1 SPDO report R. T. Schilizzi US SKA Consortium meeting Pasadena, 15 October 2009

2 SPDO Team Project Director Project Engineer Project Scientist (0.5 fte) Executive Officer System Engineer Domain Specialist Receptors Domain Specialist Signal Transport Domain Specialist Computing & Softw Domain Specialist Signal Processing Site Engineer Project Management Officer Manager, Ind. Participation Strategy Outreach Officer Office Manager Richard Schilizzi Peter Dewdney Joseph Lazio Colin Greenwood Kobus Cloete Neil Roddis Roshene McCool Duncan Hall Wallace Turner Rob Millenaar Billy Adams Phil Crosby Johanna Bowler Lisa Bell

3 PrepSKA WP2 progress Revised Work Plan for PrepSKA WP2 submitted to SSEC and PrepSKA Board Progress report for WP2 for the last 18 months submitted to SSEC and PrepSKA Board Design Reference Mission v1.0 released System Engineering Management Plan released Dish Verification Program underway (see report by Lynn Baker) Aperture Array Verification Program: draft DoW under review, funding being sought in NL, UK, Portugal, France, Italy (see report by Arnold van Ardenne)

4 WP2 Progress Signal Transport : work plans per institute in place Sub-system Design Groups formed in all domains except software &computing. Regular telecons underway. Initial descriptions of design and cost estimates : Option 1: dishes/spfs included in Decadal Review submission Option 2: dishes/paf/spfs in progress Option 3: AA + dishes/spf in SKA Memo 93 and draft DoW for AAVP Schedule Tiger Team preparing a draft report for ASG and SSEC (see report by Vern Pankonin)

5 WP2 meeting October main themes WP2 Progress System design, costing approach, and risks for dishes/spf, dishes/paf, and AA Scientific results that may have impact on the design Progress and planning in each SKA sub-system WP2 time and resources, WBS Impact of SKA roll-out and operations on SKA design SKA configurations and site planning Discussion of science/technology trade-off plans 80 people expected

6 WP2 Progress Risk Management Plan, under review by Sys Eng Design Group Documentation Plan, internal draft WP2 Gantt chart and WBS under development Post-PrepSKA Plan, early draft Project Book, internal discussion started, no progress since May consortium meeting

7 PrepSKA WP3 progress Current focus on 1) generating array configurations in Australasia and Southern Africa 2) preparation for the RFI monitoring campaign Activities starting on 1) Preparation for tropospheric phase fluctuation measurement 2) Mandate for external consultant on infrastructure capital and operations expenditure for AU and RSA 3) Mandate for external consultant on the long term RFI environment in Australia and Southern Africa

8 Configurations Needed by end-2009 for 1) identifying locations for RFI measurements 2) input for external consultant on infrastructure costs Task Force established, Rob Millenaar chair Kick-off meeting, March 09 Is generating configurations for multiple cores, intermediate region (out to ~200 km), and remote stations (out to 3000 km) Draft specifications for no-go areas under discussion with sites (RFI, geographic (water, slopes), geological, etc) 2005 site submissions provide starting points for remote site locations Extensive iteration with sites and SWG have taken place

9 Possible Site Schematic Multi-Core Centre Central Processing Facility Dishes Dense AA Sparse AA

10 RFI monitoring Late delivery of the spectrometer (ROACH Board delay). Deployment of RFI stations expected early Measurements to start in late January 2010 at both core sites using identical equipment. ASKAP and MeerKAT construction will cease during RFI measurements at core sites to avoid corrupting the results. Remote sites for RFI monitoring (4x) will be chosen to test EMC from population centres, effects of terrain shielding, and accuracy of propagation modelling for distant transmitters.

11 Industry participation Gather information from Precursors/Pathfinders/ Design Studies on their industry relationships and relevant government policies Map and verify potential global industry players Investigate current best practice models for industry participation Harmonise approach of regions to development and networking of industry capability for the SKA Analyse WTO principles, and country / regional / international models for procurement (PrepSKA WP5) Design and create industry database - proof-of -concept ongoing Develop IP strategy for the SKA project SSEC3 paper

12 Science WG Design Reference Mission v1.0 released Input provided to the US Decadal Survey input provided to the Science-Operations Plan Scholarpedia article on the SKA has been written by Rainer Beck (MPIfR), under review Preparations for SKA2010 have started A document on the scientific consequences, if any, of win-win scenarios for the site decision has been sent to the SSEC

13 SKA Operations Preliminary Operations Plan To be discussed at SSEC-3 Extrapolation from MeerKat, ASKAP, EVLA, ALMA Number of people and their distribution Annual and life-cycle costs including power Science Operations Mix of targeted and survey programs Role of regional support centers Phasing in observing during construction End-to-end data analysis Archiving and archive retrieval User interaction

14 Outreach Committee Ian Morison (part-time Outreach Officer) retired on 30 September 2009 New full-time Outreach Officer, Jo Bowler, should start mid-november New telescope fly-by animation produced by Xilostudios Support provided by Ian Morison at IAU General Assembly in Rio SKA featured in SPDO, South African and Australian displays This did not convey a unified message to the outside world Website content updated by Colin Greenwood Website re-development not yet started Brochure and posters need updating Science animation under discussion with Swinburne University

15 SKA2010 When: March 2010 Where: SPDO at U Manchester Purpose: Annual SKA Science-Engineering Meeting to discuss 1) the latest astronomical results in SKA-relevant areas 2) the status of engineering studies for the SKA systems and sub-systems, and 3) design/science trade-off issues for the SKA The results of these discussions are likely to have substantial impact on the direction of the SKA project.

