1 The iems Refresh Project Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Ronan Jamieson & Graham Newton System Operator, Wokingham

2 Agenda National Grid s iems iems Refresh Project System cut-over and go-live 2

3 Introduction to National Grid s iems

4 What is the iems? Integrated Energy Management System SCADA system to manage NG s transmission assets Receive real-time data from the network (i.e. Voltage, Power, Equipment status) Send controls to network equipment Meet licence obligations of continuously operating a safe, secure and economic electricity network for the whole of Great Britain 4

5 Key iems capabilities High Availability Dual redundant systems located in two locations, three locations capable of access Real-time Data Real-time data is collected from all NG electricity substations and from Scottish TOs and, some DNOs Selected data is transferred out to other key systems Tele command switching The ability for engineers to re-configure the network to meet operation needs PNA Analysis Security, contingency and voltage analysis of the power network in real time (< 2mins) and offline studies. Safety Management Safety application allowing work to be safely processed and carried out on the electricity grid with extensive reporting and tracking of safety document, with clear visual indications on graphical displays 5

6 Design Philosophy The design of the production IEMS systems uses the following principles: Two production systems located at different sites. Each production system is made of two independent halves, located in independent rooms. The two production systems collect and process data independently Database updates are performed independently on all iems systems All servers are physical This distributed nature of the architecture greatly minimises service loss due to a single site / system failure Site 1 PR1 (a) Production system 1 Data and updates Site 2 PR1 (b) Production system 2 PR2 (a) PR2 (b) 6

7 System Security 7

8 IEMS Interfaces Substations Other Key NG Systems Data Archive Balancing System IEMS Scottish TOs and DNOs User Interfaces ENTSO-E 8

9 System Monitoring All elements of the IEMS refresh system will be monitored 24-hours a day 365 days a year by the following four teams: CNI Health Team (CHT) This team is based in DC1, monitors the IEMS hardware Vodafone Network Monitoring Team This team is based in DC2, monitors the IEMS network and highlights any issues to the CHT. Security Team This team will be investigating alerts from the IDS system Property Team This team will provide monitoring of power and air conditioning at the three sites (DC1, DC2, and DC3) 9

10 The iems Refresh project

11 Project Scope Upgrade the existing IEMS system Software Application Replace all existing Application hardware Deliver a new IEMS production network in the UK at Wokingham, Warwick and Reading, replacing all existing IEMS network equipment. Provide an enduring replica production system, including network, for ongoing Testing (GE1) 11

12 iems Refresh Customer Benefits Ongoing Network management Secures our ability to manage power transmission systems 24x7 to mid-2020s Secure, robust and stable Provides enhanced cyber security Ensures required resilience and stability Enhanced Capabilities IEMS v17 is providing enhanced capabilities now and allowing for further future opportunities 12

13 System Quality and Testing The Project has used a extensive test regime to ensure the delivery of a high quality product: Multiple test phases, using a high number of experienced users More than 2000 tests to validate the solution Successful Failure-over testing iems Synchrocheck Test 100% Success Real-time operational switching at Minety 400kV was performed via the R17 iems system 13

14 iems Timeline September November 2017 December 2017 January 2017 Site Acceptance Testing Complete System Go-Live Post Implementation support complete Decommissioning complete / Project Closed 14

15 Cut over process Senior Management Involvement Independent Transition forum (Recommends) 3 month/1 month /1 week/1day Go / No Go Meetings Dress Rehearsal Sessions Halt Periods during cut over (Roll-back plans identified) On the day Cut Over Team (Defined roles & responsibilities over the period) 15

16 Required Control Systems Configuration Release 10 Release 17 IEMS MAIN In Control RTDT Enabled to DBU IEMS PR1 Control Disabled MAIN = Active DBU = Standby (no RTUs) PR1 = n/a available PR2 = Active SUB This is the preferred system configuration determined to be lowest risk to operations, in anticipation of cut-over activities at SGL-0 IEMS DBU IEMS PR2 Control Disabled RTDT Enabled to PR1 16

17 SGL 1day IEMS MAIN In Control RTDT Enabled to DBU IEMS PR1 Control Disabled Hands-off period to be agreed with ENCC/TNCC for approximately 0-30, whilst the Manual Entered Data (MED) is exported from IEMS-DBU. Co-ordination to be via PSM (and CHT). IEMS DBU Export all Manually Entered Data [MED]: tags, hand dressing, memo notes, etc. SUB IEMS PR2 Control Disabled RTDT Enabled to PR1 Import all MED: Failure to adhere to restriction could result in database mismatch or data corruption, causing delay or abortion of system migration activities. On completion of MED Import PR2 is available for control - MED dip-check - PNA running - Manual data catch-up and dual dressing Duration Est. 3 hours before handover 17

