1 Unique Tracking Number Assigned by MORTS Work Statement TC/TG: 7.5 Smart Building Systems Title: Fault Detection and Diagnostics for Centrifugal Chillers - Phase III: Online-Time Implementation Executive Summary: The objective of this project is to evaluate the effectiveness of fault detection and diagnostic (FDD) methods for electrically driven centrifugal chillers and to produce a specification for an algorithm that could be incorporated within commercial products. The proposed project is the final phase of a three-phase project involving the development, evaluation and laboratory and field testing. Applicability to ASHRAE Research Strategic Plan: The proposed project addresses several goals of the ASHRAE Research Strategic Plan: D1 Establish techniques to improve the energy efficiency and reliability of heating, ventilating, cooling, and refrigeration system components. D5 Develop reliable, durable, and self-correcting sensor technology for monitoring indoor environmental quality, pollutants, energy conservation, and fault detection and diagnosis. E1 Make the results of ASHRAE sponsored and cooperative research available to the technical community. The project makes a clear and direct contribution to goals D1 and D5, providing online detection and diagnosis of chiller faults. The methods developed under the project offer the potential to improve reliability and energy efficiency of the centrifugal chillers. Publication of the results will enhance member education. Application of Results: The handbook currently does not address fault detection and diagnostics (FDD). However, TC 7.5 has developed material for inclusion in Chapter 38 of Applications Handbook (TC 7.3). In addition, TC 7.5 is considering a new chapter focused on FDD for the next version of the Applications Handbook. The results of this research along with 1043-RP Fault Detection and Diagnostic Requirements and Evaluation Tools for Chillers-Phase I and 1275-RP Evaluation and Assessment of Fault Detection and Diagnostic Methods for Centrifugal Chillers-Phase II will be included in the FDD chapter (or section) in the handbook. State-of-the-Art (Background): A significant portion of the energy (over 28% of the total cooling energy consumption is attributed to chillers and district cooling Katipamula and Gaines 2003) and maintenance costs for operating commercial HVAC systems is associated with chillers. Although current control systems typically monitor many variables, the monitored information is seldom used for detecting and diagnosing faults or improper operations. At best, these systems incorporate automatic shutdown procedures that guard against catastrophic failure. Automated fault detection and diagnostics (FDD) for HVAC systems in general and chillers in particular, has the potential to reduce energy and maintenance costs and improve comfort and reliability. Inadequate maintenance can lead to inefficient operation (energy costs), a loss in cooling capacity (comfort), and increased wear of components (reliability). However, excessive maintenance leads to unnecessary costs. In addition, early diagnosis of equipment problems can reduce the costs associated with repairs by improving scheduling and reducing on-site labor time.

2 The proposed work statement is the final phase of a three-phase project involving the development, evaluation and laboratory and field testing of FDD methods for centrifugal chillers. The first phase (1043-RP, Comstock et al., 1999) consisted of: 1) identification of the most important faults for centrifugal chillers based upon frequency of service and costs; 2) development of a database of chiller performance for normal operation and with faults at different levels of severity; and 3) development of a transient chiller model that can predict the effects of faults on performance. The second phase (1275-RP) was initiated to evaluate the effectiveness and robustness of at least four promising FDD methods using the tools developed under Phase I. A methodology for assessing performance of FDD methods was also developed in Phase II. The proposed work statement is aimed at performing real-time laboratory and field testing of the FDD method(s) recommended in Phase II in order to ascertain the performance of the tools under non-ideal conditions. The primary outcome of Phase III will be a proven and tested chiller FDD algorithm. Manufacturers and end-users will be able to take the algorithm and incorporate it into a commercial product. Advancement to the State-of-the-Art: The development of FDD methods for HVAC applications has been an active area of research over the past decade. A significant amount of work has been performed for vapor-compression equipment; however, given their importance from a standpoint of comfort and energy use, there have been relatively few studies specifically aimed at chillers. Peitsman and Bakker (1996), Stylianou and Nikanpour (1996), and Bailey (1998) developed and tested FDD methods for chillers; however, each study was limited to a single chiller tested in a laboratory environment. Laboratory testing is an important aspect of the development of FDD methods because it enables controlled testing over a range of conditions; however, it is not adequate for proving the robustness of new technologies such as FDD methods. To garner buy-in from controls and equipment manufacturers, prototype software that implements the FDD method needs to be tested with field data, preferably from a large sample of units over a broad range of operating conditions. The proposed project represents a significant increase in rigor over laboratory testing alone by requiring that field-testing be performed on at least three chillers for at least one complete chiller season. Outcomes from the proposed research will contribution to the field of FDD for chillers through: 1. online testing of a computer-implemented chiller FDD method(s) in a laboratory setting that enables the introduction of the faults to be considered in a reproducible manner and under reproducible operating conditions; 2. the development and implementation of improvements to the chiller FDD method(s) stemming from the laboratory testing; 3. field-testing of the chiller FDD method(s); and 4. the development of a specification for a chiller FDD method(s) that is suitable for incorporation within a commercial system. It is envisioned that by the end of Phase III, an algorithm(s) will be specified that could be incorporated within commercial products. Justification and Value to ASHRAE: The rigorous laboratory and field-testing work proposed in this project will help speed the commercialization of chiller FDD technology, thereby benefiting building owners, facility managers, operators, and occupants by helping ensure buildings are comfortable, sustainable and energy efficient. The main benefit to the ASHRAE membership will be a major step in the

3 testing and evaluation of one or more methods that, when implemented in new and existing chillers, will detect and diagnose operating faults before they become problems, thereby reducing maintenance costs, energy costs and occupant discomfort associated with the improper operation. Potential energy savings associated with better detection and diagnosis of faults are estimated to be about $300 million annually in the U.S 1. Objectives: The objective of this project is to evaluate the effectiveness of one or more electrically driven chiller FDD methods and to produce a specification for an algorithm that could be incorporated within commercial products. First, the methods will be evaluated online in a laboratory environment, followed by evaluation in the field. The methods to be tested and procedures for conducting the evaluation were determined from Phase II research project 1275-RP. Scope: The following tasks are to be performed by the successful contractor. Additional specific information that is to be included in proposals is listed in the section titled Other Information for Bidders. The bidder will evaluate two different chiller FDD methods in both the laboratory and in the field. The evaluation will be based on online implementation of the chosen method. The bidder is required to evaluate on the two methods recommended from RP-1275: 1) the heuristic rulebased approach 2 or 2) multiple linear regression model based approach 3. If the bidder evaluates only one of the two recommended methods, the bidder is required to propose an alternate second method for testing. If the bidder selects an alternate second method, the bidder should provide a description of the method and justification of selection. A list of faults that are to be instigated in the laboratory environment should be defined by the contractor. The previous ASHRAE research projects as well as several published papers have considered several faults during their investigation. The contractor should show understanding of this issue by selecting only those which are of primary concern (such as excess energy use, loss of cooling capability, increased maintenance) rather than blindly adopting the entire list of faults. This will be one of the evaluation criteria. The major outcome of this research project is a specification of one or more algorithms for FDD of centrifugal chillers online that can be incorporated in commercial products or embedded into the control systems onboard the chiller. This will be accomplished through: 1. online testing of a computer-implemented chiller FDD method(s) in a laboratory setting that enables the introduction of the faults to be considered in a reproducible manner and under reproducible operating conditions; 2. the development and implementation of improvements to the chiller FDD method(s) stemming from the laboratory testing; 3. field-testing of the chiller FDD method(s) on three field chillers. 1 From US. Energy Information Administration data, central chillers serve 25% of the commercial-building floor area and consume about 0.3 Quad of primary energy. Assuming a power plant conversion efficiency of 33%, cooling equipment consumes 30 TWh of electricity. A savings of 10% attributable to diagnostics is worth $300M at $0.10/kWh. 2 Refer to FDD#1 in RP-1275 final report for more details on the method. 3 Refer to FDD#2 in RP-1275 final report for more details on the method.

