TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support
|
|
- Lauren Harrington
- 5 years ago
- Views:
Transcription
1 TOP/IRO Standards RC Users Group January 21, 2016 Vic Howell Manager, Operations Engineering Support Saad Malik Manager, Real-Time Operations Engineering
2 New/Revised TOP & IRO Standards November 19, 2015, FERC Order 817 Approves changes to TOP & IRO standards Accepts NERC s recommendation for the NERC Project : SOL Drafting Team to address clarity and consistency of SOLs and IROLs 2
3 General Changes 3 Fewer in number, simpler, cleaner, less prescriptive, more streamlined Alignment with new COM (effective 7/1/2016): no more Reliability Directive, replaced with Operating Instruction Authority who can issue Operating Instructions, who must comply with them SOL exceedance is a shared responsibility between TOPs and RCs NERC SOL White Paper
4 Major Change Highlights for RCs IRO-017-1: Outage Coordination R1. Each Reliability Coordinator shall develop, implement, and maintain an outage coordination process for generation and Transmission outages within its Reliability Coordinator Area. The outage coordination process shall: 1.1. Identify applicable roles and reporting responsibilities including: Development and communication of outage schedules Assignment of coordination responsibilities for outage schedules between Transmission Operator(s) and Balancing Authority(s) Specify outage submission timing requirements Define the process to evaluate the impact of Transmission and generation outages within its Wide Area Define the process to coordinate the resolution of identified outage conflicts with its Transmission Operators and Balancing Authorities, and other Reliability Coordinators. 4
5 Major Change Highlights for BAs and TOPs New TOP Purpose: To ensure that the Transmission Operator and Balancing Authority have data needed to fulfill their operational and planning responsibilities TOPs and BAs have documented data specifications Mirrors IRO for RCs 5
6 Major Change Highlights for BAs IRO R2. Perform the functions specified in its RC s outage coordination process TOP R4. Have an Operating Plan(s) for the next-day TOP R5. Notify entities identified in the Operating Plan(s) to their role in those plan(s) TOP R7. Provide its Operating Plan(s) for next-day operations to its RC 6
7 Major Change Highlights for TOPs 7 Prior to same-day and real-time: IRO R2. Perform the functions specified in its RC s outage coordination process TOP R1. Have an Operational Planning Analysis (OPA) to identify SOL exceedances TOP R2. Have Operating Plan(s) to address potential SOL exceedances identified in the OPA TOP R3. Notify entities identified in the Operating Plan(s) to their role in those plan(s) TOP R6. Provide its Operating Plan(s) for next-day operations to its RC
8 Major Change Highlights for TOPs Real-time: TOP R13. Ensure that a Real-time Assessment (RTA) is performed at least once every 30 minutes TOP R14. Initiate its Operating Plan to mitigate a SOL exceedance identified as part of its Real-time monitoring or RTA 8
9 Revised Definitions Operational Planning Analysis (OPA) Current Revised 9 An analysis of the expected system conditions for the next day s operation. (That analysis may be performed either a day ahead or as much as 12 months ahead.) Expected system conditions include things such as load forecast(s), generation output levels, Interchange, and known system constraints (transmission facility outages, generator outages, equipment limitations, etc.). An evaluation of projected system conditions to assess anticipated (pre-contingency) and potential (post-contingency) conditions for next-day operations. The evaluation shall reflect applicable inputs including, but not limited to, load forecasts; generation output levels; Interchange; known Protection System and Special Protection System status or degradation; Transmission outages; generator outages; Facility Ratings; and identified phase angle and equipment limitations. (Operational Planning Analysis may be provided through internal systems or through third-party services.)