18 SGL 0 IEMS MAIN In Control IEMS DBU SUB IEMS PR1 Control Disabled Manually synchronise database and all data IEMS PR2 Control Disabled Gain status of dip-check Gain status of PNA runs Hands-off period on Rel:17 only Manually Synchronise PR2 to PR1. On completion establish System to System synchronisation (SISO) Co-ordination to be via PSM (and CHT). On completion of ManualSynch, CHT confirms status of data between PR1 /PR2 Dual dressing continues on Rel:10 and Rel:17 Duration Est. 2 hours 18

19 SGL 0 IEMS MAIN IEMS PR1 Control Disabled MAIN system demoted from Active to Standby working. PR2 taken down, configuration changes made. To complete a warm start is initiated. SUB Visibility of power system still possible through IEMS MAIN as Standby and possible option to promote back to ACTIVE working IEMS DBU IEMS PR2 Duration Est. 30 minutes 19

20 SGL 0 (PR2 now in Control[Active]) IEMS MAIN IEMS PR1 Control Disabled Interfaces transfers outstanding PR2 returns taking control of all RTU connections. Control room initiates dummy breaker checks. PR2 = Active MAIN = Standby SUB Dual dressing continues on Rel:10 and Rel:17 IEMS DBU IEMS PR2 HOLD POINT x PR1 taken down, configuration changes made in anticipation of system being established as STANDBY. Duration Est. 45 minutes 20

21 SGL 0 Interface Transfers 1 of 3 IEMS MAIN ICCP: BM1 ICCP: EBS1 IEMS PR2 ICCP: BM2 ICCP: EBS2 Risks All ICCP connections dual feed Rel:10 and Rel:17 Activities are to establish redundant connections to Rel:17 21

22 SGL 0 Interface Transfers 2 of 3 IEMS MAIN EBS sftp OLTA sftp IEMS PR2 RMS sftp EFS sftp OSA sftp DH esb FATE rs232 Risks EFS - terminating end has opted for making changes on the day without testing to their production DH code change needed to be implemented on the day to establish Rel:17 communications 22

23 SGL 0 Interface Transfers 3 of 3 IEMS MAIN ICCP: SP ICCP: SSE IEMS PR2 ICCP: Coreso ICCP: UKPN ICCP: ENW ICCP: EAS(RTE) Risks All ICCP connections dual feed Rel:10 and Rel:17 Activities are to establish redundant connections to Rel:17 23

24 SGL 0 Establish PR1 as Standby IEMS IEMS MAIN IEMS PR1 Interface transfers complete Status PR2 = Active MAIN = Standby PR1 = Available SUB PR1 in preparation of promotion to Standby Duration Est minutes IEMS DBU IEMS PR2 24

25 SGL 0 Establish PR1 as Standby IEMS IEMS MAIN IEMS PR1 Interfaces transfers complete PR1 Promoted to Standby Final Status PR2 = Active PR1 = Standby SUB MAIN = Available DBU = Available System check conducted by CHT IEMS DBU IEMS PR2 Duration Est minutes 25

26 Questions

Dumfries and Galloway Developer Forum. Welcome and Introduction. Gareth Hislop

Dumfries and Galloway Developer Forum. Welcome and Introduction. Gareth Hislop 6 th December 2017 Dumfries and Galloway Developer Forum Welcome and Introduction Gareth Hislop Dumfries and Galloway Forum Agenda Introduction Gareth Hislop NGET Update Julian Leslie Design Update Diyar

More information

SDRC 9.1- Strategy for Inter-Control Centre Communication Protocol (ICCP)

SDRC 9.1- Strategy for Inter-Control Centre Communication Protocol (ICCP) SDRC 9.1- Strategy for Inter-Control Centre Communication Protocol (ICCP) Contents 1 Executive Summary... 4 Background... 4 Objective... 4 Approach... 5 Technical and Commercial Challenges... 5 Solution

More information

Network Configuration Document Selection for New Substations Framework

Network Configuration Document Selection for New Substations Framework Network Configuration Document Selection for New Substations Current version: 20/06/2018 EXTERNAL USE Page 1 of 14 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References...

More information

European Developments

European Developments European Developments Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Transmission Workgroup

More information

Datacentre Milton Keynes Data sheet

Datacentre Milton Keynes Data sheet Datacentre Milton Keynes Data sheet Data sheet Datacentre Milton Keynes Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the

More information

ICCP Customer Forum. Inter Control Centre Communication Protocol. Friday 30 th September 2011

ICCP Customer Forum. Inter Control Centre Communication Protocol. Friday 30 th September 2011 ICCP Customer Forum Inter Control Centre Communication Protocol Friday 30 th September 2011 Main Forum Objectives The business driver for ICCP Build a common understanding of ICCP Obtain input from a wide

More information

Datacentre Newbridge Data sheet

Datacentre Newbridge Data sheet Datacentre Newbridge Data sheet Data sheet Datacentre Newbridge Find us 7 Claylands Road Edinburgh EH28 8LF Scotland With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our

