1 August 3, 2018 To: Honorable Chair Kevin J. McIntyre, Federal Energy Regulatory Commission (FERC) Honorable Commissioner Cheryl A. LaFleur, FERC Honorable Commissioner Neil Chatterjee, FERC Honorable Commissioner Robert F. Powelson, FERC Honorable Commissioner Richard Glick, FERC Chair Kris Hafner, Western Electricity Coordinating Council (WECC) Chief Executive Officer Melanie M. Frye, WECC Chair Roy Thilly, North American Electric Reliability Council (NERC) Chief Executive Officer James B. Robb, NERC Subject: The Future of a Western Interconnection with Multiple Reliability Coordinators Dear Commissioners, Chairs, and Leadership of FERC, WECC, and NERC: The undersigned entities to this letter represent a broad group of public interest organizations across the Western states, whose primary goals are to achieve a reliable, modernized, and low carbon Western electricity grid that is capable of accommodating the many technological, policy, and market-based changes that are rapidly occurring in our region. Because grid reliability and resilience are essential to our goals, we are writing to express our concern about the potential devolution of the Western Interconnection s currently robust Reliability Coordinator (RC) function toward a minimalist function necessary to meet Electric Reliability Organization (ERO) requirements. The following remarks begin with background explaining the current state of reliability coordination in the Western Interconnection and conclude with specific recommendations for appropriately addressing near-term RC fragmentation in order to avoid the devolution of this important function. Background As the only independent RC responsible for ensuring bulk system reliability for most of the Western Interconnection, Peak Reliability has achieved a high standard of operational excellence, while concurrently developing advanced tools and methodologies to improve grid reliability and efficiency beyond the minimum reliability requirements established by the North American Electric Reliability Corporation (NERC). In particular, Peak s advancements including the Enhanced Curtailment Calculator tool have improved grid responsiveness and renewable energy integration in the Western Interconnection. However, more work remains to be done. The Future of a Western Interconnection with Multiple Reliability Coordinators

2 Regardless of the number of organizations providing RC services in the West going forward, the Western Interconnection needs a proactive RC function that has sufficient resources and continually provides and enhances a range of services to support interconnection-wide reliability, rather than a reactive function that only moves forward following major Western outages such as those in 1996 and Unlike the Eastern and Texas interconnections, the Western Interconnection has evolved into a loosely knit network of transmission facilities. The western bulk power system covers long distances with a wide range of climate, terrain, and topographical diversity. These characteristics and a rapidly changing resource mix present unique stability challenges, including unscheduled flows and inter-area oscillations, and the need for management of approximately 279 Remedial Action Schemes (RAS). By contrast, Southwest Power Pool in the Eastern Interconnection has fewer than 10 RAS. To protect grid reliability, this system topology requires robust real-time interconnection-wide situational awareness and the capability to take effective action across the interconnection. An uncoordinated, fragmented RC function may increase risks to grid reliability. However, interconnection-wide situational awareness and reliability directives alone are not sufficient to achieve effective grid reliability, given the rapid shift toward new technologies occurring in the Western Interconnection. For example, the RC function must develop and implement new tools and analyses that enable the unique capabilities of inverter-based technologies to improve grid reliability. Moreover, many other entities rely on the services, data and models of the RC function to perform assessment and compliance activities, including those required by NERC and Western Electricity Coordinating Council (WECC) reliability standards. Concerning RC certification and oversight, the likely fragmentation of the RC function in the Western Interconnection in the coming months will require that WECC, NERC and the Federal Energy Regulatory Commission (FERC) rapidly increase their level of attention and oversight to effectively accommodate the operation of multiple RCs in the West. Ultimately, close oversight is essential to determine how well Western Interconnection RCs are collectively: (1) executing the shared function of ensuring grid-wide reliability; and (2) preparing tools and conducting analyses necessary to improve situational awareness and reliability assessment on a continuous basis. Recommendations The undersigned public interest organizations offer the following recommendations to ensure ongoing system reliability in the Western Interconnection under a fragmented RC function. Our recommendations can be divided into two categories: (1) recommendations directed at the oversight agencies, and (2) recommendations directed at the future providers of RC services in the Western Interconnection. The Future of a Western Interconnection with Multiple Reliability Coordinators 2