4 Task 1: Develop Laboratory and Field Test Protocol As part of this task the contractor will developed a detailed laboratory and field testing protocol for evaluating the chosen methods online on a centrifugal chiller. The contractor shall review reports of ASHRAE research project from 1043-RP Fault Detection and Diagnostic Requirements and Evaluation Tools for Chillers to understand the instrumentation requirements and the methods used to validate the experimental data (Comstock and Braun 1999a, 1999b; and Comstock et al. 1999). In addition, the contractor shall also review the final report from RP Evaluation and Assessment of Fault Detection and Diagnostic Methods for Centrifugal Chillers-Phase II to get a better understanding the FDD methods and the evaluation process used to evaluate various FDD methods. One of the major conclusions of RP1275 was that among the four FDD methods evaluated, the heuristic rule-based approach along with a fault table (Chen and Braun 2001) and the model based approach involving regression model innovations with fault table (Li and Braun 2003) were the most promising. The contractor can pick both these FDD methods for evaluation or select one from these two (with justification) in conjunction with another FDD method (again, justification and reference to published work is required). Also, RP1275 identified certain improvements to the lab testing protocol adopted in RP1043. The contractor should show understanding of this aspect, and frame the experimental protocol accordingly. After the protocol is developed by the contractor it must be reviewed and approved by the Program Monitoring Subcommittee (PMS). The PMS will make a decision on the approval no later than 6-weeks from the submission of the draft report describing the protocol. Task 2: Laboratory Testing of the Selected Methods As part of this task the contractor will test and evaluate the selected FDD method(s) in the laboratory environment. Testing will include the introduction of the faults to be considered in a reproducible manner and under reproducible operating conditions. This task will begin only after the testing protocol is approved by the PMS (Task 1). Check the section titled Other Information to the Bidders for more information that should be included in the bid. A list of faults that are to be instigated include: 1) condenser fouling, 2) evaporator fouling, 3) loss of refrigerant, 4) excessive refrigerant, 5) condensable (nitrogen) in the system, 6) loss in condenser flow rate, 7) loss in evaporator flow rate and 8) excess oil. If the contractor intends to instigate additional faults, they should be listed in the proposal. The contractor is required to document among other details the severity level at which the fault was first detected (i.e. the degradation of COP and/or cooling capacity). Task 3: Field Testing of the Selected Methods As part of this task the contractor will test and evaluate the selected FDD method(s) in the field. The field testing should be conducted on three different chillers. Check the section titled Other Information to the Bidders for more information that should be included in the bid. Although it may be difficult to instigate faults in the field, but if the contractor intends to instigate faults in the field it should be noted in the proposal. During testing of the selected FDD methods, if pre-existing faults are detected, the contractor is should verify the faults and if possible correct it. After the correction, the FDD method should be used to validate that the fault has been corrected. The contractors are required to describe how they intend to implement this process in the proposal. Task 4: Specification of Algorithm for Incorporation into a Commercial System

5 A detailed software specification for the selected algorithms will be developed as part of this task after the completion of the testing in laboratory and in the field.

6 Task 5: Document the Results in a Final Report The contractor shall provide the test protocol document, laboratory test results document and selected data sets, field test results document and selected data sets, a detailed software specification for the selected FDD method(s), of the a comprehensive final report that describes all the work undertaken in the project, and the prototype software tool used in testing the FDD methods in both the laboratory and field environment. DELIVERABLES Task 1 report that describes the laboratory and field test protocol. Task 2 report describing the testing of the FDD method(s) in the laboratory environment. Task 3 report describing the testing of the FDD method(s) in the field environment. Prototype software tool used in testing the FDD methods online in real-time and selected data sets from both laboratory and field tests. This should include the source code and executables for all software components. Progress and financial reports shall be made to the society through the Manager of Research at quarterly intervals; specifically on or before each January 1, April 1, June 1 and October 1 of the contract period. In addition, the following will be submitted: o Itemization of research and development needs relating to design and application of distributed generation systems incorporating intelligent control strategies. o Furthermore, the Institution s Principal Investigator, subject to the Society s approval, shall, during the period of performance and after the Final Report has been submitted, report in person to the sponsoring Technical Committee/Task Group (TC/TG) at the annual and winter meetings, and be available to answer such questions regarding the research as may arise. A Final Report. o A written report, in a form approved by the Society, shall be prepared by the Institution and submitted to the Society s Manager of Research and Technical Services by the end of the Agreement term, containing complete details of all research carried out under this Agreement and as described under Task 6 above. The final report shall also include: o An Executive Summary suitable for wide distribution to the industry and to the public. o A section on "Utilization", to include: ASHRAE Handbook volume(s) and chapter(s) to which the research is related. o Aspects of the research confirming present knowledge or extending present knowledge. Suggestions for changes in the Handbook attributed to the research conducted. Suggestions for further research identified through the completed work. Unless otherwise specified, six copies of the final report shall be furnished for review by the Society s Project Monitoring Subcommittee (PMS).

7 Following approval by the PMS and the TC/TG, in their sole discretion, final copies of the Final Report will be furnished by the Institution as follows: An executive summary in a form suitable for wide distribution to the industry and to the public. Two bound copies One unbound copy, printed on one side only, suitable for reproduction. Two copies on disks; one in PDF format and one in Microsoft Word. Technical Paper - One or more papers shall be submitted first to the ASHRAE Manager of Research and Technical Services (MORTS) and then to the ASHRAE Manuscript Central website-based manuscript review system in a form and containing such information as designated by the Society suitable for presentation at a Society meeting. The Technical Paper(s) shall conform to the instructions posted in Manuscript Central for a technical paper. The technical paper title shall contain the research project number (xxxx-rp) at the end of the title in parentheses, e.g., (9999-RP). Data - Data is defined in General Condition VI, DATA All papers or articles prepared in connection with an ASHRAE research project, which are being submitted for inclusion in any ASHRAE publication, shall be submitted through the Manager of Research and Technical Services first and not to the publication's editor or Program Committee. Project Synopsis A written synopsis totaling approximately 100 words in length and written for a broad technical audience, which documents 1. Main findings of research project, 2. Why findings are significant, and 3. How the findings benefit ASHRAE membership and/or society in general shall be submitted to the Manager of Research and Technical Services by the end of the Agreement term for publication in ASHRAE Insights The Society may request the Institution submit a technical article suitable for publication in the Society s ASHRAE JOURNAL. This is considered a voluntary submission and not a Deliverable. Technical articles shall be prepared using dual units; e.g., rational inch-pound with equivalent SI units shown parenthetically. SI usage shall be in accordance with IEEE/ASTM Standard SI-10. LEVEL OF EFFORT The expected level of effort for each phase and task are Task 1 $10,000 Task 2 $60,000 Task 3 $100,000 Task 4 $15,000 Task 5 $15,000 Project $200,000 total completed in 24 months Total Effort: 20 FTE person-months, of which 6 are for the principal investigator.