More information

DCC SMETS1 PROGRAMME SMETS1 USER INTERFACE FORUM. March 2017 DCC PUBLIC

DCC SMETS1 PROGRAMME SMETS1 USER INTERFACE FORUM. March 2017 DCC PUBLIC DCC SMETS1 PROGRAMME SMETS1 USER INTERFACE FORUM March 2017 DCC PUBLIC AGENDA Agenda Item Times Coffee / Breakfast From 09:00 Welcome and introduction Agenda walkthrough UI Options Recap Breakout 1: Impact

More information

National Grid Review Group 646 Slide Pack

National Grid Review Group 646 Slide Pack National Grid Review Group 646 Slide Pack Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 13

More information

GridEye FOR A SAFE, EFFICIENT AND CONTROLLED POWER GRID

GridEye FOR A SAFE, EFFICIENT AND CONTROLLED POWER GRID FOR A SAFE, EFFICIENT AND CONTROLLED POWER GRID SMART GRID VISION To solve today s energy and pollution problems, DEPsys believes that the world should be powered entirely by renewable energy. By applying

More information

A Guide to EDT, EDL and CT with National Grid. A Guide to EDT, EDL and CT with National Grid

A Guide to EDT, EDL and CT with National Grid. A Guide to EDT, EDL and CT with National Grid A Guide to EDT, EDL and CT with National Grid Issue 1, December 2016 Contents Page Introduction 1 Informing NG of requirement 1 EDT 1 EDT Questions 2 EDL 3 EDL Questions 4 Control Telephony 4 References

More information

EBS - IT. 1st July 2014 Holiday Inn, Winnersh

EBS - IT. 1st July 2014 Holiday Inn, Winnersh EBS - IT 1st July 2014 Holiday Inn, Winnersh Agenda 1 Housekeeping and Safety moment 2 Introductions 3 Minutes of last meeting 4 National Grid Project Structure 5 Review of actions 6 Current Status 7 Testing

More information

POWER SYSTEM DATA COMMUNICATION STANDARD

POWER SYSTEM DATA COMMUNICATION STANDARD POWER SYSTEM DATA COMMUNICATION STANDARD PREPARED BY: AEMO Systems Capability VERSION: 2 EFFECTIVE DATE: 1 December 2017 STATUS: FINAL Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au

More information

Energy Networks Association

Energy Networks Association The Voice of the Networks Energy Networks Association Introduction to ENA Open Networks Project Introduction: ENA Open Networks Project In December 2016 ENA gave their commitment to a major new long-term

More information

Substation Workshop. 7 th February 2018

Substation Workshop. 7 th February 2018 Substation Workshop 7 th February 2018 1 Agenda Welcome and Introductions Antony White Substation Design Overview Andy Moore Question & Answer Session Break 1500kVA Transformers James Devriendt & Andy

More information

IT Disaster Recovery Services Program

IT Disaster Recovery Services Program Q4-2017 ISAC Update v.20171107 IT Disaster Recovery Strategy Implementation 2008 Data Center Strategic Plan Part 1 Part 2 Disaster Recovery Strategic Plan Part 1 Part 2 2016 2019 Implementation Goals Decouple

More information

ENTSO-e Operational Security Network Code. OS Code Objectives. Update for JESG meeting 20 th Feb 2013

ENTSO-e Operational Security Network Code. OS Code Objectives. Update for JESG meeting 20 th Feb 2013 ENTSO-e Operational Security Network Code Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. OS

More information

Description Activities Description. Co-ordination with GB System Operator. Co-ordination with other DSOs and Distribution Networks (including IDSOs)

Description Activities Description. Co-ordination with GB System Operator. Co-ordination with other DSOs and Distribution Networks (including IDSOs) Appendix A DSO Functions (Version 7) No. DSO Functions 1 System Coordination Description Activities Description Operate local and regional areas and co-ordinate energy and power transfers with other networks

More information

Electricity Market Reform

Electricity Market Reform Electricity Market Reform Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. John Perkins, Feed

More information

Powering the North West s Future: From DNO to DSO. Paul Bircham Commercial Strategy & Support Director

Powering the North West s Future: From DNO to DSO. Paul Bircham Commercial Strategy & Support Director Powering the North West s Future: From DNO to DSO Paul Bircham Commercial Strategy & Support Director 1 Introducing Electricity North West 5 million 2.4 million (45% of demand) 20,000 I&C (55% of demand)

More information

EBS Transition Access Validation. Pete Smith March 2013

EBS Transition Access Validation. Pete Smith March 2013 EBS Transition Access Validation Pete Smith March 2013 Access Validation Phase A reminder; Will only start after all external test phases completed Will not start until a defined period before cut-over

More information

GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3

GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3 Stage 01: Modification Proposal Grid Code GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3 Purpose of Modification: This modification (3/4) will set out within the Grid Code the following

More information

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission...