10 Revised Definitions Real-time Assessment (RTA) Current Revised An examination of existing and expected system conditions, conducted by collecting and reviewing immediately available data. An evaluation of system conditions using Realtime data to assess existing (pre-contingency) and potential (post-contingency) operating conditions. The assessment shall reflect applicable inputs including, but not limited to: load, generation output levels, known Protection System and Special Protection System status or degradation, Transmission outages, generator outages, Interchange, Facility Ratings, and identified phase angle and equipment limitations. (Real-time Assessment may be provided through internal systems or through third-party services.) 10
11 Perform RTA every 30 minutes Typically this is: o SE o RTCA Variety of solutions can be considered to meet entity RTA obligations Peak s SE, RTCA, and study tools are offered to TOPs and BAs to help meet RTA functional needs 11
12 Perform RTA every 30 minutes (Contd.) Peak s tools can serve as back-up to entity s RTA during TOP s primary tool outage to meet 30 minute requirement 12 o Enhanced Curtailment Calculator (ECC) o Peak potentially performing backup role Use of Peak s Hosted Advanced Applications o Real-time analysis and monitoring of SOLs and IROLs o Outage Studies o Access to Peak Displays o Awareness of wide-area system topology changes
13 Challenges with RAS modeling in RTA A very large number of schemes Coordination of newly added schemes and automatic actions Correct modeling information (logic diagrams, documentation, etc.) Operator training Awareness of arming in real-time? Awareness of reliability issues with RAS due to changing system conditions Transient phenomena based RAS schemes 13
14 IRO Peak Implementation Heavy focus on new IRO-017-1: Outage Coordination TOPs, BAs, and RC need to be compliant with IRO by April 1, 2017 Broad stakeholder team Small development team Peak COS survey 14
15 Outage Coordination Project Milestones Milestone Outage Coordination Process Outline developed Post initial draft of Outage Coordination Process for stakeholder comment Date Completed 6/17/ st round Stakeholder comments due 7/15/2016 Post 2 nd draft of Outage Coordination Process for stakeholder comment 8/12/ nd round Stakeholder comments due 9/2/2016 Post final Outage Coordination Process 10/3/2016 Process implementation date 2/7/2017 IRO mandatory and compliance in effect 4/1/
16 Questions?
Modifications to TOP and IRO Standards
Modifications to TOP and IRO Standards Jason Smith, Mgr Reliability Standards Development SPP RTO Compliance Forum September 21-22, 2016 Project 2016-01 Background FERC issued Order No. 817 in November
More informationStandard TOP Transmission Operations
A. Introduction 1. Title: Transmission Operations 2. Number: TOP-001-34 3. Purpose: To prevent instability, uncontrolled separation, or Cascading outages that adversely impact the reliability of the Interconnection
More informationprimary Control Center, for the exchange of Real-time data with its Balancing
A. Introduction 1. Title: Reliability Coordination Monitoring and Analysis 2. Number: IRO-002-5 3. Purpose: To provide System Operators with the capabilities necessary to monitor and analyze data needed
More informationPath Operations post WECC TOP 007 Rob Witham, WAPA RMR TSS Supervisor
Path Operations post WECC TOP 007 Rob Witham, WAPA RMR TSS Supervisor May 10, 2017 ISAS Salt Lake City, UT WECC Standard TOP 007 WECC 1a Title: System Operating Limits Purpose: To limit instances where
More informationTOP-001 v3 and v4 Monitoring Non-BES and Data Exchange Requirements. FRCC Spring RE Workshop April 17-18, 2018
TOP-001 v3 and v4 Monitoring Non-BES and Data Exchange Requirements FRCC Spring RE Workshop April 17-18, 2018 Objectives Background Reference Documents TOP-001-3 to TOP-001-4 Changes o R10 (TOP) Monitoring
More informationProject Consideration of Commission Directives in Order No. 693
Project 2009-02 Consideration of Commission Directives in Order Order P 905-906 Further, consistent with the NOPR, the Commission directs the ERO to modify IRO-002-1 to require a minimum set of tools that
More informationStandards Authorization Request Justification
Standards Authorization Request Justification Project 2009-02 Real-time Monitoring and Analysis Capabilities NERC Report Title Report Date 1 of 30 3353 Peachtree Road NE Suite 600, North Tower Atlanta,
More informationTOP-010-1(i) Real-time Reliability Monitoring and Analysis Capabilities
A. Introduction 1. Title: Real-time Reliability Monitoring and Analysis Capabilities 2. Number: TOP-010-1(i) 3. Purpose: Establish requirements for Real-time monitoring and analysis capabilities to support
More informationStandards Authorization Request Form
Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.