3 1. Oversight Agencies Oversight agencies should aim to execute an open and transparent audit process that includes input from experts and stakeholders on the most effective way to achieve interconnection-wide grid reliability for our rapidly changing bulk power system. A checklisttype audit approach for certification and oversight of individual RCs may be insufficient to uncover all potential interconnection-wide reliability weaknesses, as well as opportunities for improvement. Rather, enhanced oversight involving a more cohesive, top-down approach for determining RC effectiveness, is crucial during the transition to multiple RC organizations and their ongoing operations. Maintaining the West s high degree of grid reliability beyond minimal ERO requirements for RC certification and specifically, ensuring continued availability of the advanced applications and tools developed by Peak Reliability and currently available to Western Interconnection Balancing Authorities (BAs) and Transmission Operators (TOPs), is vital to the best interests of RC customers and consumers within the Western Interconnection. The emergence and coordination of new RC providers in the West must be overseen independently and transparently by the appropriate regional entity, regional advisory body, and stakeholders to ensure that devolution of the West s RC function does not occur. To ensure comprehensive oversight, the undersigned organizations offer the following recommendation to FERC: FERC, pursuant to its authority under Section 215(j) of the Federal Power Act, should direct the Western Interconnection Regional Advisory Body (WIRAB) to provide ongoing review and advice regarding the competency and performance of all RC providers in the Western Interconnection. Such review and advice should, at a minimum, involve an annual performance review conducted by WIRAB or its designees, in accordance with a prescribed set of performance criteria. The criteria should be aimed at ensuring reliability achievements consistent with the public good, and in accordance with those identified best practices achieved by Western RCs that demonstrably yield economic and social benefits to customers and ratepayers in the Western Interconnection. Further, WIRAB should publicly share the results of its annual review, including any recommendations for ongoing improvements, at one of its biannual meetings. 2. Future Providers of RC Services As the Western Interconnection RC function evolves, the undersigned organizations further recommend that organizations that are ultimately designated as Reliability Coordinators in the Western Interconnection do the following to ensure that the Western Interconnection s RC function does not devolve: The Future of a Western Interconnection with Multiple Reliability Coordinators 3

4 1. Provide more than the minimum capabilities required by NERC to meet the unique challenges of rapidly changing Western grid conditions. 2. Maintain situational awareness, oversight and responsiveness across the Western Interconnection without gaps during transitions where BAs and TOPs transfer from one RC organization to another. 3. Maintain and continually align the West-wide System Model (WSM) across all Western RC organizations, including key elements such as complete and accurate RAS models and support of ongoing Model Enrichment Projects (including enhanced monitoring of System Operating Limits, or SOLs; enhanced generator modeling; and improved visualization). 4. Execute or align with the following current Peak Reliability tools and initiatives, including the sharing and incorporation of relevant data into event analysis, system assessment, and where possible, real-time operations i. Enhanced Curtailment Calculator (ECC): The ECC is a tool that uses near real-time inputs from Peak s State Estimator and Supervisory Control and Data Acquisition (SCADA) platforms to accurately determine SOL exceedances. The ECC supports the reliable management of SOL exceedances by implementing preventive actions and abating unnecessary curtailments, thereby leading to both effective and efficient grid operations. ii. WECC Interchange Tool (WIT): The WIT is a central source for confirmed interchange throughout the Western Interconnection, including E-Tag validations. iii. Western Interconnection Synchrophasor Project (WISP): WISP includes 584 phasor measurement units and 77 phasor data concentrators. The use of WISP increases grid operators visibility into the bulk power system in near real-time, enables earlier detection of grid reliability threats, and facilitates critical information sharing between neighboring control areas. iv. Technical Assistance: Contribution of assistance to less technically capable BAs and TOPs a service currently provided by Peak Reliability s Hosted Applications. 5. Perform analyses of potential reliability risks and opportunities arising from the Western Interconnection s changing resource mix. 6. Develop new tools to enhance situational awareness, predictive transient stability analysis and real-time coordination, thus providing for more reliable and efficient operation of the Western Interconnection. The Future of a Western Interconnection with Multiple Reliability Coordinators 4

5 7. Ensure that any RC operating within a market (i.e., a Regional Transmission Organization or Independent System Operator) is fully capable of exercising its reliability responsibilities independent of market influence. 8. Provide for inclusive, transparent and accountable governance of each RC organization, including full representation of all affected stakeholders. 9. Recognize WIRAB s statutory authority as an advisor to FERC, NERC, and WECC on Western Interconnection reliability matters, and memorialize that role for WIRAB to directly advise the California Independent System Operator (CAISO), the Southwest Power Pool (SPP), and any other prospective RC service providers that present in the Western Interconnection. Signatories to this letter are deeply engaged in Western Interconnection processes and forums to assure that the region can transition to a low carbon grid as soon as possible, while ensuring improved reliability of the Western grid. In this era of tremendous technological and organizational change it is imperative that the West maintains its focus on reliability and resilience while modernizing the grid and its operating platforms. We look forward to engaging with RC and jurisdictional agencies during this transition. Thank you for your consideration of these comments. Sincerely, Amanda Ormond Managing Director, Western Grid Group Jennifer Gardner Senior Staff Attorney, Western Resource Advocates Julia Prochnik Director, Western Renewable Grid Planning, Natural Resources Defense Council Bill Corcoran Regional Campaign Director, Sierra Club Beyond Coal Campaign Fred Heutte Senior Policy Associate, NW Energy Coalition Doug Larson Director, DL Energy Mike Florio Senior Fellow, Gridworks Ed Smeloff Managing Director, Regulatory Team Vote Solar The Future of a Western Interconnection with Multiple Reliability Coordinators 5

6 cc: Marie Jordan, Chief Executive Officer, Peak Reliability Steve Berberich, Chief Executive Officer, California Independent System Operator Nicholas A. Brown, Chief Executive Officer, Southwest Power Pool Maury Galbraith, Executive Director, Western Interstate Regional Advisory Board Tom Forese, Chair, Arizona Corporation Commission Michael Picker, President, California Public Utilities Commission Jeffrey P. Ackermann, Chair, Colorado Public Utilities Commission Paul Kjellander, President, Idaho Public Utilities Commission Brad Johnson, Chair, Montana Public Service Commission Joe Reynolds, Chair, Nevada Public Utilities Commission Sandy Jones, Chair, New Mexico Public Regulation Commission Megan Decker, Chair, Oregon Public Utilities Commission Kristie Fiegen, Chair, South Dakota Public Service Commission Thad LeVar, Chair, Utah Public Service Commission David Danner, Chair, Washington Utilities & Transportation Commission Bill Russell, Chair, Wyoming Public Service Commission FROM: Amanda Ormond, Western Grid Group c/o CEERT th Street Suite 311 Sacramento, CA (480) The Future of a Western Interconnection with Multiple Reliability Coordinators 6