The Square Kilometre Array. Miles Deegan Project Manager, Science Data Processor & Telescope Manager

The Square Kilometre Array. Miles Deegan Project Manager, Science Data Processor & Telescope Manager The Square Kilometre Array Miles Deegan Project Manager, Science Data Processor & Telescope Manager The Square Kilometre Array (SKA) The SKA is a next-generation radio interferometer: 3 telescopes, on

More information

Square Kilometre Array

Square Kilometre Array Square Kilometre Array C4SKA 16 February 2018 David Luchetti Australian SKA Project Director Presentation 1. Video of the Murchison Radioastronomy Observatory 2. Is SKA a Collaborative project? 3. Australia/New

More information

INSPIRE status report

INSPIRE status report INSPIRE Team INSPIRE Status report 29/10/2010 Page 1 of 7 INSPIRE status report Table of contents 1 INTRODUCTION... 1 2 INSPIRE STATUS... 2 2.1 BACKGROUND AND RATIONAL... 2 2.2 STAKEHOLDER PARTICIPATION...

More information

Project Overview and Status

Project Overview and Status Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager Outline Project Goals Organization Staffing Progress since last meeting Budget Contingency

More information

Summary of Data Management Principles

Summary of Data Management Principles Large Synoptic Survey Telescope (LSST) Summary of Data Management Principles Steven M. Kahn LPM-151 Latest Revision: June 30, 2015 Change Record Version Date Description Owner name 1 6/30/2015 Initial

More information

SKA 1 Infrastructure Element Australia. SKA Engineering Meeting Presentation 8 th October 2013

SKA 1 Infrastructure Element Australia. SKA Engineering Meeting Presentation 8 th October 2013 SKA 1 Infrastructure Element Australia SKA Engineering Meeting Presentation 8 th October 2013 1. Contents Introduction Management Structures Overview Work Breakdown Structure Proposal Review Prototypes

More information

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON NOVEMBER 29, 2016

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON NOVEMBER 29, 2016 TO: FROM: SUBJECT: CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON NOVEMBER 29, 2016 KELLY SCHERR, P.ENG., MBA, FEC MANAGING DIRECTOR ENVIRONMENTAL & ENGINEERING SERVICES AND CITY ENGINEER SHIFT RAPID

More information

Memorandum of Understanding between the Central LHIN and the Toronto Central LHIN to establish a Joint ehealth Program

Memorandum of Understanding between the Central LHIN and the Toronto Central LHIN to establish a Joint ehealth Program Memorandum of Understanding between the Central LHIN and the Toronto Central LHIN to establish a Joint ehealth Program Purpose This Memorandum of Understanding (MOU) defines the terms of a joint ehealth

More information

The Virtual Observatory and the IVOA

The Virtual Observatory and the IVOA The Virtual Observatory and the IVOA The Virtual Observatory Emergence of the Virtual Observatory concept by 2000 Concerns about the data avalanche, with in mind in particular very large surveys such as

More information

SURFACE RESISTIVITY TEST

SURFACE RESISTIVITY TEST AASHTO TIG Lead States Team Marketing Plan for SURFACE RESISTIVITY TEST Lead States Team: Mario Paredes, Chair, Florida DOT Tommy Nantung, Indiana DOT Celik Ozyildirim, Virginia DOT Rob Reis, California

More information

AA CORRELATOR SYSTEM CONCEPT DESCRIPTION

AA CORRELATOR SYSTEM CONCEPT DESCRIPTION AA CORRELATOR SYSTEM CONCEPT DESCRIPTION Document number WP2 040.040.010 TD 001 Revision 1 Author. Andrew Faulkner Date.. 2011 03 29 Status.. Approved for release Name Designation Affiliation Date Signature

More information

Developing the ICSU World Data System (WDS)

Developing the ICSU World Data System (WDS) Developing the ICSU World Data System (WDS) 2009-2010 Mustapha Mokrane ICSU Secretariat Science and Information Technology Officer ICSU s Vision (A world where) universal and equitable access to high quality

More information

CSIRO Astronomy and Space Science Douglas Bock Director 6 June 2017 ASTRONOMY AND SPACE SCIENCE

CSIRO Astronomy and Space Science Douglas Bock Director 6 June 2017 ASTRONOMY AND SPACE SCIENCE CSIRO Astronomy and Space Science Douglas Bock Director 6 June 2017 ASTRONOMY AND SPACE SCIENCE A New ATNF Vision Where will be in 10 years? We will operate world-class radio astronomy facilities for users