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission... CIP-002-4 Cyber Security Critical Cyber Asset Identification Rationale and Implementation Reference Document September, 2010 Table of Contents TABLE OF CONTENts Disclaimer... 3 Executive Summary... 4 Introduction...

More information

Matthew Musto, Senior Project Manager, New York ISO Charles Alonge, Senior Software Developer, New York ISO

Matthew Musto, Senior Project Manager, New York ISO Charles Alonge, Senior Software Developer, New York ISO Industry: Transmission/Distribution/Smarts Presented by Matthew Musto, Senior Project Manager, New York ISO Charles Alonge, Senior Software Developer, New York ISO Agenda About the NYISO A New State-of-the-Art

More information

Connecting and Managing Offshore Wind Danish Embassy - 4 th December 2012

Connecting and Managing Offshore Wind Danish Embassy - 4 th December 2012 Connecting and Managing Offshore Wind Danish Embassy - 4 th December 2012 Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same

More information

Evolution of Control for the Power Grid

Evolution of Control for the Power Grid Evolution of Control for the Power Grid Anjan Bose Washington State University Pullman, WA, USA PaiFest In Honor of Prof. M. A. Pai Urbana-Champaign, IL October 15, 2015 The Past (before 1960s) Hard

More information

Offshore BMU Configuration

Offshore BMU Configuration BMU Configuration Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Steve Curtis : System Operator

More information

Datacentre Reading East 2 Data sheet

Datacentre Reading East 2 Data sheet Datacentre Reading East 2 Data sheet Data sheet Datacentre Reading East 2 Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the

More information

EPCC 2015 New SCADA/EMS Features and Challenges

EPCC 2015 New SCADA/EMS Features and Challenges EPCC 2015 New SCADA/EMS Features and Challenges Bled, 20. 5. 2014 Emil Cek Agenda Agenda 1. Introduction of ELES 2. System operation @ ELES 3. SCADA/EMS environment 4. New SCADA/EMS system 5. Features

More information

Leading the Digital Transformation from the Centre of Government

Leading the Digital Transformation from the Centre of Government 37th Meeting of Senior Officials from Centres of Government Leading the Digital Transformation from the Centre of Government Dublin, Ireland, 8-9 November 2018 Agenda 2 GOV/PGC/MPM/A(2018)1/REV1 19.00

More information

NOT PROTECTIVELY MARKED

NOT PROTECTIVELY MARKED Meeting Public SPA Board Meeting Date Location Jurys Inn Hotel, Inverness Title of Paper Proposed Transfer of Services from Inverness Area Control Room to Dundee Area Control Room and Inverness Service

More information

Next Generation Scada Architectures

Next Generation Scada Architectures Next Generation Scada Architectures Jan Vorrink TenneT at a glance Europe's first cross-border grid operator 2,813 employees EBIT 725 (EUR million) Assets 13.645 (EUR billion) Investments (2014-23) 20

More information

Electricity Balancing System (EBS) IT Subgroup

Electricity Balancing System (EBS) IT Subgroup Minutes Meeting name Meeting number 5 Date of meeting 5 th December 2012 Time 10:00-15:00 Location Electricity Balancing System (EBS) IT Subgroup National Grid Wokingham Attendees Name Initials Company

More information

NIA Progress Report. Programme Summary. 31 July Electricity North West/NIA Programme Summary/31 July 2016 Page 1 of 10

NIA Progress Report. Programme Summary. 31 July Electricity North West/NIA Programme Summary/31 July 2016 Page 1 of 10 NIA Progress Report Programme Summary 31 July 2017 Electricity rth West/NIA Programme Summary/31 July 2016 Page 1 of 10 VERSION HISTORY Version Date Author Status Comments V1.0 4 July 2017 L Eyquem Draft

More information

ISSC is invited to consider the attached report and to support the proposal to change the priority order for the migration UEA web services.

ISSC is invited to consider the attached report and to support the proposal to change the priority order for the migration UEA web services. ISC11D005 Title: UEA Website Migration Author: Jonathan Richardson, Assistant Director, Corporate Information Services Date: 1 st November 2011 Circulation: ISSC 10 November 2011 Agenda: ISC11A001 Version:

More information

SUPERVISORY CONTROL AND DATA ACQUISITION. Network Manager SCADA for rail. Operational confidence.