More informationModifications to TOP and IRO Standards
Modifications to TOP and IRO Standards Jason Smith, Southwest Power Pool Industry Webinar July 22, 2016 NERC Antitrust Guidelines It is NERC's policy and practice to obey the antitrust laws to avoid all
More informationThis section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationTOP for Transmission Operators
Meeting Title Date TOP-001-4 for Transmission Operators Compliance Team Lead, Keith Smith Background Effective July 1, 2018 Replaces currently effective TOP-001-3 Modified to address reliability concerns
More informationPeak Reliability. Reliability Coordinator Data Request and Specifications for Data Provision
Table of Contents I. Purpose... 2 II. Introduction... 2 III. Peak Roles and Responsibilities... 2 IV. Applicability and Obligations... 3 V. Questions and Comments... 6 VI. Data Request Spreadsheet... 6
More informationNovember 9, Revisions to the Violation Risk Factors for Reliability Standards IRO and TOP
!! November 9, 2016 VIA ELECTRONIC FILING Jim Crone Director, Energy Division Manitoba Innovation, Energy and Mines 1200-155 Carlton Street Winnipeg MB R3C 3H8 RE: Revisions to the Violation Risk Factors
More informationEnhanced Curtailment Calculator Update
Enhanced Curtailment Calculator Update December 13, 2017 Member Advisory Committee Meeting Brett Wangen Chief Engineering and Technology Officer Jeremy West Manager, Interconnection Reliability Initiatives
More informationStandard INT Dynamic Transfers
Standard INT-004-3.1 Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3.1 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately
More informationStandard COM-002-2a Communications and Coordination
A. Introduction 1. Title: Communication and Coordination 2. Number: COM-002-2a 3. Purpose: To ensure Balancing Authorities, Transmission Operators, and Generator Operators have adequate communications
More informationConcept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities
Concept White Paper Concepts for Proposed Content of Eventual Standard(s) for Project 2009-02: Real-Time Monitoring and Analysis Capabilities Real-time Monitoring and Analysis Capabilities Standard Drafting
More informationStandard INT Dynamic Transfers
A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately in congestion management procedures.
More informationCyber Security Reliability Standards CIP V5 Transition Guidance:
Cyber Security Reliability Standards CIP V5 Transition Guidance: ERO Compliance and Enforcement Activities during the Transition to the CIP Version 5 Reliability Standards To: Regional Entities and Responsible
More information5. Effective Date: The first day of the first calendar quarter after applicable regulatory approval.
Introduction 1. Title: IROL and SOL Mitigation in the ERCOT Region 2. Number: IRO-006-TRE-1 3. Purpose: To provide and execute transmission loading relief procedures that can be used to mitigate SOL or
More informationProject Posting 8 Frequently Asked Questions Guide
Project 2007-02 Posting 8 Frequently Asked Questions Guide General Questions 1. What were the inputs that drove the development of posting 8 of Project 2007-02? The NERC Board of Trustees November 7 th,
More informationNew Brunswick 2018 Annual Implementation Plan Version 1
New Brunswick Energy and Utilities Board Reliability Standards, Compliance and Enforcement Program New Brunswick 2018 Annual Implementation Plan Version 1 December 28, 2017 Table of Contents Version History...
More informationPhysical Security Reliability Standard Implementation
Physical Security Reliability Standard Implementation Attachment 4b Action Information Background On March 7, 2014, the Commission issued an order directing NERC to submit for approval, within 90 days,
More informationSouthwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September
Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September 23, 2009 TABLE OF CONTENTS INTRODUCTION A. RESPONSIBILITIES
More informationDraft CIP Standards Version 5
Draft CIP Standards Version 5 Technical Webinar Part 1 Project 2008-06 Cyber Security Order 706 Standards Drafting Team November 15, 2011 Agenda Opening Remarks John Lim, Consolidated Edison, Chair V5
More informationQuébec Reliability Standards Compliance Monitoring and Enforcement Program Implementation Plan Annual Implementation Plan
Québec Reliability Standards Compliance Monitoring and Enforcement Program Implementation Plan 2017 Annual Implementation Plan Effective Date: January 1, 2017 Approved by the Régie: December 1, 2016 Table
More informationPeak Reliability Coordination Services in the West March 30, 2018
Peak Reliability Coordination Services in the West March 30, 2018 Peak Reliability, 2018. 1 Peak Reliability Coordination Services in the West Peak s fundamental mission is to enhance and promote the reliability
More informationDisclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission...