More information

Phishing Activity Trends Report August, 2006

Phishing Activity Trends Report August, 2006 Phishing Activity Trends Report, 26 Phishing is a form of online identity theft that employs both social engineering and technical subterfuge to steal consumers' personal identity data and financial account

More information

The Global Carbon Capture and Storage Institute GCCSI

The Global Carbon Capture and Storage Institute GCCSI The Global Carbon Capture and Storage Institute GCCSI Position and Update as March 2009 Nick Otter CEO of Global CCS Institute CSLF Technical Group Meeting, Oslo 1-2 nd April 2009 Mandate and Objectives

More information

The South African Experience with QoS Drive Testing

The South African Experience with QoS Drive Testing The South African Experience with QoS Drive Testing ITU Workshop on Telecommunications Service Quality Rio de Janeiro, Brazil, 27-29 November 2017 Praneel Ruplal, Pr. Eng. Outline Introduction Mandate

More information

Digital TV Group (DTG) response to the BBC Trust s Canvas Proposals Provisional Conclusions

Digital TV Group (DTG) response to the BBC Trust s Canvas Proposals Provisional Conclusions Digital TV Group (DTG) response to the BBC Trust s Canvas Proposals Provisional Conclusions Context The DTG s membership of over 140 organisations is drawn from broadcasters, manufacturers, platform operators,

More information

SKA Regional Centre Activities in Australasia

SKA Regional Centre Activities in Australasia SKA Regional Centre Activities in Australasia Dr Slava Kitaeff CSIRO-ICRAR APSRC Project Engineer ERIDANUS National Project Lead Why SKA Regional Centres? SKA 1 Observatory Compute capacity: 100 Pflops

More information

Case Study: CyberSKA - A Collaborative Platform for Data Intensive Radio Astronomy

Case Study: CyberSKA - A Collaborative Platform for Data Intensive Radio Astronomy Case Study: CyberSKA - A Collaborative Platform for Data Intensive Radio Astronomy Outline Motivation / Overview Participants / Industry Partners Documentation Architecture Current Status and Services

More information

PROJECT FINAL REPORT. Tel: Fax:

PROJECT FINAL REPORT. Tel: Fax: PROJECT FINAL REPORT Grant Agreement number: 262023 Project acronym: EURO-BIOIMAGING Project title: Euro- BioImaging - Research infrastructure for imaging technologies in biological and biomedical sciences

More information

THE SKA SCIENCE AND TECHNICAL OPERATIONS PLAN

THE SKA SCIENCE AND TECHNICAL OPERATIONS PLAN THE SKA SCIENCE AND TECHNICAL OPERATIONS PLAN Document number...wp2-001.010.010-pla-001 Revision... A Author... SKA Operations Working Group Date... 2010-01-29 Status... Approved for release Name Designation

More information

Global Infrastructure Hub Update. G20 Infrastructure Working Group, January 2019

Global Infrastructure Hub Update. G20 Infrastructure Working Group, January 2019 Global Infrastructure Hub Update G20 Infrastructure Working Group, January 2019 IWG Update Introduction Dear IWG members, After a successful 2018, we start 2019 with great enthusiasm, ready to deliver

More information

Lessons learnt from building the International Virtual Observatory Alliance. Françoise Genova

Lessons learnt from building the International Virtual Observatory Alliance. Françoise Genova Lessons learnt from building the International Virtual Observatory Alliance Françoise Genova The IVOA Formed in June 2002 with a mission to "facilitate the international coordination and collaboration

More information

The Final Rule on Work Zone Safety and Mobility

The Final Rule on Work Zone Safety and Mobility Federal Highway Administration, USDOT The Final Rule on Work Zone Safety and Mobility Updates to 23 CFR Section 630, Subpart J Presented by Tracy Scriba, Federal Highway Administration Talking Operations

More information

Budget Review Process (BRP) Preliminary List of Business Initiatives. Stakeholder Meeting April 10, 2017

Budget Review Process (BRP) Preliminary List of Business Initiatives. Stakeholder Meeting April 10, 2017 2017-18 Budget Review Process (BRP) Preliminary List of Business Initiatives Stakeholder Meeting April 10, 2017 Purpose / Agenda The purpose of this presentation is to: Provide stakeholders with a BRP

More information

NEPAD ICT Broadband Infrastructure Programme: Interconnection via Umojanet

NEPAD ICT Broadband Infrastructure Programme: Interconnection via Umojanet NEPAD ICT Broadband Infrastructure Programme: Interconnection via Umojanet Presentation to the African Peering and Interconnection Forum Nairobi, August 11-12, 2010 By Dr. Edmund Katiti, Policy & Regulatory

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Western Africa Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 9 ARCHIVED on 29-Oct-2017 ISR29795 Implementing Agencies: Ministry

More information

UPDATE ON THE DEVELOPMENT OF KENYAN STANDARDS TO REGULATE LEAD IN ALL PAINTS

UPDATE ON THE DEVELOPMENT OF KENYAN STANDARDS TO REGULATE LEAD IN ALL PAINTS UPDATE ON THE DEVELOPMENT OF KENYAN STANDARDS TO REGULATE Prepared by : 1. Faridah Hussein Were Advisory Group Member Lead Paint Alliance (Kenya) Email: faridares@yahoo.com LEAD IN ALL PAINTS 2. Peter

