1 The iems Refresh Project Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Ronan Jamieson & Graham Newton System Operator, Wokingham
2 Agenda National Grid s iems iems Refresh Project System cut-over and go-live 2
3 Introduction to National Grid s iems
4 What is the iems? Integrated Energy Management System SCADA system to manage NG s transmission assets Receive real-time data from the network (i.e. Voltage, Power, Equipment status) Send controls to network equipment Meet licence obligations of continuously operating a safe, secure and economic electricity network for the whole of Great Britain 4
5 Key iems capabilities High Availability Dual redundant systems located in two locations, three locations capable of access Real-time Data Real-time data is collected from all NG electricity substations and from Scottish TOs and, some DNOs Selected data is transferred out to other key systems Tele command switching The ability for engineers to re-configure the network to meet operation needs PNA Analysis Security, contingency and voltage analysis of the power network in real time (< 2mins) and offline studies. Safety Management Safety application allowing work to be safely processed and carried out on the electricity grid with extensive reporting and tracking of safety document, with clear visual indications on graphical displays 5
6 Design Philosophy The design of the production IEMS systems uses the following principles: Two production systems located at different sites. Each production system is made of two independent halves, located in independent rooms. The two production systems collect and process data independently Database updates are performed independently on all iems systems All servers are physical This distributed nature of the architecture greatly minimises service loss due to a single site / system failure Site 1 PR1 (a) Production system 1 Data and updates Site 2 PR1 (b) Production system 2 PR2 (a) PR2 (b) 6
7 System Security 7
8 IEMS Interfaces Substations Other Key NG Systems Data Archive Balancing System IEMS Scottish TOs and DNOs User Interfaces ENTSO-E 8
9 System Monitoring All elements of the IEMS refresh system will be monitored 24-hours a day 365 days a year by the following four teams: CNI Health Team (CHT) This team is based in DC1, monitors the IEMS hardware Vodafone Network Monitoring Team This team is based in DC2, monitors the IEMS network and highlights any issues to the CHT. Security Team This team will be investigating alerts from the IDS system Property Team This team will provide monitoring of power and air conditioning at the three sites (DC1, DC2, and DC3) 9
10 The iems Refresh project
11 Project Scope Upgrade the existing IEMS system Software Application Replace all existing Application hardware Deliver a new IEMS production network in the UK at Wokingham, Warwick and Reading, replacing all existing IEMS network equipment. Provide an enduring replica production system, including network, for ongoing Testing (GE1) 11
12 iems Refresh Customer Benefits Ongoing Network management Secures our ability to manage power transmission systems 24x7 to mid-2020s Secure, robust and stable Provides enhanced cyber security Ensures required resilience and stability Enhanced Capabilities IEMS v17 is providing enhanced capabilities now and allowing for further future opportunities 12
13 System Quality and Testing The Project has used a extensive test regime to ensure the delivery of a high quality product: Multiple test phases, using a high number of experienced users More than 2000 tests to validate the solution Successful Failure-over testing iems Synchrocheck Test 100% Success Real-time operational switching at Minety 400kV was performed via the R17 iems system 13
14 iems Timeline September November 2017 December 2017 January 2017 Site Acceptance Testing Complete System Go-Live Post Implementation support complete Decommissioning complete / Project Closed 14
15 Cut over process Senior Management Involvement Independent Transition forum (Recommends) 3 month/1 month /1 week/1day Go / No Go Meetings Dress Rehearsal Sessions Halt Periods during cut over (Roll-back plans identified) On the day Cut Over Team (Defined roles & responsibilities over the period) 15