Peak Reliability Coordination Services in the West March 30, 2018

Peak Reliability Coordination Services in the West March 30, 2018 Peak Reliability Coordination Services in the West March 30, 2018 Peak Reliability, 2018. 1 Peak Reliability Coordination Services in the West Peak s fundamental mission is to enhance and promote the reliability

More information

WIRAB Report to the Peak RC Board of Directors

WIRAB Report to the Peak RC Board of Directors WIRAB Report to the Peak RC Board of Directors Eric Baran & Holly Taylor WIRAB Staff December 14, 2017 1 WIRAB Activities Peak RC Activities Outline 2 WIRAB Activities Fall 2017 Leadership Delegation to

More information

Texas Reliability Entity, Inc. Strategic Plan for 2017 TEXAS RE STRATEGIC PLAN FOR 2017 PAGE 1 OF 13

Texas Reliability Entity, Inc. Strategic Plan for 2017 TEXAS RE STRATEGIC PLAN FOR 2017 PAGE 1 OF 13 Texas Reliability Entity, Inc. Strategic Plan for 2017 TEXAS RE STRATEGIC PLAN FOR 2017 PAGE 1 OF 13 I. Vision A highly reliable and secure bulk power system in the Electric Reliability Council of Texas

More information

RC Coordination Efforts

RC Coordination Efforts RC Coordination Efforts WECC RC FORUM JULY 19, 2018 CAISO, Peak, SPP, and AESO Steering Group Purpose and Participants Provide Update on Recent RC Coordination Activities Provide Opportunity for Interested

More information

Chief Executive Officer. Pacific Northwest Utilities Conference Committee Portland, Oregon March 8, 2013

Chief Executive Officer. Pacific Northwest Utilities Conference Committee Portland, Oregon March 8, 2013 Mark W. Maher Chief Executive Officer Pacific Northwest Utilities Conference Committee Portland, Oregon March 8, 2013 Agenda WECC Overview WECC Strategic Planning Initiative Western Interconnection Synchrophasor

More information

History of NERC December 2012

History of NERC December 2012 History of NERC December 2012 Timeline Date 1962-1963 November 9, 1965 1967 1967-1968 June 1, 1968 July 13-14, 1977 1979 1980 Description Industry creates an informal, voluntary organization of operating

More information

History of NERC January 2018

History of NERC January 2018 History of NERC January 2018 Date 1962 1963 The electricity industry created an informal, voluntary organization of operating personnel to facilitate coordination of the bulk power system in the United

More information

Essential Reliability Services NERC Staff Report

Essential Reliability Services NERC Staff Report Essential Reliability Services NERC Staff Report Mark Lauby, Senior Vice President and Chief Reliability Officer Annual Meeting of the National Conference of State Legislators August 20, 2014 About NERC

More information

Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security

Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security CERTS Briefing for Kevin Kolevar, Director Office of Electricity and Energy Assurance Department of Energy Washington,

More information

Grid Security & NERC

Grid Security & NERC Grid Security & NERC Janet Sena, Senior Vice President, Policy and External Affairs Southern States Energy Board 2017 Associate Members Winter Meeting February 27, 2017 Recent NERC History Energy Policy

More information

DOE Initiatives in the U.S. Transmission Sector

DOE Initiatives in the U.S. Transmission Sector DOE Initiatives in the U.S. Transmission Sector David Meyer Senior Advisor Office of Electricity Delivery and Energy Reliability Northeast Power Coordinating Council 2009 Annual Meeting Three Topics Today

More information

BPA and NERC, WECC, ERO

BPA and NERC, WECC, ERO BPA and NERC, WECC, ERO March 2006 1 Reliability Organizations BPA has relationship with two reliability organizations: 1. North American Electric Reliability Council (NERC) 2. Western Electric Coordinating

More information

Compliance Enforcement Initiative

Compliance Enforcement Initiative Compliance Enforcement Initiative Filing and Status Update November 2, 2011 Rebecca Michael Status of the Filings NERC filed several components of the Compliance Enforcement Initiative on September 30,

More information

Enhanced Curtailment Calculator Update

Enhanced Curtailment Calculator Update Enhanced Curtailment Calculator Update December 13, 2017 Member Advisory Committee Meeting Brett Wangen Chief Engineering and Technology Officer Jeremy West Manager, Interconnection Reliability Initiatives

More information

RELIABILITY COMPLIANCE ENFORCEMENT IN ONTARIO

RELIABILITY COMPLIANCE ENFORCEMENT IN ONTARIO RELIABILITY COMPLIANCE ENFORCEMENT IN ONTARIO June 27, 2016 Training provided for Ontario market participants by the Market Assessment and Compliance Division of the IESO Module 1 A MACD training presentation