More information

Governing Body 313th Session, Geneva, March 2012

Governing Body 313th Session, Geneva, March 2012 INTERNATIONAL LABOUR OFFICE Governing Body 313th Session, Geneva, 15 30 March 2012 Programme, Financial and Administrative Section PFA FOR INFORMATION Information and communications technology questions

More information

SCHEDULE AND TIMELINE. The Project WBS, expanded to level 2, presented in the form of a Gantt chart

SCHEDULE AND TIMELINE. The Project WBS, expanded to level 2, presented in the form of a Gantt chart ALMA Test Interferometer Project Book, Chapter 14 SCHEDULE AND TIMELINE Richard Simon Last Changed 2000-Feb-22 Revision History: 2000-Feb-22: Initial version created (R. Simon) Introduction This chapter

More information

INTERGOVERNMENTAL OCEANOGRAPHIC COMMISSION (of UNESCO)

INTERGOVERNMENTAL OCEANOGRAPHIC COMMISSION (of UNESCO) Limited Distribution Paris, 28 August 2000 Original: English INTERGOVERNMENTAL OCEANOGRAPHIC COMMISSION (of UNESCO) Sixteenth Session of the IOC Committee on International Oceanographic Data and Information

More information

IVOA and European VO Efforts Status and Plans

IVOA and European VO Efforts Status and Plans IVOA and European VO Efforts Status and Plans Fabio Pasian AstroInformatics2010, Pasadena CA, 16-19 June 2010 The IVOA: http://ivoa.net Mission: To facilitate the international coordination and collaboration

More information

SKA Technical developments relevant to the National Facility. Keith Grainge University of Manchester

SKA Technical developments relevant to the National Facility. Keith Grainge University of Manchester SKA Technical developments relevant to the National Facility Keith Grainge University of Manchester Talk Overview SKA overview Receptors Data transport and network management Synchronisation and timing

More information

SSC Transformation Initiative Fairness Monitoring Services

SSC  Transformation Initiative Fairness Monitoring Services SSC Email Transformation Initiative Fairness Monitoring Services Fairness Monitoring Final Report Date of Submission: 14 June, 2013 Submitted To: Director General Operational Integrity Sector Departmental

More information

Follow-up to Information Technology Security Audit

Follow-up to Information Technology Security Audit Follow-up to Information Technology Security Audit July 2004 Report Clearance Steps Follow-up process initiated September 2003 Report completed March 2004 Follow-up report approved by Departmental Audit

More information

Baseline Project Definition

Baseline Project Definition Baseline Project Definition Project Manager 1 Outline Project Goals Budget Schedule Metrics for Completion Management structures Technical oversight and testing Procedures for evaluating system performance

More information

Report of the Working Group on Toponymic Data Files and Gazetteers

Report of the Working Group on Toponymic Data Files and Gazetteers UNITED NATIONS WORKING PAPER GROUP OF EXPERTS NO. 37 ON GEOGRAPHICAL NAMES Twenty-sixth session Vienna, 2-6 May 2011 Item 9 of the Provisional Agenda Activities relating to the Working Group on Toponymic

More information

The EuroHPC strategic initiative

The EuroHPC strategic initiative Amsterdam, 12 December 2017 The EuroHPC strategic initiative Thomas Skordas Director, DG CONNECT-C, European Commission The European HPC strategy in Horizon 2020 Infrastructure Capacity of acquiring leadership-class

More information

New Zealand Involvement in Solving the SKA Computing Challenges

New Zealand Involvement in Solving the SKA Computing Challenges New Zealand Involvement in Solving the SKA Computing Challenges D R ANDREW E N S O R D I R ECTO R H P C R ESEARC H L A B O R ATORY/ D I R ECTOR N Z SKA ALLIANCE COMPUTING FO R S K A COLLO Q U I UM 2 0

More information

Update on the Government of Canada s Information Technology Transformation Plan

Update on the Government of Canada s Information Technology Transformation Plan Update on the Government of Canada s Information Technology Transformation Plan Presentation to the Information Technology Infrastructure Roundtable June 27, 2016 Peter Bruce, Senior Assistant Deputy Minister,

More information

Mandate: Global mining collaboration on solutions to common industry problems, needs and technology through standards, guidelines and best practices.