CIP-002-4 Cyber Security Critical Cyber Asset Identification Rationale and Implementation Reference Document September, 2010 Table of Contents TABLE OF CONTENts Disclaimer... 3 Executive Summary... 4 Introduction...
More informationReliability Coordinator Procedure
No. Table of Contents Purpose... 1 1. Responsibilities... 2 2. Scope/ Applicability... 2 2.1. Background... 2 2.2. Scope... 2 2.3. Applicability... 3 3. Detail... 3 3.1. Format and Security Protocols...
More informationGuidelines for Submitting NERC Reliability Standards Required Documents to the SPP Reliability Coordinator and the SPP Balancing Authority Version 1
Guidelines for Submitting NERC Reliability Standards Required Documents to the SPP Reliability Coordinator and the SPP Balancing Authority Version 1 Revision History Version Effective Date Summary of Revisions
More informationNERC and Regional Coordination Update. Operating Committee Preston Walker January 9, 2018
NERC and Regional Coordination Update Operating Committee Preston Walker January 9, 2018 Standards Project Action End Date Project 2017-07 Standards Alignment with Registration NERC Standards Under Development
More informationA. Introduction. B. Requirements and Measures
A. Introduction 1. Title: Communications 2. Number: COM-001-3 3. Purpose: To establish Communication capabilities necessary to maintain reliability. 4. Applicability: 4.1. Functional Entities: 4.1.1. Transmission
More informationSteve Ashbaker Director Operations. NASPI Workgroup Meeting February 21, 2013 Atlanta, GA
Steve Ashbaker Director Operations NASPI Workgroup Meeting February 21, 2013 Atlanta, GA September 8, 2011 Event Update May 1 FERC/NERC Inquiry Report issued o 27 Recommendations in 8 categories July 26
More informationStandard Development Timeline
CIP-002-6 Cyber Security BES Cyber System Categorization Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the
More informationReliability Standard Audit Worksheet 1
Reliability Standard Audit Wksheet 1 EOP-008-2 Loss of Control Center Functionality This section to be completed by the Compliance Enfcement Authity. Audit ID: Registered Entity: NCR Number: Compliance
More informationStandards Authorization Request Form
Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.
More informationReliability Standard Audit Worksheet 1
Reliability Standard Audit Worksheet 1 CIP-012-1 Cyber Security Communications between Control Centers This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered Entity:
More informationStandard Authorization Request Form
Standard Authorization Request Form Title of Proposed Standard: Project 2009-02: Real-time Reliability Monitoring and Analysis Capabilities Original Request Date: June 4, 2009 Revised Date: January 15,
More informationStandard Authorization Request Form
Standard Authorization Request Form E-mail completed form to rsm@texasre.org Texas RE to Complete SAR No: Title of Proposed Standard IRO-006-TRE-1 IROL and SOL Mitigation in the ERCOT Region Request Date
More informationNERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010
Transmission Relay Loadability FERC Order 733 Project 2010-1313 NERC Relay Loadability Standard Reliability Standards Webinar November 23, 2010 Project Overview 2 Standards Involved PRC-023-2 Transmission
More informationImplementation Plan for COM-001-2
Defined Terms in the NERC Glossary The RC SDT proposes the following new definitions: Interpersonal Communication: Any medium that allows two or more individuals interact, consult, or exchange information.