SUPERVISORY CONTROL AND DATA ACQUISITION. Network Manager SCADA for rail. Operational confidence. SUPERVISORY CONTROL AND DATA ACQUISITION Network Manager SCADA for rail. Operational confidence. 2 NETWORK MANAGER SCADA Network Manager SCADA Supervisory control and data acquisition. As the world s population

More information

High Level UKL Data Migration Approach Bulk Load, IDRs and Cutover Activity. April 2016

High Level UKL Data Migration Approach Bulk Load, IDRs and Cutover Activity. April 2016 High Level UKL Data Migration Approach Bulk Load, IDRs and Cutover Activity April 2016 Data Migration Approach Objective The objective of the slides is to detail the data migration approach for Bulk Load,

More information

Audit Report. Mineral Products Qualifications Council (MPQC) 31 March 2014

Audit Report. Mineral Products Qualifications Council (MPQC) 31 March 2014 Audit Report Mineral Products Qualifications Council (MPQC) 31 March 2014 Note Restricted or commercially sensitive information gathered during SQA Accreditation s quality assurance activities is treated

More information

NAMI Affiliate Profile Center Contact Manual

NAMI Affiliate Profile Center Contact Manual NAMI Affiliate Profile Center Contact Manual Standards of Excellence/Center for Excellence November 2013 Table of Contents Chapter Page I. NAMI Affiliate Profile Center Contact Training Timetable 3 II.

More information

Tait GridLink THE INTELLIGENT CHOICE FOR DISTRIBUTION AUTOMATION. harris.com #harriscorp

Tait GridLink THE INTELLIGENT CHOICE FOR DISTRIBUTION AUTOMATION. harris.com #harriscorp Tait GridLink THE INTELLIGENT CHOICE FOR DISTRIBUTION AUTOMATION harris.com #harriscorp GRID VISIBILITY AND CONTROL Improving distribution grid operations with real time remote monitoring and control of

More information

EARTH Ex 2017 Middle Planning Conference

EARTH Ex 2017 Middle Planning Conference EARTH Ex 2017 Middle Planning Conference 20 April 2017 Emergency All-sector Response to Transnational Hazards Exercise 23 August 2017 1 EARTH Ex 2017 MPC Sector Objectives Review EARTH Ex Plan, Concepts

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: DRAFT FOR CONSULTATION Approved

More information

European Network Codes: RfG GB Grid Code Application Options

European Network Codes: RfG GB Grid Code Application Options European Network Codes: RfG GB Grid Code Application Options Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in

More information

Distribution Long Term Development Statement

Distribution Long Term Development Statement Distribution November 2017 SP Distribution for the years 2017/18 to 2021/22 Distribution for the years 2017/18 to 2021/22 The information used to compile this Statement is derived from SP Distribution

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: FINAL Approved for distribution

More information

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study XXXX Bear Creek Hydro Generation Project Interconnection Facilities Study Report No. SPA 2005-33 August 2005 System Planning (Lower Mainland & Vancouver Island) British Columbia Transmission Corporation

More information

STCP 04-1 Issue 005 Real Time Data Change Management

STCP 04-1 Issue 005 Real Time Data Change Management STCP 04-1 Issue 005 Real Time Data Change Management STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc

More information

Designing a new IEC substation architecture

Designing a new IEC substation architecture Designing a new IEC 61850 substation architecture Gerrit Dogger Senior Product and Application Specialist Cooper Power Systems gerrit.dogger@cybectec.com Garry Tennese Station Integration Specialist Manitoba

More information

How smart can the grid really be?

How smart can the grid really be? How smart can the grid really be? by Dale Pudney, HVT Power Systems and Luo Wei, NR Electric With the improvement of electronic communications and computing technology, it becomes possible to integrate

More information

The Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft

The Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft The Project Charter Project Title: VDI Data Center Design and Build Project Sponsor: South Alberta Data Centers Inc. (SADC Inc.) Project Customer: The City of Calgary Project Manager: Moe Yousof Document

More information

Overview of Brunel University National Grid CIM Research Collaboration

Overview of Brunel University National Grid CIM Research Collaboration Brunel Institute of Power Systems Overview of Brunel University National Grid CIM Research Collaboration Gareth Taylor Brunel University Nigel Hargreaves CIM Users Group, Windsor May 17 th 2012 EngD Environmental

More information

[AV-SP2016-SM]: SharePoint 2016 Site Members

[AV-SP2016-SM]: SharePoint 2016 Site Members [AV-SP2016-SM]: SharePoint 2016 Site Members Length : 1 Day Audience(s) : SharePoint Site Members/ Visitors Level : Immediate/ Advanced Technology : SharePoint 2016 Delivery Method : Instructor-led (Classroom)

More information

OPEN Networks - Future Worlds Consultation

OPEN Networks - Future Worlds Consultation ENA Open Networks Future Worlds Consultation OPEN Networks - Future Worlds Consultation Developing change options to facilitate energy decarbonisation, digitisation and decentralisation Executive Summary

More information

SERVERS / SERVICES AT DATA CENTER AND CO-LOCATION POLICY

SERVERS / SERVICES AT DATA CENTER AND CO-LOCATION POLICY SERVERS / SERVICES AT DATA CENTER AND CO-LOCATION POLICY National Video Conferencing Network Version 1.0 Released January 01, 2014 HIGHER EDUCATION COMMISSION, PAKISTAN 1 GENERAL The Higher Education Commission

