Section: Roads and Traffic Subsection: Traffic Operations Effective Date: April 25, 2012 Last Review Date: Approved by: Council Owner Division/Contact: For information on the CCTV

More information

Service Description: Software Support

Service Description: Software Support Page 1 of 1 Service Description: Software Support This document describes the service offers under Cisco Software Support. This includes Software Support Service (SWSS), Software Support Basic, Software

More information

Notification under the North West Children s Services Information Sharing Protocol (ISP)

Notification under the North West Children s Services Information Sharing Protocol (ISP) Notification under the North West Children s Services Information Sharing Protocol (ISP) 1. Issuing Local Authority Local Authority Issuing ISP Officer Name & Email Officer Telephone Number Date of Notified

More information

Institute of Technology, Sligo. Information Security Policy. Version 0.2

Institute of Technology, Sligo. Information Security Policy. Version 0.2 Institute of Technology, Sligo Information Security Policy Version 0.2 1 Document Location The document is held on the Institute s Staff Portal here. Revision History Date of this revision: 28.03.16 Date

More information

Acquisition & Use of University Supplied Mobile Devices Policy

Acquisition & Use of University Supplied Mobile Devices Policy Acquisition & Use of University Supplied Mobile Devices Policy 1. Introduction 2. Device Definitions 3. Principles of the Policy 4. Eligibility 5. Tariffs & Hardware 6. Administration of Mobile Contracts

More information

Virginia Commonwealth University School of Medicine Information Security Standard

Virginia Commonwealth University School of Medicine Information Security Standard Virginia Commonwealth University School of Medicine Information Security Standard Title: Scope: Personnel Security Standard This standard is applicable to all VCU School of Medicine personnel. Approval

More information

This document sets out my decision on a complaint from the Representative on behalf of the Company about the Provider.

This document sets out my decision on a complaint from the Representative on behalf of the Company about the Provider. TIO Decision 17 December 2018 (De-identified for publication) This document sets out my decision on a complaint from the Representative on behalf of the Company about the Provider. 1. Decision My decision

More information

This regulation outlines the policy and procedures for the implementation of wireless networking for the University Campus.

This regulation outlines the policy and procedures for the implementation of wireless networking for the University Campus. UAR NUMBER: 400.01 TITLE: Wireless Network Policy and Procedure INITIAL ADOPTION: 11/6/2003 REVISION DATES: PURPOSE: Set forth the policy for using wireless data technologies and assigns responsibilities

More information

5504 Thermocouple Analog Input Module

5504 Thermocouple Analog Input Module 550 Thermocouple Analog Input Installation, Operation and Maintenance Setup Manual 5/9/0 Safety Information The information provided in this documentation contains general descriptions and/or technical

More information

REVISION HISTORY DATE AMENDMENT DESCRIPTION OF AMENDMENT

REVISION HISTORY DATE AMENDMENT DESCRIPTION OF AMENDMENT REVISION HISTORY DATE AMENDMENT DESCRIPTION OF AMENDMENT SERVICE DESCRIPTION Page 1 of 17 SERVICE DESCRIPTION 2-11: WHOLESALE DSL SERVICE 1. THE SERVICE The Wholesale DSL service is a service which enables

More information

Service Description: Solution Support for Service Provider Software - Preferred This document

Service Description: Solution Support for Service Provider Software - Preferred This document Page 1 of 5 Service Description: Solution Support for Service Provider Software - Preferred This document describes the Cisco Solution Support for Service Provider Software - Preferred. Related Documents:

More information

Cedar Rapids ITS Deployment Project

Cedar Rapids ITS Deployment Project Cedar Rapids ITS Deployment Project Concept of Operations July 29, 2011 Table of Contents Section 1 Introduction Purpose Goal of ITS Deployments Section 2 Needs Assessment General Background Stakeholders

More information

Automatic Number Plate Recognition (ANPR) ANPR Strategy Infrastructure Development

Automatic Number Plate Recognition (ANPR) ANPR Strategy Infrastructure Development Automatic Number Plate Recognition (ANPR) ANPR Strategy 2016-2020 Infrastructure Development Version 1 July 2017 Document Control Change Control Version Date Change Author 0.1 1 June 2016 Initial draft