More information

NERC Overview and Compliance Update

NERC Overview and Compliance Update NERC Overview and Compliance Update Eric Ruskamp Manager, Regulatory Compliance August 17, 2018 1 Agenda NERC Overview History Regulatory Hierarchy Reliability Standards Compliance Enforcement Compliance

More information

Standards. Mark Lauby, Vice President and Director of Standards Board of Trustees Meeting November 7, 2013

Standards. Mark Lauby, Vice President and Director of Standards Board of Trustees Meeting November 7, 2013 Standards Mark Lauby, Vice President and Director of Standards Board of Trustees Meeting November 7, 2013 Geomagnetic Disturbance Operations EOP-010-1 Reliability benefits Enhance operating response to

More information

FERC Reliability Technical Conference -- Panel I State of Reliability and Emerging Issues

FERC Reliability Technical Conference -- Panel I State of Reliability and Emerging Issues -- State of Reliability and Emerging Issues Remarks of Thomas Burgess, Vice President and Director, Reliability Assessment and Performance Analysis Chairman Wellinghoff, Commissioners, Staff, and fellow

More information

History of NERC August 2013

History of NERC August 2013 History of NERC August 2013 Timeline Date 1962 1963 November 9, 1965 1967 1967 1968 June 1, 1968 July 13 14, 1977 1979 Description The electricity industry creates an informal, voluntary organization of

More information

ERO Enterprise Strategic Planning Redesign

ERO Enterprise Strategic Planning Redesign ERO Enterprise Strategic Planning Redesign Mark Lauby, Senior Vice President and Chief Reliability Officer Member Representatives Committee Meeting February 10, 2016 Strategic Planning Redesign Current

More information

The North American Electric Reliability Corporation ( NERC ) hereby submits

The North American Electric Reliability Corporation ( NERC ) hereby submits March 3, 2011 VIA ELECTRONIC FILING Ms. Erica Hamilton, Commission Secretary British Columbia Utilities Commission Box 250, 900 Howe Street Sixth Floor Vancouver, B.C. V6Z 2N3 Re: North American Electric

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.

More information

March 4, 2011 VIA ELECTRONIC FILING

March 4, 2011 VIA ELECTRONIC FILING March 4, 2011 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, DC 20426 Re: North American Electric Reliability Corporation,

More information

TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support

TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support TOP/IRO Standards RC Users Group January 21, 2016 Vic Howell Manager, Operations Engineering Support Saad Malik Manager, Real-Time Operations Engineering New/Revised TOP & IRO Standards November 19, 2015,

More information

Interconnection and Transmission

Interconnection and Transmission Interconnection and Transmission Gary L. Brown, P.E. Director of Energy Development Gary@ZGlobal.biz 916-985-9461 Kevin Coffee Energy Management Committee Meeting Irvine, California August 26, 2015 Interconnection

More information

NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION

NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION NARUC Energy Regulatory Partnership Program The Public Services Regulatory Commission of Armenia and The Iowa Utilities Board Janet Amick Senior Utility

More information

February 18, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

February 18, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 California Independent System Operator Corporation February 18, 2015 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Exert Influence. Combine forces to transform public policy and open new markets, at the state and federal levels

Exert Influence. Combine forces to transform public policy and open new markets, at the state and federal levels Members Join Us To Stay Informed Reduce cost of doing business through relevant tools, actionable information and expert insights Exert Influence Combine forces to transform public policy and open new

More information

Critical Infrastructure Protection Version 5

Critical Infrastructure Protection Version 5 Critical Infrastructure Protection Version 5 Tobias Whitney, Senior CIP Manager, Grid Assurance, NERC Compliance Committee Open Meeting August 9, 2017 Agenda Critical Infrastructure Protection (CIP) Standards

More information

Dynamic Transformation of the Energy Industry JUNE 25-27, 2019 COEUR D ALENE, IDAHO REGISTRATION

Dynamic Transformation of the Energy Industry JUNE 25-27, 2019 COEUR D ALENE, IDAHO REGISTRATION 9 th ANNUAL A select group of C-suite panelists and key stakeholders will engage participants in dynamic discussion and debate about the transformational change taking place in today s energy industry.

More information

DRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1

DRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1 DRAFT Cyber Security Communications between Control Centers Technical Rationale and Justification for Reliability Standard CIP-012-1 March May 2018 NERC Report Title Report Date I Table of Contents Preface...

More information

Grid Security & NERC. Council of State Governments. Janet Sena, Senior Vice President, Policy and External Affairs September 22, 2016

Grid Security & NERC. Council of State Governments. Janet Sena, Senior Vice President, Policy and External Affairs September 22, 2016 Grid Security & NERC Council of State Governments The Future of American Electricity Policy Academy Janet Sena, Senior Vice President, Policy and External Affairs September 22, 2016 1965 Northeast blackout

More information

SPP RTO Compliance Forum Western Area Power Administration March 11, 2015

SPP RTO Compliance Forum Western Area Power Administration March 11, 2015 SPP RTO Compliance Forum Western Area Power Administration March 11, 2015 Mark Buchholz WAPA Upper Great Plains Region Compliance Manager What is Western? One of four Power Marketing Administration within

More information

Power System Resilience & Reliability. Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017

Power System Resilience & Reliability. Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017 Power System Resilience & Reliability Robert W. Cummings Senior Director of Engineering and Reliability Initiatives i-pcgrid March 28, 2017 NERC, Reliability, & Resilience NERC has addressed reliability

More information

Critical Infrastructure Protection Committee Strategic Plan

Critical Infrastructure Protection Committee Strategic Plan Critical Infrastructure Protection Committee Strategic Plan 2018-2019 CIPC Executive Committee Updated:xxxxxxxx NERC Report Title Report Date I Table of Contents Preface... iii CIPC Organizational Structure...