Mandate: Global mining collaboration on solutions to common industry problems, needs and technology through standards, guidelines and best practices. Mandate: Global mining collaboration on solutions to common industry problems, needs and technology through standards, guidelines and best practices. Regulators Researchers OTM s OEM s Mining Companies

More information

Business Model for Global Platform for Big Data for Official Statistics in support of the 2030 Agenda for Sustainable Development

Business Model for Global Platform for Big Data for Official Statistics in support of the 2030 Agenda for Sustainable Development Business Model for Global Platform for Big Data for Official Statistics in support of the 2030 Agenda for Sustainable Development Introduction This note sets out a business model for a Global Platform

More information

TERMS OF REFERENCE FOR: REGIONAL CLIMATE AND GREEN GROWTH CONSULTANT EASTERN AFRICA

TERMS OF REFERENCE FOR: REGIONAL CLIMATE AND GREEN GROWTH CONSULTANT EASTERN AFRICA TERMS OF REFERENCE FOR: REGIONAL CLIMATE AND GREEN GROWTH CONSULTANT EASTERN AFRICA Background and Context The recently established Climate Change and Green Growth Department (PECG) under the Vice Presidency

More information

Reston Town Center North Development. Community Update

Reston Town Center North Development. Community Update Reston Town Center North Development Community Update May 31, 2017 1 Presentation Agenda Project Overview Site and Current Property Ownerships Development Plan/Grid of Streets Proposed Ownership Comprehensive

More information

EuroHPC: the European HPC Strategy

EuroHPC: the European HPC Strategy HPC User Forum Campus Teratec, Bruyères-le-Châtel (F) 6-7 March 2018 EuroHPC: the European HPC Strategy Leonardo Flores Añover Senior Expert, HPC and Quantum Computing Unit DG CONNECT, European Commission

More information

Public Disclosure Copy

Public Disclosure Copy AFRICA Western Africa Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2013 Seq No: 6 ARCHIVED on 31-Jan-2016 ISR20991 Implementing Agencies: Ministry of Employment, Professional Education

More information

Programme Headlines. Project Headlines. Appendix - Watford 2020 Progress Update Report 8 November 2017

Programme Headlines. Project Headlines. Appendix - Watford 2020 Progress Update Report 8 November 2017 Completed by: Liam Hornsby Period from: 23 October 2017 Date completed: 6 November 2017 Period to: 6 November 2017 Current Programme Status Trend since last report Programme Headlines R R/A A/G G Worse

More information

TDP calibration and processing group (CPG): activities and status

TDP calibration and processing group (CPG): activities and status TDP calibration and processing group (CPG): activities and status Athol Kemball (for CPG) University of Illinois at Urbana-Champaign akemball@illinois.edu Primary CPG goal Provide a quantitative cost and

More information

National Snow and Ice Data Center. Plan for Reassessing the Levels of Service for Data at the NSIDC DAAC

National Snow and Ice Data Center. Plan for Reassessing the Levels of Service for Data at the NSIDC DAAC National Snow and Ice Data Center Plan for Reassessing the Levels of Service for Data at the NSIDC DAAC Authors: R. Weaver, R. Duerr Date 10/5/2010 CHANGE LOG Revision Date Description Author 1.0 6/29/2009

More information

The CQUIN Learning Network Annual Meeting

The CQUIN Learning Network Annual Meeting Annual Meeting CQUIN Dashboard: Development and Implementation Dr. Maureen Syowai ICAP at Columbia University February 13-15 Maputo, Mozambique Outline Background Implementation Results Conclusions 2 Background

More information

National Snow and Ice Data Center. Plan for Reassessing the Levels of Service for Data at the NSIDC DAAC

National Snow and Ice Data Center. Plan for Reassessing the Levels of Service for Data at the NSIDC DAAC National Snow and Ice Data Center Plan for Reassessing the Levels of Service for Data at the NSIDC DAAC Authors: R. Weaver, R. Duerr Date 3/21/2010 CHANGE LOG Revision Date Description Author 1.0 6/29/2009

More information

GRIDS INTRODUCTION TO GRID INFRASTRUCTURES. Fabrizio Gagliardi

GRIDS INTRODUCTION TO GRID INFRASTRUCTURES. Fabrizio Gagliardi GRIDS INTRODUCTION TO GRID INFRASTRUCTURES Fabrizio Gagliardi Dr. Fabrizio Gagliardi is the leader of the EU DataGrid project and designated director of the proposed EGEE (Enabling Grids for E-science

More information

XBRL Europe Standard Business Reporting Working Group Meeting CONTENT PARTICIPANTS TO THE MEETING ANNOUNCEMENTS...

XBRL Europe Standard Business Reporting Working Group Meeting CONTENT PARTICIPANTS TO THE MEETING ANNOUNCEMENTS... Date January 31 st 2018 Topic XBRL Europe Standard Business Reporting Working Group Meeting 14 Place Author Meeting in Copenhagen (14pm CET 15.30pm CET) HIETBRINK 0. Content 0. CONTENT... 1 1. PARTICIPANTS

More information

History of the African VLBI Network: An African Story of Science

History of the African VLBI Network: An African Story of Science History of the African VLBI Network: An African Story of Science Contributors: Dr. Adrian Tiplady Dr Gordon MacLeod Dr George Nicolson Where did it start? Decision to submit African SKA bid in 2003/4 was

More information

Programmes and Activities of the. International Cooperation and Assistance. (ICA) Division

Programmes and Activities of the. International Cooperation and Assistance. (ICA) Division Programmes and Activities of the International Cooperation & Assistance (ICA) Division Presentation for Permanent Representatives to the based in Brussels 5 November 2015 Mark Albon Director, Division

More information

University of Dublin Trinity College

University of Dublin Trinity College University of Dublin Trinity College Library & Information Policy Committee Minutes of the meeting held on Monday 8 th November 2011 at 15.15 in the Henry Jones Room, Old Library. Present: Apologies: Professor