8 References: Bailey, M.B The Design and Viability of a Probabilistic Fault Detection and Diagnosis Method For Vapor Compression Cycle Equipment, Ph.D. Thesis, Department of Civil, Environmental, and Architectural Engineering, University of Colorado at Boulder. Comstock, M. C., B. Chen, and J.E. Braun Literature Review for Applications of Fault Detection and Diagnostic Methods to Vapor Compression Cooling Equipment. Ray W. Herrick Laboratories. Purdue University. HL 99-19: Report # Chen, B. and J.E. Braun, Simple rule -based methods for fault detection and diagnostics applied to packaged air conditioners, ASHRAE Trans., vol.107, part 1. Katipamula, S. and S. Gaines Characterization of Building Controls and Energy Efficiency Options Using Commercial Building Energy Consumption Survey. PNWD Pacific Northwest National Laboratory. Richland, Washington. Li, H. and J.E. Braun, An improved method for fault detection and diagnosis applied to packaged air conditioners, ASHRAE Trans., vol.109, part 2. Pietsman, J., V. Bakker Application of Black-Box Models to HVAC Systems for Fault Detection, ASHRAE Transactions, Vol. 102, pt. 1, pp Reddy, T.A., 2006.Evaluation and Assessment of Fault Detection and Diagnostic Methods for Centrifugal Chillers- Phase II, Final Report for ASHRAE RP1275, ASHRAE, July. Stylianou, M. & D. Nikanpour Performance Monitoring, Fault Detection, and Diagnosis of Reciprocating Chillers, ASHRAE Transactions 102(1): Other Information for Bidders: Task 1 - Bidders should demonstrate their knowledge of laboratory and field testing, including any tools that they might have developed or used for performance monitoring of building systems. Bidders should describe the process by which they intend to develop the laboratory and field test protocol. The protocol development process will be an important factor in the evaluation of proposals. Task 2 - Bidders are required to provide the details of the laboratory where they intend to perform the laboratory testing, including the characteristics of the centrifugal chiller, instrumentation currently installed on the chiller and additional sensors that will be installed as part of this project. If the chiller is not under the bidders control, they will need attached a letter of commitment from the owner (or manager) of the laboratory to provide the laboratory for testing. Bidders should also provide preliminary estimates of the length of testing period and how the tests will be conducted. Task 3 - Bidders are required to provide the details of the field test site(s) where they intend to perform field testing, including the characteristics of all three centrifugal chiller, instrumentation currently installed on the chillers and additional instrumentation that will be installed as part of this project. If the chillers are not under the bidders control, they

9 will need attached a letter of commitment from the building owner (or manager) clearly indicating the availability of the chillers for testing as part of this research project. Bidders should also provide preliminary estimates of the length of testing period and how the tests will be conducted. Task 2 and 3 - Bidders should describe how the method(s) selected will be implemented for online and real-time testing both in the laboratory and in the field. The details should include any prototype software that they intend to use, the preferred language for generating the prototype software and how they intend to get data in real-time for testing and analyzing the FDD methods. Contractors should provide detail description of the chillers that are selected for laboratory and field testing. The information should include: 1) size, 2) whether the chiller has sub-coolers, 3) type of mass flow controls (orifice plate, float valve, other restrictor), 4) if it has surge control and 5) how the capacity is controlled. The preferred size for the chillers should be in the range of 200 to 2,000 tons. The chillers can be either single or variable speed. Evaluation Criteria: The following weighting will be used in the selection of the Contractor: 1. Contractor s understanding of the Work Statement, as revealed in the proposal: 20% 2. Quality of methodology proposed for conducting research: 20% 3. Contractor s capability in terms of facilities: 10% 4. Qualifications of personnel for this project: 20% 5. Student involvement: 5% 6. Probability of contractor s research plan meeting the objectives of the Work Statement: 20% 7. Performance of contractor on prior ASHRAE projects or other energy projects (No penalty for new contractors): 5% Potential Bidders: 1. Jim Braun (jbraun@purdue.edu), Purdue University 2. Haorong Li (haorongli@mail.unomaha.edu), University of Nebraska 3. T. Agami Reddy (reddyta@drexel.edu), Drexel University 4. Wang Shengwei (beswwang@polyu.edu.hk), The Hong Kong Polytechnic University Authors: Srinivas Katipamula Srinivas.Katipamula@pnl.gov and John House - john.house@nrcan.gc.ca.

INVITATION TO SUBMIT A RESEARCH PROPOSAL ON AN ASHRAE RESEARCH PROJECT

INVITATION TO SUBMIT A RESEARCH PROPOSAL ON AN ASHRAE RESEARCH PROJECT INVITATION TO SUBMIT A RESEARCH PROPOSAL ON AN ASHRAE RESEARCH PROJECT 1810-TRP, Development of Reference Building Information Model (BIM) Test Cases for Improving Usage of Software Interoperability Schemas

More information

Automated Fault Detection and Diagnostics for Vapor Compression Cooling Equipment

Automated Fault Detection and Diagnostics for Vapor Compression Cooling Equipment Automated Fault Detection and Diagnostics for Vapor Compression Cooling Equipment James E. Braun Ray W. Herrick Laboratories Purdue University The Need for Low-Cost Solutions Automated fault detection

More information

Driving Proactive Facility Operations with Automated HVAC Diagnostics

Driving Proactive Facility Operations with Automated HVAC Diagnostics Driving Proactive Facility Operations with Automated HVAC Diagnostics Turn HVAC Data into Actionable Information AKA Monitoring Based Commissioning Ongoing Commissioning Automated Fault Detection & Diagnostics

More information

Modeling of Compressors and Expansion Devices With Two-Phase Refrigerant Inlet Conditions

Modeling of Compressors and Expansion Devices With Two-Phase Refrigerant Inlet Conditions Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2006 Modeling of Compressors and Expansion Devices With Two-Phase Refrigerant

More information

Energy Action Plan 2015

Energy Action Plan 2015 Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015

More information

Experimental Study on Fault Detection Algorithm Using Regression Method for Plural Indoor Units Faults of Multi-Heat Pump System under Heating Mode

Experimental Study on Fault Detection Algorithm Using Regression Method for Plural Indoor Units Faults of Multi-Heat Pump System under Heating Mode Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2012 Experimental Study on Fault Detection Algorithm Using Regression Method