16 Required Control Systems Configuration Release 10 Release 17 IEMS MAIN In Control RTDT Enabled to DBU IEMS PR1 Control Disabled MAIN = Active DBU = Standby (no RTUs) PR1 = n/a available PR2 = Active SUB This is the preferred system configuration determined to be lowest risk to operations, in anticipation of cut-over activities at SGL-0 IEMS DBU IEMS PR2 Control Disabled RTDT Enabled to PR1 16
17 SGL 1day IEMS MAIN In Control RTDT Enabled to DBU IEMS PR1 Control Disabled Hands-off period to be agreed with ENCC/TNCC for approximately 0-30, whilst the Manual Entered Data (MED) is exported from IEMS-DBU. Co-ordination to be via PSM (and CHT). IEMS DBU Export all Manually Entered Data [MED]: tags, hand dressing, memo notes, etc. SUB IEMS PR2 Control Disabled RTDT Enabled to PR1 Import all MED: Failure to adhere to restriction could result in database mismatch or data corruption, causing delay or abortion of system migration activities. On completion of MED Import PR2 is available for control - MED dip-check - PNA running - Manual data catch-up and dual dressing Duration Est. 3 hours before handover 17
18 SGL 0 IEMS MAIN In Control IEMS DBU SUB IEMS PR1 Control Disabled Manually synchronise database and all data IEMS PR2 Control Disabled Gain status of dip-check Gain status of PNA runs Hands-off period on Rel:17 only Manually Synchronise PR2 to PR1. On completion establish System to System synchronisation (SISO) Co-ordination to be via PSM (and CHT). On completion of ManualSynch, CHT confirms status of data between PR1 /PR2 Dual dressing continues on Rel:10 and Rel:17 Duration Est. 2 hours 18
19 SGL 0 IEMS MAIN IEMS PR1 Control Disabled MAIN system demoted from Active to Standby working. PR2 taken down, configuration changes made. To complete a warm start is initiated. SUB Visibility of power system still possible through IEMS MAIN as Standby and possible option to promote back to ACTIVE working IEMS DBU IEMS PR2 Duration Est. 30 minutes 19
20 SGL 0 (PR2 now in Control[Active]) IEMS MAIN IEMS PR1 Control Disabled Interfaces transfers outstanding PR2 returns taking control of all RTU connections. Control room initiates dummy breaker checks. PR2 = Active MAIN = Standby SUB Dual dressing continues on Rel:10 and Rel:17 IEMS DBU IEMS PR2 HOLD POINT x PR1 taken down, configuration changes made in anticipation of system being established as STANDBY. Duration Est. 45 minutes 20
21 SGL 0 Interface Transfers 1 of 3 IEMS MAIN ICCP: BM1 ICCP: EBS1 IEMS PR2 ICCP: BM2 ICCP: EBS2 Risks All ICCP connections dual feed Rel:10 and Rel:17 Activities are to establish redundant connections to Rel:17 21
22 SGL 0 Interface Transfers 2 of 3 IEMS MAIN EBS sftp OLTA sftp IEMS PR2 RMS sftp EFS sftp OSA sftp DH esb FATE rs232 Risks EFS - terminating end has opted for making changes on the day without testing to their production DH code change needed to be implemented on the day to establish Rel:17 communications 22
23 SGL 0 Interface Transfers 3 of 3 IEMS MAIN ICCP: SP ICCP: SSE IEMS PR2 ICCP: Coreso ICCP: UKPN ICCP: ENW ICCP: EAS(RTE) Risks All ICCP connections dual feed Rel:10 and Rel:17 Activities are to establish redundant connections to Rel:17 23
24 SGL 0 Establish PR1 as Standby IEMS IEMS MAIN IEMS PR1 Interface transfers complete Status PR2 = Active MAIN = Standby PR1 = Available SUB PR1 in preparation of promotion to Standby Duration Est minutes IEMS DBU IEMS PR2 24
25 SGL 0 Establish PR1 as Standby IEMS IEMS MAIN IEMS PR1 Interfaces transfers complete PR1 Promoted to Standby Final Status PR2 = Active PR1 = Standby SUB MAIN = Available DBU = Available System check conducted by CHT IEMS DBU IEMS PR2 Duration Est minutes 25
26 Questions
Dumfries and Galloway Developer Forum. Welcome and Introduction. Gareth Hislop
6 th December 2017 Dumfries and Galloway Developer Forum Welcome and Introduction Gareth Hislop Dumfries and Galloway Forum Agenda Introduction Gareth Hislop NGET Update Julian Leslie Design Update Diyar
More informationSDRC 9.1- Strategy for Inter-Control Centre Communication Protocol (ICCP)
SDRC 9.1- Strategy for Inter-Control Centre Communication Protocol (ICCP) Contents 1 Executive Summary... 4 Background... 4 Objective... 4 Approach... 5 Technical and Commercial Challenges... 5 Solution
More informationNetwork Configuration Document Selection for New Substations Framework
Network Configuration Document Selection for New Substations Current version: 20/06/2018 EXTERNAL USE Page 1 of 14 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References...