More information

MISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO

MISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO 1 MISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO 2 MISO Overview MISO is an independent, non-profit, memberbased organization committed to reliability. We serve as

More information

CIP Cyber Security Configuration Management and Vulnerability Assessments

CIP Cyber Security Configuration Management and Vulnerability Assessments Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

City of London Stakeholder Consultation

City of London Stakeholder Consultation City of London Stakeholder Consultation 15 May 2013 2011. UK Power Networks. All rights reserved Safety and Housekeeping No planned fire alarms Emergency exits Fire assembly points Toilets Mobile phones

More information

SOLUTION BRIEF RSA ARCHER IT & SECURITY RISK MANAGEMENT

SOLUTION BRIEF RSA ARCHER IT & SECURITY RISK MANAGEMENT RSA ARCHER IT & SECURITY RISK MANAGEMENT INTRODUCTION Organizations battle growing security challenges by building layer upon layer of defenses: firewalls, antivirus, intrusion prevention systems, intrusion

More information

MODULAR HUB AND SPOKE 17 NOVEMBER 2017

MODULAR HUB AND SPOKE 17 NOVEMBER 2017 MODULAR HUB AND SPOKE 17 NOVEMBER 2017 Executive Summary Future North Sea offshore wind farms will increasingly be located further from shore. The longer distances to shore and generally deeper waters

More information

ABB ABILITY NETWORK MANAGER X. SCADA for rail Operational confidence.

ABB ABILITY NETWORK MANAGER X. SCADA for rail Operational confidence. ABB ABILITY NETWORK MANAGER X SCADA for rail Operational confidence. 2 ABB ABILITY NETWORK MANAGER X SCADA Supervisory control and data acquisition (SCADA) with Network Manager X As the world s population

More information

Physical Security Reliability Standard Implementation

Physical Security Reliability Standard Implementation Physical Security Reliability Standard Implementation Attachment 4b Action Information Background On March 7, 2014, the Commission issued an order directing NERC to submit for approval, within 90 days,

More information

Remote Telemetry Units

Remote Telemetry Units Remote Telemetry Units IRIS-RTU - Designed by utility engineers FOR the gas and utility industries The IRIS-RTU incorporates reliable, local processing power with the advanced communications of an RTU

More information

FedRAMP: Understanding Agency and Cloud Provider Responsibilities

FedRAMP: Understanding Agency and Cloud Provider Responsibilities May 2013 Walter E. Washington Convention Center Washington, DC FedRAMP: Understanding Agency and Cloud Provider Responsibilities Matthew Goodrich, JD FedRAMP Program Manager US General Services Administration

More information

Standard CIP Cyber Security Critical Cyber As s et Identification

Standard CIP Cyber Security Critical Cyber As s et Identification A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification

More information

Lessons Learned Implementing an IEC based Microgrid Power- Management System. K.A. GRAY, J.J. MRAZ* POWER Engineers, Inc.

Lessons Learned Implementing an IEC based Microgrid Power- Management System. K.A. GRAY, J.J. MRAZ* POWER Engineers, Inc. 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2015 Grid of the Future Symposium Lessons Learned Implementing an IEC 61850-based Microgrid Power- Management System K.A.

More information

Andrew Durant/Ellen Sullivan

Andrew Durant/Ellen Sullivan AGENDA ITEM: 3.5 INFORMATION MANAGEMENT, TECHNOLOGY AND GOVERNANCE COMMITTEE DATE OF MEETING: 2 OCTOBER 2018 Subject : Approved and Presented by: Prepared by: Other Committees and meetings considered at:

More information

STCP Amendment Proposal Form

STCP Amendment Proposal Form STCP Amendment Proposal Form PA036 1. Title of Amendment Proposal STCP 09-2 Incorporation material currently within SPT SCS and making standard for both TOs. 2. Description of the Proposed Amendment (mandatory

More information

MIGRATION PROCESS FROM UCTE DEF TO CGMES SECOND EDITION

MIGRATION PROCESS FROM UCTE DEF TO CGMES SECOND EDITION MIGRATION PROCESS FROM UCTE DEF TO CGMES SECOND EDITION 24 OCTOBER 2016 PT CGM Page 1 of 18 ENTSO-E AISBL Avenue Cortenbergh 100 1000 Brussels Belgium Tel +32 2 741 09 50 Fax +32 2 741 09 51 info@entsoe.eu

More information

Red Hat Virtualization Increases Efficiency And Cost Effectiveness Of Virtualization

Red Hat Virtualization Increases Efficiency And Cost Effectiveness Of Virtualization Forrester Total Economic Impact Study Commissioned by Red Hat January 2017 Red Hat Virtualization Increases Efficiency And Cost Effectiveness Of Virtualization Technology organizations are rapidly seeking

More information

Information Services Office 365 Board. Mail Migration

Information Services Office 365 Board. Mail Migration Date: 24.09.12 B Information Services Office 365 Board Mail Migration Brief description of the paper This paper details the findings from the investigations undertaken regarding the migration of all student