More information

Experiences Commercializing FDD in the Northwest. Danny Miller, President Transformative Wave

Experiences Commercializing FDD in the Northwest. Danny Miller, President Transformative Wave Experiences Commercializing FDD in the Northwest Danny Miller, President Transformative Wave Our Background Transformative Wave is the manufacturer of the leading HVAC retrofit solution for constant volume

More information

Development of an Embedded RTU FDD using Open-Source Monitoring and Control Platform

Development of an Embedded RTU FDD using Open-Source Monitoring and Control Platform Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2016 Development of an Embedded RTU FDD using Open-Source Monitoring and Control

More information

WHAT IS THE DIGI-RTU South 59 th Street Omaha, NE bes-tech.net

WHAT IS THE DIGI-RTU South 59 th Street Omaha, NE bes-tech.net Digi-RTU WHAT IS THE DIGI-RTU The Digi-RTU is a Heating, Ventilation, and Air Conditioning (HVAC) rooftop unit control kit that is both a demand management and energy usage device. It is designed to improve

More information

Summary. Program Overview. Notice Type: Request for Proposal. Short Title: CEI Industrial Refrigeration Technical Support

Summary. Program Overview. Notice Type: Request for Proposal. Short Title: CEI Industrial Refrigeration Technical Support Notice Type: Request for Proposal Short Title: CEI Industrial Refrigeration Technical Support Posted date: December 1, 2015 E-mail response date: December 31, 2015 Point of contact at VEIC: Greg Baker

More information

Development of an Energy Impact Model for RTU Economizer Faults

Development of an Energy Impact Model for RTU Economizer Faults Development of an Energy Impact Model for RTU Economizer Faults Andrew L. Hjortland James E. Braun School of Mechanical Engineering Purdue University July 15, 2014 A. Hjortland (Purdue University) RTU

More information

Application of a Generic Evaluation Methodology to Assess Four Different Chiller FDD Methods (RP-1275)

Application of a Generic Evaluation Methodology to Assess Four Different Chiller FDD Methods (RP-1275) 2007, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in HVAC&R Research, Vol. 13, No. 5, September 2007. For personal use only. Additional reproduction,

More information

ASHRAE. Shaping Tomorrows Built Environment Today. Erich Binder - Director At Large

ASHRAE. Shaping Tomorrows Built Environment Today.  Erich Binder - Director At Large ASHRAE Shaping Tomorrows Built Environment Today Erich Binder - Director At Large http://ashare.org/ ASHRAE is the Answer People spend about 90 % of their lives indoors. Buildings are the places where

More information

ecoenergy Innovation Initiative Research and Development Component Public Report

ecoenergy Innovation Initiative Research and Development Component Public Report ecoenergy Innovation Initiative Research and Development Component Public Report Project: Integrated Approach to Development of a High Efficiency Energy Recovery and Intelligent Ventilation System Contents

More information

Better Building Controls Through Simulation

Better Building Controls Through Simulation Better Building Controls Through Simulation John M. House, Ph.D. IBPSA-USA Winter Meeting January 21, 2012 Outline Who We Are Our Simulation Needs Simulation Tools We Use Use Cases Matching Needs with

More information

where we are, where we could be, how we can get there. 12/14/2011

where we are, where we could be, how we can get there. 12/14/2011 Central Plant Optimization ASHRAE National Capitol Chapter - PES Wednesday, Nov 7, 2011 Dave Klee, LEED AP Director, Optimized Building Solutions Johnson Controls, Inc. 1 1 J o http://www.johnsoncontrols.com/cpo

More information

Must possess Universal EPA Section 608 certification; OR Type I AND Type II EPA Section 608 certification.

Must possess Universal EPA Section 608 certification; OR Type I AND Type II EPA Section 608 certification. Draft Senior HVAC Mechanic Central District Posting Date: December 14, 2015 Closing Date: December 28, 2015 Salary $18.91/hr to $30.41/hr Internal $18.91/hr to $20.88/hr Overview The Orange County, Florida,

More information

CT AEE 2018 Energy Trends Fair

CT AEE 2018 Energy Trends Fair CT AEE 2018 Energy Trends Fair Bringing Fault Detection and Diagnosis (FDD) Tools into the Mainstream: Retro Commissioning & Continuous Commissioning of HVAC and Refrigeration Systems Dr. Amy Thompson

More information

Commercial Retro-Commissioning Program Manual for 2016 SECTION 1

Commercial Retro-Commissioning Program Manual for 2016 SECTION 1 Commercial Retro-Commissioning Program Manual for 2016 SECTION 1 Introduction The Commercial Retro-Commissioning Program (RCx) is designed to achieve demand and energy savings in commercial facilities.

More information

Trane mytest Water-cooled Chiller Performance Validation What you spec is what you get *

Trane mytest Water-cooled Chiller Performance Validation What you spec is what you get * Trane mytest Water-cooled Chiller Performance Validation What you spec is what you get * Trane CenTraVac chillers: Designed and built to be the best; tested to prove it Ongoing innovation. Unmatched capabilities.

More information

ASHRAE. Strategic Plan STARTING APPROVED BY ASHRAE BOARD OF DIRECTORS JUNE 24, 2014

ASHRAE. Strategic Plan STARTING APPROVED BY ASHRAE BOARD OF DIRECTORS JUNE 24, 2014 ASHRAE Strategic Plan STARTING 2014 APPROVED BY ASHRAE BOARD OF DIRECTORS JUNE 24, 2014 2 ASHRAE Strategic Plan STARTING 2014 INTRODUCTION ASHRAE has committed to a strategic planning process designed

More information

Data Center Carbon Emission Effectiveness

Data Center Carbon Emission Effectiveness Data Center Carbon Emission Effectiveness Oxycom Fresh Air BV November 20th, 2015 Abstract Carbon Emission Effectiveness (CEE) has been proposed as a new metric similar to the Power Usage Effectiveness

More information

Daikin Blueprint: Five New Strategies to Reduce Operational Expenses for Air-cooled Chillers

Daikin Blueprint: Five New Strategies to Reduce Operational Expenses for Air-cooled Chillers Daikin Blueprint: Five New Strategies to Reduce Operational Expenses for Air-cooled Chillers Explore financial impacts that can save your budget Commissioning cash-on-cash returns of 91% for existing buildings

More information

REPORT CBEI REPORT. Funded by U.S. DOE. Title: Virtual RTU Sensing Automation, Demonstration, and Assessment. Report Date: April 30, 2016

REPORT CBEI REPORT. Funded by U.S. DOE. Title: Virtual RTU Sensing Automation, Demonstration, and Assessment. Report Date: April 30, 2016 REPORT Title: Virtual RTU Sensing Automation, Demonstration, and Assessment Report Date: April 30, 2016 Report Authors: Akash Patil, Andrew L. Hjortland, James E. Braun Funded by U.S. DOE CBEI REPORT REPORT

More information

Initial Review of ASHRAE/ANSI/ACCA Standard 180 (2010)