More informationEuropean Developments
European Developments Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Transmission Workgroup
More informationDatacentre Milton Keynes Data sheet
Datacentre Milton Keynes Data sheet Data sheet Datacentre Milton Keynes Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the
More informationICCP Customer Forum. Inter Control Centre Communication Protocol. Friday 30 th September 2011
ICCP Customer Forum Inter Control Centre Communication Protocol Friday 30 th September 2011 Main Forum Objectives The business driver for ICCP Build a common understanding of ICCP Obtain input from a wide
More informationDatacentre Newbridge Data sheet
Datacentre Newbridge Data sheet Data sheet Datacentre Newbridge Find us 7 Claylands Road Edinburgh EH28 8LF Scotland With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our
More informationDCC SMETS1 PROGRAMME SMETS1 USER INTERFACE FORUM. March 2017 DCC PUBLIC
DCC SMETS1 PROGRAMME SMETS1 USER INTERFACE FORUM March 2017 DCC PUBLIC AGENDA Agenda Item Times Coffee / Breakfast From 09:00 Welcome and introduction Agenda walkthrough UI Options Recap Breakout 1: Impact
More informationNational Grid Review Group 646 Slide Pack
National Grid Review Group 646 Slide Pack Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. 13
More informationGridEye FOR A SAFE, EFFICIENT AND CONTROLLED POWER GRID
FOR A SAFE, EFFICIENT AND CONTROLLED POWER GRID SMART GRID VISION To solve today s energy and pollution problems, DEPsys believes that the world should be powered entirely by renewable energy. By applying
More informationA Guide to EDT, EDL and CT with National Grid. A Guide to EDT, EDL and CT with National Grid
A Guide to EDT, EDL and CT with National Grid Issue 1, December 2016 Contents Page Introduction 1 Informing NG of requirement 1 EDT 1 EDT Questions 2 EDL 3 EDL Questions 4 Control Telephony 4 References
More informationEBS - IT. 1st July 2014 Holiday Inn, Winnersh
EBS - IT 1st July 2014 Holiday Inn, Winnersh Agenda 1 Housekeeping and Safety moment 2 Introductions 3 Minutes of last meeting 4 National Grid Project Structure 5 Review of actions 6 Current Status 7 Testing
More informationPOWER SYSTEM DATA COMMUNICATION STANDARD
POWER SYSTEM DATA COMMUNICATION STANDARD PREPARED BY: AEMO Systems Capability VERSION: 2 EFFECTIVE DATE: 1 December 2017 STATUS: FINAL Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au
More informationEnergy Networks Association
The Voice of the Networks Energy Networks Association Introduction to ENA Open Networks Project Introduction: ENA Open Networks Project In December 2016 ENA gave their commitment to a major new long-term
More informationSubstation Workshop. 7 th February 2018
Substation Workshop 7 th February 2018 1 Agenda Welcome and Introductions Antony White Substation Design Overview Andy Moore Question & Answer Session Break 1500kVA Transformers James Devriendt & Andy
More informationIT Disaster Recovery Services Program
Q4-2017 ISAC Update v.20171107 IT Disaster Recovery Strategy Implementation 2008 Data Center Strategic Plan Part 1 Part 2 Disaster Recovery Strategic Plan Part 1 Part 2 2016 2019 Implementation Goals Decouple
More informationENTSO-e Operational Security Network Code. OS Code Objectives. Update for JESG meeting 20 th Feb 2013
ENTSO-e Operational Security Network Code Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. OS
More informationDescription Activities Description. Co-ordination with GB System Operator. Co-ordination with other DSOs and Distribution Networks (including IDSOs)
Appendix A DSO Functions (Version 7) No. DSO Functions 1 System Coordination Description Activities Description Operate local and regional areas and co-ordinate energy and power transfers with other networks
More informationElectricity Market Reform
Electricity Market Reform Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. John Perkins, Feed
More informationPowering the North West s Future: From DNO to DSO. Paul Bircham Commercial Strategy & Support Director
Powering the North West s Future: From DNO to DSO Paul Bircham Commercial Strategy & Support Director 1 Introducing Electricity North West 5 million 2.4 million (45% of demand) 20,000 I&C (55% of demand)
More informationEBS Transition Access Validation. Pete Smith March 2013
EBS Transition Access Validation Pete Smith March 2013 Access Validation Phase A reminder; Will only start after all external test phases completed Will not start until a defined period before cut-over
More informationGC0102 Mod Title: EU Connection Codes GB Implementation Mod 3
Stage 01: Modification Proposal Grid Code GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3 Purpose of Modification: This modification (3/4) will set out within the Grid Code the following
More informationDisclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission...