More information

151 FERC 61,066 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DENYING REHEARING. (Issued April 23, 2015)

151 FERC 61,066 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DENYING REHEARING. (Issued April 23, 2015) 151 FERC 61,066 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Philip D. Moeller, Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable.

More information

Electricity Security Assessment Framework

Electricity Security Assessment Framework Electricity Security Assessment Framework Extending the framework beyond borders Matthew Wittenstein ESAP Workshop VII April 28, 2016 Keeping the lights on while transforming the power system Electricity

More information

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005 Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency Presented to TAC on April 5, 2005 and PAC on April 22, 2005 Background Power Grid has evolved from a vertically integrated

More information

Introduction to the NYISO

Introduction to the NYISO Introduction to the NYISO Power Control Center Guilderland, NY July 21, 2011 1 Today s Topics NYISO History NYISO Roles & Governance NYISO Markets Building Reliability Emerging Trends 2 Evolution of the

More information

Regulatory Impacts on Research Topics. Jennifer T. Sterling Director, Exelon NERC Compliance Program

Regulatory Impacts on Research Topics. Jennifer T. Sterling Director, Exelon NERC Compliance Program Regulatory Impacts on Research Topics Jennifer T. Sterling Director, Exelon NERC Compliance Program The 2003 Blackout On August 14, 2003, an electric power blackout affected large portions of the Northeast

More information

Terry McAuliffe-VA. Scott Walker-WI

Terry McAuliffe-VA. Scott Walker-WI Terry McAuliffe-VA Scott Walker-WI Cost Before Performance Contracting Model Energy Services Companies Savings Positive Cash Flow $ ESCO Project Payment Cost After 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

More information

2014 Reliability Leadership Summit

2014 Reliability Leadership Summit 2014 Reliability Leadership Summit September 11, 2014 9:00 a.m. to 4:30 p.m. Washington Marriott at Metro Center 775 12th St NW, Washington, DC RELIABILITY ACCOUNTABILITY 3353 Peachtree Road NE Suite 600,

More information

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 A. Introduction 1. Title: Steady State and Dynamic Data Requirements 2. Number: MOD-(11 and 13)-WECC-CRT-1.1 3. Purpose: To establish the consistent data requirements

More information

Mountain West Transmission Group. WECC MIC Update October 17, 2017

Mountain West Transmission Group. WECC MIC Update October 17, 2017 Mountain West Transmission Group WECC MIC Update October 17, 2017 Agenda Overview Mountain West Activities Mountain West Analyses Mountain West Next Steps 2 Mountain West Overview 3 What is the Mountain

More information

CIP Version 5 Transition. Steven Noess, Director of Compliance Assurance Member Representatives Committee Meeting November 12, 2014

CIP Version 5 Transition. Steven Noess, Director of Compliance Assurance Member Representatives Committee Meeting November 12, 2014 CIP Version 5 Transition Steven Noess, Director of Compliance Assurance Member Representatives Committee Meeting November 12, 2014 Purpose of the Transition Program Transitioning entities confident in

More information

WECC Internal Controls Evaluation Process WECC Compliance Oversight Effective date: October 15, 2017

WECC Internal Controls Evaluation Process WECC Compliance Oversight Effective date: October 15, 2017 WECC Internal Controls Evaluation Process WECC Compliance Oversight Effective date: October 15, 2017 155 North 400 West, Suite 200 Salt Lake City, Utah 84103-1114 WECC Internal Controls Evaluation Process

More information

Electricity Sub-Sector Coordinating Council Charter FINAL DISCUSSION DRAFT 7/9/2013

Electricity Sub-Sector Coordinating Council Charter FINAL DISCUSSION DRAFT 7/9/2013 Electricity Sub-Sector Coordinating Council Charter FINAL DISCUSSION DRAFT 7/9/2013 Purpose and Scope The purpose of the Electricity Sub-Sector Coordinating Council (ESCC) is to facilitate and support

More information

Cyber Security Incident Report

Cyber Security Incident Report Cyber Security Incident Report Technical Rationale and Justification for Reliability Standard CIP-008-6 January 2019 NERC Report Title Report Date I Table of Contents Preface... iii Introduction... 1 New

More information

Standards Authorization Request Justification

Standards Authorization Request Justification Standards Authorization Request Justification Project 2009-02 Real-time Monitoring and Analysis Capabilities NERC Report Title Report Date 1 of 30 3353 Peachtree Road NE Suite 600, North Tower Atlanta,

More information

Technical Conference on Critical Infrastructure Protection Supply Chain Risk Management

Technical Conference on Critical Infrastructure Protection Supply Chain Risk Management Technical Conference on Critical Infrastructure Protection Supply Chain Risk Management Remarks of Marcus Sachs, Senior Vice President and the Chief Security Officer North American Electric Reliability