Initial Review of ASHRAE/ANSI/ACCA Standard 180 (2010) Summary This 2010 document is the first in a series of documents by Western HVAC Performance Alliance (WHPA) industry volunteers of ASHRAE/ANSI/ACCA Standard 180. More recent WHPA documents provide detailed

More information

How Big Data Analytics Helps Hotels Improve Maintenance and Comfort, and Save Energy

How Big Data Analytics Helps Hotels Improve Maintenance and Comfort, and Save Energy How Big Data Analytics Helps Hotels Improve Maintenance and Comfort, and Save Energy Critical facility management drivers are impacting all industries Sustainability Big Data/Cloud Open Building Systems

More information

Development and Evaluation of an Automated Virtual Refrigerant Charge Sensor Training Kit

Development and Evaluation of an Automated Virtual Refrigerant Charge Sensor Training Kit Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2016 Development and Evaluation of an Automated Virtual Refrigerant Charge Sensor

More information

Evaluating Fault Detection and Diagnostics Tools with Simulations of Multiple Vapor Compression Systems

Evaluating Fault Detection and Diagnostics Tools with Simulations of Multiple Vapor Compression Systems Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2014 Evaluating Fault Detection and Diagnostics Tools with Simulations of Multiple

More information

LIFE CYCLE COST ANALYSIS, CRITERIA AND DATA SHEETS DOCUMENT NUMBER: APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL

LIFE CYCLE COST ANALYSIS, CRITERIA AND DATA SHEETS DOCUMENT NUMBER: APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL LIFE CYCLE COST ANALYSIS, CRITERIA AND DATA SHEETS DOCUMENT NUMBER: 15000 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 10-26-11 - Minor revisions to Data Sheets 04-08-10 - Allowed use

More information

Gold: points Platinum: 80+ points. Certified: points Silver: points

Gold: points Platinum: 80+ points. Certified: points Silver: points What is LEED? LEED, or Leadership in Energy & Environmental Design, is redefining the way we think about the places where we live, work and learn. As an internationally recognized mark of excellence, LEED

More information

BAS Chillers 8/15/2016. Achieving Energy Savings with BAS and Data Analytics Guanjing Lin Lawrence Berkeley National Laboratory August 10, 2016

BAS Chillers 8/15/2016. Achieving Energy Savings with BAS and Data Analytics Guanjing Lin Lawrence Berkeley National Laboratory August 10, 2016 Session 7: Building Automation and Operation Tools Outline Analytics Tools to Supplement BAS Achieving Energy Savings with BAS and Data Analytics Guanjing Lin Lawrence Berkeley National Laboratory August

More information

Last updated January 29, Approved by ECC March 3, 2015

Last updated January 29, Approved by ECC March 3, 2015 Last updated January 29, 2015 Approved by ECC March 3, 2015 ASHRAE Electronic Communications Strategic Plan Electronic Communications Committee (ECC) January 2015 Electronic Communications Committee Strategic

More information

A Prediction Method for Overall Economic Value of Fault Detection and Diagnostic Tools for Rooftop and Split Systems

A Prediction Method for Overall Economic Value of Fault Detection and Diagnostic Tools for Rooftop and Split Systems Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2016 A Prediction Method for Overall Economic Value of Fault Detection and Diagnostic

More information

IEEE Transactions on Fuzzy Systems (TFS) is published bi-monthly (February, April, June, August, October and December).

IEEE Transactions on Fuzzy Systems (TFS) is published bi-monthly (February, April, June, August, October and December). Scope IEEE Transactions on Fuzzy Systems (TFS) is published bi-monthly (February, April, June, August, October and December). TFS will consider papers that deal with the theory, design or applications

More information

DATE: JANUARY 24,2008 REAL ESTATE DIVISION

DATE: JANUARY 24,2008 REAL ESTATE DIVISION Executive Director's Report to the Board of Harbor Commissioners DATE: JANUARY 24,2008 FROM: REAL ESTATE DIVISION SUMMARY: The proposed Agreement with Meridian Management Corporation (Meridian) provides

More information

Advanced RTU Campaign Webinar June 17, 2013

Advanced RTU Campaign Webinar June 17, 2013 Advanced RTU Campaign Webinar June 17, 2013 Agenda Introductions Overview of the Advanced RTU Campaign Michael Deru Walgreens RTU Replacement Program Jason Robbins and Nirmal Sekhri Advanced Packaged Rooftop

More information

The Internet Society. on behalf of. The IETF Administrative Oversight Committee. Request for Proposal. RFC Editor RFC Format CSS Design

The Internet Society. on behalf of. The IETF Administrative Oversight Committee. Request for Proposal. RFC Editor RFC Format CSS Design The Internet Society on behalf of The IETF Administrative Oversight Committee Request for Proposal RFC Editor RFC Format CSS Design Date of Issuance: July 22, 2016 Proposal Submission Deadline: September

More information

Emergency Cooling Centres

Emergency Cooling Centres 53 Emergency Cooling Centres To: Financial Budget and Enrolment Committee Date: 09 May 2018 Report No.: 05-18-3388 Strategic Directions Make every school an effective school Recommendation It is recommended

More information

Continuous Commissioning at Sandia National Laboratories

Continuous Commissioning at Sandia National Laboratories Session: Why On going Commissioning Can Lead to Better Performing Buildings Continuous Commissioning at Sandia National Laboratories Jack Mizner Sandia National Laboratories August 10, 2016 Sandia National

More information

APPLICATION OF MODELING AND SIMULATION IN FAULT DETECTION AND DIAGNOSIS OF HVAC SYSTEMS. Lili Lan and Youming Chen

APPLICATION OF MODELING AND SIMULATION IN FAULT DETECTION AND DIAGNOSIS OF HVAC SYSTEMS. Lili Lan and Youming Chen APPLICATION OF MODELING AND SIMULATION IN FAULT DETECTION AND DIAGNOSIS OF HVAC SYSTEMS Lili Lan and Youming Chen College of Civil Engineering, Hunan University, Changsha 410082, China ABSTRACT Failures

More information

Factsheet. Power Generation Service Energy efficiency in power generation and water

Factsheet. Power Generation Service Energy efficiency in power generation and water Factsheet Power Generation Service Energy efficiency in power generation and water Opportunity identification Opportunity identification overview The opportunity identification phase of Industrial Energy

More information

Environment, Energy Security, and Sustainability Symposium and Exhibition (E2S2)

Environment, Energy Security, and Sustainability Symposium and Exhibition (E2S2) Environment, Energy Security, and Sustainability Symposium and Exhibition (E2S2) Heidi Anne Kaltenhauser Optimizing Building Performance through Integrated Design June 17, 2010 1 CTC is an independent,

More information

Silicon Valley Power Data Center Program Rebate Application

Silicon Valley Power Data Center Program Rebate Application Contact Information Tax Status (check one) Sole Proprietor Contact Name Phone Corporation Partnership Company Email address Government Not-For-Profit Customer/Facility Information Company Name SVP Account

More information

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect of Record: SPARCH Project Overview The project is located

More information

User Guide. FreeCool : Free Cooling unit V1.1 ENGY-SVU001A-GB

User Guide. FreeCool : Free Cooling unit V1.1 ENGY-SVU001A-GB User Guide FreeCool : Free Cooling unit V1.1 ENGY-SVU001A-GB Table of Contents Introduction...3 General features...4 User interface...5 Top display area... 5 Bottom display area... 5 Main display area...