CIP-002-4 Cyber Security Critical Cyber Asset Identification Rationale and Implementation Reference Document September, 2010 Table of Contents TABLE OF CONTENts Disclaimer... 3 Executive Summary... 4 Introduction...
More informationMatthew Musto, Senior Project Manager, New York ISO Charles Alonge, Senior Software Developer, New York ISO
Industry: Transmission/Distribution/Smarts Presented by Matthew Musto, Senior Project Manager, New York ISO Charles Alonge, Senior Software Developer, New York ISO Agenda About the NYISO A New State-of-the-Art
More informationConnecting and Managing Offshore Wind Danish Embassy - 4 th December 2012
Connecting and Managing Offshore Wind Danish Embassy - 4 th December 2012 Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same
More informationEvolution of Control for the Power Grid
Evolution of Control for the Power Grid Anjan Bose Washington State University Pullman, WA, USA PaiFest In Honor of Prof. M. A. Pai Urbana-Champaign, IL October 15, 2015 The Past (before 1960s) Hard
More informationOffshore BMU Configuration
BMU Configuration Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Steve Curtis : System Operator
More informationDatacentre Reading East 2 Data sheet
Datacentre Reading East 2 Data sheet Data sheet Datacentre Reading East 2 Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the
More informationEPCC 2015 New SCADA/EMS Features and Challenges
EPCC 2015 New SCADA/EMS Features and Challenges Bled, 20. 5. 2014 Emil Cek Agenda Agenda 1. Introduction of ELES 2. System operation @ ELES 3. SCADA/EMS environment 4. New SCADA/EMS system 5. Features
More informationLeading the Digital Transformation from the Centre of Government
37th Meeting of Senior Officials from Centres of Government Leading the Digital Transformation from the Centre of Government Dublin, Ireland, 8-9 November 2018 Agenda 2 GOV/PGC/MPM/A(2018)1/REV1 19.00
More informationNOT PROTECTIVELY MARKED
Meeting Public SPA Board Meeting Date Location Jurys Inn Hotel, Inverness Title of Paper Proposed Transfer of Services from Inverness Area Control Room to Dundee Area Control Room and Inverness Service
More informationNext Generation Scada Architectures
Next Generation Scada Architectures Jan Vorrink TenneT at a glance Europe's first cross-border grid operator 2,813 employees EBIT 725 (EUR million) Assets 13.645 (EUR billion) Investments (2014-23) 20
More informationElectricity Balancing System (EBS) IT Subgroup
Minutes Meeting name Meeting number 5 Date of meeting 5 th December 2012 Time 10:00-15:00 Location Electricity Balancing System (EBS) IT Subgroup National Grid Wokingham Attendees Name Initials Company
More informationNIA Progress Report. Programme Summary. 31 July Electricity North West/NIA Programme Summary/31 July 2016 Page 1 of 10
NIA Progress Report Programme Summary 31 July 2017 Electricity rth West/NIA Programme Summary/31 July 2016 Page 1 of 10 VERSION HISTORY Version Date Author Status Comments V1.0 4 July 2017 L Eyquem Draft
More informationISSC is invited to consider the attached report and to support the proposal to change the priority order for the migration UEA web services.
ISC11D005 Title: UEA Website Migration Author: Jonathan Richardson, Assistant Director, Corporate Information Services Date: 1 st November 2011 Circulation: ISSC 10 November 2011 Agenda: ISC11A001 Version:
More informationSUPERVISORY CONTROL AND DATA ACQUISITION. Network Manager SCADA for rail. Operational confidence.