More information

Securing the North American Electric Grid

Securing the North American Electric Grid SESSION ID: TECH-R02 Securing the North American Electric Grid Marcus H. Sachs, P.E. SVP and CSO North American Electric Reliability Corporation @MarcusSachs Critical Infrastructure s Common Denominator

More information

Data and Forecasting Summary

Data and Forecasting Summary Data and Forecasting Summary This article highlights the need for more integrated and aligned data systems within WPD and improved interfaces within the industry. It also looks at the increased need for

More information

DfT Policy Overview Rod Paterson

DfT Policy Overview Rod Paterson Ports Policy - BPA conference, 3 November 2016 1 DfT Policy Overview Rod Paterson BPA CONFERENCE 18 October 2017 October 17 Plan for my session this morning 1. Update on changes in structures 2. Reflections

More information

Flexible Connections for DG Customers

Flexible Connections for DG Customers Flexible Connections for DG s Session 1b: Connections Paul Pretlove UK Power Networks Ruth Kemsley Wind Prospect In partnership with: Deployment Key outputs REQUIREMENTS Interface specification guidance

More information

ERO Enterprise IT Projects Update

ERO Enterprise IT Projects Update ERO Enterprise IT Projects Update Stan Hoptroff, Vice President, Chief Technology Officer and Director of Information Technology Technology and Security Committee Meeting November 6, 2018 Agenda ERO IT

More information

An Introduction to Network Codes & The Links Between Codes

An Introduction to Network Codes & The Links Between Codes An Introduction to Network Codes & The Links Between Codes April 2014 About ENTSO-E 41 TSOs from 34 countries 532 million citizens served 828 GW generation 305 Thousand Km of transmission lines Ten-Year

More information

Guide to cyber security/cip specifications and requirements for suppliers. September 2016

Guide to cyber security/cip specifications and requirements for suppliers. September 2016 Guide to cyber security/cip specifications and requirements for suppliers September 2016 Introduction and context The AltaLink cyber security/cip specification and requirements for suppliers (the standard)

More information

NHS Fife. 2015/16 Audit Computer Service Review Follow Up

NHS Fife. 2015/16 Audit Computer Service Review Follow Up NHS Fife 2015/16 Audit Computer Service Review Follow Up Prepared for NHS Fife April 2016 Audit Scotland is a statutory body set up in April 2000 under the Public Finance and Accountability (Scotland)

More information

Welcome to Customs Declaration Services (CDS) Stakeholder Event

Welcome to Customs Declaration Services (CDS) Stakeholder Event Welcome to Customs Declaration Services (CDS) Stakeholder Event Monday, 10th April 2017 Steve Casey External Stakeholder Management and Engagement Lead Agenda 10.00 Welcome and objectives 10.10 IBM Spec/Schema

More information

AUTHORITY FOR ELECTRICITY REGULATION

AUTHORITY FOR ELECTRICITY REGULATION SULTANATE OF OMAN AUTHORITY FOR ELECTRICITY REGULATION SCADA AND DCS CYBER SECURITY STANDARD FIRST EDITION AUGUST 2015 i Contents 1. Introduction... 1 2. Definitions... 1 3. Baseline Mandatory Requirements...

More information

E-Security policy. Ormiston Academies Trust. James Miller OAT DPO. Approved by Exec, July Release date July Next release date July 2019

E-Security policy. Ormiston Academies Trust. James Miller OAT DPO. Approved by Exec, July Release date July Next release date July 2019 Ormiston Academies Trust E-Security policy Date adopted: Autumn Term 2018 Next review date: Autumn Term 2019 Policy type Author Statutory James Miller OAT DPO Approved by Exec, July 2018 Release date July

More information

National Pooling Administration Contract #FCC13C nd Revised Change Order Proposal #3B

National Pooling Administration Contract #FCC13C nd Revised Change Order Proposal #3B National Pooling Administration Contract #FCC13C0007 2 nd Revised Change Order Proposal #3B (Development and Support of the PAS NPAC API) March 8, 2017 Neustar, Inc. 21575 Ridgetop Circle Sterling VA,

More information

FOM 2.4 The Performance Indicator: Assessing & Visualizing Data Center Cooling Performance

FOM 2.4 The Performance Indicator: Assessing & Visualizing Data Center Cooling Performance FOM 2.4 The Performance Indicator: Assessing & Visualizing Data Center Cooling Performance Mark Seymour AFCOM DCW 12th Sept. 2016 Future Facilities - speaking on behalf of The Green Grid 1 The Green Grid

More information

Juniper Care Plus Advanced Services Credits

Juniper Care Plus Advanced Services Credits Juniper Care Plus Advanced Services Credits Service Overview Today s organizations are under constant pressure to meet dynamic market demands while increasing their return on investment. IT departments