More information

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577)

Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Local Government and Decentralization Project (P111577) Operation Name: Local Government

More information

MARKET NEWSLETTER No 69 February 2013

MARKET NEWSLETTER No 69 February 2013 Standing at 543 600 t, Spanish olive oil production in the first four months of 2012/13 was 62 pc down on the previous season, according to Spain s Olive Oil Agency. Although there are still some months

More information

Survey of Research Data Management Practices at the University of Pretoria

Survey of Research Data Management Practices at the University of Pretoria Survey of Research Data Management Practices at the University of Pretoria Undertaken by the Department of Library Services in order to improve research practices at the University Unisa Library Open Access

More information

Dr Michaela Black, Prof. Jonathan Wallace.

Dr Michaela Black, Prof. Jonathan Wallace. Dr Michaela Black, Prof. Jonathan Wallace mm.black@ulster.ac.uk jg.wallace@ulster.ac.uk http://www.midasproject.eu http://www.midasproject.eu Outline MIDAS - Strengths MIDAS - Consortium Partners MIDAS

More information

DISCUSSION PAPER. Recommendations for a common UN System wide agenda on NCDs

DISCUSSION PAPER. Recommendations for a common UN System wide agenda on NCDs First Meeting of UN Funds, Programmes and Agencies on the Implementation of the Political Declaration of the High level Meeting of the General Assembly on the Prevention and Control of NCDs (New York,

More information

Progress towards database management standards

Progress towards database management standards Progress towards database management standards by DONALD R. DEUTSCH General Electric Information Services Co. Nashville, Tennessee ABSTRACT The first proposals for database management standards appeared

More information

The Africa-EU Energy Partnership (AEEP) The Role of Civil Society and the Private Sector. 12 February, Brussels. Hein Winnubst

The Africa-EU Energy Partnership (AEEP) The Role of Civil Society and the Private Sector. 12 February, Brussels. Hein Winnubst The Africa-EU Energy Partnership (AEEP) The Role of Civil Society and the Private Sector 12 February, Brussels Hein Winnubst Introduction Purpose of this meeting Share information on progress and planning

More information

EPICK your GRC platform MAIN REFERENCES. EPICK REFERENCES EN Pag. 1/6

EPICK your GRC platform MAIN REFERENCES. EPICK REFERENCES EN Pag. 1/6 MAIN REFERENCES EPICK REFERENCES EN Pag. 1/6 FOREWORD This document illustrates some of the most significant past performances regarding the use of the EPICK platform and the associated expert consulting

More information

Elements of sustained data management solutions for climate

Elements of sustained data management solutions for climate WMO Elements of sustained data management solutions for climate Peer Hechler, Omar Baddour WMO; Data Management Applications Division Introduction WMO promotes collaboration among its Members to improve

More information

Phishing Activity Trends Report August, 2005

Phishing Activity Trends Report August, 2005 Phishing Activity Trends Report August, 25 Phishing is a form of online identity theft that employs both social engineering and technical subterfuge to steal consumers' personal identity data and financial

More information

Implementation Status & Results Bangladesh BD Identification System for Enhancing Access to Services (IDEA) Project (P121528)

Implementation Status & Results Bangladesh BD Identification System for Enhancing Access to Services (IDEA) Project (P121528) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Bangladesh BD Identification System for Enhancing Access to Services (IDEA) Project (P121528) Operation Name: BD

More information

N a t i o n a l I C T R & D a n d I n n o v a t i o n R o a d m a p

N a t i o n a l I C T R & D a n d I n n o v a t i o n R o a d m a p N a t i o n a l I C T R & D a n d I n n o v a t i o n R o a d m a p South Africa-VINNOVA Workshop Date: 22 October 2015 N a t i o n a l I C T R & D a n d I n n o v a t i o n R o a d m a p The ICT R&D and

More information

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended Chapter 3 Section 3.05 Metrolinx Regional Transportation Planning Standing Committee on Public Accounts Follow-Up on Section 4.08, 2014 Annual Report In November 2015, the Standing Committee on Public

More information

The World Bank Central African Backbone - APL4 - Gabon (P122776)

The World Bank Central African Backbone - APL4 - Gabon (P122776) Public Disclosure Authorized AFRICA Gabon Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2012 Seq No: 9 ARCHIVED on 25-Jan-2016 ISR22499 Implementing Agencies: Public Disclosure Authorized

More information

The Global Context of Sustainable Development Data

The Global Context of Sustainable Development Data The Global Context of Sustainable Development Data Linda Hooper, UN Statistics Division UNDA10 - Workshop for ESCWA Sound Institutional, environment, cooperation, dialogue and partnerships for the production

More information

Computational issues for HI

Computational issues for HI Computational issues for HI Tim Cornwell, Square Kilometre Array How SKA processes data Science Data Processing system is part of the telescope Only one system per telescope Data flow so large that dedicated

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Ethiopia Economic Policy Global Practice Recipient Executed Activities Investment Project Financing FY 2014 Seq No: 2 ARCHIVED on 29-Jun-2015 ISR19269 Implementing Agencies:

More information

Audit and Compliance Committee - Agenda

Audit and Compliance Committee - Agenda Audit and Compliance Committee - Agenda Board of Trustees Audit and Compliance Committee April 17, 2018, 1:30 2:30 p.m. President s Board Room Conference Call-In Phone #1-800-442-5794, passcode 463796

More information

PROJECT S PROMOTIONAL MATERIAL

PROJECT S PROMOTIONAL MATERIAL Ref. Ares(2015)3998487-29/09/2015 PROJECT S PROMOTIONAL MATERIAL DOCUMENT IDENTIFIER: D2.7 DUE DATE: 01/09/2015 DELIVERY DATE: 29/09/2015 CLASSIFICATION: Public EDITORS: Alexandre Almeida, Nídia Ferreira

More information

ISSC is invited to consider the attached report and to support the proposal to change the priority order for the migration UEA web services.

ISSC is invited to consider the attached report and to support the proposal to change the priority order for the migration UEA web services. ISC11D005 Title: UEA Website Migration Author: Jonathan Richardson, Assistant Director, Corporate Information Services Date: 1 st November 2011 Circulation: ISSC 10 November 2011 Agenda: ISC11A001 Version:

More information

ACTIVITY REPORT OF THE ENGINEERING AND OPERATING COMMITTEE (EOC)

ACTIVITY REPORT OF THE ENGINEERING AND OPERATING COMMITTEE (EOC) ACTIVITY REPORT OF THE ENGINEERING AND OPERATING COMMITTEE (EOC) Novembre, 2017 Presented by: Kouadio DJAHA Chairman of EOC 1 Summary 1. The responsibilities of the Engineering and Operation Committee

More information

Resolution adopted by the General Assembly. [on the report of the Second Committee (A/60/488/Add.3)]

Resolution adopted by the General Assembly. [on the report of the Second Committee (A/60/488/Add.3)] United Nations A/RES/60/195 General Assembly Distr.: General 2 March 2006 Sixtieth session Agenda item 52 (c) Resolution adopted by the General Assembly [on the report of the Second Committee (A/60/488/Add.3)]

More information

Establishment of the African Road Safety Observatory

Establishment of the African Road Safety Observatory International Cooperation Committee (A0010) Establishment of the African Road Safety Observatory George Yannis, Stergios Mavromatis National Technical University of Athens Antonino Tripodi, Luca Persia

More information

Chair: Markus Etter Vice-Chair: Diane Watkins Secretary: Joe Gravelle http://ewh.ieee.org/cmte/substations/ 1. Significant Accomplishments (include details and examples): a. Standards -- currently manages

More information

SALISBURY NHS FOUNDATION TRUST. TITLE - Information Strategy Annual Review

SALISBURY NHS FOUNDATION TRUST. TITLE - Information Strategy Annual Review SALISBURY NHS FOUNDATION TRUST PAPER - SFT 1931 TITLE - Information Strategy 2007 2010 Annual Review PURPOSE OF PAPER To inform the Board as to progress made within the Information Systems Strategy during

More information

Ceri J Vincent. Chair of CO 2 GeoNet Executive Committee British Geological Survey. website:

Ceri J Vincent. Chair of CO 2 GeoNet Executive Committee British Geological Survey.   website: Ceri J Vincent Chair of CO 2 GeoNet Executive Committee British Geological Survey email: info@co2geonet.com website: www.co2geonet.eu CO 2 GeoNet: pan-european research association for advancing geological

More information

The Integrated Research on Disaster Risk Programme (IRDR)

The Integrated Research on Disaster Risk Programme (IRDR) The Integrated Research on Disaster Risk Programme (IRDR) What is integrated research? Integrated disaster risk research engages multiple disciplines and researchers, scales (local to global), methodological

More information

ESA s Space Situational Awareness Near-Earth Object programme

ESA s Space Situational Awareness Near-Earth Object programme ESA s Space Situational Awareness Near-Earth Object programme Detlef Koschny, European Space Agency, Solar System Missions Division Keplerlaan 1 NL-2201 AZ Noordwijk ZH Detlef.Koschny@esa.int What is Space

More information

Cornell University Program on. Mission Statement

Cornell University Program on. Mission Statement Cornell University Program on Applied CaRDI Spring Research Roundtable April 6, 2009 Web: http://pad.human.cornell.edu Email: PADInfo@Cornell.edu Mission Statement The (PAD) --through h its skills in demographics,

More information

Survey of research data management practices at the University of Pretoria, South Africa: October 2009 March 2010

Survey of research data management practices at the University of Pretoria, South Africa: October 2009 March 2010 Survey of research data management practices at the University of Pretoria, South Africa: October 2009 March 2010 Undertaken by the Department of Library Services in order to improve research practices

More information

SUBJECT: PRESTO operating agreement renewal update. Committee of the Whole. Transit Department. Recommendation: Purpose: Page 1 of Report TR-01-17