SUPERVISORY CONTROL AND DATA ACQUISITION Network Manager SCADA for rail. Operational confidence. 2 NETWORK MANAGER SCADA Network Manager SCADA Supervisory control and data acquisition. As the world s population
More informationHigh Level UKL Data Migration Approach Bulk Load, IDRs and Cutover Activity. April 2016
High Level UKL Data Migration Approach Bulk Load, IDRs and Cutover Activity April 2016 Data Migration Approach Objective The objective of the slides is to detail the data migration approach for Bulk Load,
More informationAudit Report. Mineral Products Qualifications Council (MPQC) 31 March 2014
Audit Report Mineral Products Qualifications Council (MPQC) 31 March 2014 Note Restricted or commercially sensitive information gathered during SQA Accreditation s quality assurance activities is treated
More informationNAMI Affiliate Profile Center Contact Manual
NAMI Affiliate Profile Center Contact Manual Standards of Excellence/Center for Excellence November 2013 Table of Contents Chapter Page I. NAMI Affiliate Profile Center Contact Training Timetable 3 II.
More informationTait GridLink THE INTELLIGENT CHOICE FOR DISTRIBUTION AUTOMATION. harris.com #harriscorp
Tait GridLink THE INTELLIGENT CHOICE FOR DISTRIBUTION AUTOMATION harris.com #harriscorp GRID VISIBILITY AND CONTROL Improving distribution grid operations with real time remote monitoring and control of
More informationEARTH Ex 2017 Middle Planning Conference
EARTH Ex 2017 Middle Planning Conference 20 April 2017 Emergency All-sector Response to Transnational Hazards Exercise 23 August 2017 1 EARTH Ex 2017 MPC Sector Objectives Review EARTH Ex Plan, Concepts
More informationIMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO
IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: DRAFT FOR CONSULTATION Approved
More informationEuropean Network Codes: RfG GB Grid Code Application Options
European Network Codes: RfG GB Grid Code Application Options Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in
More informationDistribution Long Term Development Statement
Distribution November 2017 SP Distribution for the years 2017/18 to 2021/22 Distribution for the years 2017/18 to 2021/22 The information used to compile this Statement is derived from SP Distribution
More informationIMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO
IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: FINAL Approved for distribution
More informationXXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study
XXXX Bear Creek Hydro Generation Project Interconnection Facilities Study Report No. SPA 2005-33 August 2005 System Planning (Lower Mainland & Vancouver Island) British Columbia Transmission Corporation
More informationSTCP 04-1 Issue 005 Real Time Data Change Management
STCP 04-1 Issue 005 Real Time Data Change Management STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc
More informationDesigning a new IEC substation architecture
Designing a new IEC 61850 substation architecture Gerrit Dogger Senior Product and Application Specialist Cooper Power Systems gerrit.dogger@cybectec.com Garry Tennese Station Integration Specialist Manitoba
More informationHow smart can the grid really be?