More information

Policy for Accrediting Assessment Bodies Operating within the Cradle to Cradle Certified Product Certification Scheme. Version 1.2

Policy for Accrediting Assessment Bodies Operating within the Cradle to Cradle Certified Product Certification Scheme. Version 1.2 Policy for Accrediting Assessment Bodies Operating within the Cradle to Cradle Certified Product Certification Scheme Version 1.2 July 2015 Copyright, Cradle to Cradle Products Innovation Institute, 2015

More information

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable) Commercial Buildings New or Existing Institutional Buildings: Educational Facilities New

More information

Policies and Procedures for CTIA Authorized Testing Laboratories

Policies and Procedures for CTIA Authorized Testing Laboratories Policies and Procedures for CTIA Authorized Testing Laboratories Revision 1.1 June 2012 CTIA Certification Program 1400 16 th Street, NW, Suite 600 Washington, DC 20036 e-mail: certification@ctia.org Telephone:

More information

Fair City Plaza. Task: Diagnose problems, recommend improvements for small municipal district cooling system

Fair City Plaza. Task: Diagnose problems, recommend improvements for small municipal district cooling system Fair City Plaza Task: Diagnose problems, recommend improvements for small municipal district cooling system The Fair City Plaza district cooling system provides chilled water to five buildings in a downtown

More information

Contents. Rev. 2, 5/12/2016 1

Contents. Rev. 2, 5/12/2016 1 Answers to Frequently Asked Questions for CTI STD-201 Thermal Certification of Cooling Towers, Closed Circuit Coolers and Evaporative Refrigerant Condensers Contents What is CTI STD-201?... 3 To what equipment

More information

Construct Chiller Plant, Phase I

Construct Chiller Plant, Phase I Page 1 of 6 Construct Chiller Plant, Phase I project 1 of 1 Virginia Polytechnic Institute and State University (208) General Information Project Type: New Construction Project Code: 17657 Start Year:

More information

HVAC&R Technical Requirements for The Commissioning Process. Charles E Dorgan, PE, PhD, CxAP Professor Emeritus University of Wisconsin - Madison

HVAC&R Technical Requirements for The Commissioning Process. Charles E Dorgan, PE, PhD, CxAP Professor Emeritus University of Wisconsin - Madison HVAC&R Technical Requirements for The Commissioning Process Charles E Dorgan, PE, PhD, CxAP Professor Emeritus University of Wisconsin - Madison Guideline 1-2007 Purpose of this presentation is: to assist

More information

Committed to Energy Efficiency

Committed to Energy Efficiency RESOLUTE Resolute Helps PNC Arena Reduce Energy Consumption and Costs While Improving Fan Comfort Lacking the visibility, real-time data and analytics needed to optimize facility performance and reduce

More information

Energy Performance Contracting

Energy Performance Contracting Energy Performance Contracting December 2017 Outlines Section One: Jonson Controls as an Energy Service Company (ESCO) Reasons behind investment in Energy Efficiency Section Two: Funding Options of Energy

More information

WHAT IS THE DIGI-RTU South 59 th Street Omaha, NE bes-tech.net

WHAT IS THE DIGI-RTU South 59 th Street Omaha, NE bes-tech.net WHAT IS THE DIGI-RTU The Digi-RTU is a Heating, Ventilation, and Air Conditioning (HVAC) rooftop unit control kit that is both a demand management and energy usage device. It is designed to improve the

More information

ASHRAE. Strategic Plan STARTING

ASHRAE. Strategic Plan STARTING 1 ASHRAE Strategic Plan STARTING 2014 O StrategicPlan STARTING 2014 Figure 1: The Strategic Plan on a Page VISION ASHRAE will be the global leader, the foremost source of technical and educational information,

More information

REPORT TO THE BUSINESS ADMINISTRATION COMMITTEE

REPORT TO THE BUSINESS ADMINISTRATION COMMITTEE REPORT TO THE BUSINESS ADMINISTRATION COMMITTEE RECOMMENDATION TO AWARD A SOLE SOURCE CONTRACT FOR MAINTENANCE AND TECHNICAL SUPPORT OF THE CENTRAL HEATING AND COOLING PLANT S DISTRIBUTED CONTROL SYSTEM

More information

EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston

EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston Decision Summary EBRO File No.: 16EBR001.R Issue: The Ministry

More information

Your Solution For Energy and Cost Savings. McQuay Packaged Chiller Plant

Your Solution For Energy and Cost Savings. McQuay Packaged Chiller Plant Your Solution For Energy and Cost Savings McQuay Packaged Chiller Plant Innovative Solutions for Your Chiller Plant McQuay packaged chiller plants provide energy efficient chillers integrated with pumps,

More information

ART CENTER AND SATELLITE PLANT

ART CENTER AND SATELLITE PLANT CSU The California State University Office of Audit and Advisory Services CONSTRUCTION California State University, Bakersfield ART CENTER AND SATELLITE PLANT Audit Report 15-09 May 7, 2015 EXECUTIVE SUMMARY

More information

CECIP 18 GWH3. 16KMTCO 2 e 4 ABOUT CECIP CALTECH ENERGY CONSERVATION INVESTMENT PROGRAM ANNUAL REPORT 2014 ABOUT CALTECH INVESTED TO DATE

CECIP 18 GWH3. 16KMTCO 2 e 4 ABOUT CECIP CALTECH ENERGY CONSERVATION INVESTMENT PROGRAM ANNUAL REPORT 2014 ABOUT CALTECH INVESTED TO DATE CECIP CALTECH ENERGY CONSERVATION INVESTMENT PROGRAM ANNUAL REPORT 2014 ABOUT CECIP Caltech s green revolving fund, CECIP, combines finance, engineering and operations to implement energy conservation

More information

The Certified Indoor Air Quality Professional (CIAQP ) Program

The Certified Indoor Air Quality Professional (CIAQP ) Program The Certified Indoor Air Quality Professional (CIAQP ) Program Date: Venue: 15 17 November 2007 (Tentative) IVE(Morrison Hill), Oi Kwan Road, Wanchai (Tentative) Course Code: CIAQP 01/07/HK THE MARK of

More information

Mexico Chiller Concessional Lending Pilot Project

Mexico Chiller Concessional Lending Pilot Project Mexico Chiller Concessional Lending Pilot Project World Bank UK Bilateral Current status: 1 st Phase completed Financial Agents Workshop, Washington D.C. 14, 15 April 2004 Project Objectives (i) Test various

More information

BC Hydro Power Smart Forum Introducing Canada s First Utility IT Energy Conservation Program