More informationCritical Infrastructure Protection (CIP) Version 5 Revisions. Standard Drafting Team Update Industry Webinar September 19, 2014
Critical Infrastructure Protection (CIP) Version 5 Revisions Standard Drafting Team Update Industry Webinar September 19, 2014 Administrative Items NERC Antitrust Guidelines It is NERC s policy and practice
More informationOutage Coordination External Workshop. Jason Ausmus Manager, Operations Planning
Outage Coordination External Workshop Jason Ausmus Manager, Operations Planning Outage Coordination Course 8 total CEHs for this course To get the CEHs, you will need to: o Be present for the entire class
More informationStandard CIP Cyber Security Critical Cyber As s et Identification
A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification
More informationCIP Cyber Security Critical Cyber Asset Identification. Rationale and Implementation Reference Document
CIP-002-4 Cyber Security Critical Cyber Asset Identification Rationale and Implementation Reference Document NERC Cyber Security Standards Drafting Team for Order 706 December 2010 This document provides
More informationContingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting
Contingency Reserve Sharing; Ancillary Services Market Presented to the JCM Joint Stakeholder Meeting 1 Agenda Products and Nature of Current Services Contingency Reserve Sharing Group (CRSG) Agreement
More informationBritish Columbia Utilities Commission Reliability Standards with Effective Dates adopted in British Columbia
Page 1 of 15 British Columbia Utilities Reliability Standards with s adopted in British Columbia BAL-001-2 Standard Real Power Balancing Control Performance R-14-16 July 1, 2016 BAL-002-1 1 Disturbance
More informationBulk Electric System Definition Changes and Reporting
Bulk Electric System Definition Changes and Reporting June 12, 2014 Greg Sorenson, PE Senior Compliance Engineer gsorenson.re@spp.org 501.688.1713 Overview BES Definition Change BES Definition Reference
More informationProposed Convention for Numbering of NERC Reliability Standards Draft September 9, 2004
Proposed Convention for ing of NERC Reliability s Draft September 9, 2004 Introduction The Version 0 Drafting Team proposes to initiate a new convention for numbering NERC reliability standards concurrent
More informationNERC and Regional Coordination Update
NERC and Regional Coordination Update Mark Kuras Sr. Lead Engineer, NERC and Regional Coordination Planning Committee April 7, 2016 NERC Standards Under Development Standards Project Activity Due Date
More informationUnofficial Comment Form Project Operating Personnel Communications Protocols COM Operating Personnel Communications Protocols
Project 2007-02 Operating Personnel Communications Protocols COM-002-4 Operating Personnel Communications Protocols Please DO NOT use this form. Please use the electronic comment form to submit comments
More informationImplementation Plan. Project CIP Version 5 Revisions. January 23, 2015
Implementation Plan Project 2014-02 CIP Version 5 Revisions January 23, 2015 This Implementation Plan for the Reliability Standards developed as part of Project 2014-02 CIP Version 5 Revisions replaces
More informationStandard CIP Cyber Security Critical Cyber As s et Identification
A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification
More informationDRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1
DRAFT Cyber Security Communications between Control Centers Technical Rationale and Justification for Reliability Standard CIP-012-1 March May 2018 NERC Report Title Report Date I Table of Contents Preface...
More informationImplementation Plan. Project CIP Version 5 Revisions 1. January 23, 2015
Implementation Plan Project 2014-02 CIP Version 5 Revisions January 23, 2015 This Implementation Plan for the Reliability Standards developed as part of Project 2014 02 CIP Version 5 Revisions replaces
More informationNERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016
NERC Event Analysis Update Webinar Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 Webinar Agenda ERO Event Analysis Process Update Lesson Learned Presentation from Entity ERO Lessons
More informationCIP Cyber Security Configuration Change Management and Vulnerability Assessments
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationInterchange Distribution Calculator Billing
Interchange Distribution Calculator Billing Chris Russell Manager, Customer Settlements New York Independent System Operator Billing & Accounting Working Group November 26, 2012 KCC 2012 New York Independent
More informationUnofficial Comment Form Project Real-time Monitoring and Analysis Capabilities IRO and TOP-010-1
Project 2009-02 Real-time Monitoring and Analysis Capabilities IRO-018-1 and TOP-010-1 DO NOT use this form for submitting comments. Use the electronic form to submit comments on IRO- 018-1 Reliability
More informationProposed Clean and Redline for Version 2 Implementation Plan
Exhibit A Implementation Plans for CIP-002-2 through CIP-009-2 and CIP-002-3 and CIP-009-3 For Generator Owners and Generator Operators of U.S. Nuclear Power Plants Proposed Clean and Redline for Version
More informationThis section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft
More informationReliability Coordinator Procedure PURPOSE... 1
No. RC0550 Restriction: Table of Contents PURPOSE... 1 1. RESPONSIBILITIES... 2 1.1.1. CAISO RC... 2 1.1.2. RC Working Groups... 2 1.1.3. Operationally Affected Parties... 2 1.1.4. RC Oversight Committee...