More information

ERO Reliability Risk Priorities Report. Peter Brandien, Reliability Issues Steering Committee Chair WECC Reliability Workshop March 21, 2018

ERO Reliability Risk Priorities Report. Peter Brandien, Reliability Issues Steering Committee Chair WECC Reliability Workshop March 21, 2018 ERO Reliability Risk Priorities Report Peter Brandien, Reliability Issues Steering Committee Chair WECC Reliability Workshop March 21, 2018 Reliability Issues Steering Committee (RISC) Background 2 RISC

More information

MAINE STATE LEGISLATURE

MAINE STATE LEGISLATURE MAINE STATE LEGISLATURE The following document is provided by the LAW AND LEGISLATIVE DIGITAL LIBRARY at the Maine State Law and Legislative Reference Library http://legislature.maine.gov/lawlib Reproduced

More information

NERC Staff Organization Chart Budget 2019

NERC Staff Organization Chart Budget 2019 NERC Staff Organization Chart Budget 2019 President and CEO Associate Director to the Office of the CEO Senior Vice President and Chief Reliability Senior Vice President, General Counsel and Corporate

More information

Standard TOP Transmission Operations

Standard TOP Transmission Operations A. Introduction 1. Title: Transmission Operations 2. Number: TOP-001-34 3. Purpose: To prevent instability, uncontrolled separation, or Cascading outages that adversely impact the reliability of the Interconnection

More information

Modifications to TOP and IRO Standards

Modifications to TOP and IRO Standards Modifications to TOP and IRO Standards Jason Smith, Southwest Power Pool Industry Webinar July 22, 2016 NERC Antitrust Guidelines It is NERC's policy and practice to obey the antitrust laws to avoid all

More information

Alternative Fuel Vehicles in State Energy Assurance Planning

Alternative Fuel Vehicles in State Energy Assurance Planning + Alternative Fuel Vehicles in State Energy Assurance Planning July 17, 2014 Webinar hosted by the National Association of State Energy Officials (NASEO), with support from the U.S. Department of Energy

More information

Physical Security Reliability Standard Implementation

Physical Security Reliability Standard Implementation Physical Security Reliability Standard Implementation Attachment 4b Action Information Background On March 7, 2014, the Commission issued an order directing NERC to submit for approval, within 90 days,

More information

Statement for the Record

Statement for the Record Statement for the Record of Seán P. McGurk Director, Control Systems Security Program National Cyber Security Division National Protection and Programs Directorate Department of Homeland Security Before

More information

Cyber Security Reliability Standards CIP V5 Transition Guidance:

Cyber Security Reliability Standards CIP V5 Transition Guidance: Cyber Security Reliability Standards CIP V5 Transition Guidance: ERO Compliance and Enforcement Activities during the Transition to the CIP Version 5 Reliability Standards To: Regional Entities and Responsible

More information

NERC History, Mission and Current Issues Southern States Energy Board. October 16, 2011

NERC History, Mission and Current Issues Southern States Energy Board. October 16, 2011 NERC History, Mission and Current Issues Southern States Energy Board October 16, 2011 Electricity Vital to America 2 RELIABILITY ACCOUNTABILITY Risk Curve with Actual Events Severity ( Log Base 10) 2003

More information

Project Consideration of Commission Directives in Order No. 693

Project Consideration of Commission Directives in Order No. 693 Project 2009-02 Consideration of Commission Directives in Order Order P 905-906 Further, consistent with the NOPR, the Commission directs the ERO to modify IRO-002-1 to require a minimum set of tools that

More information

UNITED STATES OF AMERICA BEFORE THE U.S. DEPARTMENT OF COMMERCE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY

UNITED STATES OF AMERICA BEFORE THE U.S. DEPARTMENT OF COMMERCE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY UNITED STATES OF AMERICA BEFORE THE U.S. DEPARTMENT OF COMMERCE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY COMMENTS OF THE NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION ON NIST FRAMEWORK AND ROADMAP

More information

NARUC. Winter Committee Meetings. Staff Subcommittee On Gas

NARUC. Winter Committee Meetings. Staff Subcommittee On Gas NARUC Winter Committee Meetings Staff Subcommittee On Gas February 12, 2017 { NARUC Staff Subcommittee on Gas Who is NAESB and what does it do? Background Origin and Scope: The North American Energy Standards

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Supply Chain Risk Management ) Docket No. RM17-13-000 Reliability Standards ) COMMENTS OF THE ISO/RTO COUNCIL The ISO/RTO Council

More information

Mountain West Transmission Group. Tim Vigil RT Merchant Manager Western Area Power Administration

Mountain West Transmission Group. Tim Vigil RT Merchant Manager Western Area Power Administration Mountain West Transmission Group Tim Vigil RT Merchant Manager Western Area Power Administration Mountain West Transmission Group* Basin Electric Power Cooperative (BEPC) Black Hills Energy s three electric

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Cyber Security Incident Reporting Reliability Standards Docket Nos. RM18-2-000 AD17-9-000 COMMENTS OF THE AMERICAN PUBLIC POWER

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure No. Table of Contents Purpose... 1 1. Responsibilities... 2 2. Scope/ Applicability... 2 2.1. Background... 2 2.2. Scope... 2 2.3. Applicability... 3 3. Detail... 3 3.1. Format and Security Protocols...