How smart can the grid really be? by Dale Pudney, HVT Power Systems and Luo Wei, NR Electric With the improvement of electronic communications and computing technology, it becomes possible to integrate
More informationThe Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft
The Project Charter Project Title: VDI Data Center Design and Build Project Sponsor: South Alberta Data Centers Inc. (SADC Inc.) Project Customer: The City of Calgary Project Manager: Moe Yousof Document
More informationOverview of Brunel University National Grid CIM Research Collaboration
Brunel Institute of Power Systems Overview of Brunel University National Grid CIM Research Collaboration Gareth Taylor Brunel University Nigel Hargreaves CIM Users Group, Windsor May 17 th 2012 EngD Environmental
More information[AV-SP2016-SM]: SharePoint 2016 Site Members
[AV-SP2016-SM]: SharePoint 2016 Site Members Length : 1 Day Audience(s) : SharePoint Site Members/ Visitors Level : Immediate/ Advanced Technology : SharePoint 2016 Delivery Method : Instructor-led (Classroom)
More informationOPEN Networks - Future Worlds Consultation
ENA Open Networks Future Worlds Consultation OPEN Networks - Future Worlds Consultation Developing change options to facilitate energy decarbonisation, digitisation and decentralisation Executive Summary
More informationSERVERS / SERVICES AT DATA CENTER AND CO-LOCATION POLICY
SERVERS / SERVICES AT DATA CENTER AND CO-LOCATION POLICY National Video Conferencing Network Version 1.0 Released January 01, 2014 HIGHER EDUCATION COMMISSION, PAKISTAN 1 GENERAL The Higher Education Commission
More informationMISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO
1 MISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO 2 MISO Overview MISO is an independent, non-profit, memberbased organization committed to reliability. We serve as
More informationCIP Cyber Security Configuration Management and Vulnerability Assessments
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationThis section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationCity of London Stakeholder Consultation
City of London Stakeholder Consultation 15 May 2013 2011. UK Power Networks. All rights reserved Safety and Housekeeping No planned fire alarms Emergency exits Fire assembly points Toilets Mobile phones
More informationSOLUTION BRIEF RSA ARCHER IT & SECURITY RISK MANAGEMENT
RSA ARCHER IT & SECURITY RISK MANAGEMENT INTRODUCTION Organizations battle growing security challenges by building layer upon layer of defenses: firewalls, antivirus, intrusion prevention systems, intrusion
More informationMODULAR HUB AND SPOKE 17 NOVEMBER 2017
MODULAR HUB AND SPOKE 17 NOVEMBER 2017 Executive Summary Future North Sea offshore wind farms will increasingly be located further from shore. The longer distances to shore and generally deeper waters
More informationABB ABILITY NETWORK MANAGER X. SCADA for rail Operational confidence.
ABB ABILITY NETWORK MANAGER X SCADA for rail Operational confidence. 2 ABB ABILITY NETWORK MANAGER X SCADA Supervisory control and data acquisition (SCADA) with Network Manager X As the world s population
More informationPhysical Security Reliability Standard Implementation
Physical Security Reliability Standard Implementation Attachment 4b Action Information Background On March 7, 2014, the Commission issued an order directing NERC to submit for approval, within 90 days,
More informationRemote Telemetry Units
Remote Telemetry Units IRIS-RTU - Designed by utility engineers FOR the gas and utility industries The IRIS-RTU incorporates reliable, local processing power with the advanced communications of an RTU
More informationFedRAMP: Understanding Agency and Cloud Provider Responsibilities
May 2013 Walter E. Washington Convention Center Washington, DC FedRAMP: Understanding Agency and Cloud Provider Responsibilities Matthew Goodrich, JD FedRAMP Program Manager US General Services Administration
More informationStandard CIP Cyber Security Critical Cyber As s et Identification
A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification
More informationLessons Learned Implementing an IEC based Microgrid Power- Management System. K.A. GRAY, J.J. MRAZ* POWER Engineers, Inc.
21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2015 Grid of the Future Symposium Lessons Learned Implementing an IEC 61850-based Microgrid Power- Management System K.A.