BC Hydro Power Smart Forum Introducing Canada s First Utility IT Energy Conservation Program BC Hydro Power Smart Forum Introducing Canada s First Utility IT Energy Conservation Program David Rogers IT Advisor, BC Hydro Power Smart November 17, 2008 IT Energy Management BC Hydro Power Smart Data

More information

Instructions for Participating in ASHRAE s. Commissioning Process Management Professional (CPMP) Certification Program

Instructions for Participating in ASHRAE s. Commissioning Process Management Professional (CPMP) Certification Program Instructions for Participating in ASHRAE s Commissioning Process Management Professional (CPMP) Certification Program Effective date: 10/06/2009 Related Resources Resources available to help prepare for

More information

Workshops. 1. SIGMM Workshop on Social Media. 2. ACM Workshop on Multimedia and Security

Workshops. 1. SIGMM Workshop on Social Media. 2. ACM Workshop on Multimedia and Security 1. SIGMM Workshop on Social Media SIGMM Workshop on Social Media is a workshop in conjunction with ACM Multimedia 2009. With the growing of user-centric multimedia applications in the recent years, this

More information

Fault Detection and Diagnostics: Automated, Ongoing Commissioning Functionality for Large and Small HVAC Systems

Fault Detection and Diagnostics: Automated, Ongoing Commissioning Functionality for Large and Small HVAC Systems Fault Detection and Diagnostics: Automated, Ongoing Commissioning Functionality for Large and Small HVAC Systems Mark Cherniack New Buildings Institute Synopsis This paper highlights state-of-the-art fault

More information

Air-Cooled Series R Chiller

Air-Cooled Series R Chiller Air-Cooled Series R Chiller The next generation of Air-Cooled Helical Rotary Chillers ANOTHER RELIABLE SOURCE OF CHILLED WATER FROM TRANE The new industry standard f The next generation of the air-cooled

More information

Economizer Fault Detection and Diagnostics (FDD) for Built-Up Air Handlers Draft Report

Economizer Fault Detection and Diagnostics (FDD) for Built-Up Air Handlers Draft Report Economizer Fault Detection and Diagnostics (FDD) for Built-Up Air Handlers Draft Report Draft Code Language Last Updated: March 2017 1. INTRODUCTION The California Statewide Utility Codes and Standards

More information

Automatic tools for fault detection and diagnostic of HVAC systems for hotel and office building

Automatic tools for fault detection and diagnostic of HVAC systems for hotel and office building Automatic tools for fault detection and diagnostic of HVAC systems for hotel and office building Ph.D., H. Vaezi-Nejad, M. Jandon, Ph.D., J.C. Visier, CSTB (Centre Scientifique et Technique du Bâtiment)

More information

Utility Incentives for RTU FDD in California. Mel Johnson Southern California Edison

Utility Incentives for RTU FDD in California. Mel Johnson Southern California Edison Utility Incentives for RTU FDD in California Mel Johnson Southern California Edison 1 Agenda Strategic Direction Action Plan Industry Involvement Business Case Research Programs Field FDD Onboard FDD Challenges

More information

Unique Airflow Visualization Techniques for the Design and Validation of Above-Plenum Data Center CFD Models

Unique Airflow Visualization Techniques for the Design and Validation of Above-Plenum Data Center CFD Models Unique Airflow Visualization Techniques for the Design and Validation of Above-Plenum Data Center CFD Models The MIT Faculty has made this article openly available. Please share how this access benefits

More information

A. The high quality, lightweight, varifocal manual iris lens shall be suitable for applications where scene and lighting requirements are consistent.

A. The high quality, lightweight, varifocal manual iris lens shall be suitable for applications where scene and lighting requirements are consistent. Section 00000 SECURITY ACCESS AND SURVEILLANCE ADEMCO VIDEO VARIFOCAL MANUAL IRIS LENS PART 1 GENERAL 1.01 SUMMARY The intent of this document is to specify the minimum criteria for the design, supply,

More information

Battery Program Management Document

Battery Program Management Document Battery Program Management Document Revision 5.1 February 2011 CTIA Certification Program 1400 16 th Street, NW, Suite 600 Washington, DC 20036 e-mail: certification@ctia.org Telephone: 1.202.785.0081

More information

COMMERCIAL FURNACES CERTIFICATION PROGRAM

COMMERCIAL FURNACES CERTIFICATION PROGRAM COMMERCIAL FURNACES CERTIFICATION PROGRAM AHRI OM CFRN JANUARY 2018 2111 Wilson Blvd, Suite 500 Arlington, Virginia 22201 (703) 524-8800 Sponsored and administered by: PREFACE The following manual outlines

More information

NEES Community and Communication (NEEScomm) Data Sharing and Archiving Policies and Guidelines, Version 1. December

NEES Community and Communication (NEEScomm) Data Sharing and Archiving Policies and Guidelines, Version 1. December Introduction Policies Definitions References This document promulgates policies and guidelines from the George E. Brown, Jr. Network for Earthquake Engineering Simulation (NEES) Consortium, Inc. for archiving

More information

Maximising Energy Efficiency and Validating Decisions with Romonet s Analytics Platform. About Global Switch. Global Switch Sydney East

Maximising Energy Efficiency and Validating Decisions with Romonet s Analytics Platform. About Global Switch. Global Switch Sydney East Maximising Energy Efficiency and Validating Decisions with Romonet s Analytics Platform Case Study - Global Switch Sydney East About Global Switch Global Switch is a leading owner, operator and developer

More information

Magnitude magnetic bearing centrifugal chillers

Magnitude magnetic bearing centrifugal chillers Magnitude magnetic bearing centrifugal chillers 75-1500 tons Better Air, Better Outcomes Magnitude magnetic bearing centrifugal chillers deliver the energy savings that building owners demand under all

More information

ID-O Energy Dashboard Engaging Occupants to Save Energy

ID-O Energy Dashboard Engaging Occupants to Save Energy ID-O Energy Dashboard Engaging Occupants to Save Energy «dashboard-controllers» that enable building occupants to control energy-using components and systems with expert feedback for saving energy and

More information

Advanced Rooftop Controller

Advanced Rooftop Controller Advanced Rooftop Controller Preliminary Seventh Power Plan Energy Efficiency Estimates Conservation Resources Advisory Committee Meeting December 17, 2014 Presentation Outline Advanced Rooftop Controller

More information

CERTIFICATE SCHEME THE MATERIAL HEALTH CERTIFICATE PROGRAM. Version 1.1. April 2015

CERTIFICATE SCHEME THE MATERIAL HEALTH CERTIFICATE PROGRAM. Version 1.1. April 2015 CERTIFICATE SCHEME For THE MATERIAL HEALTH CERTIFICATE PROGRAM Version 1.1 April 2015 Copyright Cradle to Cradle Products Innovation Institute, 2015 1 Purpose The intention of the Certificate Scheme is

More information

Developing an Action Plan: Building Energy Metering and Beyond

Developing an Action Plan: Building Energy Metering and Beyond Developing an Action Plan: Building Energy Metering and Beyond Angela Lewis, PE, PhD, LEED AP, FMP Project Manager Facility Engineering Associates (FEA) MANAGING CEUs AND CFM MAINTENANCE POINTS You are