More information

IT Governance ISO/IEC 27001:2013 ISMS Implementation. Service description. Protect Comply Thrive

IT Governance ISO/IEC 27001:2013 ISMS Implementation. Service description. Protect Comply Thrive IT Governance ISO/IEC 27001:2013 ISMS Implementation Service description Protect Comply Thrive 100% guaranteed ISO 27001 certification with the global experts With the IT Governance ISO 27001 Implementation

More information

NERC Staff Organization Chart Budget 2019

NERC Staff Organization Chart Budget 2019 NERC Staff Organization Chart Budget 2019 President and CEO Associate Director to the Office of the CEO Senior Vice President and Chief Reliability Officer Senior Vice President, General Counsel and Corporate

More information

Candidate Profile for the Position of Vice President, Education and Certification

Candidate Profile for the Position of Vice President, Education and Certification Candidate Profile for the Position of Vice President, Education and Certification * * * * This profile provides information about the National Automatic Merchandising Association and the position requirements

More information

Electric Reliability Organization Enterprise Operating Plan

Electric Reliability Organization Enterprise Operating Plan Electric Reliability Organization Enterprise Operating Plan Approved by the NERC Board of Trustees: November 2017 NERC Report Title Report Date I Table of Contents Preface... iii Introduction... 1 Vision,

More information

NERC Request for Data or Information: Protection System Misoperation Data Collection August 14, 2014

NERC Request for Data or Information: Protection System Misoperation Data Collection August 14, 2014 Request for Data or Information Protection System Misoperation Data Collection August 14, 2014 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com 1 of 15 Table of

More information

Re: North American Electric Reliability Corporation Docket No. RM

Re: North American Electric Reliability Corporation Docket No. RM September 15, 2009 VIA ELECTRONIC FILING Ms. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20426 Dear Ms. Bose: Re: rth American Electric Reliability

More information

Cyber Security Standards Drafting Team Update

Cyber Security Standards Drafting Team Update Cyber Security Standards Drafting Team Update Michael Assante, VP & Chief Security Officer North American Electric Reliability Corp. February 3, 2008 Overview About NERC Project Background Proposed Modifications

More information

RELIABILITY OF THE BULK POWER SYSTEM

RELIABILITY OF THE BULK POWER SYSTEM RELIABILITY OF THE BULK POWER SYSTEM Jim Burley, VP of Compliance, Mitigation and Standards October 26, 2011 Promoting RELIABILITY and Mitigating RISKS to the Bulk Power System Context In the Beginning-2003

More information

Membership

Membership Membership Overview Overview Who We Are PSC Value Engagement Vehicles: Councils & Committees Investment & Benefits Who We Are: Mission PSC s mission is simple and focused: to provide unparalleled value

More information

GOVERNANCE, RISK MANAGEMENT AND COMPLIANCE TRENDS BY FCPAK ERIC KIMANI

GOVERNANCE, RISK MANAGEMENT AND COMPLIANCE TRENDS BY FCPAK ERIC KIMANI GOVERNANCE, RISK MANAGEMENT AND COMPLIANCE TRENDS BY FCPAK ERIC KIMANI CONTENTS Overview Conceptual Definition Implementation of Strategic Risk Governance Success Factors Changing Internal Audit Roles

More information

Multi-Region Registered Entity Coordinated Oversight Program

Multi-Region Registered Entity Coordinated Oversight Program Multi-Region Registered Entity Coordinated Oversight Program Ken McIntyre, Vice President and Director of Standards and Compliance Compliance Committee Open Meeting February 7, 2018 Coordinated Oversight

More information

Modifications to TOP and IRO Standards

Modifications to TOP and IRO Standards Modifications to TOP and IRO Standards Jason Smith, Mgr Reliability Standards Development SPP RTO Compliance Forum September 21-22, 2016 Project 2016-01 Background FERC issued Order No. 817 in November

More information

COMMENTARY. Federal Banking Agencies Propose Enhanced Cyber Risk Management Standards

COMMENTARY. Federal Banking Agencies Propose Enhanced Cyber Risk Management Standards November 2016 COMMENTARY Federal Banking Agencies Propose Enhanced Cyber Risk Management Standards The Board of Governors of the Federal Reserve System ( Federal Reserve Board ), the Federal Deposit Insurance

More information

March 15, 2011 VIA ELECTRONIC FILING

March 15, 2011 VIA ELECTRONIC FILING California Independent System Operator Corporation VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20246 Re: California

More information

NERC Staff Organization Chart Budget 2018

NERC Staff Organization Chart Budget 2018 NERC Staff Organization Chart Budget 2018 President and CEO Associate Director to the Office of the CEO Senior Vice President and Chief Reliability Senior Vice President, General Counsel and Corporate

More information

Standard Authorization Request Form

Standard Authorization Request Form Standard Authorization Request Form E-mail completed form to rsm@texasre.org Texas RE to Complete SAR No: Title of Proposed Standard IRO-006-TRE-1 IROL and SOL Mitigation in the ERCOT Region Request Date