More information

Data Protection and GDPR

Data Protection and GDPR Data Protection and GDPR At DPDgroup UK Ltd (DPD & DPD Local) we take data protection seriously and have updated all our relevant policies and documents to ensure we meet the requirements of GDPR. We have

More information

EDRMS Document Migration Guideline

EDRMS Document Migration Guideline Title EDRMS Document Migration Guideline Creation Date 23 December 2016 Version 3.0 Last Revised 28 March 2018 Approved by Records Manager and IT&S Business Partner Approval date 28 March 2018 TABLE OF

More information

NE Designing and Deploying Microsoft Exchange Server 2016

NE Designing and Deploying Microsoft Exchange Server 2016 NE-20345-2 Designing and Deploying Microsoft Exchange Server 2016 Summary Duration 5 Days Audience Microsoft Exchange Level 300 Technology Exchange Server 2016 Delivery Method Instructor-led (Classroom)

More information

GB experience with smart meters

GB experience with smart meters Presentation by Energy UK Best practice for a successful smart technology roll-out Lessons learnt and recommendations from first movers GB experience with smart meters Introduction to Energy UK and the

More information

Switching Process and Rules Systems Operations Framework. Document Number:

Switching Process and Rules Systems Operations Framework. Document Number: Switching Process and Rules Systems Operations Framework Document Number: 4808076 TABLE OF CONTENTS 1. INTRODUCTION... 5 1.1 PURPOSE... 5 1.2 HIERARCHY... 5 2. PROCESSES... 7 2.1 SWITCHING OPERATOR AUTHORISATION

More information

Standard CIP Cyber Security Critical Cyber As s et Identification

Standard CIP Cyber Security Critical Cyber As s et Identification A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification

More information

Policy. Business Resilience MB2010.P.119

Policy. Business Resilience MB2010.P.119 MB.P.119 Business Resilience Policy This policy been prepared by the Bi-Cameral Business Risk and Resilience Group and endorsed by the Management Boards of both Houses. It is effective from December to

More information

VHIMS UPGRADE VERSION

VHIMS UPGRADE VERSION Introduction A new RiskMan version release is now available for VHIMS clients. The following new features and modifications have been implemented since the previous release. What s New What s Changed Homepage

More information

Welcome! EH2741 Communications & Control in Power Systems. Lars Nordström

Welcome! EH2741 Communications & Control in Power Systems. Lars Nordström 1 Welcome! EH2741 Communications & Control in Power Systems Lars Nordström larsno@kth.se 2 Outline Administration Few words about the department Walk through of course syllabus Demonstration of KTH-social

More information

Governing Body 313th Session, Geneva, March 2012

Governing Body 313th Session, Geneva, March 2012 INTERNATIONAL LABOUR OFFICE Governing Body 313th Session, Geneva, 15 30 March 2012 Programme, Financial and Administrative Section PFA FOR INFORMATION Information and communications technology questions

More information

Energy Networks Association GB Smart Meter Programme Network Operator Use of Electricity Consumption Data

Energy Networks Association GB Smart Meter Programme Network Operator Use of Electricity Consumption Data Energy Networks Association GB Smart Meter Programme Network Operator Use of Electricity Consumption Data Paul Abreu Business Lead Smart Meter Programme December 2016 Energy Networks Association Energy

More information

Distributed Generation Customer Perspectives. Focus on LV to 33kV Connections sector (PV)

Distributed Generation Customer Perspectives. Focus on LV to 33kV Connections sector (PV) Distributed Generation Customer Perspectives Focus on LV to 33kV Connections sector (PV) James Hoare CEng MIET MEI BRE National Solar Centre -Associate Consultant LHW Partnership LLP - Owner 24 th September

More information

A HIPAA Compliance and Enforcement Update from the HHS Office for Civil Rights Session #24, 10:00 a.m. 11:00 a.m. March 6, 2018 Roger Severino, MSPP,

A HIPAA Compliance and Enforcement Update from the HHS Office for Civil Rights Session #24, 10:00 a.m. 11:00 a.m. March 6, 2018 Roger Severino, MSPP, A HIPAA Compliance and Enforcement Update from the HHS Office for Civil Rights Session #24, 10:00 a.m. 11:00 a.m. March 6, 2018 Roger Severino, MSPP, JD Director, HHS Office for Civil Rights Nicholas Heesters,

More information

Audit Report. Chartered Management Institute (CMI)

Audit Report. Chartered Management Institute (CMI) Audit Report Chartered Management Institute (CMI) 10 October 2012 Note Restricted or commercially sensitive information gathered during SQA Accreditation monitoring activities is treated in the strictest

More information

Critical Infrastructure Protection in the European Union

Critical Infrastructure Protection in the European Union 20 January, 2015 The European GNSS Programmes 1 ICG9, Prague 9-14 November 2014 Critical Infrastructure Protection in the European Union 20 January, 2015 The European GNSS Programmes 2 Each EU Member State

More information