More informationAndrew Durant/Ellen Sullivan
AGENDA ITEM: 3.5 INFORMATION MANAGEMENT, TECHNOLOGY AND GOVERNANCE COMMITTEE DATE OF MEETING: 2 OCTOBER 2018 Subject : Approved and Presented by: Prepared by: Other Committees and meetings considered at:
More informationSTCP Amendment Proposal Form
STCP Amendment Proposal Form PA036 1. Title of Amendment Proposal STCP 09-2 Incorporation material currently within SPT SCS and making standard for both TOs. 2. Description of the Proposed Amendment (mandatory
More informationMIGRATION PROCESS FROM UCTE DEF TO CGMES SECOND EDITION
MIGRATION PROCESS FROM UCTE DEF TO CGMES SECOND EDITION 24 OCTOBER 2016 PT CGM Page 1 of 18 ENTSO-E AISBL Avenue Cortenbergh 100 1000 Brussels Belgium Tel +32 2 741 09 50 Fax +32 2 741 09 51 info@entsoe.eu
More informationRed Hat Virtualization Increases Efficiency And Cost Effectiveness Of Virtualization
Forrester Total Economic Impact Study Commissioned by Red Hat January 2017 Red Hat Virtualization Increases Efficiency And Cost Effectiveness Of Virtualization Technology organizations are rapidly seeking
More informationInformation Services Office 365 Board. Mail Migration
Date: 24.09.12 B Information Services Office 365 Board Mail Migration Brief description of the paper This paper details the findings from the investigations undertaken regarding the migration of all student
More informationSecuring the North American Electric Grid
SESSION ID: TECH-R02 Securing the North American Electric Grid Marcus H. Sachs, P.E. SVP and CSO North American Electric Reliability Corporation @MarcusSachs Critical Infrastructure s Common Denominator
More informationData and Forecasting Summary
Data and Forecasting Summary This article highlights the need for more integrated and aligned data systems within WPD and improved interfaces within the industry. It also looks at the increased need for
More informationDfT Policy Overview Rod Paterson
Ports Policy - BPA conference, 3 November 2016 1 DfT Policy Overview Rod Paterson BPA CONFERENCE 18 October 2017 October 17 Plan for my session this morning 1. Update on changes in structures 2. Reflections
More informationFlexible Connections for DG Customers
Flexible Connections for DG s Session 1b: Connections Paul Pretlove UK Power Networks Ruth Kemsley Wind Prospect In partnership with: Deployment Key outputs REQUIREMENTS Interface specification guidance
More informationERO Enterprise IT Projects Update
ERO Enterprise IT Projects Update Stan Hoptroff, Vice President, Chief Technology Officer and Director of Information Technology Technology and Security Committee Meeting November 6, 2018 Agenda ERO IT
More informationAn Introduction to Network Codes & The Links Between Codes
An Introduction to Network Codes & The Links Between Codes April 2014 About ENTSO-E 41 TSOs from 34 countries 532 million citizens served 828 GW generation 305 Thousand Km of transmission lines Ten-Year
More informationGuide to cyber security/cip specifications and requirements for suppliers. September 2016
Guide to cyber security/cip specifications and requirements for suppliers September 2016 Introduction and context The AltaLink cyber security/cip specification and requirements for suppliers (the standard)
More informationNHS Fife. 2015/16 Audit Computer Service Review Follow Up
NHS Fife 2015/16 Audit Computer Service Review Follow Up Prepared for NHS Fife April 2016 Audit Scotland is a statutory body set up in April 2000 under the Public Finance and Accountability (Scotland)
More informationWelcome to Customs Declaration Services (CDS) Stakeholder Event
Welcome to Customs Declaration Services (CDS) Stakeholder Event Monday, 10th April 2017 Steve Casey External Stakeholder Management and Engagement Lead Agenda 10.00 Welcome and objectives 10.10 IBM Spec/Schema
More informationAUTHORITY FOR ELECTRICITY REGULATION
SULTANATE OF OMAN AUTHORITY FOR ELECTRICITY REGULATION SCADA AND DCS CYBER SECURITY STANDARD FIRST EDITION AUGUST 2015 i Contents 1. Introduction... 1 2. Definitions... 1 3. Baseline Mandatory Requirements...