More information

SOC for cybersecurity

SOC for cybersecurity April 2018 SOC for cybersecurity a backgrounder Acknowledgments Special thanks to Francette Bueno, Senior Manager, Advisory Services, Ernst & Young LLP and Chris K. Halterman, Executive Director, Advisory

More information

Wide-Area Reliability Monitoring and Visualization Tools

Wide-Area Reliability Monitoring and Visualization Tools OE Visualization and Controls Peer Review Wide-Area Reliability Monitoring and Visualization Tools Carlos Martinez CERTS - Electric Power Group 21 October 2008 Washington, D.C. Presentation Outline Research

More information

B O N N E V I L L E A D M I N I S T R A T I O N B O N N E V I L L E P O W E R A D M I N I S T R A T I O N

B O N N E V I L L E A D M I N I S T R A T I O N B O N N E V I L L E P O W E R A D M I N I S T R A T I O N B O N N E V I L L E A D M I N I S T R A T I O N B O N N E V I L L E P O W E R A D M I N I S T R A T I O N NERC Monitoring and Situational Awareness Conference Bonneville Power Administration Loss of EMS:

More information

Project Posting 8 Frequently Asked Questions Guide

Project Posting 8 Frequently Asked Questions Guide Project 2007-02 Posting 8 Frequently Asked Questions Guide General Questions 1. What were the inputs that drove the development of posting 8 of Project 2007-02? The NERC Board of Trustees November 7 th,

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.

More information

TransWest Express Transmission Project Interregional Transmission Project Submittal

TransWest Express Transmission Project Interregional Transmission Project Submittal TransWest Express Transmission Project 2016 2017 Interregional Transmission Project Submittal Submittals to California Independent System Operator, WestConnect and Northern Tier Transmission Group March

More information

Jim Brenton Regional Security Coordinator ERCOT Electric Reliability Council of Texas

Jim Brenton Regional Security Coordinator ERCOT Electric Reliability Council of Texas Jim Brenton Regional Security Coordinator ERCOT Electric Reliability Council of Texas Facts expressed in this presentation are Facts Opinions express in this presentation are solely my own The voices I

More information

Testimony. Christopher Krebs Director Cybersecurity and Infrastructure Security Agency U.S. Department of Homeland Security FOR A HEARING ON

Testimony. Christopher Krebs Director Cybersecurity and Infrastructure Security Agency U.S. Department of Homeland Security FOR A HEARING ON Testimony Christopher Krebs Director Cybersecurity and Infrastructure Security Agency U.S. Department of Homeland Security FOR A HEARING ON Defending Our Democracy: Building Partnerships to Protect America

More information

Building a BC/DR Control Library and Regulatory Response Program

Building a BC/DR Control Library and Regulatory Response Program Building a BC/DR Control Library and Regulatory Response Program David Garland, Senior Director, Disaster Recovery & Regulatory Compliance, Business Continuity Management CME Group Regulatory Compliance

More information

North American SynchroPhasor Initiative (NASPI) Overview

North American SynchroPhasor Initiative (NASPI) Overview North American SynchroPhasor Initiative (NASPI) Overview Data Exchange Panel ipcgrid 2013 hosted by Pacific Gas & Electric March 28, 2013 Jeff Dagle, PE Chief Electrical Engineer Advanced Power and Energy

More information

Accelerate Your Enterprise Private Cloud Initiative

Accelerate Your Enterprise Private Cloud Initiative Cisco Cloud Comprehensive, enterprise cloud enablement services help you realize a secure, agile, and highly automated infrastructure-as-a-service (IaaS) environment for cost-effective, rapid IT service

More information

Symantec Data Center Transformation

Symantec Data Center Transformation Symantec Data Center Transformation A holistic framework for IT evolution As enterprises become increasingly dependent on information technology, the complexity, cost, and performance of IT environments

More information

Misoperation Information Data Analysis System

Misoperation Information Data Analysis System Misoperation Information Data Analysis System User Guide October, 2017 NERC Report Title Report Date I Table of Contents Preface... iv Overview... v Chapter 1: User Setup... 1-1 Creating an Account...

More information

Jim Brenton Regional Security Coordinator ERCOT Electric Reliability Council of Texas

Jim Brenton Regional Security Coordinator ERCOT Electric Reliability Council of Texas Jim Brenton Regional Security Coordinator ERCOT Electric Reliability Council of Texas Facts expressed in this presentation are Facts Opinions express in this presentation are solely my own The voices I

More information

Critical Infrastructure Protection Committee Strategic Plan

Critical Infrastructure Protection Committee Strategic Plan Critical Infrastructure Protection Committee Strategic Plan 2013-2016 CIPC Executive Committee 5/14/2013 3353 Peachtree Road NE Suite 600, North Tower Atlanta, Georgia 30326 404-446-2560 www.nerc.com Table

More information

Five-Year Strategic Plan

Five-Year Strategic Plan Five-Year Strategic Plan 2016 2020 Contents A Message from the ERIS Board... 3 Introduction and Background... 4 Five-Year Plan Goal Areas... 7 Goal Area 1: State Environmental Agency Research Needs and

More information

Standards Development Update

Standards Development Update Standards Development Update Steven Noess, Director of Standards Development FRCC Reliability Performance Industry Outreach Workshop September 20, 2017 Supply Chain Risk Management 1 Cyber Security Supply

More information