More informationComment Form for 1 st Draft of Standard for Backup Facilities (Project )
Comment Form for 1 st Draft of Standard for Backup Facilities (Project 2006-04) Please use this form to submit comments on the 1 st draft of the standards for Backup Facilities (Project 2006-04). Comments
More informationDRAFT Reliability Standard Audit Worksheet 1
DRAFT Reliability Standard Audit Worksheet 1 PRC-025-2 Generator Relay Loadability This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered Entity: NCR Number: Compliance
More informationCIP Cyber Security Recovery Plans for BES Cyber Systems
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).
More informationCOM Interpersonal Communications Capabilities
COM-001-3 Interpersonal Communications Capabilities 1 Background In the FERC Notice of Proposed Rulemaking (NOPR) for COM-001-2, the Commission asked for comments on whether the standard should be modified
More informationrequirements in a NERC or Regional Reliability Standard.
CIP 002 5.1 Cyber Security BES Cyber System Categorization A. Introduction 1. Title: Cyber Security BES Cyber System Categorization 2. Number: CIP 002 5.1 3. Purpose: To identify and categorize BES Cyber
More informationStandard COM Communication and Coordination
A. Introduction 1. Title: Communication and Coordination 2. Number: COM-002-3 3. Purpose: To ensure Emergency communications between operating personnel are effective. 4. Applicability 4.1. Reliability
More informationREVISIONS TO TOP/IRO RELIABILITY STANDARDS
REVISIONS TO TOP/IRO RELIABILITY STANDARDS Meeting Notes 1. Introduction The Chair called the meeting to order at 8:00 a.m. on Tuesday, April 8, 2014 at the NERC offices in Atlanta, GA. Meeting participants
More informationOperating Reliability Subcommittee Presentations. February 10-11, 2015
Operating Reliability Subcommittee Presentations February 10-11, 2015 Presentation 1 ORS February 10, 2015 EInet Transition Efforts All current RC nodes on NERCNet have placed orders for new network EIDSN
More informationCompliance Enforcement Initiative
Compliance Enforcement Initiative Filing and Status Update November 2, 2011 Rebecca Michael Status of the Filings NERC filed several components of the Compliance Enforcement Initiative on September 30,
More informationOpen Access Transmission Tariff of Southern Companies
Open Access Transmission Tariff of Southern Companies Procedures for Reserving Transmission Capacity for Future Load Growth, Designating/Undesignating Network Resources, and Arranging for Other Related
More informationReliability Standard Audit Worksheet 1
Reliability Standard Audit Worksheet 1 PRC-004-3 Protection System Misoperation Identification and Correction This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered
More informationStandards Development Update
Standards Development Update Steven Noess, Director of Standards Development FRCC Reliability Performance Industry Outreach Workshop September 20, 2017 Supply Chain Risk Management 1 Cyber Security Supply
More informationEIM Entity Readiness Criteria May 6, 2015
EIM Entity Readiness Criteria May 6, 2015 FERC Directive Regarding Readiness Criteria We therefore direct CAISO to submit a compliance filing within 60 days of issuance of this order, to revise the EIM
More informationSummary of FERC Order No. 791
Summary of FERC Order No. 791 On November 22, 2013, the Federal Energy Regulatory Commission ( FERC or Commission ) issued Order No. 791 adopting a rule that approved Version 5 of the Critical Infrastructure
More informationProject Cyber Security - Order No. 791 Identify, Assess, and Correct; Low Impact; Transient Devices; and Communication Networks Directives
Project 2014-02 - Cyber Security - Order No. 791 Identify, Assess, and Correct; Low Impact; Transient Devices; and Communication Networks Directives Violation Risk Factor and Justifications The tables
More informationDRAFT Risks and Mitigations for Losing EMS Functions
DRAFT Risks and Mitigations for Losing EMS Functions 1.0 Executive Summary Energy Management System (EMS) is a system of computer-aided tools used by System Operators to monitor, control, and optimize
More informationStandard Development Timeline
CIP-002-6 Cyber Security BES Cyber System Categorization Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the
More informationProject , COM Operating Personnel Communications Protocols Rationale and Technical Justification
Project 2007-02, COM-002-4 Operating Personnel Communications Protocols Rationale and Technical Justification Posting 8: Background and Justification for COM-002-4 Requirements The purpose of the proposed
More informationCOM Communications and Coordination
COM-002-2 Communications and Coordination February 27, 2014 Lonnie Lindekugel ~ SPP Jim Nail ~ City of Independence INTRODUCTION NERC Reliability Standard COM-002-2 (Communications and Coordination) serves
More informationNERC Management Response to the Questions of the NERC Board of Trustees on Reliability Standard COM September 6, 2013
NERC Management Response to the Questions of the NERC Board of Trustees on Reliability Standard COM-003-1 September 6, 2013 At the August 14-15, 2013 meeting of the Board of Trustees ( Board ) of the North
More informationImplementation Plan for Newly Identified Critical Cyber Assets and Newly Registered Entities
Implementation Plan for Newly Identified Critical Cyber Assets and Newly Registered Entities This Implementation Plan applies to Cyber Security Standards CIP-002-2 through CIP-009-2 and CIP-002-3 through
More informationPeak Reliability IRO Project Overview Oct 25, 2016
Peak Reliability IRO-017-1 Project Overview Oct 25, 2016 Vic Howell Manager, Operations Engineering Support Jason Ausmus Manager, Operations Planning Objectives Overview of new IRO-017-1 Peak s Approach
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).