More informationE-Security policy. Ormiston Academies Trust. James Miller OAT DPO. Approved by Exec, July Release date July Next release date July 2019
Ormiston Academies Trust E-Security policy Date adopted: Autumn Term 2018 Next review date: Autumn Term 2019 Policy type Author Statutory James Miller OAT DPO Approved by Exec, July 2018 Release date July
More informationNational Pooling Administration Contract #FCC13C nd Revised Change Order Proposal #3B
National Pooling Administration Contract #FCC13C0007 2 nd Revised Change Order Proposal #3B (Development and Support of the PAS NPAC API) March 8, 2017 Neustar, Inc. 21575 Ridgetop Circle Sterling VA,
More informationFOM 2.4 The Performance Indicator: Assessing & Visualizing Data Center Cooling Performance
FOM 2.4 The Performance Indicator: Assessing & Visualizing Data Center Cooling Performance Mark Seymour AFCOM DCW 12th Sept. 2016 Future Facilities - speaking on behalf of The Green Grid 1 The Green Grid
More informationJuniper Care Plus Advanced Services Credits
Juniper Care Plus Advanced Services Credits Service Overview Today s organizations are under constant pressure to meet dynamic market demands while increasing their return on investment. IT departments
More informationData Protection and GDPR
Data Protection and GDPR At DPDgroup UK Ltd (DPD & DPD Local) we take data protection seriously and have updated all our relevant policies and documents to ensure we meet the requirements of GDPR. We have
More informationEDRMS Document Migration Guideline
Title EDRMS Document Migration Guideline Creation Date 23 December 2016 Version 3.0 Last Revised 28 March 2018 Approved by Records Manager and IT&S Business Partner Approval date 28 March 2018 TABLE OF
More informationNE Designing and Deploying Microsoft Exchange Server 2016
NE-20345-2 Designing and Deploying Microsoft Exchange Server 2016 Summary Duration 5 Days Audience Microsoft Exchange Level 300 Technology Exchange Server 2016 Delivery Method Instructor-led (Classroom)
More informationGB experience with smart meters
Presentation by Energy UK Best practice for a successful smart technology roll-out Lessons learnt and recommendations from first movers GB experience with smart meters Introduction to Energy UK and the
More informationSwitching Process and Rules Systems Operations Framework. Document Number:
Switching Process and Rules Systems Operations Framework Document Number: 4808076 TABLE OF CONTENTS 1. INTRODUCTION... 5 1.1 PURPOSE... 5 1.2 HIERARCHY... 5 2. PROCESSES... 7 2.1 SWITCHING OPERATOR AUTHORISATION
More informationStandard CIP Cyber Security Critical Cyber As s et Identification
A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification
More informationPolicy. Business Resilience MB2010.P.119
MB.P.119 Business Resilience Policy This policy been prepared by the Bi-Cameral Business Risk and Resilience Group and endorsed by the Management Boards of both Houses. It is effective from December to
More informationVHIMS UPGRADE VERSION
Introduction A new RiskMan version release is now available for VHIMS clients. The following new features and modifications have been implemented since the previous release. What s New What s Changed Homepage
More informationWelcome! EH2741 Communications & Control in Power Systems. Lars Nordström
1 Welcome! EH2741 Communications & Control in Power Systems Lars Nordström larsno@kth.se 2 Outline Administration Few words about the department Walk through of course syllabus Demonstration of KTH-social
More informationGoverning Body 313th Session, Geneva, March 2012
INTERNATIONAL LABOUR OFFICE Governing Body 313th Session, Geneva, 15 30 March 2012 Programme, Financial and Administrative Section PFA FOR INFORMATION Information and communications technology questions
More informationEnergy Networks Association GB Smart Meter Programme Network Operator Use of Electricity Consumption Data
Energy Networks Association GB Smart Meter Programme Network Operator Use of Electricity Consumption Data Paul Abreu Business Lead Smart Meter Programme December 2016 Energy Networks Association Energy
More informationDistributed Generation Customer Perspectives. Focus on LV to 33kV Connections sector (PV)
Distributed Generation Customer Perspectives Focus on LV to 33kV Connections sector (PV) James Hoare CEng MIET MEI BRE National Solar Centre -Associate Consultant LHW Partnership LLP - Owner 24 th September
More informationA HIPAA Compliance and Enforcement Update from the HHS Office for Civil Rights Session #24, 10:00 a.m. 11:00 a.m. March 6, 2018 Roger Severino, MSPP,
A HIPAA Compliance and Enforcement Update from the HHS Office for Civil Rights Session #24, 10:00 a.m. 11:00 a.m. March 6, 2018 Roger Severino, MSPP, JD Director, HHS Office for Civil Rights Nicholas Heesters,
More informationAudit Report. Chartered Management Institute (CMI)
Audit Report Chartered Management Institute (CMI) 10 October 2012 Note Restricted or commercially sensitive information gathered during SQA Accreditation monitoring activities is treated in the strictest
More informationCritical Infrastructure Protection in the European Union
20 January, 2015 The European GNSS Programmes 1 ICG9, Prague 9-14 November 2014 Critical Infrastructure Protection in the European Union 20 January, 2015 The European GNSS Programmes 2 Each EU Member State
More information