More information

CARRIER edesign SUITE NEWS

CARRIER edesign SUITE NEWS Welcome Welcome to the premier issue of EXchange, offering timely, informative and interesting news on the Carrier edesign Suite of Software. Delivered quarterly, each issue will provide a wealth of information

More information

United States Energy Association Energy Technology and Governance Program REQUEST FOR PROPOSALS

United States Energy Association Energy Technology and Governance Program REQUEST FOR PROPOSALS United States Energy Association Energy Technology and Governance Program REQUEST FOR PROPOSALS UTILITY CYBER SECURITY INITIATIVE (UCSI) CYBERSECURITY CAPABILITY MATURITY MODEL (C2M2) ASSESSMENT FOR THE

More information

EMCS Data Exchange Challenges: The Real Story! Srinivas Katipamula, Ph.D ASHRAE Summer Meeting Monday June 23 rd, Salt Lake City, UT

EMCS Data Exchange Challenges: The Real Story! Srinivas Katipamula, Ph.D ASHRAE Summer Meeting Monday June 23 rd, Salt Lake City, UT EMCS Data Exchange Challenges: The Real Story! Srinivas Katipamula, Ph.D. 2008 ASHRAE Summer Meeting Monday June 23 rd, Salt Lake City, UT Outline Why do we need data from building systems? Challenges

More information

Rules for LNE Certification of Management Systems

Rules for LNE Certification of Management Systems Rules for LNE Certification of Management Systems Application date: March 10 th, 2017 Rev. 040716 RULES FOR LNE CERTIFICATION OF MANAGEMENT SYSTEMS CONTENTS 1. PURPOSE... 3 2. SCOPE... 3 3. DEFINITION

More information

Magnitude magnetic bearing centrifugal chillers

Magnitude magnetic bearing centrifugal chillers Magnitude magnetic bearing centrifugal chillers 75-1500 tons Better Air, Better Outcomes Magnitude magnetic bearing centrifugal chillers deliver the energy savings that building owners demand under all

More information

Standardization Activities in ITU-T

Standardization Activities in ITU-T Standardization Activities in ITU-T Nozomu NISHINAGA and Suyong Eum Standardization activities for Future Networks in ITU-T have produced 19 Recommendations since it was initiated in 2009. The brief history

More information

MSYS 4480 AC Systems Winter 2015

MSYS 4480 AC Systems Winter 2015 MSYS 4480 AC Systems Winter 2015 Module 12: DATA CENTERS By Satwinder Singh 14/05/2015 1 Data Centers Data Centers are specialized environments that safeguard your company's most valuable equipment and

More information

Specification for TRAN Layer Services

Specification for TRAN Layer Services Specification for TRAN Layer Services Version 1.0 November 3, 1995 Sponsored by: Architecture Working Group of the 1394 Trade Association Approved for Release by: 1394 Trade Association Steering Committee

More information

2018 General Consultant Services On-Call RFP. Pre-Proposal Meeting April 30, 2018

2018 General Consultant Services On-Call RFP. Pre-Proposal Meeting April 30, 2018 2018 General Consultant Services On-Call RFP Pre-Proposal Meeting April 30, 2018 RFP Personnel Construction Management Disciplines Planning Consulting Services Contract Questions Technical Disciplines

More information

JEFFERSON COLLEGE COURSE SYLLABUS HRA249 COMMERCIAL REFRIGERATION SYSTEMS. 5 Credit Hours. Prepared by William Kaune November 30, 2010

JEFFERSON COLLEGE COURSE SYLLABUS HRA249 COMMERCIAL REFRIGERATION SYSTEMS. 5 Credit Hours. Prepared by William Kaune November 30, 2010 JEFFERSON COLLEGE COURSE SYLLABUS HRA249 COMMERCIAL REFRIGERATION SYSTEMS 5 Credit Hours Prepared by William Kaune November 30, 2010 Revised by William Kaune April 25, 2012 Mary Beth Ottinger, Ph.D., Division

More information

How to Get the Most out of Your Rooftop AC

How to Get the Most out of Your Rooftop AC How to Get the Most out of Your Rooftop AC E360 Annual Conference Atlanta, Ga. April 11 Danny Miller President Transformative Wave RTUs serve 70% of the cooled commercial floor space in North America (~

More information

SCHENDT ENGINEERING PRIOR EXPERIENCE

SCHENDT ENGINEERING PRIOR EXPERIENCE Mitchell Hall Renovation US Air Force Academy, Colorado Corp. was the prime consultant for this project. The project generally consisted of replacing all of the air handling units, exhaust fans, air curtains,

More information

Pay for Performance. Emerging Technologies. ET Emerging Technologies Showcase. Emily Levin Vermont Energy Investment Corporation

Pay for Performance. Emerging Technologies. ET Emerging Technologies Showcase. Emily Levin Vermont Energy Investment Corporation Emerging Technologies Pay for Performance ET Emerging Technologies Showcase Emily Levin Vermont Energy Investment Corporation Kathleen Belkayat Energy Trust of Oregon March 28, 2017 Sponsored by BPA s

More information

Kentucky Community and Technical College System ESPC Initiative

Kentucky Community and Technical College System ESPC Initiative Kentucky Community and Technical College System ESPC Initiative Energy Services Coalition Conference August 24, 2016 Presented by: Billie Hardin KCTCS Sustainability Project Manager OVERVIEW KCTCS Background

More information

Automated Fault Detection and Diagnostics for Outdoor-Air Ventilation Systems and Economizers: Methodology and Results from Field Testing

Automated Fault Detection and Diagnostics for Outdoor-Air Ventilation Systems and Economizers: Methodology and Results from Field Testing CH-99-5-2 Automated Fault Detection and Diagnostics for Outdoor-Air Ventilation Systems and Economizers: Methodology and Results from Field Testing Srinivas Katipamula, Ph.D. Robert G. Pratt David P. Chassin

More information

Trane Series S CenTraVac Chillers with AdaptiSpeed Technology tons

Trane Series S CenTraVac Chillers with AdaptiSpeed Technology tons Trane Series S CenTraVac Chillers with AdaptiSpeed Technology 180 390 tons The Trane Series S CenTraVac chiller: Delivering all that CenTraVac chillers stand for and more! We re proud to introduce the

More information

Request for Qualifications for Audit Services March 25, 2015

Request for Qualifications for Audit Services March 25, 2015 Request for Qualifications for Audit Services March 25, 2015 I. GENERAL INFORMATION A. Purpose This Request for Qualifications (RFQ) is to solicit a CPA firm with which to contract for a financial and

More information

PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL NW Barry Road Kansas City, MO SUMMER HVAC

PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL NW Barry Road Kansas City, MO SUMMER HVAC PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL 7703 NW Barry Road Kansas City, MO 64153 2019 SUMMER HVAC Park Hill South High School Detailed Proposal Information is Available on District Website http://www.parkhill.k12.mo.us

More information