More informationOPUC Workshop March 13, 2015 Cyber Security Electric Utilities. Portland General Electric Co. Travis Anderson Scott Smith
OPUC Workshop March 13, 2015 Cyber Security Electric Utilities Portland General Electric Co. Travis Anderson Scott Smith 1 CIP Version 5 PGE Implementation Understanding the Regulations PGE Attended WECC
More informationStandard INT Interchange Authority Distributes Arranged Interchange
Standard INT-005-2 Authority Distributes A. Introduction 1. Title: Authority Distributes 2. Number: INT-005-2 3. Purpose: To ensure that the implementation of between Source and Sink Balancing Authorities
More informationNERC Overview and Compliance Update
NERC Overview and Compliance Update Eric Ruskamp Manager, Regulatory Compliance August 17, 2018 1 Agenda NERC Overview History Regulatory Hierarchy Reliability Standards Compliance Enforcement Compliance
More informationReliability Standards Development Plan
Reliability Standards Development Plan 2012-2014 October 13, 2011 For SC Approval 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Table of Contents Table of Contents...ii
More informationRC Coordination Efforts
RC Coordination Efforts WECC RC FORUM JULY 19, 2018 CAISO, Peak, SPP, and AESO Steering Group Purpose and Participants Provide Update on Recent RC Coordination Activities Provide Opportunity for Interested
More information2016 Fall ITO Stakeholder Meeting. Topics in Operations
2016 Fall ITO Stakeholder Meeting Topics in Operations 11/17/2016 TOP-003-3 Requirement R1. Each Transmission Operator shall maintain a documented specification for the data necessary for it to perform
More informationStandard EOP Disturbance Reporting
A. Introduction 1. Title: Disturbance Reporting 2. Number: EOP-004-1 3. Purpose: Disturbances or unusual occurrences that jeopardize the operation of the Bulk Electric System, or result in system equipment
More informationCIP Cyber Security Incident Reporting and Response Planning
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationUnofficial Comment Form 1st Draft of PRC-005-3: Protection System and Automatic Reclosing Maintenance (Project )
Unofficial Comment Form 1st Draft of PRC-005-3: Protection System and Automatic Reclosing Maintenance (Project 2007-17.2) Please DO NOT use this form for submitting comments. Please use the electronic
More informationStandard CIP Cyber Security Critical Cyber Asset Identification
Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed
More informationProject Retirement of Reliability Standard Requirements
Project 2013-02 Retirement of Reliability Standard Requirements Unofficial Comment Form for Paragraph 81 (P81) Project Retirement of Reliability Standard Requirements This form is provided in a Word format
More informationStandard CIP Cyber Security Critical Cyber Asset Identification
Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed
More informationNB Appendix CIP NB-0 - Cyber Security Recovery Plans for BES Cyber Systems
This appendix establishes modifications to the FERC approved NERC standard CIP-009-6 for its specific application in New Brunswick. This appendix must be read with CIP-009-6 to determine a full understanding
More information