SUBJECT: PRESTO operating agreement renewal update. Committee of the Whole. Transit Department. Recommendation: Purpose: Page 1 of Report TR-01-17 Page 1 of Report TR-01-17 SUBJECT: PRESTO operating agreement renewal update TO: FROM: Committee of the Whole Transit Department Report Number: TR-01-17 Wards Affected: All File Numbers: 465-12, 770-11

More information

Italy - Information Day: 2012 FP7 Space WP and 5th Call. Peter Breger Space Research and Development Unit

Italy - Information Day: 2012 FP7 Space WP and 5th Call. Peter Breger Space Research and Development Unit Italy - Information Day: 2012 FP7 Space WP and 5th Call Peter Breger Space Research and Development Unit Content Overview General features Activity 9.1 Space based applications and GMES Activity 9.2 Strengthening

More information

WORLD TRADE ORGANIZATION

WORLD TRADE ORGANIZATION WORLD TRADE ORGANIZATION Committee on Trade-Related Investment Measures G/TRIMS/W/61 8 May 2009 (09-2263) Original: English COMMUNICATION FROM THE EUROPEAN COMMUNITIES AND THE UNITED STATES Certain New

More information

An Overview of the WMKO Development Phases By Sean Adkins December 8, 2005

An Overview of the WMKO Development Phases By Sean Adkins December 8, 2005 By Sean Adkins INTRODUCTION This document provides a brief description of the objectives and deliverables for each of the development phases in the new instrument development process at WMKO. THE DEVELOPMENT

More information

Statement by Mr. Vladimir Voronkov, Under-Secretary-General of the United Nations Office of Counter-Terrorism

Statement by Mr. Vladimir Voronkov, Under-Secretary-General of the United Nations Office of Counter-Terrorism Statement by Mr. Vladimir Voronkov, Under-Secretary-General of the United Nations Office of Counter-Terrorism Meeting of the United Nations Security Council Counter-Terrorism Committee Mr. Chairman, Excellencies,

More information

The Herschel Data Processing System: History, Status and latest Developments

The Herschel Data Processing System: History, Status and latest Developments The Herschel Data Processing System: History, Status and latest Developments Stephan Ott Herschel Science Data Processing Development Manager Herschel Science Data Processing Coordinator Herschel Science

More information

ANZPAA National Institute of Forensic Science BUSINESS PLAN

ANZPAA National Institute of Forensic Science BUSINESS PLAN ANZPAA National Institute of Forensic Science BUSINESS PLAN 2018 19 OUR STRATEGIC INTENT PROMOTE AND FACILITATE EXCELLENCE IN FORENSIC SCIENCE The National Institute of Forensic Science is a directorate

More information

PARTNERSHIP WITH INTERPOL

PARTNERSHIP WITH INTERPOL Chairman of Crime Stoppers Barbados, Julie Dash hosts recipients of National Awards from left, Yusuf Abramjee (Order of the Baobab, South Africa), Alex Mac Donald (The Queen s Colonial Police Medal, Bermuda)

More information

Improving the Resilience of Critical Infrastructure from Natural Hazards

Improving the Resilience of Critical Infrastructure from Natural Hazards Improving the Resilience of Critical Infrastructure from Natural Hazards David Murphy Assistant Director Natural Hazards Team Civil Contingencies Secretariat Outline Civil Contingencies Secretariat Vulnerability

More information

Unified Development Code. Public Workshop No. 3 November 7, 2017

Unified Development Code. Public Workshop No. 3 November 7, 2017 Unified Development Code Public Workshop No. 3 November 7, 2017 Purpose of the Project 2 The overall goal of the project is to bring together the County s Land Development Regulations (Chapter 74 of the

More information

The European Single Electronic Format (ESEF) Requirements for reporting entities overview of the draft regulatory standard (RTS)

The European Single Electronic Format (ESEF) Requirements for reporting entities overview of the draft regulatory standard (RTS) ESMA REGULAR USE 19 November 2018 The European Single Electronic Format (ESEF) Requirements for reporting entities overview of the draft regulatory standard (RTS) Anna Sciortino ESEF Mandate for ESMA ESMA

More information

EuroHPC Bologna 23 Marzo Gabriella Scipione

EuroHPC Bologna 23 Marzo Gabriella Scipione EuroHPC Bologna 23 Marzo 2018 Gabriella Scipione g.scipione@cineca.it EuroHPC - Europe's journey to exascale HPC http://eurohpc.eu/ What EuroHPC is a joint collaboration between European countries and

More information

HLG Briefly. HLG was established on March 6, 2015 during the 46 th Session of the UN Statistical Commission

HLG Briefly. HLG was established on March 6, 2015 during the 46 th Session of the UN Statistical Commission HLG Briefly Activity of the High-Level Group for Partnership, Coordination and Capacity Building for Statistics for Agenda 030 on Sustainable Development (HLG) HLG was established on March 6, 015 during

More information

Report from UN-GGIM: Europe A year in review

Report from UN-GGIM: Europe A year in review Report from UN-GGIM: Europe A year in review Carol Agius UN-GGIM: Europe Joint UN-GGIM: Europe ESS meeting on the Integration of Statistical and Geospatial Information March 2017 The aim of UN-GGIM: Europe

More information