More information

Axiell ALM Cloud Service - Service Level Agreement

Axiell ALM Cloud Service - Service Level Agreement Axiell ALM Cloud Service - Service Level Agreement 2017 This service level agreement (SLA) applies to the Axiell ALM Cloud services provided by Axiell ALM Netherlands BV ( Service Provider ), and includes

More information

Process Document. Scope

Process Document. Scope Process Document Subject: BCIT Access Management Process Process Number: I.0.02.00.01 Department Name: Information Technology Version: 1.4 Original Issue Date: Revision Date: 03/22/2010 Process Owner:

More information

Information Technology Access Control Policy & Procedure

Information Technology Access Control Policy & Procedure Information Technology Access Control Policy & Procedure Version 1.0 Important: This document can only be considered valid when viewed on the PCT s intranet/u: Drive. If this document has been printed

More information

Business Continuity Policy

Business Continuity Policy Business Continuity Policy Version Number: 3.6 Page 1 of 14 Business Continuity Policy First published: 07-01-2014 Amendment record Version Date Reviewer Comment 1.0 07/01/2014 Debbie Campbell 2.0 11/07/2014

More information

Switching Process and Rules Systems Operations Framework. Document Number:

Switching Process and Rules Systems Operations Framework. Document Number: Switching Process and Rules Systems Operations Framework Document Number: 4808076 TABLE OF CONTENTS 1. INTRODUCTION... 5 1.1 PURPOSE... 5 1.2 HIERARCHY... 5 2. PROCESSES... 7 2.1 SWITCHING OPERATOR AUTHORISATION

More information

Birmingham Community Healthcare NHS Foundation Trust. 2017/17 Data Security and Protection Requirements March 2018

Birmingham Community Healthcare NHS Foundation Trust. 2017/17 Data Security and Protection Requirements March 2018 1.0 Executive Summary Birmingham Community Healthcare NHS Foundation Trust 2017/17 Data Security and Protection Requirements March 2018 The Trust has received a request from NHS Improvement (NHSI) to self-assess

More information

SCHEDULE DOCUMENT N4PROTECT DDOS SERVICE PUBLIC NODE4 LIMITED 28/07/2017

SCHEDULE DOCUMENT N4PROTECT DDOS SERVICE PUBLIC NODE4 LIMITED 28/07/2017 SCHEDULE DOCUMENT N4PROTECT DDOS SERVICE PUBLIC NODE4 LIMITED 28/07/2017 SCHEDULE DOCUMENT 1.2 N4PROTECT DDOS This schedule contains additional terms and conditions, service description & Service Levels

More information

THOMSON REUTERS DEALING

THOMSON REUTERS DEALING INTRODUCTION This guide is designed to help the Dealing Coordinator manage the Service on Thomson Reuters Dealing. The Dealing Coordinator will either take personal ownership or delegate ownership for

More information

Network Services BT MPLS (Marketed as IP Connect Global)

Network Services BT MPLS (Marketed as IP Connect Global) Contents 1. 2. Network Services Customer Responsibilities 3. Network Services General 4. Service Management Boundary 5. Defined Terms Network Services Where the Customer selects Service as detailed in

More information

SWIFT USER MANUAL CONSULTANT MODULE. March 2013

SWIFT USER MANUAL CONSULTANT MODULE. March 2013 SWIFT USER MANUAL CONSULTANT MODULE March 2013 Table of Contents 1. INTRODUCTION... 4 1.1. SWIFT CONSULTANT MODULE... 4 2. SWIFT OVERVIEW... 5 2.1. AUDIT AND STAGE TYPES... 5 2.2 LOGIN PROCESS... 6 3.

More information

Reuters Dealing and Dealing 3000 Matching MATCHING COORDINATOR GUIDE

Reuters Dealing and Dealing 3000 Matching MATCHING COORDINATOR GUIDE Reuters Dealing 2000-2 and Dealing 3000 Matching MATCHING COORDINATOR GUIDE Date: June 2010 Introduction This guide is designed to help you, as a Matching Coordinator, to manage the Service at your Site.

More information

Fair and Effective Management of DNO Connection Queues: Treatment of Requests to Change Connection Applications. Good Practice Guide

Fair and Effective Management of DNO Connection Queues: Treatment of Requests to Change Connection Applications. Good Practice Guide Fair and Effective Management of DNO Connection Queues: Treatment of Requests to Change Connection Applications Good Practice Guide November 2018 Contents Fair and Effective Management of DNO Connection

More information